2. Graphs Of Coal Production In Jambi Province In
2007 - 2013
0.00
2,000,000.00
4,000,000.00
6,000,000.00
8,000,000.00
2007 2008 2009 2010 2011 2012 2013
JAMBI COAL TERMINAL 2
Coal production in the period 2007-2013 showed an increase
•2007 total production reached 2,215,496.24 MT
•2008 total production reached 4,216,057.27 MT
•2009 total production reached 3,198,868.39 MT
•2010 total production reached 7,011,018.13 MT
•2012 total production reached 6,565,306.28 MT
•2013 total production reached 3,500,000.00 MT
3. JAMBI COAL TERMINAL 3
JAMBI - SUMATRA
COAL TERMINAL AND TRANSPORTATION
LOGISTIC
THROUGH BATANG HARI RIVER SYSTEM
Promoted By Bapak Haji Daniel Candra
4. JAMBI COAL TERMINAL 4
DISTANCE COMPARATION
PADANG PORT RIAU PORT TALANG DUKU JCT TENAM
M.BUNGO SITE 287 KM 376 KM 309 KM 205 KM
SAROLANGOON SITE 361 KM 536 KM 269 KM 196 KM
TEBO SITE 331 KM 335 KM 261 KM 124 KM
5. JAMBI COAL TERMINAL 5
Parameter Typical Rej.
Total Moisture (ARB) 39% >41%
Inherent Moisture (ADB) 12-14%
Gross Calorific Value (ARB) 3500 Kcal/Kg. < 3400 Kcal/kg
Ash Content (ADB) 6% >8%
Sulphur (ADB) 0.50% > 0.80%
Volatile Matter (ADB) 40-44%
Fixed Carbon (ADB) By diff.
Size (0 to 50 mm) 90% Min
HGI 55
Technical Specifications as per ASTM/ISO Standard.
(ARB – As Received Basis)
(ADB – Air Dry Basis)
Full spec of GAR 3500
6. JAMBI COAL TERMINAL 6
Parameter Typical Rej.
Total Moisture (ARB) 20%
>22%
Inherent Moisture (ADB) 12-14%
Gross Calorific Value (ARB) 5200 Kcal/Kg.
< 5000 Kcal/kg
Ash Content (ADB) 3,73% >5%
Sulphur (ADB) 0.57% > 0.80%
Volatile Matter (ADB) 36,10%
Fixed Carbon (ADB) 47,58
Size (0 to 50 mm) 90% Min
HGI 55
Technical Specifications as per ASTM/ISO Standard.
(ARB – As Received Basis)
(ADB – Air Dry Basis)
Full Spec Gar 5200
7. JAMBI COAL TERMINAL 7
Full spec of gar
Customer Sample ID
unit
Pit 427
Lab Sample ID
Pg14
00337
Weight Of Sample 4,880 g
Analysis
1.As Received Basis (Ar)
Total Moisture ( % ) 23.29
Ash Content ( % ) 1.66
Volatille Matter ( % ) 32.46
Fixed Carbon ( % ) 42.6
Total Sulphur ( % ) 0.5
Gross Calorific Value cal/gr 5902
2.Air Dried Basis (Adb)
Moisture In The Analysis Sample ( % ) 11.04
Ash Content ( % ) 1.92
Volatille Matter ( % ) 37.64
Fixed Carbon ( % ) 49.4
Total Sulphur ( % ) 0.58
Gross Calorific Value cal/gr 6845
8. JAMBI COAL TERMINAL 8
Coal Mining Company In Jambi
in Jambi have 347 of coal mining company
already have permit from Government
206 coal mining company already do
exploration and 141 company have legal
permit from Government for production
and exploitation
Coal Resource In Jambi
coal resources in Provinces Jambi as per
declare from Jambi government is big
which total sources reaching up to 1,5
billion tons have yet exploration and total
coal has been produced up to now about
50 million tons.
9. JAMBI COAL TERMINAL 9
The Project Highlights
PT.Bara Ria Sukses is committed to offer a Total Coal Logistics
Solution from Jambi Mine hinterlands, Sumatera to overseas
Destination by
Establishing coal loading river terminal at tenam area
Establishing a REALIABLE,SUSTANIABLE and COMMON USER
terminal and river transport system in batang hari river
Establishing of coal transshipment Terminal at
sukombong to add flexibility to barge logistics chain.
10. JAMBI COAL TERMINAL 10
The Bothra Group
Since its formation in 1977, Bothra Group has evolved from a
Conventional Stevedoring, clearing and Forwading agency to
a multidimensional shipping and port logistics group of
companies including cargo terminal operations
Bothra Group enjoys a reputation beyond the shipping sector
by his group in indonesia namely PT.Jaldhi Marine Services
for a competent an reliable end to end logistics service
provider with shipping and overland logistic solutions
tailored to customer needs.and in keeping with its
philosophy, PT.Jaldhi Marine Services is now commited to
established a Coal Transport logistics in jambi through
Batang Hari River Syatem
11. JAMBI COAL TERMINAL 11
Today’s situation – The dificulties for Coal Miners to
export the produce
The mines located in the coal consession areas of jambi face great
difficulties and challenges to move the mined coal to a mother vessel
anchored at the nearest sea anchorage – Muara Sabak
This is due to
inadequate road infrastructure from mines to talang duku a
distance of nesrly 150 km, the nearest point to reach the barge loading
facility
governmental restrictions in use of public roads for coal haulage
purpose
social problem as public protest due to daily traffic jams ,
pollutions and daily accidents until some deaths due to inexperience
and illegal truckings
13. JAMBI COAL TERMINAL 13
PT.Bara Ria Sukses – Jaldhi’s Project intends to achieve…
The aim of this projects is to increase the Reliability and
Avaliability of Logistics Service in this region by using the
Batang Hari river system and thus open up the abundant
resources of this region to the world
24. JAMBI COAL TERMINAL 24
The Timeline
The Project is estimated to be Commissioned
before the mid of 2015
And with this Jaldhi , Bothra Group shall be
setting a new , efficient and eco-friendly logistics
solution for Cola Mining hinterland of Jambi