The document summarizes the construction of a 100 kW solar photovoltaic site for the Bureau of Land Management in Salem, Oregon. Key steps included removing trees, installing road base, drilling 184 caissons, forming the site in two sections, installing rebar and concrete in the caissons, placing and securing racks on the caissons, installing over 400 solar modules, installing wiring and an inverter, and connecting it to the main power distribution network to enable net metering. The project was part of a larger 455 kW solar demonstration project for the Department of the Interior with a budget of $2.3 million.