The document discusses proposed changes to the distribution system for the Carlsbad Desalination Project and the required CEQA compliance. It finds that an addendum to the original 2006 Carlsbad FEIR is the appropriate document under CEQA, as the proposed changes would not result in new significant environmental impacts. It also lists several prior environmental documents relevant to the project and indicates that the 2012 Carlsbad FEIR Second Addendum and updated Mitigation Monitoring Reporting Program will be considered for approval.
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
The goal of the stream restoration project is to build an ecologically sound restoration that balances water quality benefits with riparian function and park user experience.
Long Branch Central Watershed Management Area Project Overview October 26, 2020Fairfax County
Information about development in Fairfax County, major stormwater management project drivers, a functions-based approach to stream restoration and more information about the project is included in the presentation.
Long Branch Central Watershed Management Area 03-03-2021Fairfax County
Project Goals:
Achieve Long Branch Central TMDL waste load reduction requirements.
Provide long-term stability and have low maintenance.
Improve water quality within the Long Branch Central watershed.
Improve habitat and environmental health (ecological lift).
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Fairfax County
The Rocky Run Tributary at Hickory Hollow Lane project goals are to stabilize the stream, reduce excess sediment from flowing downstream; improve aesthetics, reduce hazards, reconnect the stream to the floodplain, improve the riparian buffer and reduce road flooding, among other goals.
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
The goal of the stream restoration project is to build an ecologically sound restoration that balances water quality benefits with riparian function and park user experience.
Long Branch Central Watershed Management Area Project Overview October 26, 2020Fairfax County
Information about development in Fairfax County, major stormwater management project drivers, a functions-based approach to stream restoration and more information about the project is included in the presentation.
Long Branch Central Watershed Management Area 03-03-2021Fairfax County
Project Goals:
Achieve Long Branch Central TMDL waste load reduction requirements.
Provide long-term stability and have low maintenance.
Improve water quality within the Long Branch Central watershed.
Improve habitat and environmental health (ecological lift).
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Fairfax County
The Rocky Run Tributary at Hickory Hollow Lane project goals are to stabilize the stream, reduce excess sediment from flowing downstream; improve aesthetics, reduce hazards, reconnect the stream to the floodplain, improve the riparian buffer and reduce road flooding, among other goals.
Flag Run at Elgar Street Stream Restoration Project - May 24, 2017Fairfax County
The project will restore about 2,900 linear feet of the channel to stabilize the banks and prevent future erosion. A healthy ecosystem will be created by installing native trees and herbaceous plants.
Long Branch Central Watershed Management Area Project Overview July 2020Fairfax County
Fairfax County overview of the Long Branch Central Watershed Project restoration of eight miles of stream to achieve waste load reduction requirements and provide long term stability with less maintenance.
Restore ~4,000 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Piney Run Public Meeting 1 October 17, 2018Fairfax County
This project will restore 4,300 feet of stream on Lake Werowance Inc. and privately owned properties. Goals are stabilized stream banks and bed, reduced sediment and nutrients, improved habitat, and enhanced water quality.
Introduction to Biohabitats presentation public meeting number one 02 11-21Fairfax County
Phase I.A – Field Assessment Work Plan Development
Existing watershed information, data and mapping
Public outreach and participation plan
Restoration goals
Field assessment plan (streams, outfalls, riparian areas and County-maintained stormwater facilities)
Preliminary approach to monitoring and identify early-action items
Preliminary design and permitting approaches
Long Branch Central Watershed Field Assessment Work Plan
Phase I.B – Watershed Field Assessment and Opportunity Identification
Field assessment and opportunity identification (streams, outfalls, riparian areas and County-maintained stormwater facilities)
Inventory and condition assessment data
Preliminary Project Identification and Prioritization
Phase I.C – Restoration Implementation Work Plan
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Fairfax County
Restore approximately 3,500 feet of stream on Lake Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through the enhancements of existing wetland features within the former lakebed
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Fairfax County
This Fairfax County project seeks to stabilize excessive, ongoing stream erosion which threatens sanitary sewer pipes, undermines trees, impacts water quality and degrades habitat for aquatic life.
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Fairfax County
This project will mitigate flooding, reduce erosion, and protect public and private property. Approximately 3,000 feet of the main channel and 1,500 feet of tributaries will be restored.
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
Flag Run at Elgar Street Stream Restoration Project - May 24, 2017Fairfax County
The project will restore about 2,900 linear feet of the channel to stabilize the banks and prevent future erosion. A healthy ecosystem will be created by installing native trees and herbaceous plants.
Long Branch Central Watershed Management Area Project Overview July 2020Fairfax County
Fairfax County overview of the Long Branch Central Watershed Project restoration of eight miles of stream to achieve waste load reduction requirements and provide long term stability with less maintenance.
Restore ~4,000 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Piney Run Public Meeting 1 October 17, 2018Fairfax County
This project will restore 4,300 feet of stream on Lake Werowance Inc. and privately owned properties. Goals are stabilized stream banks and bed, reduced sediment and nutrients, improved habitat, and enhanced water quality.
Introduction to Biohabitats presentation public meeting number one 02 11-21Fairfax County
Phase I.A – Field Assessment Work Plan Development
Existing watershed information, data and mapping
Public outreach and participation plan
Restoration goals
Field assessment plan (streams, outfalls, riparian areas and County-maintained stormwater facilities)
Preliminary approach to monitoring and identify early-action items
Preliminary design and permitting approaches
Long Branch Central Watershed Field Assessment Work Plan
Phase I.B – Watershed Field Assessment and Opportunity Identification
Field assessment and opportunity identification (streams, outfalls, riparian areas and County-maintained stormwater facilities)
Inventory and condition assessment data
Preliminary Project Identification and Prioritization
Phase I.C – Restoration Implementation Work Plan
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Fairfax County
Restore approximately 3,500 feet of stream on Lake Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through the enhancements of existing wetland features within the former lakebed
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Fairfax County
This Fairfax County project seeks to stabilize excessive, ongoing stream erosion which threatens sanitary sewer pipes, undermines trees, impacts water quality and degrades habitat for aquatic life.
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Fairfax County
This project will mitigate flooding, reduce erosion, and protect public and private property. Approximately 3,000 feet of the main channel and 1,500 feet of tributaries will be restored.
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
State Treasurer's Assessment of the Affordability and Financing Considerations of the Bay Delta Conveyance Facility
Imported Water Committee, April 23, 2015
Presentation by CleanEnergy Capital at the July 26 Board of Directors meeting. This presentation discusses potential energy use and pricing for the Carlsbad Seawater Desalination Facility/
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks and SWRCB Emergency Regulation
Special Board Meeting, May 14, 2015
Presentation by: Dana Friehauf, Water Resources Manager
Update on Supply Conditions and Drought Response Activities
Water Planning Committee - May 28, 2015 Meeting
Presentation by: Dana Friehauf, Water Resources Manager
Presentation given to American Society of Civil Engineers, Orange County Branch, April 28th, 2016 by Poseidon Water. Seawater Desalination Project at Huntington Beach. Local, Drought-Proof Source of Drinking Water for Orange County
Moffett Site 1, 22, 26, and 28 Five Year ReviewSteve Williams
Five Year Review for Installation Restoration Sites 1, 22, 26 and 28, Former Naval Air Station Moffett Field: Presentation to the Moffett Restoration Advisory Board Meeting, February 12, 2015, by Wilson Doctor, Navy Project Manager
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
Lake Siltation
Lake Accotink has been dredged three times over the past 40 years.
The most recent dredging was completed in May 2008.
An average of 20,000 CY of sediment is deposited in the lake per year.
The estimated average depth of the lake is less than 4 feet.
Park Master Plan Process
Master Plan began Spring 2016.
5 Public Meetings/Workshops held with Community.
6 Lake Management Options were shared with the public.
90% of public comments favored having the lake.
Board of Supervisors Approval of Funding
BOS approved request to seek funding for up to $30.5 million to proceed with Lake Accotink Dredging in October 2019 .
Philadelphia Water Department, Green City Clean Waters ProgramNew Jersey Future
This slide deck is from the City of Newark's trip to the Philadelphia to learn from the city's water department's green infrastructure program in September 2017.
Tim Broeder
Marcie Nolan
Jo Sesodia
Bob Daniels
The Sunshine State will always experience growth, whether rapid or slow. This growth will continue to drain the cheap and easy water resources of the State. This session will provide an overview of how three local governments have completely redesigned their long range planning program to incorporate potable water issues into their comprehensive and current plans. The
determination of demand, the single utility provider structure, and the costs of these infrastructure projects will be discussed. For local planners, the need and ability to implement long range plans through collaboration between the utility engineer and the planner will be stressed.
This presentation was shown at workshops on August 18 and 22, 2016.
http://www.countyplanning.us/services/grant-programs/state-capital-improvement-program/
Kimberly Thorner, General Manager at Olivenhain MWD, presented to the League of California Cities, San Diego County Division on October 13, 2014, about the Water Reuse Coalition.
Future Of Fintech In India | Evolution Of Fintech In IndiaTheUnitedIndian
Navigating the Future of Fintech in India: Insights into how AI, blockchain, and digital payments are driving unprecedented growth in India's fintech industry, redefining financial services and accessibility.
03062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
‘वोटर्स विल मस्ट प्रीवेल’ (मतदाताओं को जीतना होगा) अभियान द्वारा जारी हेल्पलाइन नंबर, 4 जून को सुबह 7 बजे से दोपहर 12 बजे तक मतगणना प्रक्रिया में कहीं भी किसी भी तरह के उल्लंघन की रिपोर्ट करने के लिए खुला रहेगा।
01062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
27052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
31052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
ys jagan mohan reddy political career, Biography.pdfVoterMood
Yeduguri Sandinti Jagan Mohan Reddy, often referred to as Y.S. Jagan Mohan Reddy, is an Indian politician who currently serves as the Chief Minister of the state of Andhra Pradesh. He was born on December 21, 1972, in Pulivendula, Andhra Pradesh, to Yeduguri Sandinti Rajasekhara Reddy (popularly known as YSR), a former Chief Minister of Andhra Pradesh, and Y.S. Vijayamma.
In a May 9, 2024 paper, Juri Opitz from the University of Zurich, along with Shira Wein and Nathan Schneider form Georgetown University, discussed the importance of linguistic expertise in natural language processing (NLP) in an era dominated by large language models (LLMs).
The authors explained that while machine translation (MT) previously relied heavily on linguists, the landscape has shifted. “Linguistics is no longer front and center in the way we build NLP systems,” they said. With the emergence of LLMs, which can generate fluent text without the need for specialized modules to handle grammar or semantic coherence, the need for linguistic expertise in NLP is being questioned.
हम आग्रह करते हैं कि जो भी सत्ता में आए, वह संविधान का पालन करे, उसकी रक्षा करे और उसे बनाए रखे।" प्रस्ताव में कुल तीन प्रमुख हस्तक्षेप और उनके तंत्र भी प्रस्तुत किए गए। पहला हस्तक्षेप स्वतंत्र मीडिया को प्रोत्साहित करके, वास्तविकता पर आधारित काउंटर नैरेटिव का निर्माण करके और सत्तारूढ़ सरकार द्वारा नियोजित मनोवैज्ञानिक हेरफेर की रणनीति का मुकाबला करके लोगों द्वारा निर्धारित कथा को बनाए रखना और उस पर कार्यकरना था।
role of women and girls in various terror groupssadiakorobi2
Women have three distinct types of involvement: direct involvement in terrorist acts; enabling of others to commit such acts; and facilitating the disengagement of others from violent or extremist groups.
Welcome to the new Mizzima Weekly !
Mizzima Media Group is pleased to announce the relaunch of Mizzima Weekly. Mizzima is dedicated to helping our readers and viewers keep up to date on the latest developments in Myanmar and related to Myanmar by offering analysis and insight into the subjects that matter. Our websites and our social media channels provide readers and viewers with up-to-the-minute and up-to-date news, which we don’t necessarily need to replicate in our Mizzima Weekly magazine. But where we see a gap is in providing more analysis, insight and in-depth coverage of Myanmar, that is of particular interest to a range of readers.
Carlsbad Desalination Project Water CEQA Compliance
1. Carlsbad Desalination Project Water
CEQA Compliance
San Diego County Water Authority
Special Board of Directors’ Meeting
1
November 15, 2012
1
2. CEQA Applicability
• Involves discretionary action
AND
• Involves a “project”
– Activity that may cause a direct physical change or a
reasonably foreseeable indirect physical change in the
environment, and is
• Directly undertaken by public agency; or
• Supported by public agency contracts, grants, loans, etc.; or
• Public agency issuance of lease, permit, or other entitlement
2
11. Resources Analyzed
• Aesthetics • Land Use/Planning
• Air Quality • Noise/Vibration
• Biological Resources • Transportation/Traffic
• Cultural Resources • Public Utilities/Service
• Geology/Soils Systems
• Hazards/Hazardous • Cumulative Impacts
Materials • Growth-Inducing
• Hydrology/Water Impacts
Quality
11
12. Analysis Conclusions
• Proposed changes:
– do not result in substantial project changes involving new
significant or a substantial increase in severity of
previously identified significant effects
– do not reflect a substantial change in the circumstances
under which the project is undertaken that would result in
new significant or more severe environmental effects than
previously identified
– do not provide new information of substantial importance
which was not known at the time of the prior FEIR
regarding new or substantially more severe significant
effects, previously infeasible mitigation measures that are
now feasible but are not adopted, or different mitigation
measures from those analyzed in previous EIR that would
reduce impacts but are not adopted
12
13. CEQA Compliance
• SDCWA is Responsible Agency and will use
FEIR/Addendum prepared by Carlsbad
• Evaluation of proposed distribution system
changes do not reach the threshold for
preparation of a SEIR, therefore an Addendum
to Carlsbad FEIR is appropriate document
• A Second Addendum to Carlsbad FEIR has
been prepared
13
14. Project Related Documents
• 2003 Regional Water Facilities Master Plan PFEIR
• 2005 Twin Oaks Valley Water Treatment Plant
FEIR
– 2005 Addendum
• 2006 Precise Development Plan and Desalination
Plant Project FEIR (Carlsbad FEIR)
– 2009 Addendum
• 2010 Urban Water Management Plan
• 2010 Subregional NCCP/HCP FEIR/FEIS
• 2012 Carlsbad FEIR Addendum 2
14
15. Future CEQA Actions
• Consider the following in determining
whether or how to proceed with project:
– 2006 Carlsbad FEIR, 2009 Carlsbad Addendum,
and 2010 Subregional NCCP/HCP FEIR/FEIS
• Consider and approve:
– 2012 Carlsbad FEIR Second Addendum
– Mitigation Monitoring Reporting Program
15
16. Links to Documents
• http:/sdcwa.org/uwmp
– 2010 Urban Water Management Plan
• http:/sdcwa.org/environmental-impact-reports-and-
mitigated-negative-declarations
– 2006 Carlsbad FEIR, 2009 Addendum, & Permits
– 2003 Regional Water Facilities Master Plan FEIR
– 2005 Twin Oaks Valley Water Treatment Plant FEIR & Addendum
– 2010 Subregional NCCP/HCP FEIR/FEIS
– 2012 Carlsbad FEIR Second Addendum (future)
16