Solar Photovoltaic - Why It is Important
HOW A Solar Electric Systems WORKS
DEFINITION
of
BUILDING INTEGRATED PHOTOVOLTAIC (BIPV)
• Insulated PV glass unit
WHY BIPV?
• LOWER COST
• IMPROVED ASTHETICS
• WIDER DISTRIBUTION
APPLICATION OF BIPV
• ROOFINGS
• SKYLIGHTS-CANOPIES
• CURTAIN WALLS- VERTICAL GLASS
• c-Si PV CELL COLORS
• DIFFERENT TYPES OF BIPV APPLICATIONS
COMPONENTS OF BIPV ELECTRIC SYSTEMS
 BIPV PANELS
 SOLAR INVERTERS
 SOLAR CABLES + CONNECTORS
 MOUNTING RACKS
 DISTRIBUTION PANEL
DESIGN CONSIDERATIONS
 ROOF AREA AVAILABLE VISION GLASS APPLICATION
 SPANDREL AREA INSTALLATION
 TYPE OF PV CELLS & PANELS (SIZE, COLOR & SPACING)
 TYPE & SPECIFICATION OF PCU (POWER CONDITIONING UNIT)
 CABLES & CONNECTORS TYPE
 ORIENTATION & ELEVATION
 ANTICIPATED ENERGY PRODUCTION
CURTAIN WALL CONSIDERATIONS
 ACCOMMODATE GLASS WITH END CONNECTORS
 INCORPORATE WIRES & JUNCTION BOXES
 COMPLY WITH BUILDNG CODES, IEC, IS & UL
 GASKET & SEALANT COMPATIBILITY
 AIR, WATER & THERMAL PERFORMANCE
 ALLOW FOR FUTURE ACCESS TO WIRING
QUALITY CHECKING & DESIGN CONSIDERATION OF
BIPV CELLS & PANELS
 Pv Cell Technology Has To Be Of 3rd Generation Based
 Cell Efficiency Has To Be Greater Than 17%
 Module Efficiency Must Be Greater Than 14%
 NOCT Should Lie Between 56 to 62 C
 Power Temperature Co-efficient Not More Than -0.47%/ C
 At Irradiation 600w/sq.m/Day And At 25 C , Module’s Output Need To Be 55% Or
More Of It’s Rated Peak Power.
 BIPV Modules Must Comply With IEC-61215 & IEC-61646
0
0
0
DESIGN CONSIDERATION FOR
SOLAR INVERTERS
 Micro Or String Type Inverters Can Be Used In Such Applications
 Must Have 1 MPPT Per Inverter
 Conversion Efficiency Has To Be Greater Than 95%
 Should Operate At Unity P.F
 Total Harmonic Distortion Should Be Less Than 2%
 Must Comply With Anti-islanding Protection
 Self Consumption Should Be Less Than 2%
 Transformer less Topology Is Preferable
 Grounding Arrangement Has To Be Included
 Must Have A Surge Protection Device
 Product Warranty Should Be At least 15 Years
 Remote Monitoring & Data Acquisition Facility Is Preferable
 Inverter Must Comply With UL-1741/ IEEE-1547
DESIGN CONSIDERATION FOR SOLAR CABLES
 MUST WITHSTAND 120 C TEMPERATURE
 RATED VOLTAGE HAS TO BE 0.9/1.8 KV DC
 INSULATING MATERIAL SHOULD BE HALOGEN FREE CROSS-LINKED COMPUND
 PRODUCT MUST COMPLY WITH IS-8130
0
PV ARRAY TILT & ORIENTATION
TILT
 TILT DEPENDS ON THE
LOCATION LATITUDES
 e.g FOR DELHI, THE TILT
ANGLE WILL BE 28 (FIXED)
WHERE AS FOR KOLKATA
IT’LL BE 23
 INSTALLATION OF BIPV
SHOULD BE DONE IN A WAY
TO OPTIMIZE THE TILT ANGLE
0
0
ORIENTATION
 DEPENDS ON THE LOCATION’S
AZIMUTH
 FOR INSTANCE, A SPV SYSTEM
AT DELHI SHOULD BE FACING
DIRECTLY TO SOUTH

More Related Content

What's hot

LED Lighting
LED LightingLED Lighting
LED Lighting
Ambuj Mishra
 
Photovoltaic Systems
Photovoltaic SystemsPhotovoltaic Systems
Photovoltaic Systems
Leonardo ENERGY
 
Net zero energy buildings
Net zero energy buildingsNet zero energy buildings
Net zero energy buildings
sarojkhadka059
 
Net zero energy building
Net zero energy buildingNet zero energy building
Zero energy building
Zero energy buildingZero energy building
Zero energy building
Priyankabudruk
 
Solar home lighting system
Solar home lighting systemSolar home lighting system
Solar home lighting system
Siya Agarwal
 
Types of solar panels for the house
Types of solar panels for the houseTypes of solar panels for the house
Types of solar panels for the house
lee shin
 
Zero energy building
Zero energy buildingZero energy building
Zero energy building
ANIL SINGH
 
Zero energy buildings seminar
Zero energy buildings seminarZero energy buildings seminar
Zero energy buildings seminar
Sharan Raj
 
Different type of lamps
Different type of lampsDifferent type of lamps
Different type of lamps
dgoradia
 
Net zero energy buildings
Net zero energy buildingsNet zero energy buildings
Net zero energy buildings
riyasingh188
 
Elements of energy efficient buildings
Elements of energy efficient buildingsElements of energy efficient buildings
Elements of energy efficient buildings
Ubaid Mushtaq Mir
 
Solar pv systems
Solar pv systemsSolar pv systems
Solar pv systems
Stephen Jones
 
Photovoltaic Devices: Life Cycle Considerations
Photovoltaic Devices: Life Cycle ConsiderationsPhotovoltaic Devices: Life Cycle Considerations
Photovoltaic Devices: Life Cycle Considerations
Gavin Harper
 
ppt on Earth air tunnel heat exchanger (eathe)
ppt on Earth air tunnel heat exchanger (eathe)ppt on Earth air tunnel heat exchanger (eathe)
ppt on Earth air tunnel heat exchanger (eathe)
Yuvraj Singh
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
Rajesh Pindoriya
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdf
Paul374728
 

What's hot (20)

LED Lighting
LED LightingLED Lighting
LED Lighting
 
Photovoltaic Systems
Photovoltaic SystemsPhotovoltaic Systems
Photovoltaic Systems
 
Net zero energy buildings
Net zero energy buildingsNet zero energy buildings
Net zero energy buildings
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy building
 
Zero energy building
Zero energy buildingZero energy building
Zero energy building
 
Energy Efficient Lighting
Energy Efficient LightingEnergy Efficient Lighting
Energy Efficient Lighting
 
Solar home lighting system
Solar home lighting systemSolar home lighting system
Solar home lighting system
 
Types of solar panels for the house
Types of solar panels for the houseTypes of solar panels for the house
Types of solar panels for the house
 
Zero energy building
Zero energy buildingZero energy building
Zero energy building
 
BMSOverview
BMSOverviewBMSOverview
BMSOverview
 
Zero energy buildings seminar
Zero energy buildings seminarZero energy buildings seminar
Zero energy buildings seminar
 
Different type of lamps
Different type of lampsDifferent type of lamps
Different type of lamps
 
Net zero energy buildings
Net zero energy buildingsNet zero energy buildings
Net zero energy buildings
 
Elements of energy efficient buildings
Elements of energy efficient buildingsElements of energy efficient buildings
Elements of energy efficient buildings
 
Solar pv systems
Solar pv systemsSolar pv systems
Solar pv systems
 
Solar Cooling
Solar CoolingSolar Cooling
Solar Cooling
 
Photovoltaic Devices: Life Cycle Considerations
Photovoltaic Devices: Life Cycle ConsiderationsPhotovoltaic Devices: Life Cycle Considerations
Photovoltaic Devices: Life Cycle Considerations
 
ppt on Earth air tunnel heat exchanger (eathe)
ppt on Earth air tunnel heat exchanger (eathe)ppt on Earth air tunnel heat exchanger (eathe)
ppt on Earth air tunnel heat exchanger (eathe)
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdf
 

Viewers also liked

Terra Tile Solar Project
Terra Tile Solar ProjectTerra Tile Solar Project
Terra Tile Solar Project
Energize NY
 
Bipv development project.ppt
Bipv development project.pptBipv development project.ppt
Bipv development project.pptPVaccel
 
Confort 125 robust insulated aluminium sliding door by Sapa Building System
Confort 125 robust insulated aluminium sliding door by Sapa Building SystemConfort 125 robust insulated aluminium sliding door by Sapa Building System
Confort 125 robust insulated aluminium sliding door by Sapa Building SystemSapa Building System
 
Opportunities for BIPV
Opportunities for BIPVOpportunities for BIPV
Opportunities for BIPV
n-tech Research
 
Detailed modeling of complex BIPV systems
Detailed modeling of complex BIPV systemsDetailed modeling of complex BIPV systems
Detailed modeling of complex BIPV systems
Sandia National Laboratories: Energy & Climate: Renewables
 
Building Integrated PhotoVoltaic Solutions BIPV by Sapa Building System
Building Integrated PhotoVoltaic Solutions BIPV by Sapa Building SystemBuilding Integrated PhotoVoltaic Solutions BIPV by Sapa Building System
Building Integrated PhotoVoltaic Solutions BIPV by Sapa Building System
Sapa Building System
 
Energy harvesting through footsteps
Energy harvesting through  footstepsEnergy harvesting through  footsteps
Energy harvesting through footsteps
Sharon Mansoor
 
Multifunctional, Coloured - BIPV (Glass+Glass) Solar Modules
Multifunctional, Coloured - BIPV (Glass+Glass) Solar ModulesMultifunctional, Coloured - BIPV (Glass+Glass) Solar Modules
Multifunctional, Coloured - BIPV (Glass+Glass) Solar Modules
sivakumar bharadhwaj
 

Viewers also liked (9)

Terra Tile Solar Project
Terra Tile Solar ProjectTerra Tile Solar Project
Terra Tile Solar Project
 
Bipv development project.ppt
Bipv development project.pptBipv development project.ppt
Bipv development project.ppt
 
Confort 125 robust insulated aluminium sliding door by Sapa Building System
Confort 125 robust insulated aluminium sliding door by Sapa Building SystemConfort 125 robust insulated aluminium sliding door by Sapa Building System
Confort 125 robust insulated aluminium sliding door by Sapa Building System
 
Opportunities for BIPV
Opportunities for BIPVOpportunities for BIPV
Opportunities for BIPV
 
Detailed modeling of complex BIPV systems
Detailed modeling of complex BIPV systemsDetailed modeling of complex BIPV systems
Detailed modeling of complex BIPV systems
 
Building Integrated PhotoVoltaic Solutions BIPV by Sapa Building System
Building Integrated PhotoVoltaic Solutions BIPV by Sapa Building SystemBuilding Integrated PhotoVoltaic Solutions BIPV by Sapa Building System
Building Integrated PhotoVoltaic Solutions BIPV by Sapa Building System
 
Energy harvesting through footsteps
Energy harvesting through  footstepsEnergy harvesting through  footsteps
Energy harvesting through footsteps
 
Multifunctional, Coloured - BIPV (Glass+Glass) Solar Modules
Multifunctional, Coloured - BIPV (Glass+Glass) Solar ModulesMultifunctional, Coloured - BIPV (Glass+Glass) Solar Modules
Multifunctional, Coloured - BIPV (Glass+Glass) Solar Modules
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similar to Presentation on QA/QC of BIPV project for commercial buildings

Solar pv plant and india
Solar pv plant and indiaSolar pv plant and india
Solar pv plant and india
Mahesh Chandra Manav
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
Sunrator Technologies LLP
 
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PVQuality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
Arpo Mukherjee
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Ashish Verma
 
Ornate Solar x Solar Edge
Ornate Solar x Solar Edge Ornate Solar x Solar Edge
Ornate Solar x Solar Edge
Ornate Solar
 
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE코리아
 
The Elektrotipp - Circuit - Breaker Boxes
The Elektrotipp - Circuit - Breaker BoxesThe Elektrotipp - Circuit - Breaker Boxes
The Elektrotipp - Circuit - Breaker Boxes
Hensel Electric India Private Limited
 
Sunny boy storage 2.5
Sunny boy storage 2.5Sunny boy storage 2.5
Sunny boy storage 2.5
Optimus Energy Philippines
 
Next105 Ases Power Point Presentation Internal Final
Next105 Ases Power Point Presentation Internal FinalNext105 Ases Power Point Presentation Internal Final
Next105 Ases Power Point Presentation Internal Final
Nextronex Inc
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
Solar Reference
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1Murugappa Group
 
Session 4 - Solar PV Modules.pptx
Session 4 - Solar PV Modules.pptxSession 4 - Solar PV Modules.pptx
Session 4 - Solar PV Modules.pptx
SURINDER KUMAR
 
RELINK - benefit of micro inverters
RELINK - benefit of micro invertersRELINK - benefit of micro inverters
RELINK - benefit of micro inverters
Marco Achilli
 
The Elektro Tipp - PV Generator Junction Boxes
The Elektro Tipp - PV Generator Junction BoxesThe Elektro Tipp - PV Generator Junction Boxes
The Elektro Tipp - PV Generator Junction Boxes
Hensel Electric India Private Limited
 
Dsp Sine Wave Static UPS
Dsp Sine Wave Static UPSDsp Sine Wave Static UPS
Dsp Sine Wave Static UPSMustahid Ali
 
PV power plant solutions 7-Feb-2016
PV power plant solutions 7-Feb-2016PV power plant solutions 7-Feb-2016
PV power plant solutions 7-Feb-2016Mohammad Abuhilal
 
Pv power plant solutions
Pv power plant solutionsPv power plant solutions
Pv power plant solutions
zeesaint
 

Similar to Presentation on QA/QC of BIPV project for commercial buildings (20)

Solar pv plant and india
Solar pv plant and indiaSolar pv plant and india
Solar pv plant and india
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PVQuality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
 
Ornate Solar x Solar Edge
Ornate Solar x Solar Edge Ornate Solar x Solar Edge
Ornate Solar x Solar Edge
 
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
 
The Elektrotipp - Circuit - Breaker Boxes
The Elektrotipp - Circuit - Breaker BoxesThe Elektrotipp - Circuit - Breaker Boxes
The Elektrotipp - Circuit - Breaker Boxes
 
Sunny boy storage 2.5
Sunny boy storage 2.5Sunny boy storage 2.5
Sunny boy storage 2.5
 
Solar doc
Solar docSolar doc
Solar doc
 
Next105 Ases Power Point Presentation Internal Final
Next105 Ases Power Point Presentation Internal FinalNext105 Ases Power Point Presentation Internal Final
Next105 Ases Power Point Presentation Internal Final
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1
 
Session 4 - Solar PV Modules.pptx
Session 4 - Solar PV Modules.pptxSession 4 - Solar PV Modules.pptx
Session 4 - Solar PV Modules.pptx
 
RELINK - benefit of micro inverters
RELINK - benefit of micro invertersRELINK - benefit of micro inverters
RELINK - benefit of micro inverters
 
The Elektro Tipp - PV Generator Junction Boxes
The Elektro Tipp - PV Generator Junction BoxesThe Elektro Tipp - PV Generator Junction Boxes
The Elektro Tipp - PV Generator Junction Boxes
 
Dsp Sine Wave Static UPS
Dsp Sine Wave Static UPSDsp Sine Wave Static UPS
Dsp Sine Wave Static UPS
 
Ppt1
Ppt1Ppt1
Ppt1
 
PV power plant solutions 7-Feb-2016
PV power plant solutions 7-Feb-2016PV power plant solutions 7-Feb-2016
PV power plant solutions 7-Feb-2016
 
Pv power plant solutions
Pv power plant solutionsPv power plant solutions
Pv power plant solutions
 
Products & services (new)
Products & services (new)Products & services (new)
Products & services (new)
 

Recently uploaded

Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 

Recently uploaded (20)

Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 

Presentation on QA/QC of BIPV project for commercial buildings

  • 1. Solar Photovoltaic - Why It is Important
  • 2.
  • 3. HOW A Solar Electric Systems WORKS
  • 4. DEFINITION of BUILDING INTEGRATED PHOTOVOLTAIC (BIPV) • Insulated PV glass unit
  • 5. WHY BIPV? • LOWER COST • IMPROVED ASTHETICS • WIDER DISTRIBUTION APPLICATION OF BIPV • ROOFINGS • SKYLIGHTS-CANOPIES • CURTAIN WALLS- VERTICAL GLASS • c-Si PV CELL COLORS • DIFFERENT TYPES OF BIPV APPLICATIONS
  • 6.
  • 7. COMPONENTS OF BIPV ELECTRIC SYSTEMS  BIPV PANELS  SOLAR INVERTERS  SOLAR CABLES + CONNECTORS  MOUNTING RACKS  DISTRIBUTION PANEL
  • 8. DESIGN CONSIDERATIONS  ROOF AREA AVAILABLE VISION GLASS APPLICATION  SPANDREL AREA INSTALLATION  TYPE OF PV CELLS & PANELS (SIZE, COLOR & SPACING)  TYPE & SPECIFICATION OF PCU (POWER CONDITIONING UNIT)  CABLES & CONNECTORS TYPE  ORIENTATION & ELEVATION  ANTICIPATED ENERGY PRODUCTION
  • 9. CURTAIN WALL CONSIDERATIONS  ACCOMMODATE GLASS WITH END CONNECTORS  INCORPORATE WIRES & JUNCTION BOXES  COMPLY WITH BUILDNG CODES, IEC, IS & UL  GASKET & SEALANT COMPATIBILITY  AIR, WATER & THERMAL PERFORMANCE  ALLOW FOR FUTURE ACCESS TO WIRING
  • 10. QUALITY CHECKING & DESIGN CONSIDERATION OF BIPV CELLS & PANELS  Pv Cell Technology Has To Be Of 3rd Generation Based  Cell Efficiency Has To Be Greater Than 17%  Module Efficiency Must Be Greater Than 14%  NOCT Should Lie Between 56 to 62 C  Power Temperature Co-efficient Not More Than -0.47%/ C  At Irradiation 600w/sq.m/Day And At 25 C , Module’s Output Need To Be 55% Or More Of It’s Rated Peak Power.  BIPV Modules Must Comply With IEC-61215 & IEC-61646 0 0 0
  • 11.
  • 12. DESIGN CONSIDERATION FOR SOLAR INVERTERS  Micro Or String Type Inverters Can Be Used In Such Applications  Must Have 1 MPPT Per Inverter  Conversion Efficiency Has To Be Greater Than 95%  Should Operate At Unity P.F  Total Harmonic Distortion Should Be Less Than 2%  Must Comply With Anti-islanding Protection  Self Consumption Should Be Less Than 2%  Transformer less Topology Is Preferable  Grounding Arrangement Has To Be Included  Must Have A Surge Protection Device  Product Warranty Should Be At least 15 Years  Remote Monitoring & Data Acquisition Facility Is Preferable  Inverter Must Comply With UL-1741/ IEEE-1547
  • 13. DESIGN CONSIDERATION FOR SOLAR CABLES  MUST WITHSTAND 120 C TEMPERATURE  RATED VOLTAGE HAS TO BE 0.9/1.8 KV DC  INSULATING MATERIAL SHOULD BE HALOGEN FREE CROSS-LINKED COMPUND  PRODUCT MUST COMPLY WITH IS-8130 0
  • 14.
  • 15. PV ARRAY TILT & ORIENTATION TILT  TILT DEPENDS ON THE LOCATION LATITUDES  e.g FOR DELHI, THE TILT ANGLE WILL BE 28 (FIXED) WHERE AS FOR KOLKATA IT’LL BE 23  INSTALLATION OF BIPV SHOULD BE DONE IN A WAY TO OPTIMIZE THE TILT ANGLE 0 0 ORIENTATION  DEPENDS ON THE LOCATION’S AZIMUTH  FOR INSTANCE, A SPV SYSTEM AT DELHI SHOULD BE FACING DIRECTLY TO SOUTH