SlideShare a Scribd company logo
BIM Campus
Josh Dobson
Angus Donaldson
Robert Eaton
What Is Campus?

Campus is a purpose made Building Information Modelling
(BIM) training suite, which aims at teaching and building useable and relevant BIM skills that are instantly transferable into
the workplace and which will enable young people within the
construction industry to make a valued contribution to their
employer at a very early stage.
Autodesk BPAC
Project One - The House
Project One - The House

Rev.

Amendment

Date

6685

1

A(00)GAE001

A(00)GAS001

3
1425

1200

1280

200

9

4

3
Store

3
2340

1 m²
9.9 SF

3735

1355

1100

5
1
Dining Room
15 m²
161.6 SF

UP

---

3

10
Room

6000

15 m²
157.4 SF

625

8845

4
A(00)GAE001

6

1A(00)GAE001

1
A(00)GAS002

2

15 m²
165.6 SF

12
Room

4120

5000

2
Living Room

26 m²
284.6 SF

1235

By Department Legend
Circulation

8
2340

Communal Space

4
Porch

Garage
Storage

1100

2 m²
26.6 SF

Room Schedule - Level 0
Level

7

10

North

2
1
A(00)GAE001

1

Level 0
1 : 20

Name

Level 0
Level 0
Level 0
Level 0
Level 0
Level 0

Dining Room
Living Room
Store
Porch
Room
Room

Status

525

525

305
1000

1316

1510

1424

Project Status

Project

Typical House

Drawing

General Arrangement - Level 0

Project No.

58162432

Area
15 m²
15 m²
1 m²
2 m²
15 m²
26 m²

Scale at A1

1 : 20

Dwg. No.
Drawn

A(00)GAP001

Author

Checked

Rev.

Checker

Date

10/31/13

this drawing is copyright - check all dimensions on site - inform architect / so of any discrepancies - work to figured dimensions only - do not scale
Project Two - University Projects
Project Two - University Project

Rev.

1

14
2

3

3
2
5
1

4

5

7

9
8

10
9

Amendment

11
10

Date

12
11

A(21)GAV003
A(24)GAV001
A(00)GAS002

---

Roof
10500

Level 3
7500

Level 2
4500

Level 1
1500

GROUND LEVEL
0

Level 0
-1500
TOF
-1800

1

Section 1
1 : 50

Status

Completed

Project

The Young Lit & Phil

Drawing

General Arrangement - Section 001

Project No.

Dwg.
Project Number No. A(00)GAS001

Scale at A1

1 : 50

Drawn

JD

Checked

Rev.

Checker

Date

11/07/13
Project Two - The Young Lit & Phil
Project Two - The Young Lit & Phil
Project Two - Visitor Centre
46 Westgate
Project Three - 46 Westgate

Brief:
“To design a new building tailored to the Arts, both visual and auditory. An
exploration of vertical space must be incorporated.”
Shedule of accommodation:
•	
•	
•	
•	

Performance Space
Exhibition Space
Dressing Rooms
Studios

•	

Cafe and Bar
Laser Scanning and Point Cloud

Point Cloud Data

Revit Model
Structural Modelling
Structural Modelling

Architectural & Structural models_

Structural model_
Structural Modelling

Pile Foundations are inserted

Universal Beams 356x171x51 are added

Steel Bracing is added to provide structural rigidity

Precast Concrete retaining wall is built

Universal Beams 254x146x31 are added

Insitu Concrete floor is poured

203x203x46 Structural Columns are added

Universal Beams 178x102x19 are added

Intermediate Concrete floors are poured

Universal Beams 533x210x82 are added

C Channels 152x89 are added
Project Three - 46 Westgate
Project Three - 46 Westgate
Project Three - 46 Westgate

Ground Floor Axo

First Floor Axo

Second Floor Axo
MEP Modelling and Clash Detection

Navisworks Clash Detection - Beams and Columns versus Doors, Windows and Curtain Walling
BIMCampus presentation - Northumbria University Graduates - Josh, Angus and Rob

More Related Content

Similar to BIMCampus presentation - Northumbria University Graduates - Josh, Angus and Rob

Ck21 presentation team 2
Ck21 presentation team 2Ck21 presentation team 2
Ck21 presentation team 2
Campus
 
Team 2 mep presentation
Team 2  mep presentationTeam 2  mep presentation
Team 2 mep presentation
Campus
 
Leicester riders
Leicester ridersLeicester riders
Leicester riders
David Eeles
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
RICHBUTKUS
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
RICHBUTKUS
 
Andrea Gino - Portfolio (Low Res)
Andrea Gino - Portfolio (Low Res)Andrea Gino - Portfolio (Low Res)
Andrea Gino - Portfolio (Low Res)
Andrea Gino
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
Graham H Stewart
 
INTB342 FINAL BOOKLET_v006
INTB342 FINAL BOOKLET_v006INTB342 FINAL BOOKLET_v006
INTB342 FINAL BOOKLET_v006
Naomi Kim
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
Hai Nguyen
 

Similar to BIMCampus presentation - Northumbria University Graduates - Josh, Angus and Rob (20)

Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projects
 
Ck21 presentation team 2
Ck21 presentation team 2Ck21 presentation team 2
Ck21 presentation team 2
 
Bim final documentation
Bim final documentation Bim final documentation
Bim final documentation
 
Team 2 mep presentation
Team 2  mep presentationTeam 2  mep presentation
Team 2 mep presentation
 
Leicester riders
Leicester ridersLeicester riders
Leicester riders
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
 
Managerial budgets and project management
Managerial budgets and project management Managerial budgets and project management
Managerial budgets and project management
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
 
Andrea Gino - Portfolio (Low Res)
Andrea Gino - Portfolio (Low Res)Andrea Gino - Portfolio (Low Res)
Andrea Gino - Portfolio (Low Res)
 
Kook_ Portfolio_Rev 01
Kook_ Portfolio_Rev 01Kook_ Portfolio_Rev 01
Kook_ Portfolio_Rev 01
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
 
INTB342 FINAL BOOKLET_v006
INTB342 FINAL BOOKLET_v006INTB342 FINAL BOOKLET_v006
INTB342 FINAL BOOKLET_v006
 
Construction Process Modelling
Construction Process ModellingConstruction Process Modelling
Construction Process Modelling
 
BIM Algorithmic Workflow Case Study - Mr. Eugenio FONTAN BIM Director and Co...
BIM Algorithmic Workflow Case  Study - Mr. Eugenio FONTAN BIM Director and Co...BIM Algorithmic Workflow Case  Study - Mr. Eugenio FONTAN BIM Director and Co...
BIM Algorithmic Workflow Case Study - Mr. Eugenio FONTAN BIM Director and Co...
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)
 
Ignazio deiana portfolio 2016
Ignazio deiana portfolio 2016Ignazio deiana portfolio 2016
Ignazio deiana portfolio 2016
 
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
 
PLANNING AND ANALYSIS OF COMMERCIAL BUILDING PROJECT REPORT.pdf
PLANNING AND ANALYSIS OF COMMERCIAL BUILDING PROJECT REPORT.pdfPLANNING AND ANALYSIS OF COMMERCIAL BUILDING PROJECT REPORT.pdf
PLANNING AND ANALYSIS OF COMMERCIAL BUILDING PROJECT REPORT.pdf
 
Shaft Construction
Shaft ConstructionShaft Construction
Shaft Construction
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 

More from Campus

vcms_a_global_perspective_short_paper
vcms_a_global_perspective_short_papervcms_a_global_perspective_short_paper
vcms_a_global_perspective_short_paper
Campus
 
Segment_001_of_PMoton-EMT-BIM-uptake
Segment_001_of_PMoton-EMT-BIM-uptakeSegment_001_of_PMoton-EMT-BIM-uptake
Segment_001_of_PMoton-EMT-BIM-uptake
Campus
 
Virtual City Models Avoidance of Obsolescence
Virtual City Models Avoidance of ObsolescenceVirtual City Models Avoidance of Obsolescence
Virtual City Models Avoidance of Obsolescence
Campus
 
Why should I be thinking of BIM - BIM for LA's
Why should I be thinking of BIM - BIM for LA'sWhy should I be thinking of BIM - BIM for LA's
Why should I be thinking of BIM - BIM for LA's
Campus
 
140117 nu architecture
140117 nu architecture140117 nu architecture
140117 nu architecture
Campus
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5
Campus
 
Ck21 presentation team 2
Ck21 presentation team 2Ck21 presentation team 2
Ck21 presentation team 2
Campus
 
Ck21 presentation team 1
Ck21 presentation team 1Ck21 presentation team 1
Ck21 presentation team 1
Campus
 
thinkBIM 2013 pecha kucha
thinkBIM 2013 pecha kuchathinkBIM 2013 pecha kucha
thinkBIM 2013 pecha kucha
Campus
 
131121 North East BIM Hub presentation
131121 North East BIM Hub presentation131121 North East BIM Hub presentation
131121 North East BIM Hub presentation
Campus
 
Team 5 mep presentation
Team 5 mep presentationTeam 5 mep presentation
Team 5 mep presentation
Campus
 
Team 4 mep presentation
Team 4 mep presentationTeam 4 mep presentation
Team 4 mep presentation
Campus
 
Mep team 3
Mep team 3 Mep team 3
Mep team 3
Campus
 
Mep presentation team 1
Mep presentation team 1Mep presentation team 1
Mep presentation team 1
Campus
 
Ck21 presentation team 3
Ck21 presentation team 3Ck21 presentation team 3
Ck21 presentation team 3
Campus
 
Ck21 presentation team 4
Ck21 presentation team 4Ck21 presentation team 4
Ck21 presentation team 4
Campus
 
Ck21 presentation team 1
Ck21 presentation team 1Ck21 presentation team 1
Ck21 presentation team 1
Campus
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5
Campus
 

More from Campus (19)

vcms_a_global_perspective_short_paper
vcms_a_global_perspective_short_papervcms_a_global_perspective_short_paper
vcms_a_global_perspective_short_paper
 
Segment_001_of_PMoton-EMT-BIM-uptake
Segment_001_of_PMoton-EMT-BIM-uptakeSegment_001_of_PMoton-EMT-BIM-uptake
Segment_001_of_PMoton-EMT-BIM-uptake
 
Virtual City Models Avoidance of Obsolescence
Virtual City Models Avoidance of ObsolescenceVirtual City Models Avoidance of Obsolescence
Virtual City Models Avoidance of Obsolescence
 
Why should I be thinking of BIM - BIM for LA's
Why should I be thinking of BIM - BIM for LA'sWhy should I be thinking of BIM - BIM for LA's
Why should I be thinking of BIM - BIM for LA's
 
140117 nu architecture
140117 nu architecture140117 nu architecture
140117 nu architecture
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5
 
Ck21 presentation team 2
Ck21 presentation team 2Ck21 presentation team 2
Ck21 presentation team 2
 
Ck21 presentation team 1
Ck21 presentation team 1Ck21 presentation team 1
Ck21 presentation team 1
 
thinkBIM 2013 pecha kucha
thinkBIM 2013 pecha kuchathinkBIM 2013 pecha kucha
thinkBIM 2013 pecha kucha
 
131121 North East BIM Hub presentation
131121 North East BIM Hub presentation131121 North East BIM Hub presentation
131121 North East BIM Hub presentation
 
Team 5 mep presentation
Team 5 mep presentationTeam 5 mep presentation
Team 5 mep presentation
 
Team 4 mep presentation
Team 4 mep presentationTeam 4 mep presentation
Team 4 mep presentation
 
Mep team 3
Mep team 3 Mep team 3
Mep team 3
 
Mep presentation team 1
Mep presentation team 1Mep presentation team 1
Mep presentation team 1
 
Ck21 presentation team 3
Ck21 presentation team 3Ck21 presentation team 3
Ck21 presentation team 3
 
Ck21 presentation team 4
Ck21 presentation team 4Ck21 presentation team 4
Ck21 presentation team 4
 
Ck21 presentation team 1
Ck21 presentation team 1Ck21 presentation team 1
Ck21 presentation team 1
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5
 
01 plus3 arch presentation
01 plus3 arch presentation01 plus3 arch presentation
01 plus3 arch presentation
 

Recently uploaded

Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
AlecAnidul
 

Recently uploaded (13)

PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptx
 
Top 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen DesignsTop 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen Designs
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to Fashion
 

BIMCampus presentation - Northumbria University Graduates - Josh, Angus and Rob

  • 1. BIM Campus Josh Dobson Angus Donaldson Robert Eaton
  • 2. What Is Campus? Campus is a purpose made Building Information Modelling (BIM) training suite, which aims at teaching and building useable and relevant BIM skills that are instantly transferable into the workplace and which will enable young people within the construction industry to make a valued contribution to their employer at a very early stage.
  • 4. Project One - The House
  • 5. Project One - The House Rev. Amendment Date 6685 1 A(00)GAE001 A(00)GAS001 3 1425 1200 1280 200 9 4 3 Store 3 2340 1 m² 9.9 SF 3735 1355 1100 5 1 Dining Room 15 m² 161.6 SF UP --- 3 10 Room 6000 15 m² 157.4 SF 625 8845 4 A(00)GAE001 6 1A(00)GAE001 1 A(00)GAS002 2 15 m² 165.6 SF 12 Room 4120 5000 2 Living Room 26 m² 284.6 SF 1235 By Department Legend Circulation 8 2340 Communal Space 4 Porch Garage Storage 1100 2 m² 26.6 SF Room Schedule - Level 0 Level 7 10 North 2 1 A(00)GAE001 1 Level 0 1 : 20 Name Level 0 Level 0 Level 0 Level 0 Level 0 Level 0 Dining Room Living Room Store Porch Room Room Status 525 525 305 1000 1316 1510 1424 Project Status Project Typical House Drawing General Arrangement - Level 0 Project No. 58162432 Area 15 m² 15 m² 1 m² 2 m² 15 m² 26 m² Scale at A1 1 : 20 Dwg. No. Drawn A(00)GAP001 Author Checked Rev. Checker Date 10/31/13 this drawing is copyright - check all dimensions on site - inform architect / so of any discrepancies - work to figured dimensions only - do not scale
  • 6. Project Two - University Projects
  • 7. Project Two - University Project Rev. 1 14 2 3 3 2 5 1 4 5 7 9 8 10 9 Amendment 11 10 Date 12 11 A(21)GAV003 A(24)GAV001 A(00)GAS002 --- Roof 10500 Level 3 7500 Level 2 4500 Level 1 1500 GROUND LEVEL 0 Level 0 -1500 TOF -1800 1 Section 1 1 : 50 Status Completed Project The Young Lit & Phil Drawing General Arrangement - Section 001 Project No. Dwg. Project Number No. A(00)GAS001 Scale at A1 1 : 50 Drawn JD Checked Rev. Checker Date 11/07/13
  • 8. Project Two - The Young Lit & Phil
  • 9. Project Two - The Young Lit & Phil
  • 10. Project Two - Visitor Centre
  • 12. Project Three - 46 Westgate Brief: “To design a new building tailored to the Arts, both visual and auditory. An exploration of vertical space must be incorporated.” Shedule of accommodation: • • • • Performance Space Exhibition Space Dressing Rooms Studios • Cafe and Bar
  • 13. Laser Scanning and Point Cloud Point Cloud Data Revit Model
  • 15. Structural Modelling Architectural & Structural models_ Structural model_
  • 16. Structural Modelling Pile Foundations are inserted Universal Beams 356x171x51 are added Steel Bracing is added to provide structural rigidity Precast Concrete retaining wall is built Universal Beams 254x146x31 are added Insitu Concrete floor is poured 203x203x46 Structural Columns are added Universal Beams 178x102x19 are added Intermediate Concrete floors are poured Universal Beams 533x210x82 are added C Channels 152x89 are added
  • 17. Project Three - 46 Westgate
  • 18. Project Three - 46 Westgate
  • 19. Project Three - 46 Westgate Ground Floor Axo First Floor Axo Second Floor Axo
  • 20. MEP Modelling and Clash Detection Navisworks Clash Detection - Beams and Columns versus Doors, Windows and Curtain Walling