The document discusses options for supplying natural gas to the Belawan FSRU in Medan, Indonesia. The key points are: 1) The Belawan FSRU has a capacity of 100 MMSCFD and could be supplied by LNG shuttle tankers transporting cargoes of around 75,000 CBM from the Bontang, Senoro or Tangguh LNG terminals in Indonesia, with a round trip time of up to 16 days from Tangguh. 2) PT Pertamina Gas operates the Arbel gas pipeline with a capacity of 300 MMSCFD, which currently supplies 185 MMSCFD of gas from the Arun LNG terminal to