Category Management
Launch Process
Current
Position
Strategy
Development
Strategy
Selection
Strategy
Implementation
• Category
Profiling
• Business
Needs
• Sourcing
History
• Stakeholder
Mapping
• RACI Matrix
• Communications
Charter
• Change
Management
• Portfolio
Analysis
• Supplier
Perception
Matrix
• Relationship
Positioning
• Risk Analysis
• Specification
Challenge
• Supply Market
Analysis
• Opportunity
Analysis
• Request for
Information
• Conditioning
• Price & Cost
Analysis
• Supply Chain
Analysis
• Quick Wins
• Options
Analysis
• Request for
Proposal
• Supplier
Selection
• Capability
Assessment
• Negotiation
• Contract Award
• Debriefing
• Implementation
Plan
• Savings
5, 7 or 8 steps… matters not:
each company and each
consultancy has their own
methodology
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
OK, so I’ve got a Mandate
• Corporate Governance
• Business Process
• Top-level support
• Understood by all
• RRAA must be clear
• Condition the market
1
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
I’m working on the chain gang… 2
• Not always a sequential
process
• Avoid the ‘tunnel’
• Think of ‘clusters’
• Not a form-filling
exercise
• Requires expertise
• Depth is driven by
category complexity
• Creative not predictive
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Break the category down…
• What are the sub-categories
for?
– Stationery
– BSS
– FM
– RS Components
• Why do you think this is
important?
3
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Know what has gone before…
“Study the past if you would define the future” – Confucius
Sourcing
History
What
worked?
What
changed?
Why did it
change?
Performance?
Innovation?
Bare
minimum?
Contract
parameters?
4
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Data is king
• Use it powerfully
• Don’t observe it
• Ask questions
• Is the past the same
as the future?
• What is missing?
• How have you been
influenced?
• Who made the
decisions?
“As we know, there are known knowns.
There are things we know we know.
We also know
There are known unknowns.
That is to say
We know there are some things
We do not know.
But there are also unknown unknowns,
The ones we don't know
We don't know.”
– Donald Rumsfeld
4
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Learning and changing
Stage 1: Unconscious incompetence
(Don’t know that we don’t know)
Stage 4: Unconscious competence
(Don’t know that we do know)
Stage 3: Conscious competence
(Know that we know)
Stage 2: Conscious incompetence
(Know that we don’t know)
Lost
unaware
Searching
aware
Learning
aware
4
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
If you keep doing the same thing… 5
• Be creative…
• How could you
approach these
categories differently?
– Stationery
– Office space
– Mobile phones
• Contract terms
• Duration
• Performance regime
• Relationship
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
6Know your marketplace
OMG global economic crisis
Agency Workers Regulations
Currency fluctuations
Energy prices
Raw material movements
BRICS
Bankruptcies
M&A activity
NAFTA/EU
Spending cuts
Porter’s
PESTLE
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Know your supply chain
• Who owns whom
• Weak points
• Conversion process
• Profit points
• Delay
• Haphazard
• Contrived
• Interference
7
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
“In the long history of humankind,
those who learned to collaborate
and improvize most effectively,
have prevailed.”
– Charles Darwin
Know your stakeholders
• They are not the same
• Some play games
– some enjoy it
– others can’t be bothered
• Humans are influenced
• Bad press can be good
press
• Beware of Social Proof
8
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Champion: takes personal
responsibility for ensuring
the project’s success
Helper: willing to assist
Fence-sitter: not engaged
but waiting to see how the
project unfolds
Cynic: tests the team’s
resolve by challenging at
each step
Blocker: undermines at
every opportunity
Champion
Helper
Fence-
sitter
Cynic
Blocker
Disposition
Negative Positive
Involvement
Classical Stakeholder Mapping 8
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
I want it all… but do I need it? 9
Wants
Aspirational
Feature
driven
Supplier’s
USPs
Even ego
driven
Needs
Business
driven
Logical
Non-
negotiable
Precise
“On the road from the
City of Scepticism, I had
to pass through the
Valley of Ambiguity.”
– Adam Smith
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Know your Category
• If you go blindly, accept
the consequences
• Stakeholders may know
more than you
• Acting dumb is not a
strategy
• Logic is hard to
challenge: Category
Management is logical
10
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
• Doctors are considered respected authorities
• Nurses trust doctors so much that they appear to
turn off their own intelligence when receiving
instructions from them
– e.g. a doctor’s use of abbreviations to prescribe
medication for earache resulted in the rectal
administration of ear drops (the nurse read ‘R ear’
as ‘rear’ and complied despite it making no sense;
the patient did not question the procedure either)
– e.g. nurses were found to blindly follow obviously
and dangerously incorrect dosage instructions
even when instructed by phone by a ‘doctor’ they
didn’t know
Obedience to authority: examples 10
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Don’t be afraid to be the spy
• You must make Functions
trust you
• Some may be paying for you
• Represent their views
• Be able to extol the virtues of
Category Management
• Speak their language
• Get them to speak yours
– thinking
– practices
– behaviours
11
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Visualise the relationship
• Roadmap
• Know exit strategy
• Time
• Effort
• Resource
• Never equal
• Consensus
• Realistic
• Trust
• Transparency
12
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Targets and measurement 13
• Use correct baseline
• Do not pluck out of thin air
• Prioritise approach
– resource
– benefit
– time/payback
– complexity
– PA and preferencing
• Make sure that savings
are real not imaginary
• Get sign-off from CFO
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Price and Cost
• Why is competition not
always the best solution?
• Why do suppliers price in
a particular way?
• What can you tell me
about
– price?
– cost?
– value?
– quality?
14
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Develop a range of options
• Done well, CatMan is
highly innovative
• New technologies
• New processes
• New contracting
philosophies
• New solutions
• New entrants
• New supply chains
• New markets
"Everybody has accepted by now that
change is unavoidable. But that still implies
that change is like death and taxes
– it should be postponed as long as possible
and no change would be vastly preferable.
But in a period of upheaval, such as the one
we are living in, change is the norm."
– Peter Drucker
Management Challenges for the 21st
Century (1999)
"Only the wisest and stupidest of men never
change."
– Confucius
15
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Get out of the office
• Testimonials mask reality
• Not a desk job
• Paper v reality
• Unannounced
• Access all areas
• Use your eyes
• Questions sparingly
• Time for shift changes
• Key function first
• Take colleagues
• Speak to people
16
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Look for visual clues
Lots of new cars –
perhaps indicates
higher-than-average
salaries/packages/fleet
programmes
Containers may
suggest that stock has
been rejected, hiding
excess products,
tooling
Disposal policy;
pride or lack of it
amongst employees;
volume of waste
Care and maintenance
of building fabric;
building itself; owned or
leased
Location; rents and
rates; distribution
network; labour market
pool and average
wages
Inability to hide surplus
stock; condition may
indicate that it has been
there a while!
16
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Employee attitudes: company certificates; employee awards; is
there a harmonious atmosphere?; what is the attitude to customer
service?; are staff busy getting things done?; is there an excessive
overhead burden?
Care and maintenance: dirty or clean;
old or new; proper size for operation;
safe; worn
Staff knowledge: is there intellectual
capacity to improve present operations;
enhance product designs; refine service
levels; recognise need to refresh?
Quality control: degree of inspection and
validation; frequency of checks; customer
care; statistical quality control
Observe key parts of the operation 16
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Plan your implementation
• Debrief fully
• Be realistic
• Recognise constraints
• Cover the patch
• Assume nothing
• Inform the business
• Involve stakeholders
17
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Communicate your success
• Buyers are not sellers
– useless at self-promotion
• Business needs to know
• Congratulate entire team
• Communicate all benefits
• Create Case Studies
• Learn from mistakes
• Let the supply market know
• Let management know
18
Copyright © SpringTide Consulting Ltd 2013
www.SpringTideLtd.co.uk
Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction
Any questions now?… or get in touch later
Ferryside: 01267 267553
Bristol: 01179 666513
Cannock: 01543 404667
SpringTide Procurement Solutions @ProcurementSTMike Utting

Category management (cips)

  • 1.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction In search of the Category Management Holy Grail Presented by: Mike Utting – Director SpringTide Consulting Ltd March 2013
  • 2.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Category Management Launch Process Current Position Strategy Development Strategy Selection Strategy Implementation • Category Profiling • Business Needs • Sourcing History • Stakeholder Mapping • RACI Matrix • Communications Charter • Change Management • Portfolio Analysis • Supplier Perception Matrix • Relationship Positioning • Risk Analysis • Specification Challenge • Supply Market Analysis • Opportunity Analysis • Request for Information • Conditioning • Price & Cost Analysis • Supply Chain Analysis • Quick Wins • Options Analysis • Request for Proposal • Supplier Selection • Capability Assessment • Negotiation • Contract Award • Debriefing • Implementation Plan • Savings 5, 7 or 8 steps… matters not: each company and each consultancy has their own methodology
  • 3.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction OK, so I’ve got a Mandate • Corporate Governance • Business Process • Top-level support • Understood by all • RRAA must be clear • Condition the market 1
  • 4.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction I’m working on the chain gang… 2 • Not always a sequential process • Avoid the ‘tunnel’ • Think of ‘clusters’ • Not a form-filling exercise • Requires expertise • Depth is driven by category complexity • Creative not predictive
  • 5.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Break the category down… • What are the sub-categories for? – Stationery – BSS – FM – RS Components • Why do you think this is important? 3
  • 6.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Know what has gone before… “Study the past if you would define the future” – Confucius Sourcing History What worked? What changed? Why did it change? Performance? Innovation? Bare minimum? Contract parameters? 4
  • 7.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Data is king • Use it powerfully • Don’t observe it • Ask questions • Is the past the same as the future? • What is missing? • How have you been influenced? • Who made the decisions? “As we know, there are known knowns. There are things we know we know. We also know There are known unknowns. That is to say We know there are some things We do not know. But there are also unknown unknowns, The ones we don't know We don't know.” – Donald Rumsfeld 4
  • 8.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Learning and changing Stage 1: Unconscious incompetence (Don’t know that we don’t know) Stage 4: Unconscious competence (Don’t know that we do know) Stage 3: Conscious competence (Know that we know) Stage 2: Conscious incompetence (Know that we don’t know) Lost unaware Searching aware Learning aware 4
  • 9.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction If you keep doing the same thing… 5 • Be creative… • How could you approach these categories differently? – Stationery – Office space – Mobile phones • Contract terms • Duration • Performance regime • Relationship
  • 10.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction 6Know your marketplace OMG global economic crisis Agency Workers Regulations Currency fluctuations Energy prices Raw material movements BRICS Bankruptcies M&A activity NAFTA/EU Spending cuts Porter’s PESTLE
  • 11.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Know your supply chain • Who owns whom • Weak points • Conversion process • Profit points • Delay • Haphazard • Contrived • Interference 7
  • 12.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction “In the long history of humankind, those who learned to collaborate and improvize most effectively, have prevailed.” – Charles Darwin Know your stakeholders • They are not the same • Some play games – some enjoy it – others can’t be bothered • Humans are influenced • Bad press can be good press • Beware of Social Proof 8
  • 13.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Champion: takes personal responsibility for ensuring the project’s success Helper: willing to assist Fence-sitter: not engaged but waiting to see how the project unfolds Cynic: tests the team’s resolve by challenging at each step Blocker: undermines at every opportunity Champion Helper Fence- sitter Cynic Blocker Disposition Negative Positive Involvement Classical Stakeholder Mapping 8
  • 14.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction I want it all… but do I need it? 9 Wants Aspirational Feature driven Supplier’s USPs Even ego driven Needs Business driven Logical Non- negotiable Precise “On the road from the City of Scepticism, I had to pass through the Valley of Ambiguity.” – Adam Smith
  • 15.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Know your Category • If you go blindly, accept the consequences • Stakeholders may know more than you • Acting dumb is not a strategy • Logic is hard to challenge: Category Management is logical 10
  • 16.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction • Doctors are considered respected authorities • Nurses trust doctors so much that they appear to turn off their own intelligence when receiving instructions from them – e.g. a doctor’s use of abbreviations to prescribe medication for earache resulted in the rectal administration of ear drops (the nurse read ‘R ear’ as ‘rear’ and complied despite it making no sense; the patient did not question the procedure either) – e.g. nurses were found to blindly follow obviously and dangerously incorrect dosage instructions even when instructed by phone by a ‘doctor’ they didn’t know Obedience to authority: examples 10
  • 17.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Don’t be afraid to be the spy • You must make Functions trust you • Some may be paying for you • Represent their views • Be able to extol the virtues of Category Management • Speak their language • Get them to speak yours – thinking – practices – behaviours 11
  • 18.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Visualise the relationship • Roadmap • Know exit strategy • Time • Effort • Resource • Never equal • Consensus • Realistic • Trust • Transparency 12
  • 19.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Targets and measurement 13 • Use correct baseline • Do not pluck out of thin air • Prioritise approach – resource – benefit – time/payback – complexity – PA and preferencing • Make sure that savings are real not imaginary • Get sign-off from CFO
  • 20.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Price and Cost • Why is competition not always the best solution? • Why do suppliers price in a particular way? • What can you tell me about – price? – cost? – value? – quality? 14
  • 21.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Develop a range of options • Done well, CatMan is highly innovative • New technologies • New processes • New contracting philosophies • New solutions • New entrants • New supply chains • New markets "Everybody has accepted by now that change is unavoidable. But that still implies that change is like death and taxes – it should be postponed as long as possible and no change would be vastly preferable. But in a period of upheaval, such as the one we are living in, change is the norm." – Peter Drucker Management Challenges for the 21st Century (1999) "Only the wisest and stupidest of men never change." – Confucius 15
  • 22.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Get out of the office • Testimonials mask reality • Not a desk job • Paper v reality • Unannounced • Access all areas • Use your eyes • Questions sparingly • Time for shift changes • Key function first • Take colleagues • Speak to people 16
  • 23.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Look for visual clues Lots of new cars – perhaps indicates higher-than-average salaries/packages/fleet programmes Containers may suggest that stock has been rejected, hiding excess products, tooling Disposal policy; pride or lack of it amongst employees; volume of waste Care and maintenance of building fabric; building itself; owned or leased Location; rents and rates; distribution network; labour market pool and average wages Inability to hide surplus stock; condition may indicate that it has been there a while! 16
  • 24.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Employee attitudes: company certificates; employee awards; is there a harmonious atmosphere?; what is the attitude to customer service?; are staff busy getting things done?; is there an excessive overhead burden? Care and maintenance: dirty or clean; old or new; proper size for operation; safe; worn Staff knowledge: is there intellectual capacity to improve present operations; enhance product designs; refine service levels; recognise need to refresh? Quality control: degree of inspection and validation; frequency of checks; customer care; statistical quality control Observe key parts of the operation 16
  • 25.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Plan your implementation • Debrief fully • Be realistic • Recognise constraints • Cover the patch • Assume nothing • Inform the business • Involve stakeholders 17
  • 26.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Communicate your success • Buyers are not sellers – useless at self-promotion • Business needs to know • Congratulate entire team • Communicate all benefits • Create Case Studies • Learn from mistakes • Let the supply market know • Let management know 18
  • 27.
    Copyright © SpringTideConsulting Ltd 2013 www.SpringTideLtd.co.uk Consulting | Training | Qualifications | Negotiation | Outsourcing | Cost Reduction Any questions now?… or get in touch later Ferryside: 01267 267553 Bristol: 01179 666513 Cannock: 01543 404667 SpringTide Procurement Solutions @ProcurementSTMike Utting