SlideShare a Scribd company logo
Traffic Engineering Division
• Traffic Operations • Traffic
Administration
Construction
and
maintenance of
traffic control
devices.
•Engineering design
•Signal
Coordination
•Traffic Studies
•Neighborhood
Traffic Management
Traffic Engineering Division
• Traffic Operations
Signals
Signs
Banners and Flags
Pavement
Markings
Parking Meters
Traffic Operations - Signals
Electrical
Shop:
Maintenance of
270 signalized
intersections
and school
flashers and
flashing
Traffic Operations - Signals
Electrical
Shop:
Construction
and upgrades
of signalized
intersections
with digger
derrick crew.
Traffic Administration -
Intersection upgrades
Traffic signal upgrade:
LED fixtures last longer, are brighter, & use less
energy.
•Old •New
Traffic Operations - Signals
Electronic
Shop:
Construction
and
maintenance
of signal
cabinets and
controllers.
Traffic Administration -
Intersection upgrades
Traffic cabinet upgrade:
New controllers are more reliable and
versatile.
•Old •New
Traffic Operations - Signs
Sign Shop:
Signs are
Fabricated by
screen printing
and computer
cut graphics.
Traffic Operations - Signs
Sign crews:
Installing all
signs in the
city except
Interstate and
US Route
markers.
Traffic Operations - Signs
Sign Crews:
Maintain
signs with top
priority given
to keep
critical signs
in place.
Traffic Operations - Banners
Banners:
Hang and
maintain
banners in the
Downtown
District.
Traffic Operations - Flags
Flags:
Hang and
maintain flags
on the
Veteran’s
Bridge.
Traffic Operations -
Pavement Markings
Paint Shop:
Painting 550
miles of lane
lines per
year.
Traffic Operations -
Pavement Markings
Paint Shop:
Mark lane lines
in
thermoplastic.
New truck
began in 2000.
Traffic Operations -
Pavement Markings
Paint Shop:
Crosswalks,
stop bars, and
arrows are in
thermoplastic.
Traffic Operations -
Pavement Markings
Paint Shop:
Small
thermoplastic
jobs are done
with the hand
liner.
Traffic Administration -
Railroad crossing upgrades
Railroad crossing upgrade:
Resigning and using thermoplastic warning
markings.
Traffic Operations -
Parking Meters
Meter Shop:
Metered spaces
provide parking
space turnover
which benefits
businesses.
Approximately
$450,000 per yr.
Traffic Operations -
Parking Meters
Meter Shop:
Electronic
meters are
replacing less
reliable & higher
maintenance
mechanical
meters.
Traffic Engineering Division
• Traffic Operations
• Signals
• Signs
• Banners and
Flags
• Pavement
Markings
• Parking Meters
• Traffic
Administration
• Engineering design
• Signal Coordination
• Traffic Studies
• Street Lights
• Neighborhood
Traffic Management
Traffic Administration -
Engineering Design
Creating signal,
sign, and work
zone traffic
control plans.
Design review
and approval of
site plans and
subdivisions.
Traffic Administration -
Signal Coordination
Actuated Signal Control:
Loop detectors are embedded in the
pavement.
Traffic Administration -
Signal Coordination
Automated
Signal
Control:
Microwave
detector is
triggered like
a motion
detector.
Traffic Administration -
Signal Coordination
Coordinated
Signal Control:
Computer
systems used
for closely
spaced signals
to keep traffic
moving.
Traffic Administration -
Signal Coordination
Coordinated
Signal Control:
Downtown
computer
system
consists of 76
signals.
Traffic Administration -
Signal Coordination
Coordinated
Signal Control:
Signals can be
set to move
traffic at the
speed limit.
Traffic Administration -
Traffic Studies
Traffic
Counts:
TMC board
used in
signal timing
studies.
Traffic Administration -
Traffic Studies
Traffic Counts:
Road tubes
used to
determine
volumes on a
roadway.
Volumes used
in determining
if a signal is
Traffic Administration -
Traffic Studies
Speed
Studies:
Radar gun
used to
determine
85th
percentile
speeds.
Traffic Administration -
Traffic Studies
12,107
12,498
11,984
11,071
11,016
11,368
11,668
11,787
12,449
13,285
13,129
14,108
12,664
11,941
11,908
11,948
12,656
12,889
13,502
15,018
15,884
15,859
15,831
10,500
11,500
12,500
13,500
14,500
15,500
16,500
1
9
7
8
1
9
8
0
1
9
8
2
1
9
8
4
1
9
8
6
1
9
8
8
1
9
9
0
1
9
9
2
1
9
9
4
1
9
9
6
1
9
9
8
2
0
0
0
Year
Accident
Studies:
Total
number of
Accidents
per year.
Traffic Administration -
Traffic Studies
TOP 10 HIGHEST ACCIDENT RATE LOCATIONS OF 2000
LOCATION NO. OF ACC. ACC.RATE*
1 M.L. King Blvd at Hwy 27 exit ramp and Pine St 26 4.70
2 Hwy 153 north exit ramp to Hixson Pike north 28 4.33
3 4th Ave at E 37th St 11 3.74
4 Access Rd entrance Ramp to Hwy 153 south 40 3.48
5 E. Brainerd Rd at Hickory Valley Rd & I-75 ramp 38 3.23
6 McCallie Av at Holtzclaw Av 34 3.19
7 E 4th St at Walnut St 14 3.00
8 E 4th St at Lookout St 13 2.93
9 8th St at Georgia Av 12 2.90
10 Moore Rd at Old Mission Rd 18 2.80
*number of accidents per million vehicles entering intersection
Traffic Administration -
Traffic Studies
 Upgrade
intersections to
reduce accidents.
 Adjust timing.
 Add left turn
phases.
 Change signing or
pavement
marking.
Red Light
Camera:
Catch red light
runners by
taking a picture
of their car and
license plate.
Traffic Administration
Traffic Administration -
Guardrail
Guardrail
system:
Speed zones of
less than 40
MPH.
Traffic Administration -
Guardrail
Guardrail
system:
Speed zones of
40 MPH or
more.
Traffic Administration -
Sight Distance
Sight
Distance
Triangle:
Trim hedges
for safety’s
sake.
Traffic Administration -
Sight Distance
Before After
Sight Distance:
Traffic Administration -
Street Lights
Street
Lights:
Field check
street light
requests for
new
installations.
Traffic Administration -
Street Lights
Standard
Street Lights:
Shoe box type,
full cutoff.
Used in Central
Business
District.
Traffic Administration -
Street Lights
Pedestrian
Lights:
Modified Ball and
Basket with full
cutoff.
Used in Central
Business District.
Traffic Administration -
Street Lights
Pedestrian
Lights:
Acorn fixture
with cutoff
optics.
Used in
residential
• Neighborhood Traffic Management
– Misconceptions
Traffic Administration -
Neighborhood Traffic Management
More stop signs
Lower Speed Limits
Children at Play signs
Too Many
Stops:
Reduces
effectivenes
s of justified
stops.
Traffic Administration -
Neighborhood Traffic Management
Lower
Speed
Limits:
Most drive
at speed
that feels
right.
Traffic Administration -
Neighborhood Traffic Management
Traffic Administration -
Neighborhood Traffic Management
“Children at
Play” signs:
Give a false
sense of
security.
Neighborhood
Traffic
Management
Program
(NTMP):
Petition the
city for a study.
Traffic Administration -
Neighborhood Traffic Management
Traffic Administration -
Neighborhood Traffic Management
NTMP
Projects:
Old Mission
Traffic
Circles
-Have
reduced
speeds and
Traffic Administration -
Neighborhood Traffic Management
•Traffic diverters
•Traffic islands
•Speed tables
•Textured pavement
Traffic Engineering Division
• Traffic Operations -
757-5355
• Report signs down or
signal malfunctions
• Traffic Engineering -
757-5005
• Request new
installation or
upgrade
• Request NTMP

More Related Content

Similar to c1-responsibilities-of-a-traffic-engineering-division.ppt

Traffic Calming In Fort Worth
Traffic Calming In Fort WorthTraffic Calming In Fort Worth
Traffic Calming In Fort WorthJustin Flowers
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
Aglaia Connect
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
Stone Rayhan
 
He final ppt
He final pptHe final ppt
He final ppt
ShahIshani1996
 
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two ImplementationTraffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
JumpingJaq
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONPROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
Wael Alawsey
 
ITS presentation final
ITS presentation final ITS presentation final
ITS presentation final
Alaa . H. Mousa
 
TSRGD Roadshow 9 35am and 9-45am graham hanson [compatibility mode]
TSRGD Roadshow  9 35am and 9-45am graham hanson [compatibility mode]TSRGD Roadshow  9 35am and 9-45am graham hanson [compatibility mode]
TSRGD Roadshow 9 35am and 9-45am graham hanson [compatibility mode]LisaAtTransport
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And Drainage
Prashant Ranjan
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1Syafiqah Jamian
 
2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt
Richie890303
 
Design-Criteria-for-Highway-and-Railways.pptx
Design-Criteria-for-Highway-and-Railways.pptxDesign-Criteria-for-Highway-and-Railways.pptx
Design-Criteria-for-Highway-and-Railways.pptx
PortgasDAce59
 
Intelligent Transportation Systems .pptx
Intelligent Transportation Systems .pptxIntelligent Transportation Systems .pptx
Intelligent Transportation Systems .pptx
TheConqueror2
 
Traffic control system and its management
Traffic control system and its managementTraffic control system and its management
Traffic control system and its management
MdMahbuburRahamanMur
 
Administrative Traffic Management & Transportation Training
Administrative Traffic Management & Transportation TrainingAdministrative Traffic Management & Transportation Training
Administrative Traffic Management & Transportation Training
Asia Master Training آسيا ماسترز للتدريب والتطوير
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Nathan Baker
 
Unseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESUnseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURES
ASHWIN KUMAR
 
April Live Pavement Management Webinar 1 by IPMA Academy
April Live Pavement Management Webinar 1 by IPMA AcademyApril Live Pavement Management Webinar 1 by IPMA Academy
April Live Pavement Management Webinar 1 by IPMA Academy
blairbarnhardt
 

Similar to c1-responsibilities-of-a-traffic-engineering-division.ppt (20)

Traffic Calming In Fort Worth
Traffic Calming In Fort WorthTraffic Calming In Fort Worth
Traffic Calming In Fort Worth
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
He final ppt
He final pptHe final ppt
He final ppt
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
 
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two ImplementationTraffic Signals Safety and Efficiency Project – Stage Two Implementation
Traffic Signals Safety and Efficiency Project – Stage Two Implementation
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONPROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
 
ITS presentation final
ITS presentation final ITS presentation final
ITS presentation final
 
TSRGD Roadshow 9 35am and 9-45am graham hanson [compatibility mode]
TSRGD Roadshow  9 35am and 9-45am graham hanson [compatibility mode]TSRGD Roadshow  9 35am and 9-45am graham hanson [compatibility mode]
TSRGD Roadshow 9 35am and 9-45am graham hanson [compatibility mode]
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And Drainage
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1
 
2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt2520-20measure20presentation (1).ppt
2520-20measure20presentation (1).ppt
 
Design-Criteria-for-Highway-and-Railways.pptx
Design-Criteria-for-Highway-and-Railways.pptxDesign-Criteria-for-Highway-and-Railways.pptx
Design-Criteria-for-Highway-and-Railways.pptx
 
Intelligent Transportation Systems .pptx
Intelligent Transportation Systems .pptxIntelligent Transportation Systems .pptx
Intelligent Transportation Systems .pptx
 
Traffic control system and its management
Traffic control system and its managementTraffic control system and its management
Traffic control system and its management
 
ITS Master Plan
ITS Master PlanITS Master Plan
ITS Master Plan
 
Administrative Traffic Management & Transportation Training
Administrative Traffic Management & Transportation TrainingAdministrative Traffic Management & Transportation Training
Administrative Traffic Management & Transportation Training
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
 
Unseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESUnseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURES
 
April Live Pavement Management Webinar 1 by IPMA Academy
April Live Pavement Management Webinar 1 by IPMA AcademyApril Live Pavement Management Webinar 1 by IPMA Academy
April Live Pavement Management Webinar 1 by IPMA Academy
 

Recently uploaded

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 

Recently uploaded (20)

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 

c1-responsibilities-of-a-traffic-engineering-division.ppt