1. The document discusses the history of the Water Authority's involvement with the Bay Delta Conservation Plan/California WaterFix and potential costs to the Water Authority. 2. The preferred project is a large infrastructure project to deliver water through the Delta and costs have increased to an estimated $14.9 billion. 3. There is uncertainty around supply benefits without an NCCP/HCP and around how costs will be allocated.