10000
8000
8000
8000
13100
13100
13100
13100
4500
4000
4000
4000
4000
3000
12000
3500
1000
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES.
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING
VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING
INFORMATION AND QUANTITIES TAKEOFFS.
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING:
NORTH EAST CO-ORDINATION OF CABLES ROUTING.
NORTH EAST CO-ORDINATION OF THE PIERS.
NORTH EAST CO-ORDINATION OF JOINT POINTS OF RELOCATED CABLES.
NUMBER OF CABLES AND THEIR TYPES.
9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. DESIGN DRAWING
WAS NOT ACCURATE IN TERMS OF NUMBER & TYPE OF CONTRADICTED M.V CABLES.
26
MFRR-MV-MHR-RL-26-001
ENG. Mohamed Azzam 31-07-2014
NTS00
CABLES INSIDE PVC PIPES
UNDER CONSTRUCTION STORM
CULVERT
3 X 185 MM2 M.V CABLE
3 X 300 MM2 M.V CABLE
3 X 185 MM2 M.V CABLE JOINT
3 X 300 MM2 M.V CABLE JOINT
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY
CO-ORDINATION RELOCATION .
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING
VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE
LAYING INFORMATION AND QUANTITIES TAKEOFFS.
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- CABLES DIRECT BURIED LAYING WERE IMPLEMENTED AS PER SCECO STANDARDS
AND SUPERVISION.
9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY.
10- ALL DIMENTIONS ARE IN CM.
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY
CO-ORDINATION RELOCATION .
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING
VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE
LAYING INFORMATION AND QUANTITIES TAKEOFFS.
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- CABLES DIRECT BURIED LAYING WERE IMPLEMENTED AS PER SCECO STANDARDS
AND SUPERVISION.
9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY.
10- ALL DIMENTIONS ARE IN CM.
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY
CO-ORDINATION RELOCATION .
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE
LAYING INFORMATION AND QUANTITIES TAKEOFFS.
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING:
NAME OF CABLES.
NUMBER OF CABLES AND THEIR TYPES.
9- ALL FEEDERS CONSIST OF 1 CABLE EXCEPT FOR FEEDER# AH06, AH26, AH45, AH38,
AH39, AH40, AH04, AH44 & AH25 WHICH CONSIST OF 2 CABLES.
10- REFER TO ATTACHED 'INGAZ CERTIFICATE' PROVIDED BY SCECO FOR FURTHER
DETAILS ON EACH FEEDER SOURCE & DESTINATION.
11- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY.
6
12
12
18
6
66
6 12
12
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY
CO-ORDINATION RELOCATION .
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES.
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING
VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE .
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING:
TOTAL LENGTH OF THE RELOCATED M.V CABLES FOR EACH TYPE.
TOTAL NUMBER & LENGTH OF PVC PIPES USED (PIPE UNIT = 6 METER).
TOTAL VOLUME OF EXCAVATED GROUND TRENCH IN M3.
TOTAL ROUTE OF THE RELOCATED M.V CABLES (555 METER).
9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. DESIGN DRAWING
WAS NOT ACCURATE IN TERMS OF NUMBER & TYPE OF CONTRADICTED M.V CABLES.
10- ALL VARIOUS DIMENTIONS ARE IN METER UNIT.
26
MFRR-MV-MHR-RL-26-005
ENG. Mohamed Azzam 31-07-2014
NTS00
CABLES INSIDE PVC PIPES
UNDER CONSTRUCTION STORM
CULVERT
3 X 185 MM2 M.V CABLE
3 X 300 MM2 M.V CABLE
3 X 185 MM2 M.V CABLE JOINT
3 X 300 MM2 M.V CABLE JOINT

Construction Coordination Underground M.V Relocation works

  • 1.
    10000 8000 8000 8000 13100 13100 13100 13100 4500 4000 4000 4000 4000 3000 12000 3500 1000 CONTRACTOR : CONSULTANT : LEGEND: GENERALNOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES. 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING INFORMATION AND QUANTITIES TAKEOFFS. 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING: NORTH EAST CO-ORDINATION OF CABLES ROUTING. NORTH EAST CO-ORDINATION OF THE PIERS. NORTH EAST CO-ORDINATION OF JOINT POINTS OF RELOCATED CABLES. NUMBER OF CABLES AND THEIR TYPES. 9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. DESIGN DRAWING WAS NOT ACCURATE IN TERMS OF NUMBER & TYPE OF CONTRADICTED M.V CABLES. 26 MFRR-MV-MHR-RL-26-001 ENG. Mohamed Azzam 31-07-2014 NTS00 CABLES INSIDE PVC PIPES UNDER CONSTRUCTION STORM CULVERT 3 X 185 MM2 M.V CABLE 3 X 300 MM2 M.V CABLE 3 X 185 MM2 M.V CABLE JOINT 3 X 300 MM2 M.V CABLE JOINT
  • 2.
    CONTRACTOR : CONSULTANT : LEGEND: GENERALNOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY CO-ORDINATION RELOCATION . 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING INFORMATION AND QUANTITIES TAKEOFFS. 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- CABLES DIRECT BURIED LAYING WERE IMPLEMENTED AS PER SCECO STANDARDS AND SUPERVISION. 9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. 10- ALL DIMENTIONS ARE IN CM.
  • 3.
    CONTRACTOR : CONSULTANT : LEGEND: GENERALNOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY CO-ORDINATION RELOCATION . 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING INFORMATION AND QUANTITIES TAKEOFFS. 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- CABLES DIRECT BURIED LAYING WERE IMPLEMENTED AS PER SCECO STANDARDS AND SUPERVISION. 9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. 10- ALL DIMENTIONS ARE IN CM.
  • 4.
    ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER CONTRACTOR : CONSULTANT : LEGEND: GENERALNOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY CO-ORDINATION RELOCATION . 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING INFORMATION AND QUANTITIES TAKEOFFS. 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING: NAME OF CABLES. NUMBER OF CABLES AND THEIR TYPES. 9- ALL FEEDERS CONSIST OF 1 CABLE EXCEPT FOR FEEDER# AH06, AH26, AH45, AH38, AH39, AH40, AH04, AH44 & AH25 WHICH CONSIST OF 2 CABLES. 10- REFER TO ATTACHED 'INGAZ CERTIFICATE' PROVIDED BY SCECO FOR FURTHER DETAILS ON EACH FEEDER SOURCE & DESTINATION. 11- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY.
  • 5.
    6 12 12 18 6 66 6 12 12 CONTRACTOR : CONSULTANT: LEGEND: GENERAL NOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY CO-ORDINATION RELOCATION . 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES. 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE . 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING: TOTAL LENGTH OF THE RELOCATED M.V CABLES FOR EACH TYPE. TOTAL NUMBER & LENGTH OF PVC PIPES USED (PIPE UNIT = 6 METER). TOTAL VOLUME OF EXCAVATED GROUND TRENCH IN M3. TOTAL ROUTE OF THE RELOCATED M.V CABLES (555 METER). 9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. DESIGN DRAWING WAS NOT ACCURATE IN TERMS OF NUMBER & TYPE OF CONTRADICTED M.V CABLES. 10- ALL VARIOUS DIMENTIONS ARE IN METER UNIT. 26 MFRR-MV-MHR-RL-26-005 ENG. Mohamed Azzam 31-07-2014 NTS00 CABLES INSIDE PVC PIPES UNDER CONSTRUCTION STORM CULVERT 3 X 185 MM2 M.V CABLE 3 X 300 MM2 M.V CABLE 3 X 185 MM2 M.V CABLE JOINT 3 X 300 MM2 M.V CABLE JOINT