PROFIBUS in a Marine Application
Mark O’Halloran
BAE Systems
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
2
Agenda
Introduction
Reason for Change
System Overview
System Requirements
Application of Profibus
o Network Architecture
o Installation
o Safety and System Redundancy
o Realised Benefits
Summary
Any Questions
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
3
Introduction
BAE SYSTEM Maritime are a
prime contractor for the Royal
Navy’s Surface Vessels and
Submarines.
BAE SYSTEMS Maritime
Submarines are currently building
the Astute Class Submarines and
designing Future Submarines.
Over the past 20 years the control
and instrumentation on-board
these vessels has transitioned
from hardwired controls to
computerised control systems.
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
Reductions in man-power (the crew).
Tendency to use well-proven bespoke systems.
Legacy systems suffering from obsolescence.
Difficult to maintain, requiring specialist engineering knowledge.
New more affordable systems, tending towards COTS solutions.
4
Reason for Change
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
5
System Overview – Typical Architecture
Integrated Platform Management System (IPMS)
Safety-Related System responsible for the control and monitoring of
Propulsion, Electrical, Steering and Auxiliary systems of the vessel.
Interfaces with thousands of inputs and outputs across the vessel.
Provides the user interface for the operators and maintainers of the
systems.
Vessel Systems and Local Controls
Propulsion
Auxilieries
Electrical
Steering
Communication Network
Data
Acquisition
Units
Local Operating
Panel
(LOP)
Operator ConsoleOperator ConsoleOperator Console
Printer
Printer
Inputs and Outputs
(I/O)
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
6
System Requirements
Safety Justification and Targets:
Safety Case,
Safety Integrity Level assessed to be no greater than SIL 2,
Redundancy and Availability Targets have been set.
Security (Information Assurance):
Protectively Marked Data,
Physical Security,
Technical Security, e.g. Passwords and Encryption.
Transverse Engineering:
Shock & Vibration,
Temperature,
EMC,
Materials Compliance.
Physical Constraints:
Data Collection Units size,
Cable Management and Segregation,
Integration into the vessel.
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
7
Application of PROFIBUS
Network Architecture
Dual Redundant Architecture.
Strategically located data
acquisition units.
Diverse communications paths.
Backed-up Power Supplies
Safety Assessments, based on:
o Signal Allocation,
o Function Analysis,
o Zonal Analysis.
Dual Redundant
Profibus Network
Ethernet Ring
PLC Synchronisation Link
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
8
Application of PROFIBUS
Installation
Data Aquisition Units and Console mounted I/O racks use copper
Profibus (Supplier):
o Remote I/O making use of redundant communication modules.
o Optical Link Modules used to interconnect the units.
Units interconnected via dual redundant fibre rings (Shipbuilder).
o Bulkhead Penetrations/Connectors
o Shared Network Cables
o Network Patch Boxes
Lessons Learnt so far…
o Fibre Discipline.
o Education for designers, installers and end-users.
o Accessibility for modifications and maintenance.
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
9
Application of PROFIBUS
Safety & System Redundancy
No fail-safe state,
Continuous Operation – even in degraded conditions,
Reliance on Operator – Man in the loop,
System Failure can lead directly to hazard.
Safety Assessments
Safety Argument using GSN “IPMS is tolerably safe...”,
SIL 2 Development Process (Design, Implementation & Testing),
Single Point of Failures,
HAZID and HAZOP,
RBDs and Fault Trees.
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
10
Application of PROFIBUS
Example Safety Argument using GSN
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
Example Reliability Block Diagram
Modular RBD, component parts calculated individually.
Reliability calculations developed in accordance with Manufacturer’ s
Data, MIL-HDBK and IEC 61508.
Forming part of the SIL 2 Development Process.
11
Application of PROFIBUS
Dual Profibus
Network
(Section A)
Dual Redundant
PLC
(Section A)
Ethernet Ring
Dual Redundant
PLCs
(Section B)
Dual Profibus
Network
(Section B)
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
12
Application of PROFIBUS
Realised Benefits
Adaptable to change – Easy to integrate additional I/O points.
Enhanced Diagnostics for Maintainers.
Reductions in the volume of copper cabling.
Fibre Optics reduces the impact of Electromagnetic Interference.
In-service evidence to support safety justifications.
And finally - Through Life Cost savings.
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
13
Summary
New and innovative system for the shipbuilder – new challenges
being addressed.
Regular training sessions set-up to aid boat installation,
commissioning and ultimately operating the system.
Early commissioning activities have identified a number of
advantages of the system, compared to previous systems.
o Enhanced, easy to access, diagnostics.
o Flexibility to extend the network and I/O.
Studies currently been undertaken:
o Using PROFINET,
o Smart Instrumentation,
o Standardising interfaces to equipment.
Agenda
Introduction
Reason for
Change
System Overview
System
Requirements
Application of
Profibus
Summary
Questions
14
Questions?
Thank you…
Any Questions?
Mark O’Halloran / PROFIBUS in a Marine Application

More Related Content

Viewers also liked

Profibus device configuration and commissioning using fdtdtm and eddl tools ...
Profibus device configuration and commissioning using fdtdtm and eddl tools  ...Profibus device configuration and commissioning using fdtdtm and eddl tools  ...
Profibus device configuration and commissioning using fdtdtm and eddl tools ...PROFIBUS and PROFINET InternationaI - PI UK
 
2011 Flood brochure 28 page
2011 Flood brochure 28 page2011 Flood brochure 28 page
2011 Flood brochure 28 pageLisa Adams
 
Operational Excellence Tony Vines
Operational Excellence Tony VinesOperational Excellence Tony Vines
Operational Excellence Tony VinesTony Vines
 

Viewers also liked (20)

W5a profibus pa device configuration using fdt, andy smith
W5a profibus pa device configuration using fdt, andy smithW5a profibus pa device configuration using fdt, andy smith
W5a profibus pa device configuration using fdt, andy smith
 
C3 profibus profiles, steffen ochsenreither
C3 profibus profiles, steffen ochsenreitherC3 profibus profiles, steffen ochsenreither
C3 profibus profiles, steffen ochsenreither
 
Profibus device configuration and commissioning using fdtdtm and eddl tools ...
Profibus device configuration and commissioning using fdtdtm and eddl tools  ...Profibus device configuration and commissioning using fdtdtm and eddl tools  ...
Profibus device configuration and commissioning using fdtdtm and eddl tools ...
 
PROFIsafe and IT security - Peter Brown of Siemens A&D
PROFIsafe and IT security  - Peter Brown of Siemens A&DPROFIsafe and IT security  - Peter Brown of Siemens A&D
PROFIsafe and IT security - Peter Brown of Siemens A&D
 
W1 profibus configuration, andy verwer
W1 profibus configuration, andy verwerW1 profibus configuration, andy verwer
W1 profibus configuration, andy verwer
 
Profibus project management, design and component selection andy smith
Profibus project management, design and component selection   andy smithProfibus project management, design and component selection   andy smith
Profibus project management, design and component selection andy smith
 
PROFIBUS frame analysis - Peter Thomas of Control Specialists
PROFIBUS frame analysis - Peter Thomas of Control SpecialistsPROFIBUS frame analysis - Peter Thomas of Control Specialists
PROFIBUS frame analysis - Peter Thomas of Control Specialists
 
C1 profinet design, pete brown
C1 profinet design, pete brownC1 profinet design, pete brown
C1 profinet design, pete brown
 
Engineering with PROFIsafe - Peter Brown
Engineering with PROFIsafe - Peter BrownEngineering with PROFIsafe - Peter Brown
Engineering with PROFIsafe - Peter Brown
 
Profibus and Profinet system design - Andy Verwer
Profibus and Profinet system design - Andy VerwerProfibus and Profinet system design - Andy Verwer
Profibus and Profinet system design - Andy Verwer
 
C6 profibus system design, andy verwer
C6 profibus system design, andy verwerC6 profibus system design, andy verwer
C6 profibus system design, andy verwer
 
PROFIBUS and PROFINET update - Mark Freeman of Siemens A&D
PROFIBUS and PROFINET update -  Mark Freeman of Siemens A&DPROFIBUS and PROFINET update -  Mark Freeman of Siemens A&D
PROFIBUS and PROFINET update - Mark Freeman of Siemens A&D
 
W4 profinet frame analysis, peter thomas
W4 profinet frame analysis, peter thomasW4 profinet frame analysis, peter thomas
W4 profinet frame analysis, peter thomas
 
Introduction to PROFINET - Derek Lane of Wago
Introduction to PROFINET -  Derek Lane of WagoIntroduction to PROFINET -  Derek Lane of Wago
Introduction to PROFINET - Derek Lane of Wago
 
Introduction to PROFIBUS and PROFINET - andy verwer
Introduction to PROFIBUS and PROFINET -  andy verwerIntroduction to PROFIBUS and PROFINET -  andy verwer
Introduction to PROFIBUS and PROFINET - andy verwer
 
Introduction to Profibus & Profinet - Mark Freeman
Introduction to Profibus & Profinet - Mark FreemanIntroduction to Profibus & Profinet - Mark Freeman
Introduction to Profibus & Profinet - Mark Freeman
 
Sikm brief apr 2015
Sikm brief apr 2015Sikm brief apr 2015
Sikm brief apr 2015
 
2011 Flood brochure 28 page
2011 Flood brochure 28 page2011 Flood brochure 28 page
2011 Flood brochure 28 page
 
Operational Excellence Tony Vines
Operational Excellence Tony VinesOperational Excellence Tony Vines
Operational Excellence Tony Vines
 
BAE Case Study
BAE Case StudyBAE Case Study
BAE Case Study
 

Similar to PROFIBUS in Marine Applications

FPSOOverviewPatrickDeruytter.pdf
FPSOOverviewPatrickDeruytter.pdfFPSOOverviewPatrickDeruytter.pdf
FPSOOverviewPatrickDeruytter.pdfwarihkundono2
 
Aerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves moneyAerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves moneyIntelligentManufacturingInstitute
 
CCNA Exploration 4 - Chapter 3
CCNA Exploration 4 - Chapter 3CCNA Exploration 4 - Chapter 3
CCNA Exploration 4 - Chapter 3Irsandi Hasan
 
Week12 frame relay
Week12 frame relayWeek12 frame relay
Week12 frame relaylibra aziz
 
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSPower System Operation
 
Future Onshore Wind Energy Technology
Future Onshore Wind Energy TechnologyFuture Onshore Wind Energy Technology
Future Onshore Wind Energy TechnologyPhilip Totaro
 
WAN Products
WAN ProductsWAN Products
WAN Productssathish sak
 
Moore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - onlineMoore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - onlineGabriel van der Merwe
 
10.1109@jiot.2020.29954
10.1109@jiot.2020.2995410.1109@jiot.2020.29954
10.1109@jiot.2020.29954MarcoToledoO
 
Parallex - The Supercomputer
Parallex - The SupercomputerParallex - The Supercomputer
Parallex - The SupercomputerAnkit Singh
 
Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2Jerry Brown
 
Exploring New Features that Allow for Simulation and Offline Development Oppo...
Exploring New Features that Allow for Simulation and Offline Development Oppo...Exploring New Features that Allow for Simulation and Offline Development Oppo...
Exploring New Features that Allow for Simulation and Offline Development Oppo...Rockwell Automation
 
Iben from Spirent talks at the SDN World Congress about the importance of and...
Iben from Spirent talks at the SDN World Congress about the importance of and...Iben from Spirent talks at the SDN World Congress about the importance of and...
Iben from Spirent talks at the SDN World Congress about the importance of and...Iben Rodriguez
 
Rockwell Automation Air Pollution Control Solutions
Rockwell Automation Air Pollution Control SolutionsRockwell Automation Air Pollution Control Solutions
Rockwell Automation Air Pollution Control Solutionsmkburgoon
 
PES Wind Magazine - The development of a MV power converter for FC wind turbi...
PES Wind Magazine - The development of a MV power converter for FC wind turbi...PES Wind Magazine - The development of a MV power converter for FC wind turbi...
PES Wind Magazine - The development of a MV power converter for FC wind turbi...Ingeteam Wind Energy
 
MPLS-VPN-Technology.pdf
MPLS-VPN-Technology.pdfMPLS-VPN-Technology.pdf
MPLS-VPN-Technology.pdfHuynh MVT
 
Time is ready for the Civil Infrastructure Platform
Time is ready for the Civil Infrastructure PlatformTime is ready for the Civil Infrastructure Platform
Time is ready for the Civil Infrastructure PlatformYoshitake Kobayashi
 

Similar to PROFIBUS in Marine Applications (20)

FPSOOverviewPatrickDeruytter.pdf
FPSOOverviewPatrickDeruytter.pdfFPSOOverviewPatrickDeruytter.pdf
FPSOOverviewPatrickDeruytter.pdf
 
Aerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves moneyAerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves money
 
CCNA Exploration 4 - Chapter 3
CCNA Exploration 4 - Chapter 3CCNA Exploration 4 - Chapter 3
CCNA Exploration 4 - Chapter 3
 
Week12 frame relay
Week12 frame relayWeek12 frame relay
Week12 frame relay
 
Open v ran
Open v ranOpen v ran
Open v ran
 
Vel Linked In CV
Vel Linked In CVVel Linked In CV
Vel Linked In CV
 
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
 
Future Onshore Wind Energy Technology
Future Onshore Wind Energy TechnologyFuture Onshore Wind Energy Technology
Future Onshore Wind Energy Technology
 
WAN Products
WAN ProductsWAN Products
WAN Products
 
Moore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - onlineMoore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - online
 
10.1109@jiot.2020.29954
10.1109@jiot.2020.2995410.1109@jiot.2020.29954
10.1109@jiot.2020.29954
 
Parallex - The Supercomputer
Parallex - The SupercomputerParallex - The Supercomputer
Parallex - The Supercomputer
 
Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2
 
Exploring New Features that Allow for Simulation and Offline Development Oppo...
Exploring New Features that Allow for Simulation and Offline Development Oppo...Exploring New Features that Allow for Simulation and Offline Development Oppo...
Exploring New Features that Allow for Simulation and Offline Development Oppo...
 
Resume-Sudhin
Resume-SudhinResume-Sudhin
Resume-Sudhin
 
Iben from Spirent talks at the SDN World Congress about the importance of and...
Iben from Spirent talks at the SDN World Congress about the importance of and...Iben from Spirent talks at the SDN World Congress about the importance of and...
Iben from Spirent talks at the SDN World Congress about the importance of and...
 
Rockwell Automation Air Pollution Control Solutions
Rockwell Automation Air Pollution Control SolutionsRockwell Automation Air Pollution Control Solutions
Rockwell Automation Air Pollution Control Solutions
 
PES Wind Magazine - The development of a MV power converter for FC wind turbi...
PES Wind Magazine - The development of a MV power converter for FC wind turbi...PES Wind Magazine - The development of a MV power converter for FC wind turbi...
PES Wind Magazine - The development of a MV power converter for FC wind turbi...
 
MPLS-VPN-Technology.pdf
MPLS-VPN-Technology.pdfMPLS-VPN-Technology.pdf
MPLS-VPN-Technology.pdf
 
Time is ready for the Civil Infrastructure Platform
Time is ready for the Civil Infrastructure PlatformTime is ready for the Civil Infrastructure Platform
Time is ready for the Civil Infrastructure Platform
 

More from PROFIBUS and PROFINET InternationaI - PI UK

More from PROFIBUS and PROFINET InternationaI - PI UK (20)

11. PI_Ford_Dunton_IOLINK_Safety.pdf
11. PI_Ford_Dunton_IOLINK_Safety.pdf11. PI_Ford_Dunton_IOLINK_Safety.pdf
11. PI_Ford_Dunton_IOLINK_Safety.pdf
 
7. Ford_Dunton_TSN_CRM.pdf
7. Ford_Dunton_TSN_CRM.pdf7. Ford_Dunton_TSN_CRM.pdf
7. Ford_Dunton_TSN_CRM.pdf
 
6. SRCI Profibus International v2.pdf
6. SRCI Profibus International v2.pdf6. SRCI Profibus International v2.pdf
6. SRCI Profibus International v2.pdf
 
13. CEMA - AUTOMOTIVE.pdf
13. CEMA - AUTOMOTIVE.pdf13. CEMA - AUTOMOTIVE.pdf
13. CEMA - AUTOMOTIVE.pdf
 
12. PI_OPC_UK.pdf
12. PI_OPC_UK.pdf12. PI_OPC_UK.pdf
12. PI_OPC_UK.pdf
 
4. APL PI Presentation 2023.pdf
4. APL PI Presentation 2023.pdf4. APL PI Presentation 2023.pdf
4. APL PI Presentation 2023.pdf
 
10. PI_Dunton - OT Security.pdf
10. PI_Dunton - OT Security.pdf10. PI_Dunton - OT Security.pdf
10. PI_Dunton - OT Security.pdf
 
9. PA DIM presentation.pdf
9. PA DIM presentation.pdf9. PA DIM presentation.pdf
9. PA DIM presentation.pdf
 
3. Ford Dunton Mark Freeman.pdf
3. Ford Dunton Mark Freeman.pdf3. Ford Dunton Mark Freeman.pdf
3. Ford Dunton Mark Freeman.pdf
 
2. Ford_Dunton_Introductions_CRM.pdf
2. Ford_Dunton_Introductions_CRM.pdf2. Ford_Dunton_Introductions_CRM.pdf
2. Ford_Dunton_Introductions_CRM.pdf
 
PI UK Seminar (Nov 2021) - Online Certified Training Courses
PI UK Seminar (Nov 2021) - Online Certified Training CoursesPI UK Seminar (Nov 2021) - Online Certified Training Courses
PI UK Seminar (Nov 2021) - Online Certified Training Courses
 
PI UK Seminar (Nov 2021) - PROFINET Implementation and Testing
PI UK Seminar (Nov 2021) - PROFINET Implementation and TestingPI UK Seminar (Nov 2021) - PROFINET Implementation and Testing
PI UK Seminar (Nov 2021) - PROFINET Implementation and Testing
 
PI UK Seminar (Nov 2021) - PROFINET Design Basics
PI UK Seminar (Nov 2021) - PROFINET Design BasicsPI UK Seminar (Nov 2021) - PROFINET Design Basics
PI UK Seminar (Nov 2021) - PROFINET Design Basics
 
PI UK Seminar (Nov 2021) - PROFINET Gateways
PI UK Seminar (Nov 2021) - PROFINET GatewaysPI UK Seminar (Nov 2021) - PROFINET Gateways
PI UK Seminar (Nov 2021) - PROFINET Gateways
 
PI UK Seminar (Nov 2021) - PROFIBUS and PROFINET Device Configuration
PI UK Seminar (Nov 2021) - PROFIBUS and PROFINET Device ConfigurationPI UK Seminar (Nov 2021) - PROFIBUS and PROFINET Device Configuration
PI UK Seminar (Nov 2021) - PROFIBUS and PROFINET Device Configuration
 
PI UK Seminar (Nov 2021) - PROFINET of Things
PI UK Seminar (Nov 2021) - PROFINET of ThingsPI UK Seminar (Nov 2021) - PROFINET of Things
PI UK Seminar (Nov 2021) - PROFINET of Things
 
PI UK Seminar (Nov 2021) - Update on APL
PI UK Seminar (Nov 2021) - Update on APLPI UK Seminar (Nov 2021) - Update on APL
PI UK Seminar (Nov 2021) - Update on APL
 
PROFINET to PROFIBUS gateways - Peter Thomas - 03 june 2020
PROFINET to PROFIBUS gateways - Peter Thomas - 03 june 2020PROFINET to PROFIBUS gateways - Peter Thomas - 03 june 2020
PROFINET to PROFIBUS gateways - Peter Thomas - 03 june 2020
 
PROFIBUS lightning surge protection - Peter Thomas, CSL - 10 june 2020
PROFIBUS lightning surge protection -  Peter Thomas, CSL - 10 june 2020 PROFIBUS lightning surge protection -  Peter Thomas, CSL - 10 june 2020
PROFIBUS lightning surge protection - Peter Thomas, CSL - 10 june 2020
 
PROFINET network diagnostics and support - May 2020 - Peter Thomas
PROFINET network diagnostics and support - May 2020 - Peter ThomasPROFINET network diagnostics and support - May 2020 - Peter Thomas
PROFINET network diagnostics and support - May 2020 - Peter Thomas
 

Recently uploaded

Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 

Recently uploaded (20)

Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 

PROFIBUS in Marine Applications

  • 1. PROFIBUS in a Marine Application Mark O’Halloran BAE Systems
  • 2. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 2 Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus o Network Architecture o Installation o Safety and System Redundancy o Realised Benefits Summary Any Questions
  • 3. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 3 Introduction BAE SYSTEM Maritime are a prime contractor for the Royal Navy’s Surface Vessels and Submarines. BAE SYSTEMS Maritime Submarines are currently building the Astute Class Submarines and designing Future Submarines. Over the past 20 years the control and instrumentation on-board these vessels has transitioned from hardwired controls to computerised control systems.
  • 4. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the crew). Tendency to use well-proven bespoke systems. Legacy systems suffering from obsolescence. Difficult to maintain, requiring specialist engineering knowledge. New more affordable systems, tending towards COTS solutions. 4 Reason for Change
  • 5. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 5 System Overview – Typical Architecture Integrated Platform Management System (IPMS) Safety-Related System responsible for the control and monitoring of Propulsion, Electrical, Steering and Auxiliary systems of the vessel. Interfaces with thousands of inputs and outputs across the vessel. Provides the user interface for the operators and maintainers of the systems. Vessel Systems and Local Controls Propulsion Auxilieries Electrical Steering Communication Network Data Acquisition Units Local Operating Panel (LOP) Operator ConsoleOperator ConsoleOperator Console Printer Printer Inputs and Outputs (I/O)
  • 6. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 6 System Requirements Safety Justification and Targets: Safety Case, Safety Integrity Level assessed to be no greater than SIL 2, Redundancy and Availability Targets have been set. Security (Information Assurance): Protectively Marked Data, Physical Security, Technical Security, e.g. Passwords and Encryption. Transverse Engineering: Shock & Vibration, Temperature, EMC, Materials Compliance. Physical Constraints: Data Collection Units size, Cable Management and Segregation, Integration into the vessel.
  • 7. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 7 Application of PROFIBUS Network Architecture Dual Redundant Architecture. Strategically located data acquisition units. Diverse communications paths. Backed-up Power Supplies Safety Assessments, based on: o Signal Allocation, o Function Analysis, o Zonal Analysis. Dual Redundant Profibus Network Ethernet Ring PLC Synchronisation Link
  • 8. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 8 Application of PROFIBUS Installation Data Aquisition Units and Console mounted I/O racks use copper Profibus (Supplier): o Remote I/O making use of redundant communication modules. o Optical Link Modules used to interconnect the units. Units interconnected via dual redundant fibre rings (Shipbuilder). o Bulkhead Penetrations/Connectors o Shared Network Cables o Network Patch Boxes Lessons Learnt so far… o Fibre Discipline. o Education for designers, installers and end-users. o Accessibility for modifications and maintenance.
  • 9. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 9 Application of PROFIBUS Safety & System Redundancy No fail-safe state, Continuous Operation – even in degraded conditions, Reliance on Operator – Man in the loop, System Failure can lead directly to hazard. Safety Assessments Safety Argument using GSN “IPMS is tolerably safe...”, SIL 2 Development Process (Design, Implementation & Testing), Single Point of Failures, HAZID and HAZOP, RBDs and Fault Trees.
  • 10. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 10 Application of PROFIBUS Example Safety Argument using GSN
  • 11. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Example Reliability Block Diagram Modular RBD, component parts calculated individually. Reliability calculations developed in accordance with Manufacturer’ s Data, MIL-HDBK and IEC 61508. Forming part of the SIL 2 Development Process. 11 Application of PROFIBUS Dual Profibus Network (Section A) Dual Redundant PLC (Section A) Ethernet Ring Dual Redundant PLCs (Section B) Dual Profibus Network (Section B)
  • 12. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 12 Application of PROFIBUS Realised Benefits Adaptable to change – Easy to integrate additional I/O points. Enhanced Diagnostics for Maintainers. Reductions in the volume of copper cabling. Fibre Optics reduces the impact of Electromagnetic Interference. In-service evidence to support safety justifications. And finally - Through Life Cost savings.
  • 13. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 13 Summary New and innovative system for the shipbuilder – new challenges being addressed. Regular training sessions set-up to aid boat installation, commissioning and ultimately operating the system. Early commissioning activities have identified a number of advantages of the system, compared to previous systems. o Enhanced, easy to access, diagnostics. o Flexibility to extend the network and I/O. Studies currently been undertaken: o Using PROFINET, o Smart Instrumentation, o Standardising interfaces to equipment.
  • 14. Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions 14 Questions? Thank you… Any Questions? Mark O’Halloran / PROFIBUS in a Marine Application