This document is a practicum submitted by CW2 Todd D. Brown to Roger Williams University in partial fulfillment of requirements for an Industrial Technology degree. It discusses Brown's efforts to implement Total Quality Management principles at the Indiana Army National Guard Field Maintenance Shop #3. The document focuses on three areas for improvement: parts management, tool storage, and final inspection procedures. For parts management, Brown analyzes issues like excessive inventory and inefficient storage locations. He plans to define problems, measure metrics, and improve processes to streamline parts management.
The document provides an overview of training on electrical systems, including:
1. It describes the main components of a power supply system such as transformers, circuit breakers, lightning arresters, and isolators.
2. It discusses different types of maintenance including planned maintenance like preventative and predictive maintenance, and unplanned maintenance like emergency and breakdown maintenance.
3. It emphasizes the importance of documentation in maintenance to analyze breakdowns and reduce downtime.
The document discusses the maintenance management activities at Shahi Exports Unit 12. It outlines the planning, maintenance, and improvement activities carried out by the maintenance department. The department plans machinery in advance, arranges machines for batch setting, and provides work aids to enhance productivity. It aims to reduce downtime and maintain machines in good working condition through scheduled maintenance. The department also coordinates with other departments on future styles and product requirements. The overall goal is to improve processes through methods like Total Productive Maintenance which focuses on continuous improvement, employee involvement, and measurement of results.
The document discusses maintenance and reliability in operations management. It defines maintenance as activities to keep equipment working and reliability as the probability equipment will function properly for a specified time. The document outlines different types of maintenance like preventive and breakdown maintenance. It discusses how to improve reliability through improving individual components and providing redundancy. It also discusses techniques to improve maintenance like implementing preventive maintenance, increasing repair capabilities, and total productive maintenance. Cost comparisons are provided between preventive and breakdown maintenance.
Maintenance management involves planning, organizing, and directing resources to control the availability and performance of industrial plants. It aims to minimize downtime and repair costs while maximizing efficiency, prolonging asset life, and ensuring quality production. Effective maintenance management requires categorizing maintenance needs, prioritizing objectives like uptime and safety, and planning using approaches such as total productive maintenance which emphasizes prevention, employee involvement, and continuous improvement.
This document presents a case study on implementing an effective preventive maintenance (PM) scheduling system. It analyzes PM practices in a semiconductor company with 109 machines and identifies issues like inefficient scheduling and lack of prioritization of critical machines. Data on machine downtimes from January to September 2011 is collected and the highest downtime months/machines are identified. Root cause analysis finds the main causes are wear and tear from chemicals and technical issues. The document proposes clustering machines, distinguishing critical machines, integrating PM with production planning, and training technicians to help reduce downtimes and improve PM effectiveness.
This document discusses various maintenance policies and strategies. It describes different types of maintenance tasks including breakdown maintenance, planned maintenance (preventive maintenance, corrective maintenance, predictive maintenance, condition-based maintenance, and reliability-centered maintenance). Preventive maintenance aims to eliminate breakdowns and deviations from optimal operating conditions. Predictive maintenance uses equipment operating data to optimize plant operations. Condition-based maintenance techniques include vibration monitoring, thermography, tribology, and electrical motor analysis. The document also covers lubrication methods like hydrostatic, hydrodynamic, boundary, and extreme pressure lubrication. Automatic lubrication systems include single line parallel, dual line parallel, single line progressive, mist lubrication, and multi-port direct lubrication systems.
Maintenance management aims to minimize equipment breakdowns and maximize asset availability for production. It involves planning and controlling maintenance activities to reduce overall costs. Preventive maintenance through periodic inspections and repairs helps anticipate failures, improve productivity and quality, and minimize accidents and repair costs compared to reactive breakdown maintenance. While preventive maintenance is more expensive initially, it has long-term benefits like increased equipment life, higher reliability, and reduced downtime.
Principles and practices of maintenance planningMudit M. Saxena
The document discusses principles and practices of maintenance planning. It covers topics like objectives of maintenance planning, reliability measures like MTBF and MTTR, and importance of maintenance systems. The key objectives of maintenance planning are to maximize production capacity at lowest cost, reduce breakdowns, and optimize resource utilization. Reliability is defined as the probability that an item will perform its intended function for a specified time period. MTBF is the average time between failures, while MTTR is the average time required to repair a failure and return the equipment to working order.
The document provides an overview of training on electrical systems, including:
1. It describes the main components of a power supply system such as transformers, circuit breakers, lightning arresters, and isolators.
2. It discusses different types of maintenance including planned maintenance like preventative and predictive maintenance, and unplanned maintenance like emergency and breakdown maintenance.
3. It emphasizes the importance of documentation in maintenance to analyze breakdowns and reduce downtime.
The document discusses the maintenance management activities at Shahi Exports Unit 12. It outlines the planning, maintenance, and improvement activities carried out by the maintenance department. The department plans machinery in advance, arranges machines for batch setting, and provides work aids to enhance productivity. It aims to reduce downtime and maintain machines in good working condition through scheduled maintenance. The department also coordinates with other departments on future styles and product requirements. The overall goal is to improve processes through methods like Total Productive Maintenance which focuses on continuous improvement, employee involvement, and measurement of results.
The document discusses maintenance and reliability in operations management. It defines maintenance as activities to keep equipment working and reliability as the probability equipment will function properly for a specified time. The document outlines different types of maintenance like preventive and breakdown maintenance. It discusses how to improve reliability through improving individual components and providing redundancy. It also discusses techniques to improve maintenance like implementing preventive maintenance, increasing repair capabilities, and total productive maintenance. Cost comparisons are provided between preventive and breakdown maintenance.
Maintenance management involves planning, organizing, and directing resources to control the availability and performance of industrial plants. It aims to minimize downtime and repair costs while maximizing efficiency, prolonging asset life, and ensuring quality production. Effective maintenance management requires categorizing maintenance needs, prioritizing objectives like uptime and safety, and planning using approaches such as total productive maintenance which emphasizes prevention, employee involvement, and continuous improvement.
This document presents a case study on implementing an effective preventive maintenance (PM) scheduling system. It analyzes PM practices in a semiconductor company with 109 machines and identifies issues like inefficient scheduling and lack of prioritization of critical machines. Data on machine downtimes from January to September 2011 is collected and the highest downtime months/machines are identified. Root cause analysis finds the main causes are wear and tear from chemicals and technical issues. The document proposes clustering machines, distinguishing critical machines, integrating PM with production planning, and training technicians to help reduce downtimes and improve PM effectiveness.
This document discusses various maintenance policies and strategies. It describes different types of maintenance tasks including breakdown maintenance, planned maintenance (preventive maintenance, corrective maintenance, predictive maintenance, condition-based maintenance, and reliability-centered maintenance). Preventive maintenance aims to eliminate breakdowns and deviations from optimal operating conditions. Predictive maintenance uses equipment operating data to optimize plant operations. Condition-based maintenance techniques include vibration monitoring, thermography, tribology, and electrical motor analysis. The document also covers lubrication methods like hydrostatic, hydrodynamic, boundary, and extreme pressure lubrication. Automatic lubrication systems include single line parallel, dual line parallel, single line progressive, mist lubrication, and multi-port direct lubrication systems.
Maintenance management aims to minimize equipment breakdowns and maximize asset availability for production. It involves planning and controlling maintenance activities to reduce overall costs. Preventive maintenance through periodic inspections and repairs helps anticipate failures, improve productivity and quality, and minimize accidents and repair costs compared to reactive breakdown maintenance. While preventive maintenance is more expensive initially, it has long-term benefits like increased equipment life, higher reliability, and reduced downtime.
Principles and practices of maintenance planningMudit M. Saxena
The document discusses principles and practices of maintenance planning. It covers topics like objectives of maintenance planning, reliability measures like MTBF and MTTR, and importance of maintenance systems. The key objectives of maintenance planning are to maximize production capacity at lowest cost, reduce breakdowns, and optimize resource utilization. Reliability is defined as the probability that an item will perform its intended function for a specified time period. MTBF is the average time between failures, while MTTR is the average time required to repair a failure and return the equipment to working order.
1) Maintenance is defined as actions intended to retain or restore an item to a state in which it can perform its required function.
2) There are different types of maintenance including preventive maintenance, which aims to reduce failures before they occur; corrective maintenance, which repairs items after failure; and run-to-failure maintenance, which only repairs items after breakdown.
3) Attitudes toward maintenance have changed over time from seeing it as only a cost to recognizing its role in production, quality, safety, and the environment. Modern companies rely on well-organized maintenance programs for success.
The document discusses principles and practices of maintenance planning. It covers key topics like maintenance, planning concepts, types of planning, maintenance planning, objectives of maintenance planning, principles of maintenance, reliability, need for reliability in maintenance, failure pattern of equipment, and failure density. The main points are:
- Maintenance ensures machines are kept in normal operating condition to deliver expected performance without damage.
- Planning ensures smooth system operation by converting concepts into actions like long, short, and immediate activity planning.
- Maintenance planning organizes resources to carry out jobs satisfactorily at reasonable cost within a specified time.
- Objectives include minimizing breakdowns and keeping plants in optimum working condition at lowest cost.
This document outlines the importance of maintenance for equipment and outlines objectives and types of maintenance systems. The key objectives of maintenance are to improve reliability, increase asset life, ensure operational readiness, enable safe production, prevent waste, and support more sophisticated automation. There are two main types of maintenance systems - repair maintenance which addresses breakdowns, and preventive maintenance which aims to prevent breakdowns. Effective maintenance planning and control involves scheduling work, controlling costs, maintaining staffing, and ensuring continuity of production and automation.
Computerized Maintenance Management Systems (CMMS) programs help organizations improve maintenance efficiency and cost control by eliminating paper-based systems. They provide features like preventive maintenance scheduling, automatic work order updates, inventory control, and predictive maintenance analysis. Implementing a CMMS can help maintenance departments shift from reactive to preventive maintenance, reduce downtime, capture employee knowledge, and generate reports to optimize processes.
Plant maintenance involves keeping industrial plants in good operating condition through day-to-day problem solving and resource management. It aims to control and improve plant availability and performance. Maintenance includes both corrective actions to restore facilities as well as preventive maintenance like lubrication, inspection, and condition monitoring to predict and prevent failures. The goal is to minimize downtime and repair costs while ensuring safety, quality production, and prolonging equipment life. Preventive maintenance is particularly important, requiring careful planning, record keeping, and parameter monitoring using specialized equipment. Both too much and too little preventive maintenance can be problematic, requiring judgment to determine the optimal approach.
This document discusses different types of maintenance strategies. It defines maintenance as activities carried out to keep equipment in optimal working condition at minimum cost. Breakdown maintenance involves repair only after failure, while preventive maintenance aims to reduce failures through scheduled inspections and repairs. Predictive maintenance uses equipment monitoring and statistical analysis to predict and prevent failures. The strategies discussed range from reactive breakdown repair to proactive preventive and predictive approaches aimed at improving equipment reliability and productivity.
Check Interval Escalation, this is a hard topic for airlines, it mostly deliver and governed by aircraft manufactures, it needs a strong back ground in statistics, but it has a great impact on maintenance cost, and it is not widely familiar and implemented in the airline industry.
This presentation discusses trends in maintenance management. It covers different maintenance management systems from reactive to preventative to predictive. Reactive maintenance only repairs after failure, while preventative maintenance follows scheduled maintenance. Predictive maintenance uses condition monitoring to detect and diagnose faults. Total productive maintenance involves participation from all employees. Computerized maintenance management systems use software to manage maintenance operations and produce reports. In conclusion, while new trends emerge, older approaches still have applications, and maintenance management will play a larger role as industries grow more automated.
The document discusses the importance of maintenance for productivity, quality, safety and profitability. It outlines different types of maintenance including corrective, preventive and predictive maintenance. Corrective maintenance involves repairs after equipment fails, while preventive maintenance aims to reduce breakdowns through scheduled inspections and minor repairs. The benefits of preventive maintenance include reduced downtime, lower repair costs, improved safety and quality, and extended equipment lifespan. The document emphasizes that the costs of equipment failure, including lost production and delayed shipments, can outweigh the costs of proper maintenance.
The document discusses principles and practices of maintenance planning in engineering systems. It describes key concepts like maintenance engineering, types of planning, objectives of planned maintenance, principles of maintenance systems, reliability measures like MTBF and MTTR, maintenance organization structures, and maintenance economics and costs. The overall goal of maintenance planning is to optimize equipment availability and performance at lowest cost through reliable maintenance strategies.
The document discusses maintenance policies and work order processes. It provides details on different types of maintenance policies including failure based, time based, condition based, and risk based approaches. It then describes the purpose and benefits of work orders, including recording downtime data, ensuring repairs are completed properly, and providing a source for planning and key performance indicators. Guidelines are provided on the information included in work orders like inventory details, requestor information, work descriptions, and actual completion details. The work order system and typical flow from generation to completion is outlined.
Maintenance and Operation Management-Emergency Management System YoungTae (Henry) Huh
This document provides an overview of maintenance and operation for an Emergency Management System (EMS) case study in Bangladesh. It describes the key components of an EMS including software, hardware, network architecture and users. It then covers various aspects of maintaining and operating the EMS such as defining maintenance and operations, the management process, necessary systems and tools, required organization and human resources, different phases and types of maintenance. It also discusses methods, procedures and checks for regular and special maintenance of the EMS.
This document discusses maintenance management. It outlines different types of maintenance including breakdown, preventive, predictive, routine, and planned maintenance. The objectives of maintenance are to minimize downtime and costs while keeping assets operational. Maintenance involves civil, mechanical, and electrical areas. A key point is that total maintenance costs include commitment costs, preventive maintenance costs, and breakdown costs, with the optimal policy balancing these to achieve the lowest overall costs.
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...IRJET Journal
This document discusses the effective implementation of planned maintenance at a gas producing plant using Total Productive Maintenance (TPM) methodology. It begins by introducing TPM and explaining that planned maintenance is one of its pillars, with the goal of optimizing equipment efficiency through scheduled maintenance tasks. The document then provides details of the planned maintenance program implemented at a specific gas producing plant, including developing maintenance plans and schedules based on failure analysis, performing preventative maintenance to reduce failures and increase equipment availability, and tracking metrics like mean time between failures and mean time to repair to measure improvements. In summary, the document outlines how a gas plant used planned maintenance as part of TPM to increase equipment uptime and reduce maintenance costs.
This document provides an overview of maintenance concepts for business students. It defines maintenance and maintenance management, and describes different types of maintenance including corrective, preventive, predictive, routine and planned maintenance. It also discusses spares management in terms of insurance, capital and reusable spares. Other topics covered include maintenance policy and scheduling, types of failures based on normal and Poisson distributions, and self-assessment questions.
The document discusses methods for extending maintenance check intervals for aircraft to increase availability and reduce costs. It proposes using reliability data from aircraft systems to determine if check intervals can be safely increased through analytical approaches like Weibull analysis. A case study models extending a check C interval from 1600 to 2000 flight hours for a hydraulic system. Statistical tests of reliability parameters from the system's data over several years would need to support the interval extension without adversely affecting safety.
MS-57 JULY DECEMBER 2016 SOLVED ASSIGNMENTignou4you
This document provides information on conducting a maintenance audit through preparing a questionnaire. The key points are:
1. A maintenance audit evaluates the effectiveness of a maintenance program and identifies areas for improvement.
2. A questionnaire is prepared covering issues related to maintenance management. It is circulated in advance and the responses are compiled.
3. The audit examines organizational performance areas like maintenance effectiveness, service response time, and breakdown analysis reporting.
4. The audit provides an effectiveness rating, identifies areas for improvement, and highlights potential productivity gains. It evaluates components like planning, documentation, resources, and management support.
This document provides information on Flexible Manufacturing Systems (FMS) and Automated Guided Vehicle Systems (AGVS). It defines FMS and describes its key components, types, flexibility, planning and control. It also defines AGVS, discusses its applications and benefits, and describes vehicle guidance technologies and management systems used to control traffic and dispatch vehicles.
If you want to help or donate please donate at my paypal:
dyokimura@gmail.com
Credits:
NJM
MM
SUPPORT ME:
https://www.buymeacoffee.com/dyokimura6
CHECK MY GAMING CHANNEL:
https://www.youtube.com/channel/UCoKOObshfyyxhVkw1VjyQNA
Piyush Kumar Srivastav has over 6 years of experience in project handling, coordination, documentation, recruitment, and operations. He has worked on projects in the pharmaceutical, education, and legal industries. Currently, he works as an Executive Operation at SHRIRAM NEW HORIZONS LTD where he is responsible for recruitment, salary administration, billing, and database management for various government projects.
1) Maintenance is defined as actions intended to retain or restore an item to a state in which it can perform its required function.
2) There are different types of maintenance including preventive maintenance, which aims to reduce failures before they occur; corrective maintenance, which repairs items after failure; and run-to-failure maintenance, which only repairs items after breakdown.
3) Attitudes toward maintenance have changed over time from seeing it as only a cost to recognizing its role in production, quality, safety, and the environment. Modern companies rely on well-organized maintenance programs for success.
The document discusses principles and practices of maintenance planning. It covers key topics like maintenance, planning concepts, types of planning, maintenance planning, objectives of maintenance planning, principles of maintenance, reliability, need for reliability in maintenance, failure pattern of equipment, and failure density. The main points are:
- Maintenance ensures machines are kept in normal operating condition to deliver expected performance without damage.
- Planning ensures smooth system operation by converting concepts into actions like long, short, and immediate activity planning.
- Maintenance planning organizes resources to carry out jobs satisfactorily at reasonable cost within a specified time.
- Objectives include minimizing breakdowns and keeping plants in optimum working condition at lowest cost.
This document outlines the importance of maintenance for equipment and outlines objectives and types of maintenance systems. The key objectives of maintenance are to improve reliability, increase asset life, ensure operational readiness, enable safe production, prevent waste, and support more sophisticated automation. There are two main types of maintenance systems - repair maintenance which addresses breakdowns, and preventive maintenance which aims to prevent breakdowns. Effective maintenance planning and control involves scheduling work, controlling costs, maintaining staffing, and ensuring continuity of production and automation.
Computerized Maintenance Management Systems (CMMS) programs help organizations improve maintenance efficiency and cost control by eliminating paper-based systems. They provide features like preventive maintenance scheduling, automatic work order updates, inventory control, and predictive maintenance analysis. Implementing a CMMS can help maintenance departments shift from reactive to preventive maintenance, reduce downtime, capture employee knowledge, and generate reports to optimize processes.
Plant maintenance involves keeping industrial plants in good operating condition through day-to-day problem solving and resource management. It aims to control and improve plant availability and performance. Maintenance includes both corrective actions to restore facilities as well as preventive maintenance like lubrication, inspection, and condition monitoring to predict and prevent failures. The goal is to minimize downtime and repair costs while ensuring safety, quality production, and prolonging equipment life. Preventive maintenance is particularly important, requiring careful planning, record keeping, and parameter monitoring using specialized equipment. Both too much and too little preventive maintenance can be problematic, requiring judgment to determine the optimal approach.
This document discusses different types of maintenance strategies. It defines maintenance as activities carried out to keep equipment in optimal working condition at minimum cost. Breakdown maintenance involves repair only after failure, while preventive maintenance aims to reduce failures through scheduled inspections and repairs. Predictive maintenance uses equipment monitoring and statistical analysis to predict and prevent failures. The strategies discussed range from reactive breakdown repair to proactive preventive and predictive approaches aimed at improving equipment reliability and productivity.
Check Interval Escalation, this is a hard topic for airlines, it mostly deliver and governed by aircraft manufactures, it needs a strong back ground in statistics, but it has a great impact on maintenance cost, and it is not widely familiar and implemented in the airline industry.
This presentation discusses trends in maintenance management. It covers different maintenance management systems from reactive to preventative to predictive. Reactive maintenance only repairs after failure, while preventative maintenance follows scheduled maintenance. Predictive maintenance uses condition monitoring to detect and diagnose faults. Total productive maintenance involves participation from all employees. Computerized maintenance management systems use software to manage maintenance operations and produce reports. In conclusion, while new trends emerge, older approaches still have applications, and maintenance management will play a larger role as industries grow more automated.
The document discusses the importance of maintenance for productivity, quality, safety and profitability. It outlines different types of maintenance including corrective, preventive and predictive maintenance. Corrective maintenance involves repairs after equipment fails, while preventive maintenance aims to reduce breakdowns through scheduled inspections and minor repairs. The benefits of preventive maintenance include reduced downtime, lower repair costs, improved safety and quality, and extended equipment lifespan. The document emphasizes that the costs of equipment failure, including lost production and delayed shipments, can outweigh the costs of proper maintenance.
The document discusses principles and practices of maintenance planning in engineering systems. It describes key concepts like maintenance engineering, types of planning, objectives of planned maintenance, principles of maintenance systems, reliability measures like MTBF and MTTR, maintenance organization structures, and maintenance economics and costs. The overall goal of maintenance planning is to optimize equipment availability and performance at lowest cost through reliable maintenance strategies.
The document discusses maintenance policies and work order processes. It provides details on different types of maintenance policies including failure based, time based, condition based, and risk based approaches. It then describes the purpose and benefits of work orders, including recording downtime data, ensuring repairs are completed properly, and providing a source for planning and key performance indicators. Guidelines are provided on the information included in work orders like inventory details, requestor information, work descriptions, and actual completion details. The work order system and typical flow from generation to completion is outlined.
Maintenance and Operation Management-Emergency Management System YoungTae (Henry) Huh
This document provides an overview of maintenance and operation for an Emergency Management System (EMS) case study in Bangladesh. It describes the key components of an EMS including software, hardware, network architecture and users. It then covers various aspects of maintaining and operating the EMS such as defining maintenance and operations, the management process, necessary systems and tools, required organization and human resources, different phases and types of maintenance. It also discusses methods, procedures and checks for regular and special maintenance of the EMS.
This document discusses maintenance management. It outlines different types of maintenance including breakdown, preventive, predictive, routine, and planned maintenance. The objectives of maintenance are to minimize downtime and costs while keeping assets operational. Maintenance involves civil, mechanical, and electrical areas. A key point is that total maintenance costs include commitment costs, preventive maintenance costs, and breakdown costs, with the optimal policy balancing these to achieve the lowest overall costs.
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...IRJET Journal
This document discusses the effective implementation of planned maintenance at a gas producing plant using Total Productive Maintenance (TPM) methodology. It begins by introducing TPM and explaining that planned maintenance is one of its pillars, with the goal of optimizing equipment efficiency through scheduled maintenance tasks. The document then provides details of the planned maintenance program implemented at a specific gas producing plant, including developing maintenance plans and schedules based on failure analysis, performing preventative maintenance to reduce failures and increase equipment availability, and tracking metrics like mean time between failures and mean time to repair to measure improvements. In summary, the document outlines how a gas plant used planned maintenance as part of TPM to increase equipment uptime and reduce maintenance costs.
This document provides an overview of maintenance concepts for business students. It defines maintenance and maintenance management, and describes different types of maintenance including corrective, preventive, predictive, routine and planned maintenance. It also discusses spares management in terms of insurance, capital and reusable spares. Other topics covered include maintenance policy and scheduling, types of failures based on normal and Poisson distributions, and self-assessment questions.
The document discusses methods for extending maintenance check intervals for aircraft to increase availability and reduce costs. It proposes using reliability data from aircraft systems to determine if check intervals can be safely increased through analytical approaches like Weibull analysis. A case study models extending a check C interval from 1600 to 2000 flight hours for a hydraulic system. Statistical tests of reliability parameters from the system's data over several years would need to support the interval extension without adversely affecting safety.
MS-57 JULY DECEMBER 2016 SOLVED ASSIGNMENTignou4you
This document provides information on conducting a maintenance audit through preparing a questionnaire. The key points are:
1. A maintenance audit evaluates the effectiveness of a maintenance program and identifies areas for improvement.
2. A questionnaire is prepared covering issues related to maintenance management. It is circulated in advance and the responses are compiled.
3. The audit examines organizational performance areas like maintenance effectiveness, service response time, and breakdown analysis reporting.
4. The audit provides an effectiveness rating, identifies areas for improvement, and highlights potential productivity gains. It evaluates components like planning, documentation, resources, and management support.
This document provides information on Flexible Manufacturing Systems (FMS) and Automated Guided Vehicle Systems (AGVS). It defines FMS and describes its key components, types, flexibility, planning and control. It also defines AGVS, discusses its applications and benefits, and describes vehicle guidance technologies and management systems used to control traffic and dispatch vehicles.
If you want to help or donate please donate at my paypal:
dyokimura@gmail.com
Credits:
NJM
MM
SUPPORT ME:
https://www.buymeacoffee.com/dyokimura6
CHECK MY GAMING CHANNEL:
https://www.youtube.com/channel/UCoKOObshfyyxhVkw1VjyQNA
Piyush Kumar Srivastav has over 6 years of experience in project handling, coordination, documentation, recruitment, and operations. He has worked on projects in the pharmaceutical, education, and legal industries. Currently, he works as an Executive Operation at SHRIRAM NEW HORIZONS LTD where he is responsible for recruitment, salary administration, billing, and database management for various government projects.
This curriculum vitae summarizes the career of Dr. Lance K. Gordon, including his extensive experience in vaccine development and leadership of biotechnology companies. He has held roles such as Director of Neglected Infectious Diseases at the Bill & Melinda Gates Foundation, President and CEO of multiple vaccine companies, and clinical roles earlier in his career. Dr. Gordon has overseen numerous vaccine development programs and clinical trials, with a focus on infectious diseases affecting developing countries.
In this file, you can ref interview materials for product such as types of interview questions, product situational interview, product behavioral interview…
The document discusses the various technologies used to create a film. It describes using Photoshop to create graphics, Premier Pro for editing and creating an animatic. Hardware used included a digital camera, boom box, and tripod. Software applications like Premier Pro were used for editing despite initial difficulties learning the programs. Various websites like Blogger, YouTube, Prezi and SlideShare were employed to share elements of the work. Creating the film helped develop skills in using software programs, cameras and capturing different shot types.
The document provides resources for product interviews, including cover letter samples, tips, resume samples, and examples of different types of interview questions. It lists several websites that offer free ebooks and guides on topics like cover letters, interview questions and answers, secrets to winning job interviews, and job search strategies. The resources listed are intended to help candidates prepare for and succeed in product-related job interviews.
קלאב 4 יו הינה חברה שנותנת שירות להגרלות הלוטו של מפעל הפיס.
שירותי החברה כוללים מילוי אוטומטי של טפסי הלוטו, שליחתם, בדיקתם, עדכוני זכיות
והעברתם ישירות לחשבון בנק הלקוח.
שירות לקוחות - קלאב פור יו:
072-2507752/4
א'-ה':9:00 - 15:00
This short document promotes creating presentations using Haiku Deck on SlideShare. It encourages the reader to get started making their own Haiku Deck presentation by providing a button to click to begin the process. The document is advertising the ability to easily create presentations on SlideShare using Haiku Deck.
Parental investment theory proposes that the differences in reproductive strategies between males and females stem from their differing levels of minimal parental investment. For females, pregnancy and lactation require extensive energetic resources, limiting the number of offspring that can be produced. In contrast, males can father many offspring with minimal investment. As a result, females evolve to be more selective in choosing mates who can provide resources, while males benefit from pursuing multiple mating partners. This theory helps explain sex differences in mate preferences, jealousy, and parent-offspring conflicts as organisms strive to maximize their inclusive fitness within the constraints of their biological roles.
The document discusses supply chain management. It defines a supply chain as a network of facilities that procure materials, transform them into products, and deliver products to customers. It discusses key aspects of supply chain management including customer service, inventory management, and flexibility. Customer service depends on maintaining appropriate inventory levels while balancing the costs of inventory against lost sales from stockouts. Flexibility is the ability to respond to changes and depends on flexibility throughout the entire supply chain. The document outlines common pitfalls in inventory management and discusses the effects of globalization on increasing supply chain complexity.
The document discusses various aspects of maintenance management policies, including:
1. Policies around work allocation, such as determining the appropriate level of scheduling, selection of jobs to schedule, and balancing preventive and breakdown maintenance.
2. Policies regarding the workforce, including deciding whether to use an in-house workforce or outside contractors, and factors to consider in that decision.
3. General policies cover areas like interplant relations and control of the maintenance function.
CMMS- Streamlining Maintenance management for Food and Beverage Industry to c...ijmvsc
CMMS stands for Computerized Maintenance Management System. In today’s world, when technology is advancing each day at an astonishing rate, any organization must have a detailed knowledge and understanding of its current state of machinery, the number of resources spent on the production floor to maintain equipment reliability, and resource allocation. CMMS is a critical and powerful tool that assists and helps any manufacturing industry to make full use of its capabilities, manage or direct workforce, improve the machine reliability, find innovative ways to improve productivity, stay in compliance with food and dietary regulatory standards as per the safe quality foods (SQF) and national sanitation foundation (NSF) standards and achieve series of goal and benefits the organization overall. Today, the food and beverage industry has grown tremendously and is the backbone of the manufacturing industry. Every company looks at creative ways to help them excel by selecting a reliable CMMS that suits their operations and processes to make educated decisions by monitoring their KPIs. This theoretical study aims to provide a building framework to set up plant maintenance modules to manage work orders, including emergency breakdowns and scheduled maintenance repairs in the food and beverage industry.
The document discusses maintenance management. It defines maintenance as keeping equipment operational or repairing it. The objectives of maintenance are increased availability, safety, and optimized costs. Maintenance management involves managing maintenance functions. Common maintenance strategies discussed are breakdown, preventive, predictive, opportunity, and design-out maintenance. Functions of the maintenance department include maintaining equipment, installations, preventive maintenance, condition monitoring, modifications, inventory management, and record keeping. Elements of effective maintenance management discussed are maintenance policy, materials control, work orders, job planning, data recording, and performance measurement.
This document discusses various topics related to fleet maintenance and management. It covers maintenance control cycles, work order systems, record keeping, the structure of maintenance control systems, types of work orders, the work order process flow, vehicle maintenance record keeping, maintenance cost control, and quality control.
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Ricky Smith CMRP
“It is not possible to manage what you cannot control and you cannot control what you cannot measure!” (Peter Drucker)
Performance measurement is a fundamental principle of management. The measurement of performance is important because it identifies current performance gaps between current and desired performance and provides indication of progress towards closing the gaps. Carefully selected key performance indicators identify precisely where to take action to improve performance.
This paper deals with the identification of key performance indicators for the maintenance function, by first looking at the ways that maintenance performance metrics relate to manufacturing metrics. Since performance measurements for maintenance must include both results metrics and metrics for the process that produces the results, this document presents a representation for the business process for maintenance. The document then identifies typical business process and results metrics that can be used as key performance indicators for the maintenance function.
Planners and schedulers play an important role in optimizing asset utilization and uptime through effective maintenance work planning and scheduling. The document discusses several best practices for planning and scheduling including developing job planning steps, work plans, standard maintenance procedures, ensuring accurate bills of materials, implementing 5S practices, and kitting of planned parts to improve maintenance productivity and asset reliability. Effective planning and scheduling can increase effective maintenance time from an average of 2.5 hours per day to over 45-55% of the work day.
Ml0010 warehousing and supply chain managementsmumbahelp
The document provides sample assignments and questions for a Master of Business Administration course on Warehousing and Supply Chain Management. It includes 6 sample questions and answers that cover topics such as the meaning of warehousing, dimensions of customer service, drivers of supply chain performance, steps to achieve strategic fit, basics of strategic supply chain management, and factors for assessing suppliers. Students are instructed to send their semester and specialization details to a provided email or call a phone number to receive fully solved assignments.
The document discusses five types of maintenance procedures:
1) Run-to-failure maintenance which can make economic sense for inexpensive, easily replaceable assets.
2) Preventive maintenance which involves dividing equipment into components, selecting maintenance methods and frequencies, and implementing tasks through a CMMS.
3) Corrective maintenance which aims to efficiently address unplanned failures through proper detection, communication, diagnosis and repair procedures.
4) Predictive maintenance which uses techniques like vibration monitoring, infrared inspection and oil sampling to replace components before failure.
5) Improvement maintenance which focuses on eliminating downtime, extending equipment life, and introducing best practices.
Reliability-Centered Maintenance's Role in Asset Performance ManagementUSC Consulting Group
Reliability-Centered Maintenance (RCM) is a systematic approach to determining effective asset maintenance strategies. It examines failure modes, consequences, and objectives to identify applicable preventative maintenance tasks. The document discusses key RCM concepts like the four consequences of failure and corresponding objectives. It provides examples of how informal RCM analysis improved production for a steel pipe manufacturer and candy manufacturer. The conclusion emphasizes that RCM identifies maintenance to minimize failure consequences and ensure asset safety and reliability in a cost-effective manner.
Ml0010 warehousing and supply chain managementsmumbahelp
The document provides information about getting fully solved assignments for the Fall 2013 semester of the Master of Business Administration program. It includes sample assignments, answers, and questions for the course ML0010 - Warehousing and Supply Chain Management. Students can send their semester and specialization details to the email address or call the phone number provided to receive the assignments. The assignments cover topics like the meaning and attributes of warehousing, dimensions of customer service, drivers of supply chain performance, steps for strategic fit, the basics of strategic supply chain management, and factors for assessing and scoring suppliers.
This document summarizes a chapter from an edited book on asset management from a lifecycle perspective. The chapter discusses a 8-phase model for maintenance management that integrates decision areas like defining objectives, prioritizing assets, maintenance strategy, and continuous improvement. It focuses on the importance of life cycle cost analysis (LCCA) in estimating the costs of asset failure over its lifetime. The document introduces the Non-homogeneous Poisson Process model for reliability analysis to estimate failure frequency and costs in LCCA.
This document provides an overview and direction for conducting building condition assessments. It defines key terms like maintenance, preventive maintenance, deferred maintenance, and operations and maintenance. The objectives of condition assessments are to serve as a physical inventory, inform asset valuation by determining deferred maintenance, and identify future work needs. Condition assessments should be coordinated with other required surveys and integrated when possible. The document provides guidance on scheduling assessments and focusing on major repair items over minor ones. The foremost objectives are having standardized inspections, care standards, and cost estimates.
Investigation on Cycle Time Reduction in Production and Implementation of an ...IRJET Journal
This document discusses implementing lean practices and an inventory model in an apparel industry to reduce cycle times and costs. It found that long material delivery times caused production delays. By analyzing activities, it identified fabric delivery as the bottleneck. It then implemented an inventory model using ABC analysis and continuous review to reduce material wait times. This allowed sections to start earlier, reducing cycle time from 27 to 11 days. It concluded that inventory management improved on-time delivery and reduced costs by 6.66% by preventing excess orders.
Maintenance management involves various techniques to keep equipment in proper working condition. These include reactive, preventive, and predictive maintenance. The document outlines the objectives of maintenance as minimizing costs while maintaining equipment reliability. It also discusses maintenance planning, scheduling, and techniques like total productive maintenance (TPM). TPM is a company-wide effort involving all employees to improve equipment effectiveness through approaches like 5S, autonomous maintenance, kaizen, planned maintenance, quality maintenance, training, and safety/environmental protection. The overall goal is to eliminate failures and downtime through optimized maintenance practices.
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )
Towards predictive maintenance for marine sector in malaysiaConference Papers
This research uses machine learning on sensor data from ships to predict failures of components and their remaining useful life. Interviews with marine experts identified significant maintenance items to prioritize for ship supply chains. The results were analyzed to provide recommendations to a government company on implementing predictive analytics and supply chain strategies for ship maintenance in Malaysia.
Reducing Costs of Spares and Inventory LevelsDavid Thompson
This document discusses how Ramsoft (UK) provides training and consultancy services to help companies optimize and reduce costs associated with spare parts inventory. It outlines Ramsoft's 4-day training course which covers topics like improving spare parts data quality, challenging vendor recommendations, effective cataloging and inventory management processes, reliability concepts, setting reorder points and safety stock levels, alternate inventory strategies, and key performance indicators. The training aims to help companies develop strategic plans, audit current practices, optimize stock levels through rationalization, and achieve cost reductions of over 50% in stored inventory values. Case studies show how Ramsoft's services have helped clients improve data quality and reduce line items by up to 60% through standardization and removal of duplicates.
Similar to Brown_IT472.91_Practicum_Final Report (20)
1. 1
“TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS”
By
CW2 Todd D. Brown
Indiana Army National Guard
Field Maintenance Shop (FMS) # 3
2 May 2012
To
Louis M. Swiczewicz, Jr., Ph.D.
School of Continuing Studies
Roger Williams University
A Practicum Presented to Roger Williams University in Partial Fulfillment of the Requirements
for the BS Degree in Industrial Technology.
3. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 3
INTRODUCTION
Over the course of the last three years I have attempted to model and develop my
maintenance facility around the concepts of Total Quality Management (TQM), Lean Operations
as well as incorporate some of the facets of Just In Time (JIT) logistics. I have been a supervisor
of an Indiana Army National Guard maintenance facility for nine years and continue to evaluate
our procedures, protocols and practices as they relate to shop layout, work order management,
inventory management, and tool storage.
Over the last few years I have noticed a need to streamline our operation and make it
more efficient. A couple of specific areas that require attention are parts and tool storage. I
don’t believe our repair parts and special tools are stored properly, which in turn lead to
inefficient operations. Moreover, I believe we have too much inventory on hand. As I was
reviewing some of the key points of interest regarding Lean operations, I turned my attention to a
few focus areas that my facility could possibly improve upon if I can successfully implement
these changes. I believe that there are three significant areas that I need to address in order to
adopt the principles of lean operation, as well as Total Quality Management. The areas are as
follows: Parts Management; Tool Storage; and Final Inspection.
Additionally, as I reviewed the textbook Quality Management for Organization
Excellence by Goetsch and Davis I was drawn to a few chapters that I took particular interest in
and believe I could use to identify, assess, and implement quality management strategies and
techniques within my facility. Some of these areas include: Partnering, Leadership and Change,
Education and Training, and Total Quality Tools. Many of the Total Quality Tools mentioned in
this textbook are keys to the Lean Six Sigma concept of process improvement. There are five
steps of process improvement which are: Define; Measure; Analyze; Improve; and Control
4. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 4
(DMAIC). DMAIC will be the driving force behind this
practicum and the order of precedence is depicted in figure 1 to
the right.
In this practicum, I will layout background history,
significance, procedures used regarding the topic, results and
my recommendations for each TQM topic. Due to the time sensitive nature of this practicum, I
may need to hypothesize recommendations on one or more of these topics.
BACKGROUND AND SIGNIFICANCE (Parts Management)
Parts Management will be the first TQM topic discussed. Prior to 2007, the Indiana
Army National Guard utilized the Standard Army Management Information System (STAMIS)
computer system known as Unit Level Logistics System – Ground (ULLS-G) to manage repair
parts within military units and maintenance facilities. These parts were referred to as the
prescribed load list or PLL. Management and control guidance for PLL stockage is governed by
Army Regulation (AR) 710-2. FMS # 3 stored and managed a significant amount of PLL
belonging to our customers. This PLL stockage was locked within cargo trucks stored at our
maintenance shop.
There was a frame of mind within the Army and specifically the Indiana Army National
Guard of what is known as hoarding. The hoarding of excessive amounts of repair parts and
hardware came to be in large part due to budget constraints. These budget constraints consisted
of two main issues which were the common theme of no funding and secondly the withholding
of repair parts funding until the end of the fiscal year. Some years, Maintenance facilities such as
mine would have to spend large amounts of repair parts funding very quickly. Moreover,
lengthy customer wait time (CWT) and requisition wait time (RWT) caused maintenance
Figure 1
5. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 5
supervisors to be fearful of not having large amounts
of repair parts on hand. These large quantities of
repair parts were considered a security blanket for
equipment readiness. Figure 2 to the right, provides
clarification regarding both CWT and RWT. The acronym SSA stands for Supply Support
Activity, and is basically a warehouse of repair parts. There are numerous SSA’s throughout the
U.S. Army.
There has been a paradigm shift in Army logistics since the mid 1990’s with the
inception of Velocity Management (Dumond et al 2001, ix). The term Velocity Management
was replaced in 2002 with the Army’s current logistics doctrine, and is now known as
Distribution Management. In the fall of 2007, FMS # 3 switched from the Prescribed Load List
to Shop Stock and Bench Stock. It was during this period that FMS # 3 absorbed all repair parts
previously stocked by the six units the facility supported. Distribution Management (DM) is a
system that takes a page right out of six sigma’s five steps of process improvement; utilizing
three of the five steps: define, measure and improve to make the Army’s logistics system more
responsive, effective and efficient.
One of the most significant contributions to the Army logistics system that can be
attributed to DM is the reduction of requisition wait times and customer wait times. These time
reductions are the key elements required to eliminate the need for units and facilities to maintain
large amounts of stock on hand and ties directly into what is known in the civilian sector as Just
In Time logistics.
Figure 2
6. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 6
Figure 3 to the right depicts the
process management techniques of
distribution management and the benefits
derived.
PROCEDURES
Define – The problem revolving around FMS # 3’s parts management system is twofold;
one that has been a perpetual issue of overstockage and also one of storage placement. One
additional area in parts management that requires defining is when mechanics order the wrong
part. As previously stated in the background and significance, there has been a paradigm shift in
the U.S. Army regarding parts stockage. The overstockage of parts has been an ongoing issue at
my facility, and one that I have addressed over the last couple of years. Although I have been
analyzing our stockage levels for quite some time, I felt compelled to show the significant
improvement in this area and further explain a few differences in types of stock. Army
maintenance facilities are authorized to stock either shop stock or bench stock.
“Shop stocks are demand-supported repair parts and consumables stocked within a
support-level maintenance activity. They are used to accomplish maintenance requests or
programmed repair” (Army Regulation (AR) 710-2 2008, 46). Bench stocks are low cost, high
use, consumable repair parts used by maintenance personnel at an unpredictable rate (AR 710-2
2008, 48). A computer database is used to track inventory stockage, demand or usage and
reorder as repair parts are consumed. Inventory of shop stock must be conducted on a quarterly
basis and bench stock on a semi-annual basis. Support activities with large amounts of inventory
on hand will naturally spend a significant amount of time performing these inventories.
Figure 3
7. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 7
The second problem that I will define is the issue of repair parts storage location. The
person responsible for work order and parts management is called the Production Controller
(PC). This person is undoubtedly one of the busiest employees within a maintenance facility. Of
particular note at FMS # 3, is our PC performs the function of two employees since we do not
have a Tool and Parts attendant on staff due to funding constraints. The Tool and Parts
attendant’s duties would encompass inventory control, stockage and issue of both repair parts
and tools. The normal day to day duties of the PC are further complicated by absorbing the
additional responsibilities of the Tool and Parts attendant. The location of the parts storage
conex and the work order storage conex required the PC an enormous amount of travel time
incurred walking across the facility and between the two storage conex’s.
Since this person has an enormous responsibility, I feel compelled to make their day
more efficient which should result in a more effective operation. During the execution of their
duties the PC is required to do the following: acquire repair parts from current stock for work
orders; stock repair parts delivered directly to the shop by commercial vendors; and issue parts to
mechanics for work orders that are ready to come into the facility for repair. Furthermore, the
PC was required to acquire repair parts for work orders from two locations, the first being the
Shop’s repair parts storage and the second being repair parts belonging to our supported units.
The second process was eliminated in the fall of 2007, but I have included this info to
help illuminate the existing problem and also show proof of some improvement prior to this
practicum. Figures 4 and 5 reflect the graphic depiction of the routes the PC must take on a daily
basis to acquire repair parts for work orders, handle direct deliveries and issue parts for work
orders.
9. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 9
The third area within parts management that must be defined is based upon errors in parts
ordering. There are two types of errors that occur that can cost the facility both time and
funding. These two occurrences can happened when a mechanic either orders the wrong part to
repair an equipment deficiency or when the wrong part is ordered based upon misdiagnoses of
the malfunction. Although some of the repair parts that are ordered incorrectly may not be
expensive in nature, the overall effect on the shop operation is very detrimental. The main issue
is the delay of the timely completion of the work order and also places a burden upon the
Production Controller and Shop Supervisor’s ability to perform maintenance management
functions.
Repair cycle time (RCT), is the Army’s metric to track how long a work order takes to
complete. This time is tracked at both the Organizational (Unit) and Support level, and can be
accessed via the Army’s Integrated Logistics Analysis Program (ILAP). Long RCT reflects
poorly upon the support maintenance facility and also inhibit the Supported Unit’s ability to
conduct training or support State Active Duty missions. Moreover, if the wrong part is ordered
and then turned back into the SSA, the Indiana Army National Guard will not recover the
funding. Once the requisition is fulfilled, the Indiana Army Guard will be charged for the repair
part. This further emphasizes the need to order the correct part for the equipment malfunction.
Measure – Shop and bench stock listings are two significant reports that a manager can
use to determine the amount of shop and bench stock lines, quantity of each repair part on hand
for each line, the cost of each line, demands or usage, and the total cost of inventory on hand.
These reports are generated out of the SAMS-E database, and must be kept on file for a
minimum of two years. One of the other metrics that affects parts management is customer wait
10. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 10
time. As previously stated in the introduction, customer wait time is the time measurement of
when a part is requisitioned until the part is received by the customer.
The reduction of inventory of the last few years has reduced the amount of time required
to conduct the inventory. This quarterly shop stock inventory took the PC four days to complete
when the shop stock inventory was between 400 and 600 lines. During a recent shop and bench
stock inventory in March 2012, the amount of time required to conduct the inventory was 1 ½
days for a delta of 2 ½ days per inventory. The shop stock inventory was conducted four times
per year, but the bench stock inventory is only conducted twice per year. Table # 1 displays the
reduction in total inventory since the inception of the SAMS-E system. Moreover, the table also
reflects the transition of shop stock to bench stock while reducing the total number of repair parts
lines within the shop. A line doesn’t reflect the quantity of parts on hand, it is a term used to
reflect a stockage of repair parts. The quantity of a repair parts on hand for a stockage line could
be one to ninety-nine.
Sep-07 Apr-09 Sep-09 Feb-10 Apr-11 Sep-11 Mar-12
Shop Stock 684 470 362 343 4 5 5
Bench Stock 0 0 0 0 183 249 176
Total Lines of
Stock
684 470 362 343 187 254 181
684
470
362 343
4 5 50 0 0 0
183
249
176
684
470
362 343
187
254
181
0
100
200
300
400
500
600
700
800 Lines of Stocked Parts
Table 1
11. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 11
There are two ways our maintenance facility acquires parts required for work order
repair. Parts are requisitioned through the SAMS-E, and then funded via the National Guards
Integrated Material Automation Program (IMAP). IMAP is a web-based program that transmits
the requisition to Indiana’s SSA. If the SSA has the part on hand in their Authorized Storage
Listing (ASL), they will pick the part and place it in the maintenance facility’s repair parts bin.
If the part/s is not on hand, the requisition will be transmitted to the Army’s supply depots;
which are part of the Defense Supply Center network and the Defense Logistics Agency. The
National Guard receives these requisition fulfillments via commercial delivery, which is also
called direct delivery.
These two times directly influence what is known as repair cycle time, and help provide
the justification to maintenance manager’s decisions to reduce on hand inventory. I utilized two
measurement techniques to capture the average CWT for repair parts requisitioned for work
orders. Direct delivery metrics were captured through the use of the Army’s Integrated Logistics
Analysis Program portal that is accessed through the Logistics Information Warehouse (LIW)
website. The report utilized is called the Distribution Management/Supply Chain Metrics/CWT
Summary. Data was pulled from January 2012 to March 2012. Indiana’s SSA average CWT
during this period was six days.
The second metric was established using the SAMS-E report known as the document
control register (DCR). This process involved a few more steps that the CWT summary report.
Each repair part is assigned a document number when the requisition is created in the SAMS-E.
The date the part was ordered is embedded within the document number, and is represented by
the Julian date. All repair parts requested are shown on the DCR. When repair parts requested
are delivered by direct delivery, the PC would enter the date received on the DCR. This data was
12. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 12
captured from 1 Feb 12 through 29 Feb12. I added up the total number of days for each delivery
and divided the sum by the number of orders received. The average CWT during this period was
three days.
One of the other metrics that I needed to determine was the amount of time was necessary
for the PC to acquire repair parts for work orders, handle direct deliveries and issue parts for
work orders. The metric was achieved by first measuring the time required for the PC to walk to
each specific parts location. Three separate times were taken to measure this action.
Furthermore, an average number of events per day were required to determine an average daily
total time. The average number of events per day was based upon the total trips performed for
each action during the month of February 2012. The tasks labeled Pick Part/s for Work Order &
Direct Delivery and Issue Part/s for Work Order in Table 2 and Table 3 reveal the metrics
associated with the PC clerks travel time required to perform his day to day responsibilities.
13. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 13
Parts ordering errors were captured at the production control office. All employees were
briefed about the error data collection, and the need to track any repair part that was incorrectly
ordered. The PC was instructed to enter the number of occurrences, as well as the dollar value
associated with the incorrect parts. This flow of this information is dictated by the shop internal
standard operating procedures. These procedures are specific regarding the flow of work orders
and parts ordering within the shop. This guidance states that work orders are routed through the
production controller each time there is a status change. This status could be a work order
requiring repair parts, a work order that has been completed, or a work order issued to a
mechanic.
The cost associated with each repair part is determined by using the Defense Logistics
Agency (DLA) FEDLOG printout. The DLA FEDLOG system is updated monthly and provides
the user: unit of issue, price, class of supply, recoverability code, and characteristics. Tables 4 &
5 below exhibit the data metrics of the parts ordering errors for FMS # 3.
14. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 14
FEBRUARY MARCH APRIL MAY
Misdiagnosed Repair Cost $0 $0 $0 $0
Wrong Part Ordered Cost $1,400 $31.50 $0 $0
Monthly Cost $1,400 $31.50 $0 $0
$0 $0 $0 $0
$1,400
$31.50 $0 $0
$1,400
$31.50 $0 $0
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
Shop MisdiagnosedRepair& Wrong Parts Cost
FEBRUARY MARCH APRIL MAY
Misdiagnosed Repair* 0 0
Wrong Part Ordered** 1 4
Parts Errors Monthly Total 1 4
0 0
1
4
1
4
0
1
2
3
4
5 Shop MisdiagnosedRepair& Wrong Parts
Table 4
Table 5
15. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 15
RESULTS
Analyze – As I look over the data and tables regarding FMS # 3’s parts management, I
can definitely see areas that can be improved upon. Parts stockage is trending in the right
direction, but needs further attention to determine if we are stocking the correct parts on hand. In
September 2007 the shop had a total stockage of 684 lines, and during the last inventory in
March 2012 the shop had reduced stockage to 181 lines for a delta of 503 lines of inventory.
This is a 74% reduction in stockage. One of the other items analyzed regarding shop stockage
and whether is the length of time required to acquire repair parts for work orders. SSA fulfilled
requests averaged six days of CWT and direct deliveries averaged three days of CWT for a
combined total repair parts average CWT of 4 ½ days for FMS # 3.
Based upon Army ILAP statistics during the 2nd Quarter of Fiscal Year 2012, Direct
Support RCT averaged 36 days for the entire state of Indiana. One of the main reasons repair
cycle time is over one month for maintenance activities within the Indiana Army National Guard
is attributed to a shortage of authorized man-power required to service and maintain tactical
equipment. With that said, a 4 ½ day average CWT for repair parts and a maintenance backlog
in excess of one month reduces the requirement to maintain large stocks of repair parts.
Moreover, FMS # 3 transitioned much of its repair parts stockage from shop stock to bench stock
in April of 2011.
Although by doctrine bench stock part usage is at an unpredictable rate, FMS # 3 stocks
low-cost scheduled service parts which are consumed at fairly predictable rate. In order to meet
regulatory guidance set forth in AR 710-2, we stock only 30 days of supply for each bench stock
line. This stock level was simple to determine by taking the total fleet size of equipment and
16. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 16
dividing by twelve months. This process was repeated for each scheduled service part required
for each piece of equipment supported by FMS # 3. Although much of the bench stock parts on
hand were scheduled service related, I determined that numerous bench stock lines were for
unscheduled repairs. Furthermore, many of the lines stocked at FMS # 3 had minimal or no
demands since the last inventory period.
One of the other benefits of reducing the high cost shop stock lines and transitioning the
inventory to bench stock, I eliminated two timely inventories. FMS # 3 only stocks five lines of
shop stock, which can be inventoried quarterly in about five minutes.
It is apparent after analyzing the walking times incurred by the PC throughout a typical
day at FMS # 3, this person is spending an enormous amount of time go to and from the repair
parts storage locations. The PC performs three major functions regarding the handling of repair
parts. The three tasks of acquire repair parts for work orders, handle direct deliveries and issue
parts for work orders take 7.66 minutes, 3.67 minutes, and 3.7 minutes per day respectively. The
sum of these three events totals just over 15 minutes per day spent walking during the duty day
of the FMS # 3 PC. My Production Controller is spending way too much time walking during
the day. The location of our stocked parts as well as parts for work order repairs is creating an
inefficient environment and is degrading the effectiveness of the Production Controller.
The data gathered regarding parts ordering errors identifies significant issues in the realm
of parts requisitions for work orders. Mechanics have been very accurate diagnosing
malfunctions, but have had some difficulty ordering the correct parts for the malfunction. One of
key areas of concern revolves around what is known as the usable on code (UOC). The UOC is
a code which identifies the model of equipment the repair part fits. For example, the High
17. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 17
Mobility Multipurpose Wheeled Vehicle (HMMWV) has multiple UOC’s for the numerous
models of HMMWV’s that are manufactured. The UOC for a M1097 will be different from a
M1097A2. The A2 model is the newer model and has updated suspension and drive train parts
that are not interchangeable.
Chart # 1
If a mechanic fails to check this code, an error can occur when ordering repair parts. Of
the five parts ordering errors that occurred from February 2012 through April 2012, four of these
errors involved improper UOC usage. Chart # 1 above illustrates this breakdown.
Improvements must be developed to correct these systemic errors. This chart is a good example
of Dr. Joseph Juran’s 85/15 rule that states 85% of errors can be improved by changing
procedures or systems (Goetsch and Davis 2010, 413). These changes are normally determined
by management. The improvements I will recommend and implement will be listed in the next
section of this practicum.
Incorrect UOC
4
80%
Wrong Item #
1
20%
Type of Error
Incorrect UOC Wrong Item #
18. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 18
RECOMMENDATION
Improve – I have defined, measured and analyzed the three issues discussed earlier in this
practicum. After performing these steps, I have formulated a few recommendations to help
improve the efficiency of maintenance operations at FMS # 3. The first issue of the stockage
level of repair parts at the shop can be improved by reducing the bench stock inventory. In order
to systematically reduce this inventory, we must first ensure that scheduled service parts are kept
on hand. The stockage of scheduled service parts must be continually reviewed to ensure parts
stocked for obsolete equipment are turned in to the SSA, but also stocking service parts for new
equipment to our supported units.
Moreover, we must look at the demand history of each line between the semi-annual
inventory to determine what stockage lines should be eliminated. Regulatory guidance states
that in order to add a shop stock line, the repair part in question must have at least three demands
during the control period. Also, in order to retain the part there must be at least one demand to
retain the item. This guidance is only mandatory for shop stock and bench stock is not subject to
demand supported criteria. It is my recommendation that FMS # 3 utilize the same criteria
regarding our bench stock levels. Stocking service parts is very easy to manage due to the
perpetual process of equipment services. Each year every piece of equipment in the Indiana
Army National Guard inventory must serviced during the scheduled annual service. The demand
for stocked service parts is therefore very easy to justify their stockage levels.
The improvement for FMS # 3’s bench stock will require a detailed look at each line, the
demands during the last control cycle, and the preparation of turn in documents to reduce the
inventory on hand. We must eliminate subjective opinion regarding bench stock, and utilize
19. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 19
objective reports generated from the SAMS-E computer to determine the correct level of
inventory FMS # 3 should have on hand.
The second and most challenging improvement deals with the location of FMS # 3’s
repair parts storage locations. This challenge was constrained by the limitations the existing
floor plan and conex storage space. In order to reduce PC walking times, the shop and bench
stock inventory needed to be relocated to a closer location next to the facility. Furthermore, the
work order repair parts storage location needed to be relocated to a location closer to the PC
office. In order to accomplish this storage location recommendation, the key move to free the
space required was the placement of the FMS # 3 tool room. This location will be discussed
later within this practicum.
The tool room relocated from the old location next to the PC office to tool cage located just off
of the work area floor of the facility. This move allowed the movement of the work order repair
parts from the conex just out the south door of the shop to the old tool room. The last move
20. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 20
regarding repair parts involved moving the stocked parts from the north conex on the east side of
the building to the old work order repair parts conex on the south side of the shop. Figure 6
above demonstrates the shop layout after the three storage relocations were accomplished.
The movement of the repair parts storage location uses one of the lean principles of what
is known as point of use storage (POUS). By definition POUS is used to ensure tools and parts
are stored conveniently near the activity and to help minimize movement (Goetsch and Davis
2010, 510). Tables 6 and 7 below display the new time metrics taken after the recommended
moves were accomplished. These times were compiled using the same techniques demonstrated
in the paragraphs within the results section of this practicum. The three tasks of acquire repair
parts for work orders, handle direct deliveries and issue parts for work orders take 4.94 minutes,
33 seconds, and 33 seconds per day respectively. The sum of these three events totals just over
six minutes per day giving a delta of almost nine minutes per day. Over a one week period, this
move will save the PC forty-five minutes of time that can be spent performing more important
functions.
21. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 21
The last area of the parts management topic requiring improvement is the errors that
have been occurring when ordering repair parts. The recommendation and improvement action
plan I want to put into place will encompass the use of a simple check sheet embedded within the
FEDLOG print out.
UOC of Equip:
UOC of Part:
Inspector Verified:
Figure 7
22. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 22
The FEDLOG print out is required; per the shop internal SOP when mechanics
request repair parts for work orders. There will be three items requiring information on the
FEDLOG print out. The items required will be the UOC of the equipment, the UOC of the repair
part and an accountability check by the inspector. The inspector will initial the parts FEDLOG
sheet. The initials will signify that the inspector has verified the UOC of the equipment and the
repair part UOC matches the equipment UOC. Figure 7 above is an example of a FEGLOG print
out and the information that will be required for future requisitions. This improvement was
implemented on 1 April 2012.
Chart # 2 above displays a trend line of before the shop implemented the check sheet
version of the FEDLOG print out, and after the checks were instituted at the shop. It is clear by
the amount of errors that the check sheet version has reduced the parts ordering errors that were
occurring before the change. Although the FEDLOG changes were very simple, they have
forced each mechanic to verify the UOC of each part they order. Moreover, a “second set” of
0 0 0 0
1
4
0 0
1
4
0 0
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN
Repair Parts ErrorTrending
Misdiagnosed Repair* Wrong Part Ordered** Parts Errors Monthly Total
Fedlog check
sheet
Chart # 2
23. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 23
eyes by the inspector ensures there is little chance that an error will occur because of a UOC
mistake.
Control – This is last step in the DMAIC system and is the step that requires standard
measures are implemented as well as maintained. It is imperative that we continue to review the
quarterly shop stock inventories and semi-annual bench stock inventories. The standard to
perform these inventories is set forth in AR 710-2, but FMS # 3 practices regarding bench stock
will be to perform a review of demands at the same time of this inventory. Based upon this
review, we will eliminate lines that do not have the necessary demands and also add bench stock
parts that should be stocked. These procedures will be further codified in the FMS # 3 internal
standard operating procedure (SOP). This procedures and protocols in this SOP are reviewed
annual to determine effectiveness. Additionally, it is very important that all employee within the
facility understand these procedures of how to obtain repair parts for work orders and that these
procedures must be adhered to. If mechanics circumvent the PC for repair parts, inventory will
not be accurate and demands will not be properly captured. These procedures are also outlined
in the internal SOP.
The movement of storage locations will be much easier to control, because this is not a
fluid change. What must be continually reviewed is whether or not our facility has the required
amount of storage for work order repair parts and even stocked parts. We must be ready and
willing to make changes to the new storage plan, if it is not adequate for our operational needs.
Point of use repair parts storage will definitely make the PC’s job responsibilities much easier.
One of the focal points of POUS was also the manner in how our special tools were stored,
which will be discussed in the following pages.
24. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 24
Control of repair parts requisitions will require significant management involvement to
spot check requisitions to ensure proper procedures are being followed. Additionally, the PC
will need to ensure all FEDLOG sheets are filled out correctly when mechanics submit parts
request with work orders. They must “kick back” any FEDLOG sheet that is not filled out
correctly. The PC must inform the shop supervisor if mechanics systemically fail to fill out the
FED LOG sheet correctly. At the time of this practicum, parts ordered through the misdiagnoses
of malfunctions were not an issue for the shop, but I will remain watchful of this as a potential
problem area that may need further attention as the year progresses.
BACKGROUND AND SIGNIFICANCE (Tool Storage)
The second topic of this practicum focuses on special tool storage and some of the
requirements surrounding the storage and inventory. AR 710-2 states tool rooms will be
inventoried semi-annually. Before defining the problems regarding tool storage and inventory, I
will elaborate upon what these tools encompass. Special tools are tools that are required to
perform specific maintenance tasks. Special tools are not part of the individual’s personal tool
box inventory and are stored in a secure room or cage. Some of these tools can be basic hand
tools like a sledge hammer or sensitive hand tools like a micrometer.
Physical security regulations require any hand tool that can be used to breach an entry
must be secured. For example, a crow bar, a sledge hammer or a cutting torch would be tools
requiring secure storage. FMS # 3 has approximately 1,500 tools and components that are
stored within the tool room. Since FMS # 3 does not have a funded Tool and Parts attendant, the
duties of maintaining and inventorying the room are a collateral duty performed by an appointed
Tool Room Custodian and Alternate Tool Room Custodian.
25. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 25
PROCEDURES
Define – There are two problems with the tool storage at FMS # 3. The location of the
tool room is the most significant problem and segues off of the repair parts storage issues
addressed earlier within this practicum. The tool room is located in a back room next to the shop
office and is not near the mechanics work bays. Furthermore, the tools are stored within large
cabinets that make it difficult to identify and locate tools. Moreover, the tools are not labeled
and require the mechanic to remember which drawer they retrieved the tool from in order to
return it to that cabinet drawer. If the mechanic places the tool in the incorrect location, the next
mechanic will spend extra time trying to locate the tool because it was incorrectly stored.
Mechanics are spending too much time walking to and from the tool room, and searching for
tools. Additionally, the second order effect of having the tools stored within the cabinets and not
labeled properly creates an inefficient environment. This inefficiency manifests itself in more
time being spent on the semi-annual inventory performed by the Tool Room Custodian.
Measure – In order to develop an action plan regarding the tool room relocation, metrics
needed to be established. The first action that was measured was the amount of time it takes the
Tool Room Custodian to complete an inventory in the old tool room. This inventory took four
days to complete. Additionally, two more metrics were required to establish the amount of travel
time was expended to walk to the tool room and also the amount of time it took mechanics to
locate a tool.
At the time of this practicum, FMS # 3 had five direct labor mechanics working on the
bay floor. Bays 1 through 3 have one mechanic each, and Bay 4 has two mechanics. Three
separate measurements were taken from each bay to determine an average walking time to the
26. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 26
tool room. In order to acquire an accurate portrayal of the amount of trips each mechanic
performs each day to obtain an event per day metric, I had each mechanic track the amount of
times they signed out a tool from the tool room. Each mechanic was given a log to track this
info during from 30 Jan 12 to 2 Mar 12. This gave me a snap shot of four work weeks at the
shop. At the conclusion of the month, I added up the total number of trips to the tool room by
each mechanic and divided by that number by 20. At took the sum of each mechanic’s average
and divided that number by five to get a mean average number of trips for the entire facility.
Table 8 below illustrates the data that was collected during this period.
The last item measured was the amount time necessary for a mechanic to locate a specific
tool within the tool room. I took three measurements with three different mechanics who were
instructed to locate the same tool in the storage cabinet. Table 8 demonstrates this time as well.
27. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 27
RESULTS
Analyze – After reviewing the data collected of the tool room location, it is clear that the
location and method of storage is fueling an inefficient environment for the shop’s mechanics as
well as limiting their ability to perform maintenance operations. Mechanics should not be
wasting time walking extra distances and searching for tools to repair or service equipment on
work order to the shop. The tool room storage location issue runs parallel with the repair parts
storage issue. In order to improve and relocate the repair parts storage, the tool room storage
problems needed to be addressed using the DMAIC system.
I assessed FMS # 3’s the amount of tools on hand, the estimated space required and
shelving units to store to complete an improvement action plan. I estimated that an area of
approximately 10’ X 12’ is required to accommodate the shop tools, and eight shelving units to
properly store them. The shelving units will replace the cabinets, and will make the tools visible
for the mechanic. The improvement action plan will be discussed in the next section.
RECOMMENDATION
Improve – The first item that must be addressed is the new location of the tool room.
This improvement recommendation will also accommodate the work order repair parts storage
problem, as well as place the tools in a more convenient location for the mechanics. After
relocating a shop safety board on the outside of the boiler room wall, I determined there was
adequate space to install a tool cage next to the boiler room. The floor space selected was a dead
space and was not being used in a manner to benefit the shop’s mission. Figure 8 below is gives
a graphic depiction of the tool room location before and after the improvement plan.
28. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 28
The lean technique of point of use storage is clearly in use by relocating the tool room to a tool
cage next to the mechanic’s work area. This move will reduce travel times immensely. Prior to
the move, mechanics were spending approximately 4.93 minutes per day walking and 8.67
minutes per day searching for tools. The sum of these two metrics is 13.6 minutes per day.
After we relocated the tool room, I used the same measurement techniques discussed in the
analyze portion of this topic which resulted in the following times. Mechanic walking time was
reduced to 2.4 minutes per day, search time was reduced to 2.87 minutes per day, and the total
time spent for both tasks was reduced to 5.27 minutes per day for a delta of 8.33 minutes per day
saved. Table # 9 below gives a better illustration of this data and the metrics utilized.
29. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 29
The total amount of time saved per month with this improvement will be 2 ¾ hours of
mechanic production. The initial cost of the tool cage and shelf units was $3,179. Because this
move was necessary to facilitate the repair parts storage relocation, I factored in the Production
controller’s time saved per month of 3 hours to determine the amount of time required to break
even. Based upon these two times, it will take approximately 20 months to recoup the initial
investment for the tool cage and shelf units.
I derived at this by multiplying the average mechanics hourly wage and the PC’s hourly
wage by the monthly time saved for the improvements. I then divided the initial cost by this
amount to arrive number of months identified above. Lastly, I had the Tool Room Custodian
perform another inventory to determine how many days it would take to complete. The new
inventory took only two days to complete, which is half of the time required prior to the move.
30. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 30
Control – There is very little to control regarding this shop improvement, but one are that
was improved upon deals with tool marking. Prior to the move, tools were not labeled. During
the relocation of the tools, each tool was labeled with a shelf location. This improvement will
help control the misplacement of tools when they are returned after use. One other area that will
be addressed in the control phase is a semi-annual assessment of tools on hand to determine if
they are still required. Just like repair parts, tools can become antiquated due to equipment
losses by our supported units. If tools of this nature are identified during the semi-annual
inventory, they must be turned in to using proper supply channels to remove them from the shop
inventory.
BACKGROUND AND SIGNIFICANCE (Final Inspection)
The process of inspection is an integral part of the maintenance process. This step is also
referred to as quality assurance (QA) and quality control (QC) in the Army. Maintenance
Technicians are tasked to monitor the quality assurance program (DA PAM 750-3 2006, 16).
The quality assurance program must be continually evaluated for effectiveness and also to
determine if there are any systemic trends that may be affecting maintenance operations. A poor
quality assurance program may result in a work orders having to be reworked, which translates
into more labor costs. Poor quality assurance can also lengthen repair cycle times, which can
affect customer relations if we are unable to fulfill the customer’s requirements.
The current quality assurance program at FMS # 3 utilizes two senior Wage Grade (WG)
– 10 mechanics to perform final inspection on all work orders completed at the shop. One
inspector is a primary and the other is considered the alternate inspector to maintain coverage
within the facility. Once a work order has been completed by a mechanic, it is routed through
the PC before going to final inspection. The PC will change the status of the work order to
31. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 31
“awaiting final inspection”, and place it in the appropriate work order bin. Priority of the work
order will dictate how quickly the work order must be inspected. Once the Shop inspector
conducts his final inspection, he will bring the work order back to the PC and state whether the
vehicle is “ready for pickup” or must come back into the shop. The term “come back” is
synonymous with a final inspection failure, and is considered a derogatory term throughout the
maintenance community.
PROCEDURES
Define – To identify the problem within our final inspection and quality assurance
program, I will take a straight forward approach. Any final inspection failure is one too many,
and therefore when a work order fails final inspection there is an issue with our process. The Six
Sigma goal is to reduce defects to near zero in the work place, which equate to approximately a
99.99% accuracy rate. Using this metric as a goal, I can state that our facility will need improve
upon our quality assurance program.
Measure – I created a spreadsheet incorporating bar graphs, and a pie chart to track the
frequency of failure, mechanic responsible, and what type of malfunction caused the final
inspection failure. The Production Controller in concert with the Wage Grade 10 inspector was
tasked to track this data and fill in the appropriate information at the conclusion of the work
order. Mechanics production is also tracked as part of the data collection in order to determine
an accuracy rate. The total number of work orders performed correctly by each mechanic was
divided by total number of work order performed to arrive at this percentage. Table # 10
illustrates a by mechanic breakdown of work orders performed, final inspection failures, and
their accuracy rate.
32. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 32
92% 89%
0%
MAR APR MAY
AccuracyRate
Shop Accuracy Rate
Table # 10
I also measured the monthly accuracy rate to determine shops trends. Monthly numbers
are the sum of all work orders completed and final inspection failures. Table 11 demonstrates
monthly numbers regarding final inspection as well as accuracy percentage.
FEB MAR APR MAY
Monthly Completed N/A 24 28 0
Monthly Failure N/A 2 3 0
Shop Accuracy Rate N/A 92% 89% #DIV/0!
Table 12 below reflects the monthly accuracy trend for the facility.
MECH 1 MECH 2 MECH 3 MECH 4 MECH 5
SHOP
TOTAL
PERFORMED 8 13 9 9 13 52
FAILED 0 1 1 1 2 5
ACCURACY RATE 100% 92% 89% 89% 85% 90%
8
13
9 9
13
52
0 1 1 1 2
5
100% 92% 89% 89% 85% 90%
0
10
20
30
40
50
60
Final Insp. Failure by Mechanic
Table # 11
Table # 12
Check sheet implemented
on 12 Apr 12
33. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 33
Additionally data was collected on any work order that failed final inspection to capture
what item was missed or occurred to cause the “come back”. This information and data will be
discussed in the analyze portion of this practicum.
RESULTS
Analyze – There are two areas that must be addressed in this section by answering the
questions of what is causing the mechanics to improperly complete a work order and why are
they making mistakes? Through the use of a cause and effect diagram, I was able to identify
some of the reasons work orders may fail final inspections. Figure # 9 below represents this
methodology.
As discussed earlier in this section, I have captured data on why the work orders failed
final inspection. I have inputted this information into a cascading Pareto chart. The Pareto chart
is a tool that was promoted by Dr. Joseph Juran, and is named after Italian economist Vilfredo
Pareto (Goetsch and Davis 2010, 352). This chart reveals that a vital few defects created most
Figure # 9
34. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 34
of the problems surrounding final inspection failures. Chart # 3 below is the Pareto analysis for
FMS # 3.
Pareto Analysis
FMS # 3
TQM in Maintenance Operations
The first 3 Causes cover 100% of the Total Defects
Cumulative Percentage
Cutoff: 80%
# Causes Defects Cumulative%
1 Incomplete 3 60.0%
2 Oil Leaks 1 80.0%
3 Electrical 1 100.0%
4 Steering 100.0%
5 Air Leaks 100.0%
6 Drive Train 100.0%
7 Brakes 100.0%
Chart # 3
As you can see, incomplete work orders accounted for 60% of the final inspection
failures for the shop. The problem here occurred because two mechanics did not complete an
onsite work order properly, and had to return to the supported unit to complete the mission. This
Incomplete
OilLeaks
Electrical
Steering
AirLeaks
DriveTrain
Brakes
0%
20%
40%
60%
80%
100%
0
0.5
1
1.5
2
2.5
3
3.5
Cumulative%
Defects
Causes
Type of Malfuncion
Vital Few Useful Many Cumulative% Cut Off %
35. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 35
type of error is very costly, because of the man-hours expended traveling back to the onsite
location to complete. Additionally, the third incomplete was the product of a mechanic not
installing all required components on a gunner’s platform. This was captured during the final
inspection.
RECOMMENDATION
Improve – As I review both the cause and effect diagram and the Pareto chart, I felt that
much of our issues revolve around process and less on the individual. Dr. Juran’s 85/15 rule
characterizes this concept, where he states that 85% of the problem can be corrected by changing
systems and only 15% are under the workers control (Goetsch and Davis 2010, 413). I discussed
this principle earlier in this practicum in the parts management section, and feel that it is
applicable here as well. One of the process improvements that I am going to implement is the
use of a work order check sheet. This check sheet will list numerous items relating to work order
completion, and will serve as a reminder for both the mechanic and the PC to ensure all steps
have been completed during the work order process. One of the key steps included on this check
sheet is the use of the lean tool/technique of self-inspection.
The self-inspection procedure will be codified in the FMS # 3 internal SOP which is in
keeping with the TQM concept of catching errors before the end of the cycle or process. The
implementation of a mandatory self-inspection by each mechanic performing a repair or service
should help eliminate errors found by the senior mechanic performing the final inspection. For
example the electrical problem captured during the measurement phase was due to a mechanic
not inspecting the working lights on a forklift after replacing the lights. A self-inspection would
have caught this malfunction before the final inspection. Figure # 10 below is an example of the
check sheet that will be incorporated into the internal SOP.
36. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 36
Figure # 10
Two of the incomplete final inspection failures can be attributed to management and the
production controller not clearly communicating the intent of the onsite mission. This can be
improved upon by effective communication, where the message is received and understood by
the receiver in the manner the sender intended it to be. Another key to onsite repair accuracy is
to ensure work order tasks are clearly entered into the Support SAMS-E. The work order tasks
state what must be completed on the work order, and if they are ambiguous the mechanics may
have trouble fully completing the work order. Additionally, I must continue to create an
37. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 37
environment that encourages quality and the desire to deliver outstanding maintenance support.
Mechanics who fail to uphold these values must be counseled and trained to ensure they meet the
highest standards set forth within. This will reinforce a work climate that embraces quality.
Control – Controlling the final inspection failure process will be a perpetual system
which will encompass data collection used to determine trends as well as what caused the failure.
Trend analysis will need to take place to determine if changes in the process need to take place or
specific maintenance training tasks are required to improve mechanic’s skills. The internal SOP
also requires an annual review to ensure the information within the SOP is relevant to the
maintenance shop’s mission. This is a minimum requirement, but in order to embrace the TQM
philosophy our maintenance shop must continually assess our processes and procedures to
determine if they are efficient and effective.
In order to achieve an almost near perfect accuracy rating during final inspections,
everyone employee within the facility must accept the TQM principles. I must create a climate
that focuses on quality and institute new processes and procedures to facilitate this attitude. I
believe Dr. Deming’s fifth point of his fourteen points which states “Improve continuously and
forever the system of production and service. It is the management’s responsibility to constantly
improve processes, product, and services while reducing waste.” (Goetsch and Davis 2010, 16)
sums up this point.
38. TOTAL QUALITY MANAGEMENT IN MAINTENANCE OPERATIONS 38
References
Army Regulation 710-2. 2008. Inventory Management, Supply Policy Below the National Level
Department of the Army Pamphlet 750-3. 2006. Soldier’s Guide for Field Maintenance
Operations
Goetsch, David L. and Stanley B. Davis. 2010. Quality Management for Organizational
Excellence. New Jersey: Pearson
Pande, Peter S., Robert P. Neuman and Roland R. Cavanagh. 2002. The Six Sigma Way, An
Implementation Guide for Process Improvement Teams. New York: McGraw-Hill