Building a Project Team
Six Sigma-Define – Lesson 4
A review of how to build a project team and stakeholder analysis using
the ARMI tool.
Introduction #08 – Key Roles in a Lean Six Sigma Project
Introduction #12 – CAP Model
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means
(electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
Building a Project Team
o How do I build a project team?
• Begin with a top-down approach.
 When reviewing the project with each level
(from the top-down), be sure to ask who
the next layer of team members will be.
• Talk to each person on the team.
 Visit with them 1 on 1 to find out:
– Do they agree with the problem statement?
– Do they agree with the scope?
– Do they agree with who else is on the team?
– What is their level of experience/expertise with the problem?
– Who are the other potential stakeholders for the project?
 Be sure to probe them if they answer “No” to any question.
– You may find other team members feel the same way - it may change the entire direction of the project.
• Resolve any team conflict immediately.
 It’s not uncommon for a Process Owner or SMEs to have conflicting opinions about the project’s direction.
 If there’s disagreement on a major point in the project (e.g., priority of the problem/project, scope, etc.),
then get it resolved quickly! Don’t ignore it!
– Some team members may not tell you about their disagreement or lack of support, but their behavior may indicate it
(e.g., won’t return calls/emails, late for meetings, many negative comments, indifference, etc.).
– These people are not “bad apples”; they can often become your greatest advocate. Listen to their perspective and
consider elevating their concerns to the team (without making them appear like a naysayer).
o Building a project team takes time, but it’s well worth the investment.
• Having the right team should give you confidence you’ll find the right solutions more quickly.
• If the project is well scoped, the team size should be between 5 to 10 people.
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
Sponsor >
Champion >
Process Owner >
SMEs >
Stakeholder Analysis (ARMI) Defined
o What is a Stakeholder Analysis?
• It’s a tool to help evaluate who the project stakeholders are and their level of support.
o What does ARMI mean?
• It refers to the 4 different levels assigned to each stakeholder in the analysis. They are…
o What is the purpose of a Stakeholder Analysis?
• To understand all the different business areas affected by the project.
• To identify potential gaps or conflicts in the level of support by the stakeholders.
• To help plan what stakeholders to talk to and how to talk to them to increase their support.
o The Stakeholder Analysis (ARMI) helps identify any risk of acceptance.
• The goal is not to get a perfectly accurate or agreed upon assessment of each person’s support.
• The goal is to identify any perceived or potential gaps in each person’s support.
 Each gap represents a risk of “Acceptance” (Q x A = E).
 How can we improve the gaps to gain stronger support for the project and help ensure its success?
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
3
A
Approver of team
decisions
R
Resource whose
expertise, skills or
clout may be
needed
M
Member of team
with authority of the
charter
I
Interested party who
should be informed
on direction &
findings
Stakeholder Analysis (ARMI) Example
o Below is an example of a Stakeholder Analysis (ARMI):
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
4
Define Measure Analyze Improve Control
Mickey Mouse Black Belt (Project Leader) M M M M M Strongly Supportive
Minnie Mouse Sponsor A A A A A Strongly Supportive
Goofy Champion A A A A A Strongly Supportive
Pluto Process Owner M M M M M Moderately Supportive
Daisy Duck SME 1 M M M M M Low Support
Donald Duck SME 2 M M M M M Moderately Supportive
Buzz Lightyear VP, Sales (Stakeholder) I I I I I Moderately Supportive
Woody VP, Pricing (Stakeholder) I I I I I Moderately Supportive
Hamm VP, Marketing (Stakeholder) I I I I I Low Support
Rex VP, Training (Stakeholder) I I Moderately Supportive
Mr Potato Head VP, Customer Service (Stakeholder) I I I I I Strongly Supportive
Mike Wazowski Director, Business Development I R R Moderately Supportive
James P Sullivan Master Black Belt (Mentor) I I I I I Strongly Supportive
Mr Waternoose Manager, Pricing I I I I I Moderately Supportive
Celia Director, Sales I I I I I Low Support
Randall Manager, Customer Service R R TBD
Roz Business Analyst (Reporting) I R R R R Moderately Supportive
Phlegm Bile Data Analyst I R R R R TBD
StakeholdersAdd'lSupport
Stakeholders Title/Influence
Project Phase
Stakeholder Analysis
CoreTeam
Legend:
A = Approval of team decisions outside their charter
R = Resource to the team; one w hose expertise, skills or clout may be needed on an ad hoc basis
M = Member of team w ith the authority and boundaries of the charter
I = Interested party, one w ho w ill need to be kept informed on direction and findings, if later support is needed
Building a Stakeholder Analysis (ARMI)
o How do you build the Stakeholder Analysis (ARMI)?
1. Identify all the core team members, outside stakeholders, and any additional support needed.
2. For each person, identify the type of support each may contribute for each project phase.
3. Estimate the level of support each person may have toward the entire project.
4. Review the analysis with the team to get their feedback.
5. For any stakeholder with less than strong support, discuss with the team how to improve it.
 Evaluate the level of risk each person may contribute to the project and prioritize them.
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
5
Define Measure Analyze Improve Control
Mickey Mouse Black Belt (Project Leader) M M M M M Strongly Supportive
Minnie Mouse Sponsor A A A A A Strongly Supportive
Goofy Champion A A A A A Strongly Supportive
Pluto Process Owner M M M M M Moderately Supportive
Daisy Duck SME 1 M M M M M Low Support
Donald Duck SME 2 M M M M M Moderately Supportive
Buzz Lightyear VP, Sales (Stakeholder) I I I I I Moderately Supportive
Woody VP, Pricing (Stakeholder) I I I I I Moderately Supportive
Hamm VP, Marketing (Stakeholder) I I I I I Low Support
Rex VP, Training (Stakeholder) I I Moderately Supportive
Mr Potato Head VP, Customer Service (Stakeholder) I I I I I Strongly Supportive
Mike Wazowski Director, Business Development I R R Moderately Supportive
James P Sullivan Master Black Belt (Mentor) I I I I I Strongly Supportive
Mr Waternoose Manager, Pricing I I I I I Moderately Supportive
Celia Director, Sales I I I I I Low Support
Randall Manager, Customer Service R R TBD
Roz Business Analyst (Reporting) I R R R R Moderately Supportive
Phlegm Bile Data Analyst I R R R R TBD
StakeholdersAdd'lSupport
Stakeholders Title/Influence
Project Phase
Stakeholder Analysis
CoreTeam
As core team members,
these represent the biggest
risk. Start with Daisy, then
Donald & Pluto.
As executive stakeholders,
these are the next biggest
risk. Start with Hamm, then
the others.
As additional support,
these represent the least
risk. Start with Celia; and
consider contacting the
others as needed.
Practical Application
o Think of 2 project teams you were part of (personally or at work) and answer the
following questions:
• Were the roles and expectations clearly defined for each team?
 If not, then what impact did this cause? (i.e., confusion, political battles, lack of participation, etc.)
• Was there anyone that had low support at the beginning of the project?
 If so, then how did the project leader (or others) handle this?
 Did the support from that person improve by the end of the project?
– If so, then what do you think influenced it the change?
• Was there anyone that started with high support but later decreased to low support?
 If so, then how did the project leader (or others) handle this?
 What do you think influenced the change in their level of support?
• What would you do differently in building a team that could prevent some problems that you may
have experienced in the other project teams?
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
6

More Related Content

What's hot

Poka Yoke with Matt Hansen at StatStuff
Poka Yoke with Matt Hansen at StatStuffPoka Yoke with Matt Hansen at StatStuff
Poka Yoke with Matt Hansen at StatStuff
Matt Hansen
 
Introduction to Lean with Matt Hansen at StatStuff
Introduction to Lean with Matt Hansen at StatStuffIntroduction to Lean with Matt Hansen at StatStuff
Introduction to Lean with Matt Hansen at StatStuff
Matt Hansen
 
Project Pre-Assessment Using a Min/Max Analysis with Matt Hansen at StatStuff
Project Pre-Assessment Using a Min/Max Analysis with Matt Hansen at StatStuffProject Pre-Assessment Using a Min/Max Analysis with Matt Hansen at StatStuff
Project Pre-Assessment Using a Min/Max Analysis with Matt Hansen at StatStuff
Matt Hansen
 
Building a Problem Statement with Matt Hansen at StatStuff
Building a Problem Statement with Matt Hansen at StatStuffBuilding a Problem Statement with Matt Hansen at StatStuff
Building a Problem Statement with Matt Hansen at StatStuff
Matt Hansen
 
Documenting a New Process with SOPs
Documenting a New Process with SOPsDocumenting a New Process with SOPs
Documenting a New Process with SOPs
Matt Hansen
 
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuffLeading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
Matt Hansen
 
Defining a Project Scope with Matt Hansen at StatStuff
Defining a Project Scope with Matt Hansen at StatStuffDefining a Project Scope with Matt Hansen at StatStuff
Defining a Project Scope with Matt Hansen at StatStuff
Matt Hansen
 
Risk Analysis with Matt Hansen at StatStuff
Risk Analysis with Matt Hansen at StatStuffRisk Analysis with Matt Hansen at StatStuff
Risk Analysis with Matt Hansen at StatStuff
Matt Hansen
 
Prioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuffPrioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuff
Matt Hansen
 
Corporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuffCorporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuff
Matt Hansen
 
Closing a Project
Closing a ProjectClosing a Project
Closing a Project
Matt Hansen
 
Project Financial Benefits with Matt Hansen at StatStuff
Project Financial Benefits with Matt Hansen at StatStuffProject Financial Benefits with Matt Hansen at StatStuff
Project Financial Benefits with Matt Hansen at StatStuff
Matt Hansen
 
Getting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolGetting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta Tool
Matt Hansen
 
Building a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuffBuilding a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuff
Matt Hansen
 
Transfer Function with Matt Hansen at StatStuff
Transfer Function with Matt Hansen at StatStuffTransfer Function with Matt Hansen at StatStuff
Transfer Function with Matt Hansen at StatStuff
Matt Hansen
 
5S Program with Matt Hansen at StatStuff
5S Program with Matt Hansen at StatStuff5S Program with Matt Hansen at StatStuff
5S Program with Matt Hansen at StatStuff
Matt Hansen
 
Value Added with Matt Hansen at StatStuff
Value Added with Matt Hansen at StatStuffValue Added with Matt Hansen at StatStuff
Value Added with Matt Hansen at StatStuff
Matt Hansen
 
Risk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolRisk Assessment with a FMEA Tool
Risk Assessment with a FMEA Tool
Matt Hansen
 
Building a Control Plan
Building a Control PlanBuilding a Control Plan
Building a Control Plan
Matt Hansen
 
Identify Root Causes – C&E Matrix
Identify Root Causes – C&E MatrixIdentify Root Causes – C&E Matrix
Identify Root Causes – C&E Matrix
Matt Hansen
 

What's hot (20)

Poka Yoke with Matt Hansen at StatStuff
Poka Yoke with Matt Hansen at StatStuffPoka Yoke with Matt Hansen at StatStuff
Poka Yoke with Matt Hansen at StatStuff
 
Introduction to Lean with Matt Hansen at StatStuff
Introduction to Lean with Matt Hansen at StatStuffIntroduction to Lean with Matt Hansen at StatStuff
Introduction to Lean with Matt Hansen at StatStuff
 
Project Pre-Assessment Using a Min/Max Analysis with Matt Hansen at StatStuff
Project Pre-Assessment Using a Min/Max Analysis with Matt Hansen at StatStuffProject Pre-Assessment Using a Min/Max Analysis with Matt Hansen at StatStuff
Project Pre-Assessment Using a Min/Max Analysis with Matt Hansen at StatStuff
 
Building a Problem Statement with Matt Hansen at StatStuff
Building a Problem Statement with Matt Hansen at StatStuffBuilding a Problem Statement with Matt Hansen at StatStuff
Building a Problem Statement with Matt Hansen at StatStuff
 
Documenting a New Process with SOPs
Documenting a New Process with SOPsDocumenting a New Process with SOPs
Documenting a New Process with SOPs
 
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuffLeading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
 
Defining a Project Scope with Matt Hansen at StatStuff
Defining a Project Scope with Matt Hansen at StatStuffDefining a Project Scope with Matt Hansen at StatStuff
Defining a Project Scope with Matt Hansen at StatStuff
 
Risk Analysis with Matt Hansen at StatStuff
Risk Analysis with Matt Hansen at StatStuffRisk Analysis with Matt Hansen at StatStuff
Risk Analysis with Matt Hansen at StatStuff
 
Prioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuffPrioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuff
 
Corporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuffCorporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuff
 
Closing a Project
Closing a ProjectClosing a Project
Closing a Project
 
Project Financial Benefits with Matt Hansen at StatStuff
Project Financial Benefits with Matt Hansen at StatStuffProject Financial Benefits with Matt Hansen at StatStuff
Project Financial Benefits with Matt Hansen at StatStuff
 
Getting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolGetting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta Tool
 
Building a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuffBuilding a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuff
 
Transfer Function with Matt Hansen at StatStuff
Transfer Function with Matt Hansen at StatStuffTransfer Function with Matt Hansen at StatStuff
Transfer Function with Matt Hansen at StatStuff
 
5S Program with Matt Hansen at StatStuff
5S Program with Matt Hansen at StatStuff5S Program with Matt Hansen at StatStuff
5S Program with Matt Hansen at StatStuff
 
Value Added with Matt Hansen at StatStuff
Value Added with Matt Hansen at StatStuffValue Added with Matt Hansen at StatStuff
Value Added with Matt Hansen at StatStuff
 
Risk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolRisk Assessment with a FMEA Tool
Risk Assessment with a FMEA Tool
 
Building a Control Plan
Building a Control PlanBuilding a Control Plan
Building a Control Plan
 
Identify Root Causes – C&E Matrix
Identify Root Causes – C&E MatrixIdentify Root Causes – C&E Matrix
Identify Root Causes – C&E Matrix
 

Similar to Building a Project Team with Matt Hansen at StatStuff

Managing stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellenceManaging stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellence
The Jamilah H
 
Putting the "Strategic" into Strategic Business Partner
Putting the "Strategic" into Strategic Business PartnerPutting the "Strategic" into Strategic Business Partner
Putting the "Strategic" into Strategic Business Partner
Human Capital Media
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015
Leon Lim
 
Organizational Communication
Organizational CommunicationOrganizational Communication
Organizational Communication
amanideutsch
 
Understanding and Managing Change
Understanding and Managing ChangeUnderstanding and Managing Change
Understanding and Managing Change
TechWell
 
Crisis Communications Webinar - June 10
Crisis Communications Webinar - June 10Crisis Communications Webinar - June 10
Crisis Communications Webinar - June 10
Ted Skinner
 
Know Your Audience
Know Your AudienceKnow Your Audience
Know Your Audience
Salesforce Marketing Cloud
 
Leading Change—Even If You’re Not in Charge
Leading Change—Even If You’re Not in ChargeLeading Change—Even If You’re Not in Charge
Leading Change—Even If You’re Not in Charge
TechWell
 
Handling Negative Comments Sm
Handling Negative Comments SmHandling Negative Comments Sm
Handling Negative Comments Sm
Viosk International
 
Making hr more strategic phrma 2010 v5 PPT
Making hr more strategic   phrma 2010 v5 PPTMaking hr more strategic   phrma 2010 v5 PPT
Making hr more strategic phrma 2010 v5 PPT
Cox Business Consulting
 
Value Proposition framework - clutchplayadvisors.com
Value Proposition framework - clutchplayadvisors.comValue Proposition framework - clutchplayadvisors.com
Value Proposition framework - clutchplayadvisors.com
Adrian Galea ◽️ startupstories
 
BoSUSA22 | Bruce McCarthy | Managing Stakeholders
BoSUSA22 | Bruce McCarthy | Managing StakeholdersBoSUSA22 | Bruce McCarthy | Managing Stakeholders
BoSUSA22 | Bruce McCarthy | Managing Stakeholders
Business of Software Conference
 
The Art of Managing Up: Building Strong Relationships [Webcast]
The Art of Managing Up: Building Strong Relationships [Webcast]The Art of Managing Up: Building Strong Relationships [Webcast]
The Art of Managing Up: Building Strong Relationships [Webcast]
LinkedIn Talent Solutions
 
Tweet, Tweet, Ping, Ping Social Media Strategies For Insurance
Tweet, Tweet, Ping, Ping   Social Media Strategies For InsuranceTweet, Tweet, Ping, Ping   Social Media Strategies For Insurance
Tweet, Tweet, Ping, Ping Social Media Strategies For Insurance
St. Nick Media Services
 
Ruth Murray APM RISK MANAGEMENT SIG CONFERENCE
 Ruth Murray APM RISK MANAGEMENT SIG CONFERENCE Ruth Murray APM RISK MANAGEMENT SIG CONFERENCE
Ruth Murray APM RISK MANAGEMENT SIG CONFERENCE
Association for Project Management
 
Creating a marketing communications plan tools
Creating a marketing communications plan toolsCreating a marketing communications plan tools
Creating a marketing communications plan tools
Deborah Spector
 
Communicating in crisis summer 2011
Communicating in crisis summer 2011Communicating in crisis summer 2011
Communicating in crisis summer 2011
Todd Felts
 
Into the Fire: Crisis Communications Starts with Preparedness
Into the Fire: Crisis Communications Starts with PreparednessInto the Fire: Crisis Communications Starts with Preparedness
Into the Fire: Crisis Communications Starts with Preparedness
Christopher Tarantino, MEP CMCP CHEC-III
 
Making HR more strategic NHRMA 2011
Making HR more strategic NHRMA 2011Making HR more strategic NHRMA 2011
Making HR more strategic NHRMA 2011
Cox Business Consulting
 
WORKING WITH GROUPS
WORKING WITH GROUPSWORKING WITH GROUPS
WORKING WITH GROUPS
yusririskyamelia
 

Similar to Building a Project Team with Matt Hansen at StatStuff (20)

Managing stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellenceManaging stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellence
 
Putting the "Strategic" into Strategic Business Partner
Putting the "Strategic" into Strategic Business PartnerPutting the "Strategic" into Strategic Business Partner
Putting the "Strategic" into Strategic Business Partner
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015
 
Organizational Communication
Organizational CommunicationOrganizational Communication
Organizational Communication
 
Understanding and Managing Change
Understanding and Managing ChangeUnderstanding and Managing Change
Understanding and Managing Change
 
Crisis Communications Webinar - June 10
Crisis Communications Webinar - June 10Crisis Communications Webinar - June 10
Crisis Communications Webinar - June 10
 
Know Your Audience
Know Your AudienceKnow Your Audience
Know Your Audience
 
Leading Change—Even If You’re Not in Charge
Leading Change—Even If You’re Not in ChargeLeading Change—Even If You’re Not in Charge
Leading Change—Even If You’re Not in Charge
 
Handling Negative Comments Sm
Handling Negative Comments SmHandling Negative Comments Sm
Handling Negative Comments Sm
 
Making hr more strategic phrma 2010 v5 PPT
Making hr more strategic   phrma 2010 v5 PPTMaking hr more strategic   phrma 2010 v5 PPT
Making hr more strategic phrma 2010 v5 PPT
 
Value Proposition framework - clutchplayadvisors.com
Value Proposition framework - clutchplayadvisors.comValue Proposition framework - clutchplayadvisors.com
Value Proposition framework - clutchplayadvisors.com
 
BoSUSA22 | Bruce McCarthy | Managing Stakeholders
BoSUSA22 | Bruce McCarthy | Managing StakeholdersBoSUSA22 | Bruce McCarthy | Managing Stakeholders
BoSUSA22 | Bruce McCarthy | Managing Stakeholders
 
The Art of Managing Up: Building Strong Relationships [Webcast]
The Art of Managing Up: Building Strong Relationships [Webcast]The Art of Managing Up: Building Strong Relationships [Webcast]
The Art of Managing Up: Building Strong Relationships [Webcast]
 
Tweet, Tweet, Ping, Ping Social Media Strategies For Insurance
Tweet, Tweet, Ping, Ping   Social Media Strategies For InsuranceTweet, Tweet, Ping, Ping   Social Media Strategies For Insurance
Tweet, Tweet, Ping, Ping Social Media Strategies For Insurance
 
Ruth Murray APM RISK MANAGEMENT SIG CONFERENCE
 Ruth Murray APM RISK MANAGEMENT SIG CONFERENCE Ruth Murray APM RISK MANAGEMENT SIG CONFERENCE
Ruth Murray APM RISK MANAGEMENT SIG CONFERENCE
 
Creating a marketing communications plan tools
Creating a marketing communications plan toolsCreating a marketing communications plan tools
Creating a marketing communications plan tools
 
Communicating in crisis summer 2011
Communicating in crisis summer 2011Communicating in crisis summer 2011
Communicating in crisis summer 2011
 
Into the Fire: Crisis Communications Starts with Preparedness
Into the Fire: Crisis Communications Starts with PreparednessInto the Fire: Crisis Communications Starts with Preparedness
Into the Fire: Crisis Communications Starts with Preparedness
 
Making HR more strategic NHRMA 2011
Making HR more strategic NHRMA 2011Making HR more strategic NHRMA 2011
Making HR more strategic NHRMA 2011
 
WORKING WITH GROUPS
WORKING WITH GROUPSWORKING WITH GROUPS
WORKING WITH GROUPS
 

More from Matt Hansen

Control Charts: Recalculating Control Limits
Control Charts: Recalculating Control LimitsControl Charts: Recalculating Control Limits
Control Charts: Recalculating Control Limits
Matt Hansen
 
Control Charts: U Chart
Control Charts: U ChartControl Charts: U Chart
Control Charts: U Chart
Matt Hansen
 
Control Charts: P Chart
Control Charts: P ChartControl Charts: P Chart
Control Charts: P Chart
Matt Hansen
 
Control Charts: Xbar-S Chart
Control Charts: Xbar-S ChartControl Charts: Xbar-S Chart
Control Charts: Xbar-S Chart
Matt Hansen
 
Control Charts: I-MR Chart
Control Charts: I-MR ChartControl Charts: I-MR Chart
Control Charts: I-MR Chart
Matt Hansen
 
Control Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control ChartControl Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control Chart
Matt Hansen
 
Building a Scorecard
Building a ScorecardBuilding a Scorecard
Building a Scorecard
Matt Hansen
 
Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)
Matt Hansen
 
Piloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanPiloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot Plan
Matt Hansen
 
Piloting Solutions: The Process
Piloting Solutions: The ProcessPiloting Solutions: The Process
Piloting Solutions: The Process
Matt Hansen
 
Prioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixPrioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact Matrix
Matt Hansen
 
Brainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity DiagramBrainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity Diagram
Matt Hansen
 
Brainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a WorkoutBrainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a Workout
Matt Hansen
 
Testing for Multicollinearity
Testing for MulticollinearityTesting for Multicollinearity
Testing for Multicollinearity
Matt Hansen
 
Compiling Analysis Results
Compiling Analysis ResultsCompiling Analysis Results
Compiling Analysis Results
Matt Hansen
 
Improve Phase Roadmap (Level 3)
Improve Phase Roadmap (Level 3)Improve Phase Roadmap (Level 3)
Improve Phase Roadmap (Level 3)
Matt Hansen
 
Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)
Matt Hansen
 
Hypothesis Testing: Relationships (Compare 1:1)
Hypothesis Testing: Relationships (Compare 1:1)Hypothesis Testing: Relationships (Compare 1:1)
Hypothesis Testing: Relationships (Compare 1:1)
Matt Hansen
 
Hypothesis Testing: Relationships (Overview)
Hypothesis Testing: Relationships (Overview)Hypothesis Testing: Relationships (Overview)
Hypothesis Testing: Relationships (Overview)
Matt Hansen
 
Hypothesis Testing: Spread (Compare 2+ Factors)
Hypothesis Testing: Spread (Compare 2+ Factors)Hypothesis Testing: Spread (Compare 2+ Factors)
Hypothesis Testing: Spread (Compare 2+ Factors)
Matt Hansen
 

More from Matt Hansen (20)

Control Charts: Recalculating Control Limits
Control Charts: Recalculating Control LimitsControl Charts: Recalculating Control Limits
Control Charts: Recalculating Control Limits
 
Control Charts: U Chart
Control Charts: U ChartControl Charts: U Chart
Control Charts: U Chart
 
Control Charts: P Chart
Control Charts: P ChartControl Charts: P Chart
Control Charts: P Chart
 
Control Charts: Xbar-S Chart
Control Charts: Xbar-S ChartControl Charts: Xbar-S Chart
Control Charts: Xbar-S Chart
 
Control Charts: I-MR Chart
Control Charts: I-MR ChartControl Charts: I-MR Chart
Control Charts: I-MR Chart
 
Control Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control ChartControl Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control Chart
 
Building a Scorecard
Building a ScorecardBuilding a Scorecard
Building a Scorecard
 
Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)
 
Piloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanPiloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot Plan
 
Piloting Solutions: The Process
Piloting Solutions: The ProcessPiloting Solutions: The Process
Piloting Solutions: The Process
 
Prioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixPrioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact Matrix
 
Brainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity DiagramBrainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity Diagram
 
Brainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a WorkoutBrainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a Workout
 
Testing for Multicollinearity
Testing for MulticollinearityTesting for Multicollinearity
Testing for Multicollinearity
 
Compiling Analysis Results
Compiling Analysis ResultsCompiling Analysis Results
Compiling Analysis Results
 
Improve Phase Roadmap (Level 3)
Improve Phase Roadmap (Level 3)Improve Phase Roadmap (Level 3)
Improve Phase Roadmap (Level 3)
 
Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)
 
Hypothesis Testing: Relationships (Compare 1:1)
Hypothesis Testing: Relationships (Compare 1:1)Hypothesis Testing: Relationships (Compare 1:1)
Hypothesis Testing: Relationships (Compare 1:1)
 
Hypothesis Testing: Relationships (Overview)
Hypothesis Testing: Relationships (Overview)Hypothesis Testing: Relationships (Overview)
Hypothesis Testing: Relationships (Overview)
 
Hypothesis Testing: Spread (Compare 2+ Factors)
Hypothesis Testing: Spread (Compare 2+ Factors)Hypothesis Testing: Spread (Compare 2+ Factors)
Hypothesis Testing: Spread (Compare 2+ Factors)
 

Recently uploaded

Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
thesiliconleaders
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Neil Horowitz
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & InnovationInnovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Operational Excellence Consulting
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
SEOSMMEARTH
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
my Pandit
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
GraceKohler1
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
my Pandit
 

Recently uploaded (20)

Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & InnovationInnovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & Innovation
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
 

Building a Project Team with Matt Hansen at StatStuff

  • 1. Section & Lesson #: Pre-Requisite Lessons: Complex Tools + Clear Teaching = Powerful Results Building a Project Team Six Sigma-Define – Lesson 4 A review of how to build a project team and stakeholder analysis using the ARMI tool. Introduction #08 – Key Roles in a Lean Six Sigma Project Introduction #12 – CAP Model Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
  • 2. Building a Project Team o How do I build a project team? • Begin with a top-down approach.  When reviewing the project with each level (from the top-down), be sure to ask who the next layer of team members will be. • Talk to each person on the team.  Visit with them 1 on 1 to find out: – Do they agree with the problem statement? – Do they agree with the scope? – Do they agree with who else is on the team? – What is their level of experience/expertise with the problem? – Who are the other potential stakeholders for the project?  Be sure to probe them if they answer “No” to any question. – You may find other team members feel the same way - it may change the entire direction of the project. • Resolve any team conflict immediately.  It’s not uncommon for a Process Owner or SMEs to have conflicting opinions about the project’s direction.  If there’s disagreement on a major point in the project (e.g., priority of the problem/project, scope, etc.), then get it resolved quickly! Don’t ignore it! – Some team members may not tell you about their disagreement or lack of support, but their behavior may indicate it (e.g., won’t return calls/emails, late for meetings, many negative comments, indifference, etc.). – These people are not “bad apples”; they can often become your greatest advocate. Listen to their perspective and consider elevating their concerns to the team (without making them appear like a naysayer). o Building a project team takes time, but it’s well worth the investment. • Having the right team should give you confidence you’ll find the right solutions more quickly. • If the project is well scoped, the team size should be between 5 to 10 people. Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher. Sponsor > Champion > Process Owner > SMEs >
  • 3. Stakeholder Analysis (ARMI) Defined o What is a Stakeholder Analysis? • It’s a tool to help evaluate who the project stakeholders are and their level of support. o What does ARMI mean? • It refers to the 4 different levels assigned to each stakeholder in the analysis. They are… o What is the purpose of a Stakeholder Analysis? • To understand all the different business areas affected by the project. • To identify potential gaps or conflicts in the level of support by the stakeholders. • To help plan what stakeholders to talk to and how to talk to them to increase their support. o The Stakeholder Analysis (ARMI) helps identify any risk of acceptance. • The goal is not to get a perfectly accurate or agreed upon assessment of each person’s support. • The goal is to identify any perceived or potential gaps in each person’s support.  Each gap represents a risk of “Acceptance” (Q x A = E).  How can we improve the gaps to gain stronger support for the project and help ensure its success? Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher. 3 A Approver of team decisions R Resource whose expertise, skills or clout may be needed M Member of team with authority of the charter I Interested party who should be informed on direction & findings
  • 4. Stakeholder Analysis (ARMI) Example o Below is an example of a Stakeholder Analysis (ARMI): Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher. 4 Define Measure Analyze Improve Control Mickey Mouse Black Belt (Project Leader) M M M M M Strongly Supportive Minnie Mouse Sponsor A A A A A Strongly Supportive Goofy Champion A A A A A Strongly Supportive Pluto Process Owner M M M M M Moderately Supportive Daisy Duck SME 1 M M M M M Low Support Donald Duck SME 2 M M M M M Moderately Supportive Buzz Lightyear VP, Sales (Stakeholder) I I I I I Moderately Supportive Woody VP, Pricing (Stakeholder) I I I I I Moderately Supportive Hamm VP, Marketing (Stakeholder) I I I I I Low Support Rex VP, Training (Stakeholder) I I Moderately Supportive Mr Potato Head VP, Customer Service (Stakeholder) I I I I I Strongly Supportive Mike Wazowski Director, Business Development I R R Moderately Supportive James P Sullivan Master Black Belt (Mentor) I I I I I Strongly Supportive Mr Waternoose Manager, Pricing I I I I I Moderately Supportive Celia Director, Sales I I I I I Low Support Randall Manager, Customer Service R R TBD Roz Business Analyst (Reporting) I R R R R Moderately Supportive Phlegm Bile Data Analyst I R R R R TBD StakeholdersAdd'lSupport Stakeholders Title/Influence Project Phase Stakeholder Analysis CoreTeam Legend: A = Approval of team decisions outside their charter R = Resource to the team; one w hose expertise, skills or clout may be needed on an ad hoc basis M = Member of team w ith the authority and boundaries of the charter I = Interested party, one w ho w ill need to be kept informed on direction and findings, if later support is needed
  • 5. Building a Stakeholder Analysis (ARMI) o How do you build the Stakeholder Analysis (ARMI)? 1. Identify all the core team members, outside stakeholders, and any additional support needed. 2. For each person, identify the type of support each may contribute for each project phase. 3. Estimate the level of support each person may have toward the entire project. 4. Review the analysis with the team to get their feedback. 5. For any stakeholder with less than strong support, discuss with the team how to improve it.  Evaluate the level of risk each person may contribute to the project and prioritize them. Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher. 5 Define Measure Analyze Improve Control Mickey Mouse Black Belt (Project Leader) M M M M M Strongly Supportive Minnie Mouse Sponsor A A A A A Strongly Supportive Goofy Champion A A A A A Strongly Supportive Pluto Process Owner M M M M M Moderately Supportive Daisy Duck SME 1 M M M M M Low Support Donald Duck SME 2 M M M M M Moderately Supportive Buzz Lightyear VP, Sales (Stakeholder) I I I I I Moderately Supportive Woody VP, Pricing (Stakeholder) I I I I I Moderately Supportive Hamm VP, Marketing (Stakeholder) I I I I I Low Support Rex VP, Training (Stakeholder) I I Moderately Supportive Mr Potato Head VP, Customer Service (Stakeholder) I I I I I Strongly Supportive Mike Wazowski Director, Business Development I R R Moderately Supportive James P Sullivan Master Black Belt (Mentor) I I I I I Strongly Supportive Mr Waternoose Manager, Pricing I I I I I Moderately Supportive Celia Director, Sales I I I I I Low Support Randall Manager, Customer Service R R TBD Roz Business Analyst (Reporting) I R R R R Moderately Supportive Phlegm Bile Data Analyst I R R R R TBD StakeholdersAdd'lSupport Stakeholders Title/Influence Project Phase Stakeholder Analysis CoreTeam As core team members, these represent the biggest risk. Start with Daisy, then Donald & Pluto. As executive stakeholders, these are the next biggest risk. Start with Hamm, then the others. As additional support, these represent the least risk. Start with Celia; and consider contacting the others as needed.
  • 6. Practical Application o Think of 2 project teams you were part of (personally or at work) and answer the following questions: • Were the roles and expectations clearly defined for each team?  If not, then what impact did this cause? (i.e., confusion, political battles, lack of participation, etc.) • Was there anyone that had low support at the beginning of the project?  If so, then how did the project leader (or others) handle this?  Did the support from that person improve by the end of the project? – If so, then what do you think influenced it the change? • Was there anyone that started with high support but later decreased to low support?  If so, then how did the project leader (or others) handle this?  What do you think influenced the change in their level of support? • What would you do differently in building a team that could prevent some problems that you may have experienced in the other project teams? Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher. 6