32. Who Wants Regional Transmission Built? My load shouldn’t pay. They aren’t using the transmission. I don’t want to pay, either. I want in-state wind because it brings jobs and property taxes. Very Windy State Low Load Low Wind State High Load Transmission? 8
33. Agenda Navigating Interconnection and Transmission in the Major US Markets Clipper Snapshot 1 Background: Key Transmission Policy Issues 2 FERC “Pro Forma” Generator Interconnection Process 3 Regional Interconnection Processes 4 Navigating Interconnection 5 9
42. Agenda Navigating Interconnection and Transmission in the Major US Markets Clipper Snapshot 1 Background: Key Transmission Policy Issues 2 FERC “Pro Forma” Generator Interconnection Process 3 Regional Interconnection Processes 4 Navigating Interconnection 5 NOTE: Many LGIP details have paraphrased/simplified in the interests of time. Please refer to Open Access Transmission Tariffs for the definitive rules of Generator Interconnection Processes. 13
43.
44.
45.
46.
47.
48.
49. Suspension limit of 18 months, $5,000,000 (€3.750.000) deposit due at 6 months.*Demonstration of project seriousness means one of the following: Letter of Credit for Network Upgrades, Power Purchase Agreement, evidence of a “Designated Resource”, Purchase Order for Generating Equipment, Application for Air Permit, Filing of FAA Notice 15
61. Agenda Navigating Interconnection and Transmission in the Major US Markets Clipper Snapshot 1 Background: Key Transmission Policy Issues 2 FERC “Pro Forma” Generator Interconnection Process 3 Regional Interconnection Processes 4 Navigating Interconnection 5 19
62.
63.
64. The challenges faced by the US wind industry cannot be met by individual companies. Industry Organizations play a critical role in responding to policies that create barriers to wind development Wind on the Wires (“WoW”) – MISO, Midwest The Wind Coalition – SPP, ERCOT AWEA Transmission Committee – National Center for Energy Efficiency and Renewable Technologies – CAISO and West CALWEA—California Wind Energy Association – CAISO Interwest Energy Alliance – West Mid Atlantic Renewable Energy Coalition RENEW New England – ISO-NE Renewable Northwest Project (“RNP”) – BPA Alliance for Clean Energy New York – NYISO NWCC-Northwest Wind Coordinating Committee 21
65. Thank You Rhonda Peters, Ph.D. Grid Interconnection and Transmission EngineerTel: +1 (805)-576-1188Email: rpeters@clipperwind.com 22
Editor's Notes
PLEASE FILL IN YOUR OWN AGENDA TITLES AND TEXT. Change the blue bar location and add check marks as you move through the agenda.
PLEASE FILL IN YOUR OWN AGENDA TITLES AND TEXT. Change the blue bar location and add check marks as you move through the agenda.
This is a ’smart object’ so you can add or delete bubbles using the gadget on the upper left of the selected graphic.
PLEASE FILL IN YOUR OWN AGENDA TITLES AND TEXT. Change the blue bar location and add check marks as you move through the agenda.
PLEASE FILL IN YOUR OWN AGENDA TITLES AND TEXT. Change the blue bar location and add check marks as you move through the agenda.
PLEASE FILL IN YOUR OWN AGENDA TITLES AND TEXT. Change the blue bar location and add check marks as you move through the agenda.
THIS PAGE MUST BE USED IN ORDER TO PROTECT CLIPPER’S INTELLECUAL PROPERTY RIGHTS. DO NOT DELETE