Topics of Discussion Recap of our Project  Project Scheduled  Client / Server Connection  Lookup State  Cross Platform Access  Conclusion
Recap of our project Existing System  Network uses IPv4. Lack of Addressing Space. Lack of Security. Proposed System Implementation of IPv6. Increased address space 128 bits = 340 trillion 3  addresses. Integrated security features.
Topics of Discussion Recap of our Project  Project Scheduled  Client / Server Connection  Lookup State  Cross Platform Access  Conclusion
Our Project Scheduled Module 1   Kernel Compilation and Creation of Batch Work.  Module 2   DNS Configuration Settings. Module 3 Establishing Connection between Client and Server. Module 4 Cross Platform Resource Access. Module 5 Testing our Project modules in System Testing.
Topics of Discussion Recap of our Project  Project Scheduled  Client / Server Connection  Lookup State  Cross Platform Access  Conclusion
Registering the Clients with the Server through desired port number.  Check the status of server for adding the clients in the network access. It can be done by specifying the IPv6 address for each of the clients available in the network. Client / Server Connection
Snapshots for Client and Server conn.
Topics of Discussion Recap of our Project  Project Scheduled  Client / Server Connection  Lookup State  Cross Platform Access  Conclusion
Lookup State Initially the Server state is enabled. The Client checks the Server status  through desired port number. If the server is not responding the clients produces an error message  “ The server is not active”.
Snap shot for Lookup State
Snap shot for Lookup State
Topics of Discussion Recap of our Project  Project Scheduled  Client / Server Connection  Lookup State  Cross Platform Access  Conclusion
Server is under RedHat Linux with IPv6 Support. Client may be Windows / Linux family with IPv4 support. Enabling the IPV6 Support in Client / Server Machines by service packs or kernel Modules. Finally, Messages and Files can be Transferred regardless of the platform. Cross Platform Resource Access
Snap Shot  of IPv6 DNS Panel
Snap Shot of IPv4 DNS Record
Snap Shot of IPv6 DNS Record
Topics of Discussion Recap of our Project  Project Scheduled  Client / Server Connection  Lookup State  Cross Platform Access  Conclusion
Conclusion Long-term solution, Scalable, Reliable, Manageable Secure and High-performance IP networks.  Resolving IPv6 and IPv4 name servers in network. The  Future Enhancement   for our project involves: Implementation of IPv6 Name Server. Implementation of DHCP Name Server. Implementation of SAMBA Server.
Questions? Thanks for your attention Any questions?
<<<<< Thanks to u all >>>>>

Building a Linux IPv6 DNS Server Project review PPT v3.0

  • 1.
  • 2.
    Guided by ShankarS. M.E Academic Project Review Compiled by Linux Professionals Team
  • 3.
    Topics of DiscussionRecap of our Project Project Scheduled Client / Server Connection Lookup State Cross Platform Access Conclusion
  • 4.
    Recap of ourproject Existing System Network uses IPv4. Lack of Addressing Space. Lack of Security. Proposed System Implementation of IPv6. Increased address space 128 bits = 340 trillion 3 addresses. Integrated security features.
  • 5.
    Topics of DiscussionRecap of our Project Project Scheduled Client / Server Connection Lookup State Cross Platform Access Conclusion
  • 6.
    Our Project ScheduledModule 1 Kernel Compilation and Creation of Batch Work. Module 2 DNS Configuration Settings. Module 3 Establishing Connection between Client and Server. Module 4 Cross Platform Resource Access. Module 5 Testing our Project modules in System Testing.
  • 7.
    Topics of DiscussionRecap of our Project Project Scheduled Client / Server Connection Lookup State Cross Platform Access Conclusion
  • 8.
    Registering the Clientswith the Server through desired port number. Check the status of server for adding the clients in the network access. It can be done by specifying the IPv6 address for each of the clients available in the network. Client / Server Connection
  • 9.
    Snapshots for Clientand Server conn.
  • 10.
    Topics of DiscussionRecap of our Project Project Scheduled Client / Server Connection Lookup State Cross Platform Access Conclusion
  • 11.
    Lookup State Initiallythe Server state is enabled. The Client checks the Server status through desired port number. If the server is not responding the clients produces an error message “ The server is not active”.
  • 12.
    Snap shot forLookup State
  • 13.
    Snap shot forLookup State
  • 14.
    Topics of DiscussionRecap of our Project Project Scheduled Client / Server Connection Lookup State Cross Platform Access Conclusion
  • 15.
    Server is underRedHat Linux with IPv6 Support. Client may be Windows / Linux family with IPv4 support. Enabling the IPV6 Support in Client / Server Machines by service packs or kernel Modules. Finally, Messages and Files can be Transferred regardless of the platform. Cross Platform Resource Access
  • 16.
    Snap Shot of IPv6 DNS Panel
  • 17.
    Snap Shot ofIPv4 DNS Record
  • 18.
    Snap Shot ofIPv6 DNS Record
  • 19.
    Topics of DiscussionRecap of our Project Project Scheduled Client / Server Connection Lookup State Cross Platform Access Conclusion
  • 20.
    Conclusion Long-term solution,Scalable, Reliable, Manageable Secure and High-performance IP networks. Resolving IPv6 and IPv4 name servers in network. The Future Enhancement for our project involves: Implementation of IPv6 Name Server. Implementation of DHCP Name Server. Implementation of SAMBA Server.
  • 21.
    Questions? Thanks foryour attention Any questions?
  • 22.
    <<<<< Thanks tou all >>>>>