SlideShare a Scribd company logo
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 100
WD100
Adrian Ball & Lindy Shaw
Checker
05/17/13
COVER PAGE
WD3 Working Drawings for type C building
Owner
BDWDG501A
BDWDG501A
ADRIAN BALL & LINDY SHAW
WORKING DRAWINGS 3
BEN CARSON
MONDAY 20 MAY 2013
Sheet List
Sheet Number Sheet Name Drawn By
WD100 COVER PAGE Adrian Ball & Lindy Shaw
WD101 SITE SETOUT PLAN Lindy Shaw & Adrian Ball
WD102 SITE PLAN Lindy Shaw & Adrain Ball
WD103 GROUND FLOOR PLAN Lindy Shaw & Adrian Ball
WD104 FIRST FLOOR PLAN Lindy Shaw & Adrian Ball
WD105 REFLECTED CEILING PLAN Lindy Shaw & Adrian Ball
WD106 ELEVATION NORTH & EAST Lindy Shaw & Adrian Ball
WD107 ELEVATION SOUTH & WEST Lindy Shaw & Adrian Ball
WD108 SECTION A & B Lindy Shaw & Adian Ball
WD109 DETAIL B1 & B2 Lindy Shaw & Adrian Ball
WD110 DETAIL B3 & B4 Lindy Shaw & Adrian Ball
WD111 DETAIL A1 & A2 Lindy Shaw & Adrian Ball
WD112 DETAIL A3 & A4 Lindy Shaw & Adiran Ball
WD113 DETAIL A5 & B5 Lindy Shaw & Adrian Ball
WD114 DOOR & WINDOW SCHEDULE Adrian Ball & Lindy Shaw
FINAL SUBMISSION
B B
A A
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
80.000 m
60.000m
SINGERSTREET
PROPERTY BOUNDARY
4930 4930 4930 4930 4930 4930 4930 4930
14768
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 200
WD101
Lindy Shaw & Adrian Ball
Checker
20/05/2013
SITE SETOUT PLAN
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 200
SITE SETOUT PLAN
1
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
N
60250
60500
60750
61000
61250
61500
61750
62000
60.25
60.50
60.75
61.00
61.25
61.50
61.75
62.00
80.000 m
60.000m
SINGERSTREET
STORMWATER
DRIVEWAYTYPE
B29000
6500
2500 2500 2500 2500 3200
32002500250025002500250023001300
6000 6000 6000 6000 6300
B B
A A
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
PROPERTYBOUNDARY
LANDSCAPING
POTENTIAL FUTURE
DEVELOPMENT
AWNING AWNING
SHEET METAL
ROOFING
CARPARKING
PEDESTRIAN PATHWAY
CARPARKING
CARPARKING
REFUSE
LANDSCAPING
AV TURNING CIRCLE
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 200
WD102
Lindy Shaw & Adrain Ball
Checker
20/05/2013
SITE PLAN
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 200
SITE PLAN
1
1
2
3
4
5
6
7
20
0 5 10 m
N
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
LOT XX
RP XX
PARISH OF XX
COUNTY OF XX
SITE AREA: 4800m2
BUILDING AREA:
SITE COVER:
SOFT LANDSCAPING: 305m2 (6.3%)
PARKING
SPACES REQUIRED: 17
SPACES PROVIDED: 17
REF.B B
A A
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
1
WD108
10
10
190 6000 190
GF
11
GF
5
GF
12
GF
13
GF
14
GF
1
TERRACE
WC
MR2
MR1
WC
WCWC
WC
U
B
B B
B
SHWSHW
M F
KITCHEN
RECEPTION
STR
PWD
WAREHOUSE
MEZZANINE
OVER
B
1902000190
190
1200
190
1800
190
1531
90
1000 190
19020144190
1906500902200902700902700905684190
150 39290 90 2079 90 2000 90 2039 190 6000 190
903800902680901590150
150159090657090
90 3124 90 3124
150
1200
90
3621
90
1000
190
190476015015274150
19020184150
FHR
FHR
GF
22
GF
24GF
23
LIFT
2
WD108
LOCKERS
GF
27
GF
28
GF
1
GF
2
UP
VINYL COVERING
CARPET
CARPET
TILED
600X600
TILED
300X300
TILED
300X300
SEALED CONCRETE
TILED
300X300
TILED
450X450
TILED
450X450
STR
VINYL
FW
FW FW
EXIT
EXIT
EXIT
EXIT
EXIT
DPDP
ENTRANCE
MATWELL
1
WD113
2
WD113
FW
GF
4
GF
3
DP
DP
DP
DPDPDP
DP
ROLLER DOORROLLER DOOR
WC
FF
7
52208
UP
FSL 61.000
AWNING ABOVEAWNING ABOVE
ROOFOVER
FW FW
50
B BASIN
WC WASH CLOSET
U URINAL
SHW SHOWER
FW FLOOR WASTE
STR STORE ROOM
MR1 MEETING ROOM 1
MR2 MEETING ROOM 2
REF REFRIGERATOR
PWD PERSON WITH DISABILITY
ACCESSIBLE
FHR FIRE HOSE REEL
LEGEND
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
As indicated
WD103
Lindy Shaw & Adrian Ball
Checker
20/05/2013
GROUND FLOOR PLAN
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 100
GROUND FLOOR
1
0 5 10 m
N
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
B B
A A
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
1
WD108
10
10
BOARDROOM
CEO
MEZZANINE
OFFICE
PRINT
CFO
WAREHOUSE
AD
FF
5
FF
6
FF
3
FF
3
FF
4
190 2935 90 2976 190
190 6000 190
7428 150120090 2000 90 2621 190
1905134901420906820901600704830190
19020144190
150159013684150
1902000190
150 38277 7401 190 6000 190
15015274150
LIFT
2
WD108
GF
22
GF
23 FF
14
FF
13
FF
15
FF
12
FF
11
FF
10
FF
9
FF
8
FF
7
FF
6
FF
5
CARPET CARPET
CARPET
CARPET
CARPET
VINYL FLOOR
COVERING
VOID TO WAREHOUSE
UPUP
52208
AD ADMIN
FHR FIRE HOSE REEL
LEGEND
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
As indicated
WD104
Lindy Shaw & Adrian Ball
Checker
20/05/2013
FIRST FLOOR PLAN
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 100
FIRST FLOOR PLAN
1
0 5 10 m
N
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
B
A
10
10
1200
520334712
205 1200 1200 1200 1200 210
FLUSH, PLASTERBOARD
CEILING 10MM
FLUSH, PLASTERBOARD
CEILING 10MM
CD CD
CD
CD
B
A
9
9
10
10
24315001500150015001500127
97592310008771485793
1485493
957
1549 1083 1083 1606
368 262163 137
599991
FLUSH, FC SHEETING
9MM CEILING TO BATHROOMS,
KITCHEN, SOFFIT AND TERRACE
FLUSH, PLASTERBOARD
CEILING 10MM
CD
CD
CD
CD
LEGEND
AIRCON DUCTING
AIRCON RETURN DUCT
RECESSED, LOUVERED
FLUORESCENT TROFFER
TASK LIGHTING -
FLUSH, LED DOWNLIGHT
CEILING DIRECTION - CD
[INDICATED BY ARROW ]
CD
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
As indicated
WD105
Lindy Shaw & Adrian Ball
Checker
20/05/2013
REFLECTED CEILING PLAN
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 100
FIRST FLOOR OFFICE
11 : 100
GROUND FLOOR
2
0 5 10 m
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
GROUND FLOOR
61000
FIRST FLOOR PLAN
64350
B A
1
WD108
FINISH HEIGHT
8.300m FROM NGL
69300
FF
9
FF
8
FF
7
FF
6
FF
5
GF
1
GF
2
FF
1
RENDERED
BLOCK WORK
WALL
DP
CONC TILT UP
PANELS
METAL ROOF
METAL
SHEETING
WAREHOUSE
BEYOND
GROUND FLOOR
61000
FIRST FLOOR PLAN
64350
12345678910
FINISH HEIGHT
8.300m FROM NGL
693005°
2
WD108
GF
15
GF
14
GF
13
FF
24
FF
22
GF
12
GF
11
GF
10
FF
23
DP
DP DP DP DP DP DP
ROLLER DOOR ROLLER DOOR
RENDERED
BLOCK WORK
WALL
CONC TILT UP
PANELS
METAL ROOF
AWNING AWNING
RENDERED
FC SHEET
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 100
WD106
Lindy Shaw & Adrian Ball
Checker
20/05/2013
ELEVATION NORTH & EAST
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 100
EAST ELEVATION
1
1 : 100
NORTH ELEVATION
2
0 5 10 m
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
GROUND FLOOR
61000
FIRST FLOOR PLAN
64350
1 2 3 4 5 6 7 8 9 10
FINISH HEIGHT
8.300m FROM NGL
69300
2
WD108
GF
4
GF
3
DP
RENDERED
BLOCK WORK
WALL
CONC TILT UP
PANELS
METAL ROOF
RENDERED
FC SHEET
DPDPDPDP
5°
TERRACE
GROUND FLOOR
61000
FIRST FLOOR PLAN
64350
BA
1
WD108
FINISH HEIGHT
8.300m FROM NGL
69300
GF
7
RENDERED
BLOCK WORK
WALL
DP
CONC TILT UP
PANELS
AWNING
DP
5775
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 100
WD107
Lindy Shaw & Adrian Ball
Checker
20/05/2013
ELEVATION SOUTH & WEST
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 100
SOUTH ELEVATION
1
1 : 100
WEST ELEVATION
2
0 5 10 m
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
GROUND FLOOR
61000
FIRST FLOOR PLAN
64350
OFFICE CEILING
67350
1 2 3 4 5 6 7 8 9 10
30003003050
FINISH HEIGHT
8.300m FROM NGL
69300
2
WD112
2
WD108
1
WD111
2
WD111
1
WD112
MEZZANINE
PATIO
WAREHOUSEROLLER DOOR ROLLER DOOR RENDERED
BLOCK WORK
WALL
CONC TILT UP
PANELS
METAL ROOF
LIGHT WEIGHT
WALL FRAMING
BOARDROOM
KITCHEN
GROUND FLOOR
61000
FIRST FLOOR PLAN
64350
BA
FINISH HEIGHT
8.300m FROM NGL
69300
-
---
2
WD109
1
WD109
2
WD110
1
WD110 MEZZANINE
PATIOPWD M
CONC TILT UP
PANELS
RECEPTION/
OFFICES
BEYOND
METAL ROOF
2.5°
STEEL PORTAL
FRAME
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 100
WD108
Lindy Shaw & Adian Ball
Checker
20/05/2013
SECTION A & B
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 100
SECTION A
1
1 : 100
SECTION B
2
0 5 10 m
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
A
FINISH HEIGHT
8.300m FROM NGL
69300
PRECAST
CONCRETE
PARAPET CAP
TILTUP PANEL
410UB PORTAL FRAME
BOX GUTTER
FOLDED
0.6BMT SHEET
LYSAGHT KLIP LOK ROOF
SHEET .42BMT WITH 130MM
INSULATION, SAFETY MESHPARAPET
2.5° ROOF PITCH
SEPERATION
50
Z PURLINS
BOX GUTTER
BRACKET @ 450CTRS
CONTINUOUS
GUTTER TRAY
SAW CUT REGULATE
INDICATIVE SUMP
AND DOWN PIPE
GROUND FLOOR
61000
A
SETDOWN
200
REINFORCED CONCRETE
SLAB TO ENGINEERS DETAILS
50MM SAND BED
VAPOUR BARIER
PILE CAP
410UB STEEL PORTAL FRAME
GROUND FALL
1:50
SEPERATION
50
ANCHOR BOLTS TO
ENGINEERS DETAILS
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 5
WD109
Lindy Shaw & Adrian Ball
Checker
20/05/2013
DETAIL B1 & B2
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 5
DETAIL B1
1 1 : 5
DETAIL B2
2
0 5 10 m
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
FIRST FLOOR PLAN
64350
FIRST FLOOR
OFFICE
64100
B
410 UB PORTAL FRAME
DRIP EDGE
MEZZANINE
PATIO
TILT UP PANEL
SEPERATION
50
VINYL FLOORING ON
PLY SUBSTRATE
SCREWED TO C250
BOLTED TO 200 PFC
9MM FC SHEETING
SCREWED TO C250 @
600 CTRS
C250 FIXED TO TILT
UP PANEL
FIRST FLOOR PLAN
64350
FIRST FLOOR
OFFICE
64100
PWD BATHROOM
MEZZANINE
BALUSTRADE 90
STEEL STUD CLAD
IN 13MM
PLASTERBOARD
90 STEEL STUD CLAD
IN 13MM
PLASTERBOARD
VINYL FLOORING ON
PLY SUBSTRATE
SCREWED TO C250
BOLTED TO 200 PFC
9MM FC SHEETING
FIXED TO 90 STEEL
STUDS @ 600 CTRS
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 5
WD110
Lindy Shaw & Adrian Ball
Checker
20/05/2013
DETAIL B3 & B4
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 5
DETAIL B4
21 : 5
DETAIL B3
1
0 5 10 m
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
EXTERNAL ROOF
GUTTER
[200 x 250 x 180]
9mm FC SOFFIT
FACIA PURLIN - FIXED TO
250 UB
LYSAGHT KLIPLOK .42 BMT
ROOF SHEET ON Z PURLINS
FIXED TO 250UB
RENDERED
BLOCK WALL
9mm FC SHEETING
75 SHS
5°
GROUND FLOOR
61000
REINFORCED CONCRETE SLAB TO
ENGINEERS DETAILS
50MM SAND BED
BORED REINFORCED
CONCRETE PIER TO
ENGINEERS DETAILS
VAPOUR BARIER
PILE CAP
200 SERIES CORE
FILLED CONCRETE
BLOCK WORK WALL
GROUND FALL
1:50
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 5
WD111
Lindy Shaw & Adrian Ball
Checker
05/17/13
DETAIL A1 & A2
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 5
DETAIL A1
1 1 : 5
DETAIL A2
2
0 5 10 m
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
FIRST FLOOR PLAN
64350
FIRST FLOOR
OFFICE
64100
BALUSTRADE 90
STEEL STUDS
CLAD IN 13MM PB
MEZZANINE
PATIO
VINYL FLOORING ON
PLY SUBSTRATE
SCREWED TO C250
BOLTED TO 200 PFC
9MM FC SHEETING
FIXED TO C250 @ 600
CTRS
C200 LINTEL
9MM FC SHEETING
FIXED TO 90SHS @ 600
CTRS
13MM FIXED TO C250
@ 600CTRS
C250
TRIMMER
STAIRCASE
BEYOND
200 PFC
10
FINISH HEIGHT
8.300m FROM NGL
69300
150
LYSAGHT KLIPLOK ROOF
SHEET .43 BMT
5° ROOF PITCH
Z PURLIN FIXED TO 75
EQUAL ANGLE ,
WELDED TO 250 UB
PARAPET
CAPPING
LYSAGHT KLIP LOK ROOF SHEET
.42 BMT WITH 130MM INSULATION
SAFTEY MESH 2.5° ROOF PITCH
TILIT-UP PANEL
410 UB PORTAL
FRAME
FLASHING
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
1 : 5
WD112
Lindy Shaw & Adiran Ball
Checker
20/05/2013
DETAIL A3 & A4
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 5
DETAIL A4
1
0 5 10 m
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
1 : 5
DETAIL A3
2
GROUND FLOOR
61000
FIRST FLOOR PLAN
64350
430
GF
4
FF
11
FWFWFW
90 2770 900 30 900 30 900 30 1010 90
SHWWCWCU
BB
800
MM
S
980 560 200 560 470
748980
20
180
102
40860
970 970
65 2193 65 2022 65
GROUND FLOOR
61000
FIRST FLOOR PLAN
64350
2200200
800
380 560 200 560 980
FF
12
FWFW
65 1560 65 2635 65 1731
FW
SHW WC WC WC
90 1010 30 900 30 900 30 900 90 2680 90
970 970
B B
M M
S
3
1800
2032
6101490
B BASIN
WC WASH CLOSET
U URINAL
SHW SHOWER
FW FLOOR WASTE
M MIRROR
S SHELF
LEGEND
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
As indicated
WD113
Lindy Shaw & Adrian Ball
Checker
20/05/2013
DETAIL A5 & B5
WD3 Working Drawings for type C building
Owner
BDWDG501A
1 : 20
SECTION B5
1 1 : 20
SECTION A5
2
0 5 10 m
A Preliminary Hand in 20/03/13 B
B Final Assessment 20/05/13
Teacher: Ben Carson
Scale
Checked By
Drawn By
Date
ADRIAN BALL | LINDY SHAW
Issue Issue Description Date
Issue
Project Description Drawing Name
Drawing Number
General Notes
© Copyright SLAB ARCHITECTS
Do not scale off drawing use figured
dimensions only. Contractor shall verify and
be responsible for all dimensions on site.
WD114
Adrian Ball & Lindy Shaw
Checker
05/17/13
DOOR & WINDOW SCHEDULE
WD3 Working Drawings for type C building
Owner
BDWDG501A
Door Schedule
Level Mark Height Width Comments
GROUND FLOOR 1 2040 820
GROUND FLOOR 5 2032 915
GROUND FLOOR 7 2032 915
GROUND FLOOR 11 2032 915
GROUND FLOOR 12 2032 915
GROUND FLOOR 13 2032 915
GROUND FLOOR 14 2032 915
GROUND FLOOR 21 2040 620
GROUND FLOOR 22 5000 3600
GROUND FLOOR 23 5000 3600
GROUND FLOOR 24 2134 915
GROUND FLOOR 25 2134 915
GROUND FLOOR 26 2040 519
GROUND FLOOR 27 2134 3200
GROUND FLOOR 28 2134 3200
GROUND FLOOR: 15
FIRST FLOOR PLAN 3 2032 915
FIRST FLOOR PLAN 4 2032 915
FIRST FLOOR PLAN 5 2032 915
FIRST FLOOR PLAN 6 2032 915
FIRST FLOOR PLAN: 4
Grand total: 19
Window Schedule
Level Mark Width Height Comments
GROUND FLOOR 1 2400 1220
GROUND FLOOR 2 600 1220
GROUND FLOOR 3 915 610
GROUND FLOOR 4 915 610
FIRST FLOOR PLAN 5 2400 1220
FIRST FLOOR PLAN 6 2400 1220
FIRST FLOOR PLAN 7 2400 1220
FIRST FLOOR PLAN 8 2400 1220
FIRST FLOOR PLAN 9 2400 1220
GROUND FLOOR 10 4000 1030
GROUND FLOOR 11 4000 1030
GROUND FLOOR 12 4000 1030
GROUND FLOOR 13 4000 1030
GROUND FLOOR 14 4000 1030
GROUND FLOOR 15 4000 1030

More Related Content

Viewers also liked

Vivek Sarma: Portfolio
Vivek Sarma: PortfolioVivek Sarma: Portfolio
Vivek Sarma: Portfolio
Vivek Sarma
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structures
MECandPMV
 
Carbon stocks
Carbon stocksCarbon stocks
Carbon stockscenafrica
 
El voleibol
El voleibolEl voleibol
El voleibol
3152185249
 
Connolly japan menthol(3)
Connolly japan menthol(3)Connolly japan menthol(3)
Connolly japan menthol(3)Tobacco Commons
 
Bondia.cat 08/05/2014
Bondia.cat 08/05/2014Bondia.cat 08/05/2014
Bondia.cat 08/05/2014
Bondia Lleida Sl
 
Role of organizational structure in university entrepreneurship
Role of organizational structure in university entrepreneurshipRole of organizational structure in university entrepreneurship
Role of organizational structure in university entrepreneurship
Alexander Decker
 
IPFE-ReputaciónCorporativa-AdrianCorderoVillafaneEspaña
IPFE-ReputaciónCorporativa-AdrianCorderoVillafaneEspañaIPFE-ReputaciónCorporativa-AdrianCorderoVillafaneEspaña
IPFE-ReputaciónCorporativa-AdrianCorderoVillafaneEspaña
IPFE - Instituto Peruano de Fomento Educativo
 
TWT Lösung: Adressdatenvalidierung auf Basis von Google Maps
TWT Lösung: Adressdatenvalidierung auf Basis von Google MapsTWT Lösung: Adressdatenvalidierung auf Basis von Google Maps
TWT Lösung: Adressdatenvalidierung auf Basis von Google Maps
TWT
 
Spice
SpiceSpice
Me muevo de mil maneras
Me muevo de mil manerasMe muevo de mil maneras
Me muevo de mil maneras
Julio Hidalgo
 
Column rank in the interior design of contemporary architecture a comparative...
Column rank in the interior design of contemporary architecture a comparative...Column rank in the interior design of contemporary architecture a comparative...
Column rank in the interior design of contemporary architecture a comparative...
Alexander Decker
 
Dictamen de Contraloría por Coches Victoria Viña del Mar Of. 5646 2016
Dictamen de Contraloría por Coches Victoria Viña del Mar Of. 5646 2016Dictamen de Contraloría por Coches Victoria Viña del Mar Of. 5646 2016
Dictamen de Contraloría por Coches Victoria Viña del Mar Of. 5646 2016
Ecopolis Disciplinas Integradas
 
OCPE digital catalog 2014-2015 v.links
OCPE digital catalog 2014-2015 v.linksOCPE digital catalog 2014-2015 v.links
OCPE digital catalog 2014-2015 v.links
Odor Control Products and Equipment, LLC
 
MZIT Company Profile 2015
MZIT Company Profile 2015MZIT Company Profile 2015
MZIT Company Profile 2015Mark Taylor
 
It audit methodologies
It audit methodologiesIt audit methodologies
It audit methodologies
Salih Islam
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
Sumit Singh
 
Formula One Season 2013 - Social Media Monitoring
Formula One Season 2013 - Social Media MonitoringFormula One Season 2013 - Social Media Monitoring
Formula One Season 2013 - Social Media Monitoring
Felix Scherrer
 
Ciclo biogeoquímico del azufre
Ciclo biogeoquímico del azufreCiclo biogeoquímico del azufre
Ciclo biogeoquímico del azufre
Andrea Cocoba
 
Moment Co-efficient Method
Moment Co-efficient MethodMoment Co-efficient Method
Moment Co-efficient MethodYousuf Bin Aziz
 

Viewers also liked (20)

Vivek Sarma: Portfolio
Vivek Sarma: PortfolioVivek Sarma: Portfolio
Vivek Sarma: Portfolio
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structures
 
Carbon stocks
Carbon stocksCarbon stocks
Carbon stocks
 
El voleibol
El voleibolEl voleibol
El voleibol
 
Connolly japan menthol(3)
Connolly japan menthol(3)Connolly japan menthol(3)
Connolly japan menthol(3)
 
Bondia.cat 08/05/2014
Bondia.cat 08/05/2014Bondia.cat 08/05/2014
Bondia.cat 08/05/2014
 
Role of organizational structure in university entrepreneurship
Role of organizational structure in university entrepreneurshipRole of organizational structure in university entrepreneurship
Role of organizational structure in university entrepreneurship
 
IPFE-ReputaciónCorporativa-AdrianCorderoVillafaneEspaña
IPFE-ReputaciónCorporativa-AdrianCorderoVillafaneEspañaIPFE-ReputaciónCorporativa-AdrianCorderoVillafaneEspaña
IPFE-ReputaciónCorporativa-AdrianCorderoVillafaneEspaña
 
TWT Lösung: Adressdatenvalidierung auf Basis von Google Maps
TWT Lösung: Adressdatenvalidierung auf Basis von Google MapsTWT Lösung: Adressdatenvalidierung auf Basis von Google Maps
TWT Lösung: Adressdatenvalidierung auf Basis von Google Maps
 
Spice
SpiceSpice
Spice
 
Me muevo de mil maneras
Me muevo de mil manerasMe muevo de mil maneras
Me muevo de mil maneras
 
Column rank in the interior design of contemporary architecture a comparative...
Column rank in the interior design of contemporary architecture a comparative...Column rank in the interior design of contemporary architecture a comparative...
Column rank in the interior design of contemporary architecture a comparative...
 
Dictamen de Contraloría por Coches Victoria Viña del Mar Of. 5646 2016
Dictamen de Contraloría por Coches Victoria Viña del Mar Of. 5646 2016Dictamen de Contraloría por Coches Victoria Viña del Mar Of. 5646 2016
Dictamen de Contraloría por Coches Victoria Viña del Mar Of. 5646 2016
 
OCPE digital catalog 2014-2015 v.links
OCPE digital catalog 2014-2015 v.linksOCPE digital catalog 2014-2015 v.links
OCPE digital catalog 2014-2015 v.links
 
MZIT Company Profile 2015
MZIT Company Profile 2015MZIT Company Profile 2015
MZIT Company Profile 2015
 
It audit methodologies
It audit methodologiesIt audit methodologies
It audit methodologies
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Formula One Season 2013 - Social Media Monitoring
Formula One Season 2013 - Social Media MonitoringFormula One Season 2013 - Social Media Monitoring
Formula One Season 2013 - Social Media Monitoring
 
Ciclo biogeoquímico del azufre
Ciclo biogeoquímico del azufreCiclo biogeoquímico del azufre
Ciclo biogeoquímico del azufre
 
Moment Co-efficient Method
Moment Co-efficient MethodMoment Co-efficient Method
Moment Co-efficient Method
 

Similar to WD3 SLAB SEMESTER 1 2013 _FINAL

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - WATERMANS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - WATERMANSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - WATERMANS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - WATERMANSSunit Dhingra
 
Sheena Gozon_Revit Class_Arch 202_Final Project
Sheena Gozon_Revit Class_Arch 202_Final ProjectSheena Gozon_Revit Class_Arch 202_Final Project
Sheena Gozon_Revit Class_Arch 202_Final Project
Sheena Gozon
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA sMike Darwich
 
FOUNDATION_lAYOUT
FOUNDATION_lAYOUTFOUNDATION_lAYOUT
FOUNDATION_lAYOUTamroz S.K
 
Residence addition _ Structural plans and details
Residence addition _ Structural plans and detailsResidence addition _ Structural plans and details
Residence addition _ Structural plans and detailsTeresa Seasons
 
FEEDER & GRIZZLY STEEL STRUCTRE
FEEDER & GRIZZLY STEEL STRUCTREFEEDER & GRIZZLY STEEL STRUCTRE
FEEDER & GRIZZLY STEEL STRUCTRETokunbo Akinsara
 
STEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfSTEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdf
Adnan Lazem
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
Tomcully18
 
3D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 03D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 0Rochelle Abrie
 
PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00Mansoor Sakharkar
 
B.3. RESISTANCE C3
B.3. RESISTANCE C3B.3. RESISTANCE C3
B.3. RESISTANCE C3Andrei Loata
 
Coastal joinery hardware specialist ironmongery - catalogue version v.03 pa...
Coastal joinery hardware   specialist ironmongery - catalogue version v.03 pa...Coastal joinery hardware   specialist ironmongery - catalogue version v.03 pa...
Coastal joinery hardware specialist ironmongery - catalogue version v.03 pa...Coastal Joinery Hardware
 
GA-01.pdf
GA-01.pdfGA-01.pdf
GA-01.pdf
Sasanka Tharaka
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
Canberra Institute of technology
 

Similar to WD3 SLAB SEMESTER 1 2013 _FINAL (20)

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - WATERMANS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - WATERMANSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - WATERMANS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - WATERMANS
 
Sheena Gozon_Revit Class_Arch 202_Final Project
Sheena Gozon_Revit Class_Arch 202_Final ProjectSheena Gozon_Revit Class_Arch 202_Final Project
Sheena Gozon_Revit Class_Arch 202_Final Project
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s
 
sw portofolio
sw portofoliosw portofolio
sw portofolio
 
FOUNDATION_lAYOUT
FOUNDATION_lAYOUTFOUNDATION_lAYOUT
FOUNDATION_lAYOUT
 
Aldi Inala
Aldi InalaAldi Inala
Aldi Inala
 
final presentation.pdf
final presentation.pdffinal presentation.pdf
final presentation.pdf
 
Residence addition _ Structural plans and details
Residence addition _ Structural plans and detailsResidence addition _ Structural plans and details
Residence addition _ Structural plans and details
 
FEEDER & GRIZZLY STEEL STRUCTRE
FEEDER & GRIZZLY STEEL STRUCTREFEEDER & GRIZZLY STEEL STRUCTRE
FEEDER & GRIZZLY STEEL STRUCTRE
 
STEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfSTEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdf
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
3D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 03D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 0
 
PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00
 
B.3. RESISTANCE C3
B.3. RESISTANCE C3B.3. RESISTANCE C3
B.3. RESISTANCE C3
 
Coastal joinery hardware specialist ironmongery - catalogue version v.03 pa...
Coastal joinery hardware   specialist ironmongery - catalogue version v.03 pa...Coastal joinery hardware   specialist ironmongery - catalogue version v.03 pa...
Coastal joinery hardware specialist ironmongery - catalogue version v.03 pa...
 
12777 coastal single pages part26
12777  coastal single pages part2612777  coastal single pages part26
12777 coastal single pages part26
 
GA-01.pdf
GA-01.pdfGA-01.pdf
GA-01.pdf
 
MUDHER ARCHITECTS
MUDHER ARCHITECTSMUDHER ARCHITECTS
MUDHER ARCHITECTS
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 

WD3 SLAB SEMESTER 1 2013 _FINAL

  • 1. Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 100 WD100 Adrian Ball & Lindy Shaw Checker 05/17/13 COVER PAGE WD3 Working Drawings for type C building Owner BDWDG501A BDWDG501A ADRIAN BALL & LINDY SHAW WORKING DRAWINGS 3 BEN CARSON MONDAY 20 MAY 2013 Sheet List Sheet Number Sheet Name Drawn By WD100 COVER PAGE Adrian Ball & Lindy Shaw WD101 SITE SETOUT PLAN Lindy Shaw & Adrian Ball WD102 SITE PLAN Lindy Shaw & Adrain Ball WD103 GROUND FLOOR PLAN Lindy Shaw & Adrian Ball WD104 FIRST FLOOR PLAN Lindy Shaw & Adrian Ball WD105 REFLECTED CEILING PLAN Lindy Shaw & Adrian Ball WD106 ELEVATION NORTH & EAST Lindy Shaw & Adrian Ball WD107 ELEVATION SOUTH & WEST Lindy Shaw & Adrian Ball WD108 SECTION A & B Lindy Shaw & Adian Ball WD109 DETAIL B1 & B2 Lindy Shaw & Adrian Ball WD110 DETAIL B3 & B4 Lindy Shaw & Adrian Ball WD111 DETAIL A1 & A2 Lindy Shaw & Adrian Ball WD112 DETAIL A3 & A4 Lindy Shaw & Adiran Ball WD113 DETAIL A5 & B5 Lindy Shaw & Adrian Ball WD114 DOOR & WINDOW SCHEDULE Adrian Ball & Lindy Shaw FINAL SUBMISSION
  • 2. B B A A 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 80.000 m 60.000m SINGERSTREET PROPERTY BOUNDARY 4930 4930 4930 4930 4930 4930 4930 4930 14768 Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 200 WD101 Lindy Shaw & Adrian Ball Checker 20/05/2013 SITE SETOUT PLAN WD3 Working Drawings for type C building Owner BDWDG501A 1 : 200 SITE SETOUT PLAN 1 A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson N
  • 3. 60250 60500 60750 61000 61250 61500 61750 62000 60.25 60.50 60.75 61.00 61.25 61.50 61.75 62.00 80.000 m 60.000m SINGERSTREET STORMWATER DRIVEWAYTYPE B29000 6500 2500 2500 2500 2500 3200 32002500250025002500250023001300 6000 6000 6000 6000 6300 B B A A 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 PROPERTYBOUNDARY LANDSCAPING POTENTIAL FUTURE DEVELOPMENT AWNING AWNING SHEET METAL ROOFING CARPARKING PEDESTRIAN PATHWAY CARPARKING CARPARKING REFUSE LANDSCAPING AV TURNING CIRCLE Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 200 WD102 Lindy Shaw & Adrain Ball Checker 20/05/2013 SITE PLAN WD3 Working Drawings for type C building Owner BDWDG501A 1 : 200 SITE PLAN 1 1 2 3 4 5 6 7 20 0 5 10 m N A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson LOT XX RP XX PARISH OF XX COUNTY OF XX SITE AREA: 4800m2 BUILDING AREA: SITE COVER: SOFT LANDSCAPING: 305m2 (6.3%) PARKING SPACES REQUIRED: 17 SPACES PROVIDED: 17
  • 4. REF.B B A A 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 1 WD108 10 10 190 6000 190 GF 11 GF 5 GF 12 GF 13 GF 14 GF 1 TERRACE WC MR2 MR1 WC WCWC WC U B B B B SHWSHW M F KITCHEN RECEPTION STR PWD WAREHOUSE MEZZANINE OVER B 1902000190 190 1200 190 1800 190 1531 90 1000 190 19020144190 1906500902200902700902700905684190 150 39290 90 2079 90 2000 90 2039 190 6000 190 903800902680901590150 150159090657090 90 3124 90 3124 150 1200 90 3621 90 1000 190 190476015015274150 19020184150 FHR FHR GF 22 GF 24GF 23 LIFT 2 WD108 LOCKERS GF 27 GF 28 GF 1 GF 2 UP VINYL COVERING CARPET CARPET TILED 600X600 TILED 300X300 TILED 300X300 SEALED CONCRETE TILED 300X300 TILED 450X450 TILED 450X450 STR VINYL FW FW FW EXIT EXIT EXIT EXIT EXIT DPDP ENTRANCE MATWELL 1 WD113 2 WD113 FW GF 4 GF 3 DP DP DP DPDPDP DP ROLLER DOORROLLER DOOR WC FF 7 52208 UP FSL 61.000 AWNING ABOVEAWNING ABOVE ROOFOVER FW FW 50 B BASIN WC WASH CLOSET U URINAL SHW SHOWER FW FLOOR WASTE STR STORE ROOM MR1 MEETING ROOM 1 MR2 MEETING ROOM 2 REF REFRIGERATOR PWD PERSON WITH DISABILITY ACCESSIBLE FHR FIRE HOSE REEL LEGEND Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. As indicated WD103 Lindy Shaw & Adrian Ball Checker 20/05/2013 GROUND FLOOR PLAN WD3 Working Drawings for type C building Owner BDWDG501A 1 : 100 GROUND FLOOR 1 0 5 10 m N A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 5. B B A A 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 1 WD108 10 10 BOARDROOM CEO MEZZANINE OFFICE PRINT CFO WAREHOUSE AD FF 5 FF 6 FF 3 FF 3 FF 4 190 2935 90 2976 190 190 6000 190 7428 150120090 2000 90 2621 190 1905134901420906820901600704830190 19020144190 150159013684150 1902000190 150 38277 7401 190 6000 190 15015274150 LIFT 2 WD108 GF 22 GF 23 FF 14 FF 13 FF 15 FF 12 FF 11 FF 10 FF 9 FF 8 FF 7 FF 6 FF 5 CARPET CARPET CARPET CARPET CARPET VINYL FLOOR COVERING VOID TO WAREHOUSE UPUP 52208 AD ADMIN FHR FIRE HOSE REEL LEGEND Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. As indicated WD104 Lindy Shaw & Adrian Ball Checker 20/05/2013 FIRST FLOOR PLAN WD3 Working Drawings for type C building Owner BDWDG501A 1 : 100 FIRST FLOOR PLAN 1 0 5 10 m N A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 6. B A 10 10 1200 520334712 205 1200 1200 1200 1200 210 FLUSH, PLASTERBOARD CEILING 10MM FLUSH, PLASTERBOARD CEILING 10MM CD CD CD CD B A 9 9 10 10 24315001500150015001500127 97592310008771485793 1485493 957 1549 1083 1083 1606 368 262163 137 599991 FLUSH, FC SHEETING 9MM CEILING TO BATHROOMS, KITCHEN, SOFFIT AND TERRACE FLUSH, PLASTERBOARD CEILING 10MM CD CD CD CD LEGEND AIRCON DUCTING AIRCON RETURN DUCT RECESSED, LOUVERED FLUORESCENT TROFFER TASK LIGHTING - FLUSH, LED DOWNLIGHT CEILING DIRECTION - CD [INDICATED BY ARROW ] CD Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. As indicated WD105 Lindy Shaw & Adrian Ball Checker 20/05/2013 REFLECTED CEILING PLAN WD3 Working Drawings for type C building Owner BDWDG501A 1 : 100 FIRST FLOOR OFFICE 11 : 100 GROUND FLOOR 2 0 5 10 m A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 7. GROUND FLOOR 61000 FIRST FLOOR PLAN 64350 B A 1 WD108 FINISH HEIGHT 8.300m FROM NGL 69300 FF 9 FF 8 FF 7 FF 6 FF 5 GF 1 GF 2 FF 1 RENDERED BLOCK WORK WALL DP CONC TILT UP PANELS METAL ROOF METAL SHEETING WAREHOUSE BEYOND GROUND FLOOR 61000 FIRST FLOOR PLAN 64350 12345678910 FINISH HEIGHT 8.300m FROM NGL 693005° 2 WD108 GF 15 GF 14 GF 13 FF 24 FF 22 GF 12 GF 11 GF 10 FF 23 DP DP DP DP DP DP DP ROLLER DOOR ROLLER DOOR RENDERED BLOCK WORK WALL CONC TILT UP PANELS METAL ROOF AWNING AWNING RENDERED FC SHEET Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 100 WD106 Lindy Shaw & Adrian Ball Checker 20/05/2013 ELEVATION NORTH & EAST WD3 Working Drawings for type C building Owner BDWDG501A 1 : 100 EAST ELEVATION 1 1 : 100 NORTH ELEVATION 2 0 5 10 m A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 8. GROUND FLOOR 61000 FIRST FLOOR PLAN 64350 1 2 3 4 5 6 7 8 9 10 FINISH HEIGHT 8.300m FROM NGL 69300 2 WD108 GF 4 GF 3 DP RENDERED BLOCK WORK WALL CONC TILT UP PANELS METAL ROOF RENDERED FC SHEET DPDPDPDP 5° TERRACE GROUND FLOOR 61000 FIRST FLOOR PLAN 64350 BA 1 WD108 FINISH HEIGHT 8.300m FROM NGL 69300 GF 7 RENDERED BLOCK WORK WALL DP CONC TILT UP PANELS AWNING DP 5775 Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 100 WD107 Lindy Shaw & Adrian Ball Checker 20/05/2013 ELEVATION SOUTH & WEST WD3 Working Drawings for type C building Owner BDWDG501A 1 : 100 SOUTH ELEVATION 1 1 : 100 WEST ELEVATION 2 0 5 10 m A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 9. GROUND FLOOR 61000 FIRST FLOOR PLAN 64350 OFFICE CEILING 67350 1 2 3 4 5 6 7 8 9 10 30003003050 FINISH HEIGHT 8.300m FROM NGL 69300 2 WD112 2 WD108 1 WD111 2 WD111 1 WD112 MEZZANINE PATIO WAREHOUSEROLLER DOOR ROLLER DOOR RENDERED BLOCK WORK WALL CONC TILT UP PANELS METAL ROOF LIGHT WEIGHT WALL FRAMING BOARDROOM KITCHEN GROUND FLOOR 61000 FIRST FLOOR PLAN 64350 BA FINISH HEIGHT 8.300m FROM NGL 69300 - --- 2 WD109 1 WD109 2 WD110 1 WD110 MEZZANINE PATIOPWD M CONC TILT UP PANELS RECEPTION/ OFFICES BEYOND METAL ROOF 2.5° STEEL PORTAL FRAME Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 100 WD108 Lindy Shaw & Adian Ball Checker 20/05/2013 SECTION A & B WD3 Working Drawings for type C building Owner BDWDG501A 1 : 100 SECTION A 1 1 : 100 SECTION B 2 0 5 10 m A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 10. A FINISH HEIGHT 8.300m FROM NGL 69300 PRECAST CONCRETE PARAPET CAP TILTUP PANEL 410UB PORTAL FRAME BOX GUTTER FOLDED 0.6BMT SHEET LYSAGHT KLIP LOK ROOF SHEET .42BMT WITH 130MM INSULATION, SAFETY MESHPARAPET 2.5° ROOF PITCH SEPERATION 50 Z PURLINS BOX GUTTER BRACKET @ 450CTRS CONTINUOUS GUTTER TRAY SAW CUT REGULATE INDICATIVE SUMP AND DOWN PIPE GROUND FLOOR 61000 A SETDOWN 200 REINFORCED CONCRETE SLAB TO ENGINEERS DETAILS 50MM SAND BED VAPOUR BARIER PILE CAP 410UB STEEL PORTAL FRAME GROUND FALL 1:50 SEPERATION 50 ANCHOR BOLTS TO ENGINEERS DETAILS Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 5 WD109 Lindy Shaw & Adrian Ball Checker 20/05/2013 DETAIL B1 & B2 WD3 Working Drawings for type C building Owner BDWDG501A 1 : 5 DETAIL B1 1 1 : 5 DETAIL B2 2 0 5 10 m A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 11. FIRST FLOOR PLAN 64350 FIRST FLOOR OFFICE 64100 B 410 UB PORTAL FRAME DRIP EDGE MEZZANINE PATIO TILT UP PANEL SEPERATION 50 VINYL FLOORING ON PLY SUBSTRATE SCREWED TO C250 BOLTED TO 200 PFC 9MM FC SHEETING SCREWED TO C250 @ 600 CTRS C250 FIXED TO TILT UP PANEL FIRST FLOOR PLAN 64350 FIRST FLOOR OFFICE 64100 PWD BATHROOM MEZZANINE BALUSTRADE 90 STEEL STUD CLAD IN 13MM PLASTERBOARD 90 STEEL STUD CLAD IN 13MM PLASTERBOARD VINYL FLOORING ON PLY SUBSTRATE SCREWED TO C250 BOLTED TO 200 PFC 9MM FC SHEETING FIXED TO 90 STEEL STUDS @ 600 CTRS Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 5 WD110 Lindy Shaw & Adrian Ball Checker 20/05/2013 DETAIL B3 & B4 WD3 Working Drawings for type C building Owner BDWDG501A 1 : 5 DETAIL B4 21 : 5 DETAIL B3 1 0 5 10 m A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 12. EXTERNAL ROOF GUTTER [200 x 250 x 180] 9mm FC SOFFIT FACIA PURLIN - FIXED TO 250 UB LYSAGHT KLIPLOK .42 BMT ROOF SHEET ON Z PURLINS FIXED TO 250UB RENDERED BLOCK WALL 9mm FC SHEETING 75 SHS 5° GROUND FLOOR 61000 REINFORCED CONCRETE SLAB TO ENGINEERS DETAILS 50MM SAND BED BORED REINFORCED CONCRETE PIER TO ENGINEERS DETAILS VAPOUR BARIER PILE CAP 200 SERIES CORE FILLED CONCRETE BLOCK WORK WALL GROUND FALL 1:50 Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 5 WD111 Lindy Shaw & Adrian Ball Checker 05/17/13 DETAIL A1 & A2 WD3 Working Drawings for type C building Owner BDWDG501A 1 : 5 DETAIL A1 1 1 : 5 DETAIL A2 2 0 5 10 m A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 13. FIRST FLOOR PLAN 64350 FIRST FLOOR OFFICE 64100 BALUSTRADE 90 STEEL STUDS CLAD IN 13MM PB MEZZANINE PATIO VINYL FLOORING ON PLY SUBSTRATE SCREWED TO C250 BOLTED TO 200 PFC 9MM FC SHEETING FIXED TO C250 @ 600 CTRS C200 LINTEL 9MM FC SHEETING FIXED TO 90SHS @ 600 CTRS 13MM FIXED TO C250 @ 600CTRS C250 TRIMMER STAIRCASE BEYOND 200 PFC 10 FINISH HEIGHT 8.300m FROM NGL 69300 150 LYSAGHT KLIPLOK ROOF SHEET .43 BMT 5° ROOF PITCH Z PURLIN FIXED TO 75 EQUAL ANGLE , WELDED TO 250 UB PARAPET CAPPING LYSAGHT KLIP LOK ROOF SHEET .42 BMT WITH 130MM INSULATION SAFTEY MESH 2.5° ROOF PITCH TILIT-UP PANEL 410 UB PORTAL FRAME FLASHING Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. 1 : 5 WD112 Lindy Shaw & Adiran Ball Checker 20/05/2013 DETAIL A3 & A4 WD3 Working Drawings for type C building Owner BDWDG501A 1 : 5 DETAIL A4 1 0 5 10 m A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson 1 : 5 DETAIL A3 2
  • 14. GROUND FLOOR 61000 FIRST FLOOR PLAN 64350 430 GF 4 FF 11 FWFWFW 90 2770 900 30 900 30 900 30 1010 90 SHWWCWCU BB 800 MM S 980 560 200 560 470 748980 20 180 102 40860 970 970 65 2193 65 2022 65 GROUND FLOOR 61000 FIRST FLOOR PLAN 64350 2200200 800 380 560 200 560 980 FF 12 FWFW 65 1560 65 2635 65 1731 FW SHW WC WC WC 90 1010 30 900 30 900 30 900 90 2680 90 970 970 B B M M S 3 1800 2032 6101490 B BASIN WC WASH CLOSET U URINAL SHW SHOWER FW FLOOR WASTE M MIRROR S SHELF LEGEND Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. As indicated WD113 Lindy Shaw & Adrian Ball Checker 20/05/2013 DETAIL A5 & B5 WD3 Working Drawings for type C building Owner BDWDG501A 1 : 20 SECTION B5 1 1 : 20 SECTION A5 2 0 5 10 m A Preliminary Hand in 20/03/13 B B Final Assessment 20/05/13 Teacher: Ben Carson
  • 15. Scale Checked By Drawn By Date ADRIAN BALL | LINDY SHAW Issue Issue Description Date Issue Project Description Drawing Name Drawing Number General Notes © Copyright SLAB ARCHITECTS Do not scale off drawing use figured dimensions only. Contractor shall verify and be responsible for all dimensions on site. WD114 Adrian Ball & Lindy Shaw Checker 05/17/13 DOOR & WINDOW SCHEDULE WD3 Working Drawings for type C building Owner BDWDG501A Door Schedule Level Mark Height Width Comments GROUND FLOOR 1 2040 820 GROUND FLOOR 5 2032 915 GROUND FLOOR 7 2032 915 GROUND FLOOR 11 2032 915 GROUND FLOOR 12 2032 915 GROUND FLOOR 13 2032 915 GROUND FLOOR 14 2032 915 GROUND FLOOR 21 2040 620 GROUND FLOOR 22 5000 3600 GROUND FLOOR 23 5000 3600 GROUND FLOOR 24 2134 915 GROUND FLOOR 25 2134 915 GROUND FLOOR 26 2040 519 GROUND FLOOR 27 2134 3200 GROUND FLOOR 28 2134 3200 GROUND FLOOR: 15 FIRST FLOOR PLAN 3 2032 915 FIRST FLOOR PLAN 4 2032 915 FIRST FLOOR PLAN 5 2032 915 FIRST FLOOR PLAN 6 2032 915 FIRST FLOOR PLAN: 4 Grand total: 19 Window Schedule Level Mark Width Height Comments GROUND FLOOR 1 2400 1220 GROUND FLOOR 2 600 1220 GROUND FLOOR 3 915 610 GROUND FLOOR 4 915 610 FIRST FLOOR PLAN 5 2400 1220 FIRST FLOOR PLAN 6 2400 1220 FIRST FLOOR PLAN 7 2400 1220 FIRST FLOOR PLAN 8 2400 1220 FIRST FLOOR PLAN 9 2400 1220 GROUND FLOOR 10 4000 1030 GROUND FLOOR 11 4000 1030 GROUND FLOOR 12 4000 1030 GROUND FLOOR 13 4000 1030 GROUND FLOOR 14 4000 1030 GROUND FLOOR 15 4000 1030