13. BULIDING REGULATION
PART C
Consideration should be given to:
Floodwater entering the building through
drains
Rising Groundwater entering buildings
through floor slabs and through basement
walls.
Ability to inspect floor voids that have
been flooded
17. BULIDING REGULATION
PART C
The assessment process is set out
in ‘Model procedures in
contaminated land’ report CLR 11.
CLR 11 was published in Oct 2004
and is available to download free
from the Environmental Agency
website.
20. BULIDING REGULATION
PART C
Items 2.15 to 2.22 set out measures for:
Treatment – biological, chemical, physical.
Containment – barriers or covering.
Removal – Dig or dump.
Items 2.25 to 2.41 deal with measures
relating to sites where methane and other
gases are in the ground or Radon gas is
present.