JEROME LEE PINDER
720 Keaton Parkway, Ocoee, FL 34761, Cell No. 919-328-0728, jpinder@thalle.com
Objective:
Construction Manager/Engineer with Thalle, a Construction Company capable of dominating the Florida
Landfill Market both Public and Private, with a will to face new challenging opportunities anywhere there is
a company need to utilize my specialized skills and experience.
Profile Summary:
 28 years of Landfill Cell, Closure, and Waste Water Treatment Plant construction experience
in Texas, Alabama, Georgia, and Florida mentoring with “in the trench hands on leadership by
example of an old school work ethic”.
 Over 224 environmental projects completed as ERC with a total revenue exceeding $86,000,000.
Currently Project Manager of $54,000,000 in project revenues on three construction projects.
 Maintained the Experience Modification Rate for Workers Compensation under 0.86 with no lost
time accidents for 3 years 2010- 2013, and a Total Reportable Incident Rate (TRIR) less or equal
to 3. This is due to mandated daily interactive employee safety demonstrations/drills.
 Completed over 75 major Landfill Projects involving more than 20 million cubic yards of earthwork
using scrapers, off road trucks, pull pans, and excavators dewatering in South Florida.
 Composting Facility Construction for Waste Management in Apopka Florida in 2012-2013, a new
recycling requirement from their biggest clients.
 Competent in evaluating a bid opportunity with onsite survey layout design analysis as it relates to
a historicalclaim history and error history ofthe engineer ofrecord where their challengesrepresent
opportunities for a bid advantage. Hard work almost always wins the low bid.
 Competent in the engineering field of Chemical, with minor experience/education in Electrical
schematics, mechanical design, Industrial plants, Civil Engineering, Surveying, and Computer
Engineering.
 A passion for survey layout, modeling design surfaces in AutoCadd, uploading new design surfaces
and designing 3D pipe line work for machine control and rover layout. Programing dozers in the
field for site work deviations and change orders as needed.
 Flying an airplane at first light to start the weeks work in Naples, Miami, Jacksonville, Pensacola,
or Atlanta where projects are in progress to facilitate production evaluations and needed reforms
on each and every project.
 A passion for 36” HDPE welding and Landfill Gas System Installations involving Flare Systems.
Skills Summary:
 Strong record keeping skills as it pertains to claim support documentation required daily linking
each days work to the overall project schedule, daily costs, and daily revenues, hourly
labor/equipment claim impacts, and daily overhead/profit evaluation.
 Finish operator on scrapers (631, 621, 623, 615, 613), Off-road Trucks (A25C-A40F), Mass
excavators (330, 450’s, 325, 345), Dozers (D3-D9, 450-750 w/ GPS machine control), and misc.
heavy equipment. Have maintained a fleet of 18 owned pieces of heavy equipment including
mechanic work.
 Strong ability to direct the work by leading by example running heavy equipment, surveying, and
mentoring operators, foreman, and superintendents to meet required job skill goals by actually
being in the trenches hands on. Not only instruct/mentor but demonstrate skill sets to employees
teaching survey layout, finish operator stills including programing, and HDPE welding and pipe
fitting skills.
 Scheduling with Primavera for over 19 years, submittal contract management for 26 years.
 Computer programing skills include AutoCAD Civil 3D 2010 Imperial (DTM surface/e arthworks),
Terramodel 10.5, SCS DataManager, Sitevision Office, QuickMeasure, and Microsoft Office
Programs with 28 years working with Excel programmable spreadsheets.
 Strong learning skills as a hobby on new computer programs for bidding, takeoffs, and new
technology keeping up with the latest improvements of a paperless environment.
 Excellent time management skills with the ability to evaluate daily logs ofpersonneland equipment
usage as it equates to costs and revenue goals.
PROFESSIONALHISTORY:
1991 - Present ERC General ContractingServices,Inc.
PresidentandOwner
Environmental LandfillConstructionandClosure,WWTPConstruction
1991 - 1997 ERC General ContractingServices,Inc. Vice
PresidentandOwnerEnvironmentalLandfill
Installation,closure,andRemediation.
1989 -. 1991 ERC General ContractingServices,Inc.
EngineerandProjectManager,Landfill
installation,closure,andHazardousWaste
Remediation.
1988 – 1990 Earth ResourcesCorporation,(ERC)
ProjectManager of the Hazardous Waste,RemediationDivision.
1987 - 1988 HazardousWaste Consultants,Inc.
General ManagerandProjectEngineer Environmental Consulting,Waste
Cleanup,and hazardouswaste transportation, PlantClosures.
1985 - 1987 TestWell Craig Laboratory, Inc.
Laboratory Manager/Project Engineer for hazardous material
removal
projects.
1980 - 1985 Gulfside Construction, Inc.
Concrete foundation foreman, heavy equipment operator.
1976 - 1980 Spoolstra Pool Company, Inc.
Journeyman Carpenter, concrete construction mason.
Education Details:
 Bachelor of Science, University of South Florida, 1986, Engineering Major
 Bachelor of Arts, University of South Florida, 1986, Natural Science (Biology).
Certifications
Class A General Contractor’s license – Florida
General Contractor’s license – Georga
Underground utility license
Reference:
Lee/Hendry Landfill Cell 5, Leachate Collection Ponds/Lift Stations
Laura Grey, Solid Waste Engineer (239)707-1537
Compost Facility Construction:
Sheree Grant, Waste Management Engineer, (407) 902-1469
Landfill Cell Construction/Closure/Gas Systems last 10 years
Rich Siemering, HDR, (813)282-2300
Itza Rivera-Frisco, HDR, (813) 294-1580
Landfill Gas Systems, Closures
Jim Flynt, Orange County Solid Waste (407) 836-6601
Key Projects:
2013-2014
City of Jacksonville Phase 4 Clay Landfill Closure, 28 acres, $5,754,000
At 60% complete, City cancelled the contract. Hands on welding of over 2,000 LF of 30”
HDPE pipe terrace inlets, surveying and as-builts of project, site superintendent installing a clay
liner, top soil, storm water management, GPS modeling for machine control “in house”.
Daylight hours, 7 days/week, rainy season clay closure under the most intense conditions
imaginable.
2013-2014
City of Jacksonville Project for Waste Management, 28 acre gas system, $ 345,069
Hands on welding and excavator operator for 14,000 LF of 2”, 4”, 6”, 8” HDPE air/fm and gas
system installation including 36” vertical wells. Performed all functions of project management
and site work.
2013-2014
Golden Gem Landfill Gas Flare System and Closure, $ 375,461
8,000 LF of 10” and 8” header, 42 gas vents, 650 cfm Flare installation. Design build engineer
on site operator, surveyor, and welder.
2013
Hillsborough County SE Landfill Sect. 7, 8, &9 Gas Collection/Control System, $992,401,
Richard Seimering HDR Project Manager & Reference.
10,000 LF of 10” and 12” header to horizontal gas collections system in ash up to 12’ deep,
Project Superintendent and welder/surveyor/operator/engineer design build.
2013
BP Port Everglades, Fuel Tank Farm Liner/Berm Installation, $ 285,672
Under an intense safety requirement, a design/build berm was installed around a gas storage tank
farm which included constant confined space entry protocols, liner installation, and heavy
equipment operation among live fueling piping. Liner extrusion welder, heavy equipment
operator, superintendent, survey layout, design build.
2011-2012
City of Jacksonville Landfill Closure, 24 acre clay liner, $ 4,124,738
Project Engineer and HDPE welder for the 30” HDPE pipe for the terraces designed by ETM.
GPS programmer and ACAD modeler. Operator/Superintendent on site part time.
2011-2012
WSI Private JED Cell 8 Landfill, $1,136,239
Project Manager and Engineer for this 14 acre cell construction. Double lined 60 mil HDPE
system w/ GCL base, 320,000 cy of earthwork, site drainage system and structures, leachate lift
stations (3), electrical pad, pumps.
2012
Lake County Landfill Closure, 25 acres, $1,940,607
Site Superintendent/Engineer/Heavy Equipment Operator/Welder for a design build closure
design by HDR Inc (David Beben). Performed the survey/layout/as-built, operated a local pit,
imported 160,000 cy of clay, HDPE lined with pipe welding, gas venting, HDPE storm water
pipe and structures, sodding. Hired and trained local operators to complete the work with myself
as their mentor. No full time ERC employees used due to increased company workload in
Jacksonville.
2012
Medley Landfill Gas Systemand Lined Closure for Waste Management, 20 acres,
$1,222,705
Site Superintendent/Engineer/operator/welder for a design build closure developed by SCS-
Globex Engineering. Hired local operators and trained them in landfill work, surveying,
machine control, and welding as no full time ERC employees were available. Developed on site
ACAD GPS modeling for machine control dozers. Installed 80,000 cy of cover over a HDPE
liner system after installing a 18” gas systemin extremely wet and deep conditions.
2011-2012
Naples Landfill Gas System and Closure for Waste Management, 12 acres, $725,720
Site Superintendent/Engineer/Operator/Welder for a design build closure system developed by
SCS-Globex Engineering. A 1,500 LF 20”-18” header systemwas installed after performing a
lined HDPE closure. Extremely complicated design of perimeter HDPE piping, geonet, and
capture systems on 1:1 slope intercepts.
2012
Marion County Baseline Landfill, 10 acres, $ 452,794
Jones Edmunds and Assoc. (Mikey Pollman) designed an infill in an existing closed landfill
involving the installation of a deep trench drain and 60 mil liner tie-in at the base of the existing
landfill. HDPE gas piping, horizontal trenching, rain tarps. This was the second phase of work
from 2011. Provided superintendent/operator/surveyor and project administration.
2012
Vista Landfill Apopka Florida for Waste Management, $92,010
Installed a pond system for Cell 3, a roadway to the new recycling facility including storm water
structures, HDPE piping, 3” water force main, and recycled roadway.
2011
Marion County Baseline Landfill, 10 acres, $ 392,793
Jones Edmunds and Assoc. (Mikey Pollman) designed an infill in an existing closed landfill
involving the installation of a deep trench drain and 60 mil liner tie-in at the base of the existing
landfill. HDPE gas piping, horizontal trenching, rain tarps. This was the first phase of work
from starting in 2011. Project superintendent/operator/surveyor and project administration.
2011
Hardee County Landfill, 25 acre Closure and infill cell, $ 2,493,609
SCS Engineering (Shane Fischer) designed the infill cell with a composite 60 mil liner system,
leachate collections HDPE piping system, and HDPE liner closure system along with vertical gas
vents. Gas well installation, passive gas system, 60 and 40 mil HDPE liner systems, drainage layers,
storm water terrace system,drainage system, asphalt roadways and GFFR swale. Imported 110,000 cy
of drainage sand/cover materials. Provided all Project Management, contract administration,
HDPE welding, assisted in Site Superintendent.
2011
Vista Landfill Compost Recycling Facility Infrastructure and site development, $610,000
Cell 2 Gas System Installation, Composting Center Storm water grid system. Site
Superintendent/surveyor/welder for a 10 acre heavy clearing operation, 40,000 cy fill, 36” RCP
with 12 inlet structures, roadways, concrete tanks.
2011
Pasco County Ridge Road Landfill Flare System, $392,793
Site Superintendent/surveyor/heavy equipment operator/welder/concrete mason. Installed a
design build gas system on an existing closed landfill, Flare System, Building covering the
System, upgraded electrical work.
2010
Putnam County Class 1 Landfill, 2010 - $3,554,000
14 acre cell, double lined 60 mil system w/ GCL base, 245,000 cy ofearthwork, imported fill,on site
drainage system, leachate lift stations, electrical systems, pumps, asphalt roadways,storm water drainage
systems with triple RCP road crossings. On site part time superintendent.
2009-2010
Osceola County JED Waste ServicesInc. - $2,290,773
Site Project Engineer/Superintendent/Heavy Equipment Operator/Surveyor/Programer/Welder.
Landfill class 1 cells 6 and cell 7 using double lined 60 mil HDPE liner and GCL base, including storm
water ponds for cells 1-7, and closure work for cells 1-4, 2009-2010, cell 6 size 9 acres,cell 7 size 11
acres,earthwork on site 425,000 cy, work performed in 120 days for each project.
2009-2010
Vista Landfill C&D Cell - Waste Management Inc. Apoka Fl - $2,800,000
Full time site superintendent/surveyor/welder/ and project manager.
Lined 60 mil Vista Cell 2, 13 acres,Keene Road Landfill plus a 75 acre landfill closure with 50 mil liner
system, 350,000 cy ofearthwork, gas flare system with 9,000 lfofHDPE header pipe work
performed within 160 days. Owner paid direct for materials, total job over $4,000,000.
2009-2010
City ofTallahassee WWTP Piping, Concrete,and Lagoon Installation, $1,566,160
Demolition of an existing WWTP, WWTP piping to 30” diameter,concrete stormwater wallsystems,
lined 40 mil lagoons to 40 acres. Full time site superintendent and project engineer.
2008 Polk County Landfill Toe Closure and Biogas System Redesign, $1,174,450.
60 mil Liner system, toe drain, and extensive HDPE Biogas System piping and storm water controls and
structures. Full time site superintendent.
2007
Hillsborough County Waste ServicesInc. C&DLandfill - $4,958,353
Sun Country Materials C&D Landfill 18 acre cells with a 60 mil liner system, 24 acre closure, and
passive gas system. 469,000 cy ofearth work on site including importing drainage sand. The storm
water ponds were excavated without dewatering systems due to wetland impacts. Leachate Storage ponds
and transfer pumping systems. Full time site superintendent/project
management/engineering/administration/heavy equipment operator.
2007 St. Lucie County, Class 1 Landfill, $4,590,110
15 acres,double lined 60 mil cell with GCL base, 280,000 cy ofearthwork, offsite imported fill,
drainage system, leachate collection lift stations, pumps, roadways. Full time site supervisor and all
project management/engineering/administration.
2007
Polk County Landfill Closure, $1,174,450
35 acre closure of two landfills including 50 mil liner system installation, Gas well installation,
roadways, and storm water piping. Full time site supervisor.
2007
City ofTallahassee WWTP Lagoon Liner System and Sludge Dewatering, $522,570
Lined WWTP lagoon construction, 20 acres,asphalt roadways,sludge removal. Site
supervisor/engineer/heavy equipment operator.
2005-2006
Hillsborough County Landfill Cell 8 and leachate piping system to Cell 7, $ 4,165,593.
16 acres,double lined 60 mil class 1 cell with clay liner base. Earthwork totaled 350,000 cy of on site
phosphetic clay removal, imported fill, and imported drainage sand. Full time site supervisor/heavy
equipment operator/welder/surveyor.
Project from 1989-2005 available.

More Related Content

What's hot

Troy Weiss Resume
Troy Weiss ResumeTroy Weiss Resume
Troy Weiss ResumeTroy Weiss
 
BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10Barry Draycott
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internalJeff Sperlbaum
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15Dave Beveridge
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09arosental
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray ResumeRon Bray
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16Amir pia
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil
 
RonWells m-resume
RonWells m-resumeRonWells m-resume
RonWells m-resumeRon Wells
 
GRC 2018 Registry of Geothermal Services and Equipment
GRC 2018 Registry of Geothermal Services and EquipmentGRC 2018 Registry of Geothermal Services and Equipment
GRC 2018 Registry of Geothermal Services and EquipmentGeothermal Resources Council
 
larry_dosher opengr resume
larry_dosher opengr resumelarry_dosher opengr resume
larry_dosher opengr resumeLarry Dosher
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2clinton collier
 

What's hot (20)

Troy Weiss Resume
Troy Weiss ResumeTroy Weiss Resume
Troy Weiss Resume
 
BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internal
 
Siemens_CV1
Siemens_CV1Siemens_CV1
Siemens_CV1
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
RonWells m-resume
RonWells m-resumeRonWells m-resume
RonWells m-resume
 
GRC 2018 Registry of Geothermal Services and Equipment
GRC 2018 Registry of Geothermal Services and EquipmentGRC 2018 Registry of Geothermal Services and Equipment
GRC 2018 Registry of Geothermal Services and Equipment
 
larry_dosher opengr resume
larry_dosher opengr resumelarry_dosher opengr resume
larry_dosher opengr resume
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2
 
Land surveyor
Land surveyorLand surveyor
Land surveyor
 

Similar to Construction Manager Resume

Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin SummaryIlyas Ahsan
 
Resume holley troyhilite
Resume holley troyhiliteResume holley troyhilite
Resume holley troyhiliteTroy D Holley
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Dylan Gonsalves
 
David Garza - Resume
David Garza - ResumeDavid Garza - Resume
David Garza - ResumeDavid Garza
 
Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedDennis Talley
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Ron Roof
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Snyder
 
David Beck Resume
David Beck ResumeDavid Beck Resume
David Beck ResumeDavid Beck
 
CV Anselm Jacobs combined 200716
CV Anselm Jacobs combined 200716CV Anselm Jacobs combined 200716
CV Anselm Jacobs combined 200716Anselm Jacobs
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013Stephen Ciulla
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand Dhawan
 

Similar to Construction Manager Resume (20)

Mchael_Gorelik_Design
Mchael_Gorelik_DesignMchael_Gorelik_Design
Mchael_Gorelik_Design
 
M.foreman's resume'
M.foreman's resume'M.foreman's resume'
M.foreman's resume'
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin Summary
 
Tringale Resume 9-2-14
Tringale Resume 9-2-14Tringale Resume 9-2-14
Tringale Resume 9-2-14
 
Resume holley troyhilite
Resume holley troyhiliteResume holley troyhilite
Resume holley troyhilite
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 
David Garza - Resume
David Garza - ResumeDavid Garza - Resume
David Garza - Resume
 
Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formatted
 
DCG_CV
DCG_CVDCG_CV
DCG_CV
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
 
TracyQuinnfinal
TracyQuinnfinalTracyQuinnfinal
TracyQuinnfinal
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
David Beck Resume
David Beck ResumeDavid Beck Resume
David Beck Resume
 
Heather McCall Resume
Heather McCall ResumeHeather McCall Resume
Heather McCall Resume
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
 
CV Anselm Jacobs combined 200716
CV Anselm Jacobs combined 200716CV Anselm Jacobs combined 200716
CV Anselm Jacobs combined 200716
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013
 
Resume of Eng.Ali
Resume of  Eng.AliResume of  Eng.Ali
Resume of Eng.Ali
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 

Construction Manager Resume

  • 1. Introducing JEROME LEE PINDER 720 Keaton Parkway, Ocoee, FL 34761, Cell No. 919-328-0728, jpinder@thalle.com Objective: Construction Manager/Engineer with Thalle, a Construction Company capable of dominating the Florida Landfill Market both Public and Private, with a will to face new challenging opportunities anywhere there is a company need to utilize my specialized skills and experience. Profile Summary:  28 years of Landfill Cell, Closure, and Waste Water Treatment Plant construction experience in Texas, Alabama, Georgia, and Florida mentoring with “in the trench hands on leadership by example of an old school work ethic”.  Over 224 environmental projects completed as ERC with a total revenue exceeding $86,000,000. Currently Project Manager of $54,000,000 in project revenues on three construction projects.  Maintained the Experience Modification Rate for Workers Compensation under 0.86 with no lost time accidents for 3 years 2010- 2013, and a Total Reportable Incident Rate (TRIR) less or equal to 3. This is due to mandated daily interactive employee safety demonstrations/drills.  Completed over 75 major Landfill Projects involving more than 20 million cubic yards of earthwork using scrapers, off road trucks, pull pans, and excavators dewatering in South Florida.  Composting Facility Construction for Waste Management in Apopka Florida in 2012-2013, a new recycling requirement from their biggest clients.  Competent in evaluating a bid opportunity with onsite survey layout design analysis as it relates to a historicalclaim history and error history ofthe engineer ofrecord where their challengesrepresent opportunities for a bid advantage. Hard work almost always wins the low bid.  Competent in the engineering field of Chemical, with minor experience/education in Electrical schematics, mechanical design, Industrial plants, Civil Engineering, Surveying, and Computer Engineering.  A passion for survey layout, modeling design surfaces in AutoCadd, uploading new design surfaces and designing 3D pipe line work for machine control and rover layout. Programing dozers in the field for site work deviations and change orders as needed.  Flying an airplane at first light to start the weeks work in Naples, Miami, Jacksonville, Pensacola, or Atlanta where projects are in progress to facilitate production evaluations and needed reforms on each and every project.  A passion for 36” HDPE welding and Landfill Gas System Installations involving Flare Systems. Skills Summary:  Strong record keeping skills as it pertains to claim support documentation required daily linking each days work to the overall project schedule, daily costs, and daily revenues, hourly labor/equipment claim impacts, and daily overhead/profit evaluation.
  • 2.  Finish operator on scrapers (631, 621, 623, 615, 613), Off-road Trucks (A25C-A40F), Mass excavators (330, 450’s, 325, 345), Dozers (D3-D9, 450-750 w/ GPS machine control), and misc. heavy equipment. Have maintained a fleet of 18 owned pieces of heavy equipment including mechanic work.  Strong ability to direct the work by leading by example running heavy equipment, surveying, and mentoring operators, foreman, and superintendents to meet required job skill goals by actually being in the trenches hands on. Not only instruct/mentor but demonstrate skill sets to employees teaching survey layout, finish operator stills including programing, and HDPE welding and pipe fitting skills.  Scheduling with Primavera for over 19 years, submittal contract management for 26 years.  Computer programing skills include AutoCAD Civil 3D 2010 Imperial (DTM surface/e arthworks), Terramodel 10.5, SCS DataManager, Sitevision Office, QuickMeasure, and Microsoft Office Programs with 28 years working with Excel programmable spreadsheets.  Strong learning skills as a hobby on new computer programs for bidding, takeoffs, and new technology keeping up with the latest improvements of a paperless environment.  Excellent time management skills with the ability to evaluate daily logs ofpersonneland equipment usage as it equates to costs and revenue goals. PROFESSIONALHISTORY: 1991 - Present ERC General ContractingServices,Inc. PresidentandOwner Environmental LandfillConstructionandClosure,WWTPConstruction 1991 - 1997 ERC General ContractingServices,Inc. Vice PresidentandOwnerEnvironmentalLandfill Installation,closure,andRemediation. 1989 -. 1991 ERC General ContractingServices,Inc. EngineerandProjectManager,Landfill installation,closure,andHazardousWaste Remediation. 1988 – 1990 Earth ResourcesCorporation,(ERC) ProjectManager of the Hazardous Waste,RemediationDivision. 1987 - 1988 HazardousWaste Consultants,Inc. General ManagerandProjectEngineer Environmental Consulting,Waste Cleanup,and hazardouswaste transportation, PlantClosures.
  • 3. 1985 - 1987 TestWell Craig Laboratory, Inc. Laboratory Manager/Project Engineer for hazardous material removal projects. 1980 - 1985 Gulfside Construction, Inc. Concrete foundation foreman, heavy equipment operator. 1976 - 1980 Spoolstra Pool Company, Inc. Journeyman Carpenter, concrete construction mason. Education Details:  Bachelor of Science, University of South Florida, 1986, Engineering Major  Bachelor of Arts, University of South Florida, 1986, Natural Science (Biology). Certifications Class A General Contractor’s license – Florida General Contractor’s license – Georga Underground utility license Reference: Lee/Hendry Landfill Cell 5, Leachate Collection Ponds/Lift Stations Laura Grey, Solid Waste Engineer (239)707-1537 Compost Facility Construction: Sheree Grant, Waste Management Engineer, (407) 902-1469 Landfill Cell Construction/Closure/Gas Systems last 10 years Rich Siemering, HDR, (813)282-2300 Itza Rivera-Frisco, HDR, (813) 294-1580 Landfill Gas Systems, Closures Jim Flynt, Orange County Solid Waste (407) 836-6601 Key Projects: 2013-2014 City of Jacksonville Phase 4 Clay Landfill Closure, 28 acres, $5,754,000 At 60% complete, City cancelled the contract. Hands on welding of over 2,000 LF of 30”
  • 4. HDPE pipe terrace inlets, surveying and as-builts of project, site superintendent installing a clay liner, top soil, storm water management, GPS modeling for machine control “in house”. Daylight hours, 7 days/week, rainy season clay closure under the most intense conditions imaginable. 2013-2014 City of Jacksonville Project for Waste Management, 28 acre gas system, $ 345,069 Hands on welding and excavator operator for 14,000 LF of 2”, 4”, 6”, 8” HDPE air/fm and gas system installation including 36” vertical wells. Performed all functions of project management and site work. 2013-2014 Golden Gem Landfill Gas Flare System and Closure, $ 375,461 8,000 LF of 10” and 8” header, 42 gas vents, 650 cfm Flare installation. Design build engineer on site operator, surveyor, and welder. 2013 Hillsborough County SE Landfill Sect. 7, 8, &9 Gas Collection/Control System, $992,401, Richard Seimering HDR Project Manager & Reference. 10,000 LF of 10” and 12” header to horizontal gas collections system in ash up to 12’ deep, Project Superintendent and welder/surveyor/operator/engineer design build. 2013 BP Port Everglades, Fuel Tank Farm Liner/Berm Installation, $ 285,672 Under an intense safety requirement, a design/build berm was installed around a gas storage tank farm which included constant confined space entry protocols, liner installation, and heavy equipment operation among live fueling piping. Liner extrusion welder, heavy equipment operator, superintendent, survey layout, design build. 2011-2012 City of Jacksonville Landfill Closure, 24 acre clay liner, $ 4,124,738 Project Engineer and HDPE welder for the 30” HDPE pipe for the terraces designed by ETM. GPS programmer and ACAD modeler. Operator/Superintendent on site part time. 2011-2012 WSI Private JED Cell 8 Landfill, $1,136,239 Project Manager and Engineer for this 14 acre cell construction. Double lined 60 mil HDPE system w/ GCL base, 320,000 cy of earthwork, site drainage system and structures, leachate lift stations (3), electrical pad, pumps. 2012 Lake County Landfill Closure, 25 acres, $1,940,607 Site Superintendent/Engineer/Heavy Equipment Operator/Welder for a design build closure design by HDR Inc (David Beben). Performed the survey/layout/as-built, operated a local pit, imported 160,000 cy of clay, HDPE lined with pipe welding, gas venting, HDPE storm water pipe and structures, sodding. Hired and trained local operators to complete the work with myself
  • 5. as their mentor. No full time ERC employees used due to increased company workload in Jacksonville. 2012 Medley Landfill Gas Systemand Lined Closure for Waste Management, 20 acres, $1,222,705 Site Superintendent/Engineer/operator/welder for a design build closure developed by SCS- Globex Engineering. Hired local operators and trained them in landfill work, surveying, machine control, and welding as no full time ERC employees were available. Developed on site ACAD GPS modeling for machine control dozers. Installed 80,000 cy of cover over a HDPE liner system after installing a 18” gas systemin extremely wet and deep conditions. 2011-2012 Naples Landfill Gas System and Closure for Waste Management, 12 acres, $725,720 Site Superintendent/Engineer/Operator/Welder for a design build closure system developed by SCS-Globex Engineering. A 1,500 LF 20”-18” header systemwas installed after performing a lined HDPE closure. Extremely complicated design of perimeter HDPE piping, geonet, and capture systems on 1:1 slope intercepts. 2012 Marion County Baseline Landfill, 10 acres, $ 452,794 Jones Edmunds and Assoc. (Mikey Pollman) designed an infill in an existing closed landfill involving the installation of a deep trench drain and 60 mil liner tie-in at the base of the existing landfill. HDPE gas piping, horizontal trenching, rain tarps. This was the second phase of work from 2011. Provided superintendent/operator/surveyor and project administration. 2012 Vista Landfill Apopka Florida for Waste Management, $92,010 Installed a pond system for Cell 3, a roadway to the new recycling facility including storm water structures, HDPE piping, 3” water force main, and recycled roadway. 2011 Marion County Baseline Landfill, 10 acres, $ 392,793 Jones Edmunds and Assoc. (Mikey Pollman) designed an infill in an existing closed landfill involving the installation of a deep trench drain and 60 mil liner tie-in at the base of the existing landfill. HDPE gas piping, horizontal trenching, rain tarps. This was the first phase of work from starting in 2011. Project superintendent/operator/surveyor and project administration. 2011 Hardee County Landfill, 25 acre Closure and infill cell, $ 2,493,609 SCS Engineering (Shane Fischer) designed the infill cell with a composite 60 mil liner system, leachate collections HDPE piping system, and HDPE liner closure system along with vertical gas vents. Gas well installation, passive gas system, 60 and 40 mil HDPE liner systems, drainage layers, storm water terrace system,drainage system, asphalt roadways and GFFR swale. Imported 110,000 cy of drainage sand/cover materials. Provided all Project Management, contract administration, HDPE welding, assisted in Site Superintendent.
  • 6. 2011 Vista Landfill Compost Recycling Facility Infrastructure and site development, $610,000 Cell 2 Gas System Installation, Composting Center Storm water grid system. Site Superintendent/surveyor/welder for a 10 acre heavy clearing operation, 40,000 cy fill, 36” RCP with 12 inlet structures, roadways, concrete tanks. 2011 Pasco County Ridge Road Landfill Flare System, $392,793 Site Superintendent/surveyor/heavy equipment operator/welder/concrete mason. Installed a design build gas system on an existing closed landfill, Flare System, Building covering the System, upgraded electrical work. 2010 Putnam County Class 1 Landfill, 2010 - $3,554,000 14 acre cell, double lined 60 mil system w/ GCL base, 245,000 cy ofearthwork, imported fill,on site drainage system, leachate lift stations, electrical systems, pumps, asphalt roadways,storm water drainage systems with triple RCP road crossings. On site part time superintendent. 2009-2010 Osceola County JED Waste ServicesInc. - $2,290,773 Site Project Engineer/Superintendent/Heavy Equipment Operator/Surveyor/Programer/Welder. Landfill class 1 cells 6 and cell 7 using double lined 60 mil HDPE liner and GCL base, including storm water ponds for cells 1-7, and closure work for cells 1-4, 2009-2010, cell 6 size 9 acres,cell 7 size 11 acres,earthwork on site 425,000 cy, work performed in 120 days for each project. 2009-2010 Vista Landfill C&D Cell - Waste Management Inc. Apoka Fl - $2,800,000 Full time site superintendent/surveyor/welder/ and project manager. Lined 60 mil Vista Cell 2, 13 acres,Keene Road Landfill plus a 75 acre landfill closure with 50 mil liner system, 350,000 cy ofearthwork, gas flare system with 9,000 lfofHDPE header pipe work performed within 160 days. Owner paid direct for materials, total job over $4,000,000. 2009-2010 City ofTallahassee WWTP Piping, Concrete,and Lagoon Installation, $1,566,160 Demolition of an existing WWTP, WWTP piping to 30” diameter,concrete stormwater wallsystems, lined 40 mil lagoons to 40 acres. Full time site superintendent and project engineer. 2008 Polk County Landfill Toe Closure and Biogas System Redesign, $1,174,450. 60 mil Liner system, toe drain, and extensive HDPE Biogas System piping and storm water controls and structures. Full time site superintendent. 2007 Hillsborough County Waste ServicesInc. C&DLandfill - $4,958,353 Sun Country Materials C&D Landfill 18 acre cells with a 60 mil liner system, 24 acre closure, and passive gas system. 469,000 cy ofearth work on site including importing drainage sand. The storm water ponds were excavated without dewatering systems due to wetland impacts. Leachate Storage ponds and transfer pumping systems. Full time site superintendent/project management/engineering/administration/heavy equipment operator.
  • 7. 2007 St. Lucie County, Class 1 Landfill, $4,590,110 15 acres,double lined 60 mil cell with GCL base, 280,000 cy ofearthwork, offsite imported fill, drainage system, leachate collection lift stations, pumps, roadways. Full time site supervisor and all project management/engineering/administration. 2007 Polk County Landfill Closure, $1,174,450 35 acre closure of two landfills including 50 mil liner system installation, Gas well installation, roadways, and storm water piping. Full time site supervisor. 2007 City ofTallahassee WWTP Lagoon Liner System and Sludge Dewatering, $522,570 Lined WWTP lagoon construction, 20 acres,asphalt roadways,sludge removal. Site supervisor/engineer/heavy equipment operator. 2005-2006 Hillsborough County Landfill Cell 8 and leachate piping system to Cell 7, $ 4,165,593. 16 acres,double lined 60 mil class 1 cell with clay liner base. Earthwork totaled 350,000 cy of on site phosphetic clay removal, imported fill, and imported drainage sand. Full time site supervisor/heavy equipment operator/welder/surveyor. Project from 1989-2005 available.