SlideShare a Scribd company logo
110 KV / 40 MVA
TR
110 KV / 40 MVA
TR
TRANSFORMER TO BE MOVED
TOWARDS THE ROOM WALL BY 2.3
METER JUST BEFORE THE RISING
H.V CABLES.
FINAL STEP IS TO BE MOVED
TOWARDS IT'S AXIS TILL FULLY
PUT AND FITS ON THE TRAILER.
110KV/40MVA
TR
TRANSFORMER TO BE ROTATED
BACK INWARDS BY 10
ALIGNED AS POSSIBLE WITH THE TRAILER.
PART OF IT ON THE TRAILER WHILE THE
OTHER PART IS SUPPORTED ON SLIDING
ROLLS TEMPORARILY.
110KV/40MVA
TR
110KV/40MVA
TR
THEN TO BE ROTATED ONCE AGAIN
BY 33
ABUTMENT, PART OF IT ON THE TRAILER
WHILE THE OTHER PART IS SUPPORTED
ON SLIDING ROLLS TEMPORARILY.
110 KV / 40 MVA
TR
TRANSFORMER TO BE MOVED ON
RAILS TILL OPENING GATE, THEN
TO BE PUT ON SLIDING ROLLS.
110KV/40MVATR
THEN TO BE ROTATED AROUND
THE ROTATION BASE BY 42 JUST
BEFORE THE ROOM WALL.
110KV/40MVA
TR
THEN TO BE MOVED ALONG IT'S
AXIS BY 2 METER TOWARDS
OUTSIDE, WHERE TRAILER IS
AWAITING TO CARRY PART OF THE
TRANSFORMER.
110 KV / 40 MVA
TR
1
CONSULTANT :
Kingdom of Saudi Arabia
DES-CHILLER AJYAD-TR-SCENARIO-001
KEY MAP:
GENERAL NOTES:-
LEGEND:-
TRANSFORMER & ROOM
DIMENTIONS
2 3 4
5678
1- SITE CONDITION TO BE TAKEN INTO CONSIDERATION.
2- THIS SCENARIO IS REVERSIBLE.
3- METHOD OF MOVING THE TRANSFORMER IN & OUT OF THE ROOM IS
VIA JACKING AND SLIDING.
4- TRANSFORMER SHOWN DIMENSIONS IS AFTER DISMANTLE IT'S RADIATORS AT BOTH
SIDES.
3- ALL DIMENTIONS ARE IN METERS.
CONTRACTOR :
CONSULTANT :
Kingdom of Saudi Arabia
DES-CHILLER AJYAD-TR-SCENARIO-002
KEY MAP:
GENERAL NOTES:-
LEGEND:-
1- REFER TO ATTACHED MANUAL FOR MOBILE CRANE FULL
DIMENTIONS AND SELECTIVITY OF PROPER LIFTING
CAPACITIES & HEIGHTS.
2- SITE CONDITION TO BE TAKEN INTO CONSIDERATION.
Ajyad
Ramp
AjyadRoad
110 KV
TR
AjyadRoad
AjyadRoad
AjyadRoad
Ajyad
Ramp
AjyadRoad

More Related Content

What's hot

Grounding System At SKT-B8
Grounding System At SKT-B8Grounding System At SKT-B8
Grounding System At SKT-B8
Phemakorn Khoonsri
 
Transpotation
TranspotationTranspotation
Transpotation
VinodChandrakar1
 
Vnx.su nsx_часть3
Vnx.su  nsx_часть3Vnx.su  nsx_часть3
Vnx.su nsx_часть37gsxr
 
Breaker Operation & Maintenance
Breaker Operation & MaintenanceBreaker Operation & Maintenance
Breaker Operation & Maintenance
Sheikh Nazmul Islam
 
132kvsub stvisit-090328064243-phpapp02
132kvsub stvisit-090328064243-phpapp02132kvsub stvisit-090328064243-phpapp02
132kvsub stvisit-090328064243-phpapp02
Shabith Ahamed
 
BUCHHOLZ RELAY ON TRANSFORMER
BUCHHOLZ RELAY ON TRANSFORMERBUCHHOLZ RELAY ON TRANSFORMER
BUCHHOLZ RELAY ON TRANSFORMERALOWONLE JULIUS
 
bistable multivibrator
bistable multivibratorbistable multivibrator
bistable multivibrator
Dhaniraj Yadav
 
Bucholz relay
Bucholz relayBucholz relay
Bucholz relay
Bhavesh Manghnani
 
Vnx.su nsx_часть2
Vnx.su  nsx_часть2Vnx.su  nsx_часть2
Vnx.su nsx_часть27gsxr
 
Primary Current Calculation for XF Stabilty
Primary Current Calculation for XF StabiltyPrimary Current Calculation for XF Stabilty
Primary Current Calculation for XF StabiltyMuhammad Irfanullah
 
Oil filled transformer accessories - copy
Oil  filled  transformer   accessories - copyOil  filled  transformer   accessories - copy
Oil filled transformer accessories - copy
ayyadurai SHANMUGAM
 
SoundTube 3 Inch Loudspeaker Platform
SoundTube 3 Inch Loudspeaker PlatformSoundTube 3 Inch Loudspeaker Platform
SoundTube 3 Inch Loudspeaker Platform
Sound Directions Ltd
 
Testing and trouble shooting of multivibrators
Testing and trouble shooting of multivibratorsTesting and trouble shooting of multivibrators
Testing and trouble shooting of multivibrators
Sandeep Jamdar
 
FREQUENCY ENTRAINMENT IN A WIEN BRIDGE OSCILLATOR
FREQUENCY ENTRAINMENT IN A WIEN BRIDGE OSCILLATORFREQUENCY ENTRAINMENT IN A WIEN BRIDGE OSCILLATOR
FREQUENCY ENTRAINMENT IN A WIEN BRIDGE OSCILLATOR
SwgwmsaBoro
 
xfr oparation & maintenance
xfr oparation & maintenancexfr oparation & maintenance
xfr oparation & maintenance
Sheikh Nazmul Islam
 

What's hot (16)

Presentation 1
Presentation 1Presentation 1
Presentation 1
 
Grounding System At SKT-B8
Grounding System At SKT-B8Grounding System At SKT-B8
Grounding System At SKT-B8
 
Transpotation
TranspotationTranspotation
Transpotation
 
Vnx.su nsx_часть3
Vnx.su  nsx_часть3Vnx.su  nsx_часть3
Vnx.su nsx_часть3
 
Breaker Operation & Maintenance
Breaker Operation & MaintenanceBreaker Operation & Maintenance
Breaker Operation & Maintenance
 
132kvsub stvisit-090328064243-phpapp02
132kvsub stvisit-090328064243-phpapp02132kvsub stvisit-090328064243-phpapp02
132kvsub stvisit-090328064243-phpapp02
 
BUCHHOLZ RELAY ON TRANSFORMER
BUCHHOLZ RELAY ON TRANSFORMERBUCHHOLZ RELAY ON TRANSFORMER
BUCHHOLZ RELAY ON TRANSFORMER
 
bistable multivibrator
bistable multivibratorbistable multivibrator
bistable multivibrator
 
Bucholz relay
Bucholz relayBucholz relay
Bucholz relay
 
Vnx.su nsx_часть2
Vnx.su  nsx_часть2Vnx.su  nsx_часть2
Vnx.su nsx_часть2
 
Primary Current Calculation for XF Stabilty
Primary Current Calculation for XF StabiltyPrimary Current Calculation for XF Stabilty
Primary Current Calculation for XF Stabilty
 
Oil filled transformer accessories - copy
Oil  filled  transformer   accessories - copyOil  filled  transformer   accessories - copy
Oil filled transformer accessories - copy
 
SoundTube 3 Inch Loudspeaker Platform
SoundTube 3 Inch Loudspeaker PlatformSoundTube 3 Inch Loudspeaker Platform
SoundTube 3 Inch Loudspeaker Platform
 
Testing and trouble shooting of multivibrators
Testing and trouble shooting of multivibratorsTesting and trouble shooting of multivibrators
Testing and trouble shooting of multivibrators
 
FREQUENCY ENTRAINMENT IN A WIEN BRIDGE OSCILLATOR
FREQUENCY ENTRAINMENT IN A WIEN BRIDGE OSCILLATORFREQUENCY ENTRAINMENT IN A WIEN BRIDGE OSCILLATOR
FREQUENCY ENTRAINMENT IN A WIEN BRIDGE OSCILLATOR
 
xfr oparation & maintenance
xfr oparation & maintenancexfr oparation & maintenance
xfr oparation & maintenance
 

Viewers also liked

2015 CRW - Jack & Roll Techniques
2015 CRW - Jack & Roll Techniques2015 CRW - Jack & Roll Techniques
2015 CRW - Jack & Roll Techniques
Specialized Carriers & Rigging Association
 
Ablution Power feeding & calculations
Ablution Power feeding & calculationsAblution Power feeding & calculations
Ablution Power feeding & calculations
Mohamed Azzam
 
Temp. Relocation of Electrical utilities @ Lowering Of Jabal Al-Kabaa Project
Temp. Relocation of Electrical utilities @ Lowering Of Jabal Al-Kabaa ProjectTemp. Relocation of Electrical utilities @ Lowering Of Jabal Al-Kabaa Project
Temp. Relocation of Electrical utilities @ Lowering Of Jabal Al-Kabaa Project
Mohamed Azzam
 
Haram Expansion cables arrangement, MEP coordination and cable trays maneuver
Haram Expansion cables arrangement, MEP coordination and cable trays maneuverHaram Expansion cables arrangement, MEP coordination and cable trays maneuver
Haram Expansion cables arrangement, MEP coordination and cable trays maneuver
Mohamed Azzam
 
Construction Coordination Underground M.V Relocation works
Construction Coordination Underground M.V Relocation worksConstruction Coordination Underground M.V Relocation works
Construction Coordination Underground M.V Relocation works
Mohamed Azzam
 
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...Nick Hyde CEng MIMechE
 
Diversifying source feeding loads for chiller Ajyad Haram
Diversifying source feeding loads for chiller Ajyad HaramDiversifying source feeding loads for chiller Ajyad Haram
Diversifying source feeding loads for chiller Ajyad Haram
Mohamed Azzam
 
Haram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources ScenrioHaram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources Scenrio
Mohamed Azzam
 
3D Renderings
3D Renderings3D Renderings
3D Renderings
Eric Carlberg
 
M.V/H.V Cable trays earthing systems
M.V/H.V Cable trays earthing systemsM.V/H.V Cable trays earthing systems
M.V/H.V Cable trays earthing systems
Mohamed Azzam
 
Haram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsHaram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposals
Mohamed Azzam
 
Basic load out methodologies introduction
Basic load out methodologies introductionBasic load out methodologies introduction
Basic load out methodologies introduction
Bruce nguyen
 
Pinnacle Infotech partaking at 2017 PCI Convention
 Pinnacle Infotech partaking at 2017 PCI Convention  Pinnacle Infotech partaking at 2017 PCI Convention
Pinnacle Infotech partaking at 2017 PCI Convention
Pinnacle Infotech
 
Honeymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferryHoneymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferry
Nomer Adona
 
How to write a good business letter
How to write a good business letter   How to write a good business letter
How to write a good business letter
Sukh Sandhu
 

Viewers also liked (17)

2015 CRW - Jack & Roll Techniques
2015 CRW - Jack & Roll Techniques2015 CRW - Jack & Roll Techniques
2015 CRW - Jack & Roll Techniques
 
Ablution Power feeding & calculations
Ablution Power feeding & calculationsAblution Power feeding & calculations
Ablution Power feeding & calculations
 
Temp. Relocation of Electrical utilities @ Lowering Of Jabal Al-Kabaa Project
Temp. Relocation of Electrical utilities @ Lowering Of Jabal Al-Kabaa ProjectTemp. Relocation of Electrical utilities @ Lowering Of Jabal Al-Kabaa Project
Temp. Relocation of Electrical utilities @ Lowering Of Jabal Al-Kabaa Project
 
Haram Expansion cables arrangement, MEP coordination and cable trays maneuver
Haram Expansion cables arrangement, MEP coordination and cable trays maneuverHaram Expansion cables arrangement, MEP coordination and cable trays maneuver
Haram Expansion cables arrangement, MEP coordination and cable trays maneuver
 
Construction Coordination Underground M.V Relocation works
Construction Coordination Underground M.V Relocation worksConstruction Coordination Underground M.V Relocation works
Construction Coordination Underground M.V Relocation works
 
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
 
Diversifying source feeding loads for chiller Ajyad Haram
Diversifying source feeding loads for chiller Ajyad HaramDiversifying source feeding loads for chiller Ajyad Haram
Diversifying source feeding loads for chiller Ajyad Haram
 
Haram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources ScenrioHaram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources Scenrio
 
3D Renderings
3D Renderings3D Renderings
3D Renderings
 
M.V/H.V Cable trays earthing systems
M.V/H.V Cable trays earthing systemsM.V/H.V Cable trays earthing systems
M.V/H.V Cable trays earthing systems
 
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
STAINES AP-PLANS PHDD C2-A0 HVAC  MECHSTAINES AP-PLANS PHDD C2-A0 HVAC  MECH
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
 
Haram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsHaram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposals
 
1 Generral Layout
1 Generral Layout1 Generral Layout
1 Generral Layout
 
Basic load out methodologies introduction
Basic load out methodologies introductionBasic load out methodologies introduction
Basic load out methodologies introduction
 
Pinnacle Infotech partaking at 2017 PCI Convention
 Pinnacle Infotech partaking at 2017 PCI Convention  Pinnacle Infotech partaking at 2017 PCI Convention
Pinnacle Infotech partaking at 2017 PCI Convention
 
Honeymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferryHoneymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferry
 
How to write a good business letter
How to write a good business letter   How to write a good business letter
How to write a good business letter
 

Similar to 110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO

Pamphlet on important psi parameters rdso
Pamphlet on important psi parameters rdsoPamphlet on important psi parameters rdso
Pamphlet on important psi parameters rdso
sonu200186
 
220 66 kv nrs sub report
220 66 kv nrs sub report220 66 kv nrs sub report
220 66 kv nrs sub report
Mayur Dhanaji Rane
 
Presentation (2).pptx
Presentation (2).pptxPresentation (2).pptx
Presentation (2).pptx
TejusManikandan
 
Danapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final ModelDanapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final ModelMd Ishteyaque
 
TRANSFORMER.pptx
TRANSFORMER.pptxTRANSFORMER.pptx
TRANSFORMER.pptx
MadhusmitaMohanty29
 
Jagdeesh ppt
Jagdeesh pptJagdeesh ppt
Jagdeesh ppt
risab24
 
Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station
Bikash Gyawali
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
Sagnik Saha
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
kumarmayursinha
 

Similar to 110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO (11)

Pamphlet on important psi parameters rdso
Pamphlet on important psi parameters rdsoPamphlet on important psi parameters rdso
Pamphlet on important psi parameters rdso
 
GENERATORS
GENERATORS GENERATORS
GENERATORS
 
220 66 kv nrs sub report
220 66 kv nrs sub report220 66 kv nrs sub report
220 66 kv nrs sub report
 
Presentation (2).pptx
Presentation (2).pptxPresentation (2).pptx
Presentation (2).pptx
 
Danapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final ModelDanapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final Model
 
TRANSFORMER.pptx
TRANSFORMER.pptxTRANSFORMER.pptx
TRANSFORMER.pptx
 
ELECTRICAL SYSTEMS
ELECTRICAL SYSTEMSELECTRICAL SYSTEMS
ELECTRICAL SYSTEMS
 
Jagdeesh ppt
Jagdeesh pptJagdeesh ppt
Jagdeesh ppt
 
Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 

Recently uploaded

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 

Recently uploaded (20)

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 

110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO

  • 1. 110 KV / 40 MVA TR 110 KV / 40 MVA TR TRANSFORMER TO BE MOVED TOWARDS THE ROOM WALL BY 2.3 METER JUST BEFORE THE RISING H.V CABLES. FINAL STEP IS TO BE MOVED TOWARDS IT'S AXIS TILL FULLY PUT AND FITS ON THE TRAILER. 110KV/40MVA TR TRANSFORMER TO BE ROTATED BACK INWARDS BY 10 ALIGNED AS POSSIBLE WITH THE TRAILER. PART OF IT ON THE TRAILER WHILE THE OTHER PART IS SUPPORTED ON SLIDING ROLLS TEMPORARILY. 110KV/40MVA TR 110KV/40MVA TR THEN TO BE ROTATED ONCE AGAIN BY 33 ABUTMENT, PART OF IT ON THE TRAILER WHILE THE OTHER PART IS SUPPORTED ON SLIDING ROLLS TEMPORARILY. 110 KV / 40 MVA TR TRANSFORMER TO BE MOVED ON RAILS TILL OPENING GATE, THEN TO BE PUT ON SLIDING ROLLS. 110KV/40MVATR THEN TO BE ROTATED AROUND THE ROTATION BASE BY 42 JUST BEFORE THE ROOM WALL. 110KV/40MVA TR THEN TO BE MOVED ALONG IT'S AXIS BY 2 METER TOWARDS OUTSIDE, WHERE TRAILER IS AWAITING TO CARRY PART OF THE TRANSFORMER. 110 KV / 40 MVA TR 1 CONSULTANT : Kingdom of Saudi Arabia DES-CHILLER AJYAD-TR-SCENARIO-001 KEY MAP: GENERAL NOTES:- LEGEND:- TRANSFORMER & ROOM DIMENTIONS 2 3 4 5678 1- SITE CONDITION TO BE TAKEN INTO CONSIDERATION. 2- THIS SCENARIO IS REVERSIBLE. 3- METHOD OF MOVING THE TRANSFORMER IN & OUT OF THE ROOM IS VIA JACKING AND SLIDING. 4- TRANSFORMER SHOWN DIMENSIONS IS AFTER DISMANTLE IT'S RADIATORS AT BOTH SIDES. 3- ALL DIMENTIONS ARE IN METERS.
  • 2. CONTRACTOR : CONSULTANT : Kingdom of Saudi Arabia DES-CHILLER AJYAD-TR-SCENARIO-002 KEY MAP: GENERAL NOTES:- LEGEND:- 1- REFER TO ATTACHED MANUAL FOR MOBILE CRANE FULL DIMENTIONS AND SELECTIVITY OF PROPER LIFTING CAPACITIES & HEIGHTS. 2- SITE CONDITION TO BE TAKEN INTO CONSIDERATION. Ajyad Ramp AjyadRoad 110 KV TR AjyadRoad AjyadRoad AjyadRoad Ajyad Ramp AjyadRoad