SlideShare a Scribd company logo
WWW.NESGLOBALTALENT.COM
ASIA’S BIGGEST
OIL & GAS
PIPELINES
01 WEST-EAST PIPELINE
PROECT (WEPP)//
CHINA, NATURAL GAS
designed to connect the
eastern markets of China
with western resources
Petrochina /
CNPC
The pipelines traverse plateaus, mountains, deserts and
rivers in order to link the 560,000 square kilometre Tarim
Basin in Xinjiang Autonomous Region and Turkmenistan with
the Yangtze Delta and Pearl Delta regions.
The basin has enormous gas resources with proven reserves
of 532.9 billion cubic metres and prospective
reserves of up to one trillion cubic metres.
01 | WEPP
01 | WEPP
15+ years
45+ bn
20,000 km (12,427 miles)
4 pipelines
• 9,000km+ (5,592 miles)
• 15 provinces
• linking 10 major pipelines
• $22+bn alone
• 30bcm transmission capacity
01 | WEPP
WEPP II//
WORLD’S LONGEST
NATURAL GAS PIPELINE
The pipelines have reduced coal usage by
over 75 million tons, meaning that China’s
greenhouse gas emissions have reduced
by 130 million tons of CO2 and
1.44 million tons of SO2.
01 | WEPP
Want to work on exciting
Oil & Gas projects?
NES recruit international technical and
specialist personnel for some of the biggest
engineering projects on the planet.
View our latest jobs here
WWW.NESGLOBALTALENT.COM
02 EASTERN SIBERIA–
PACIFIC OCEAN PIPELINE
(ESPO)// SIBERIA, OIL
Transeft
A pipeline system for
exporting Russian crude
oil to major Asian markets
There are two phases to
the pipeline:
PHASE 1
• 2,757km (1,713 miles)
• Annual crude oil transfer
capacities of 80m tonnes
• 32 pumping stations
• $14+bn cost
PHASE 2
• 1,963km (1,210 miles)
• location chosen because
of the proximity of the
Trans-Siberian railway
02 | ESPO
02 | ESPO
4,188 km (2,602 miles)
In areas of seismic activity pipes
have a three-layer coating of extruded
polyethylene to prevent spillage
02 | ESPO
02 | ESPO
In 2014, an additional three oil pumping
stations were added to the pipeline,
bringing the oil pumping capacity of the
first phase stations to an enormous
58 million tonnes a year.
Our international Oil & Gas
opportunities could help you take
your career to the next level.
Find your next role here
WWW.NESGLOBALTALENT.COM
03 KAZAKHSTAN-CHINA
PIPELINE, OIL
Transports crude oil from
western kazakhstan to the
Dushanzi refinery located in
the Xinjiang province of China
CNPC /
Kazmunaigaz
Oil from Kazakhstan enters
China via an oil meterage
station in Alanshankou
03 | K-C
CHALLENGING CLIMATE
It is a seismically active area with
a lack of infrastructure, extreme
temperatures and heavy floods.
03 | K-C
03 | K-C
• capacity of ten million tons a year (mt/y)
• 813mm diameter pipeline
• 5 years after construction the pipeline had
transported more than 30mt of crude oil
• the pipeline helps to support the growing
energy demand within China
KEY POINTS
4+ years 3+ bn
2,798 km (1,738 miles)
03 | K-C
Fancy working in the
Oil & Gas industry?
NES has operations across the globe
managing international personnel for some of
the biggest engineering projects on the planet.
View our latest O&G jobs here
WWW.NESGLOBALTALENT.COM

More Related Content

What's hot

COMO ACP AHORRARÍA CIEN MILLONES DE DÓLARES
COMO ACP AHORRARÍA CIEN MILLONES DE DÓLARES COMO ACP AHORRARÍA CIEN MILLONES DE DÓLARES
COMO ACP AHORRARÍA CIEN MILLONES DE DÓLARES
ernesto pinillo
 
Agriculture component of the re-optimization and reoperation study of the Ako...
Agriculture component of the re-optimization and reoperation study of the Ako...Agriculture component of the re-optimization and reoperation study of the Ako...
Agriculture component of the re-optimization and reoperation study of the Ako...
International Water Management Institute (IWMI)
 
The Importance of Coal
The Importance of CoalThe Importance of Coal
The Importance of Coal
Verena Roberts
 
Sitios óptimos para la energía de mareas
Sitios óptimos para la energía de mareasSitios óptimos para la energía de mareas
Sitios óptimos para la energía de mareas
Energy 4 Impact
 
Wac Ncc100809 China’s Energy,Strategic Perspective
Wac Ncc100809 China’s Energy,Strategic PerspectiveWac Ncc100809 China’s Energy,Strategic Perspective
Wac Ncc100809 China’s Energy,Strategic PerspectiveDavid Edick Jr
 
Mangla Dam by Zain Ramzan
Mangla Dam by Zain RamzanMangla Dam by Zain Ramzan
Mangla Dam by Zain Ramzan
Zain Ramzan
 
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
ITE Oil&Gas
 
Coal As A Source Of Energybv
Coal As A Source Of EnergybvCoal As A Source Of Energybv
Coal As A Source Of Energybvtudorgeog
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b ProjectsAnandhan Annasamy
 
Coal fired power plants by Waqas Ali Tunio (07ME34)
Coal fired power plants by Waqas Ali Tunio (07ME34)Coal fired power plants by Waqas Ali Tunio (07ME34)
Coal fired power plants by Waqas Ali Tunio (07ME34)Waqas Ali Tunio
 

What's hot (11)

COMO ACP AHORRARÍA CIEN MILLONES DE DÓLARES
COMO ACP AHORRARÍA CIEN MILLONES DE DÓLARES COMO ACP AHORRARÍA CIEN MILLONES DE DÓLARES
COMO ACP AHORRARÍA CIEN MILLONES DE DÓLARES
 
Agriculture component of the re-optimization and reoperation study of the Ako...
Agriculture component of the re-optimization and reoperation study of the Ako...Agriculture component of the re-optimization and reoperation study of the Ako...
Agriculture component of the re-optimization and reoperation study of the Ako...
 
The Importance of Coal
The Importance of CoalThe Importance of Coal
The Importance of Coal
 
Sitios óptimos para la energía de mareas
Sitios óptimos para la energía de mareasSitios óptimos para la energía de mareas
Sitios óptimos para la energía de mareas
 
Wac Ncc100809 China’s Energy,Strategic Perspective
Wac Ncc100809 China’s Energy,Strategic PerspectiveWac Ncc100809 China’s Energy,Strategic Perspective
Wac Ncc100809 China’s Energy,Strategic Perspective
 
LNG vs CNG_2010_Istanbul OK
LNG vs CNG_2010_Istanbul OKLNG vs CNG_2010_Istanbul OK
LNG vs CNG_2010_Istanbul OK
 
Mangla Dam by Zain Ramzan
Mangla Dam by Zain RamzanMangla Dam by Zain Ramzan
Mangla Dam by Zain Ramzan
 
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
 
Coal As A Source Of Energybv
Coal As A Source Of EnergybvCoal As A Source Of Energybv
Coal As A Source Of Energybv
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b Projects
 
Coal fired power plants by Waqas Ali Tunio (07ME34)
Coal fired power plants by Waqas Ali Tunio (07ME34)Coal fired power plants by Waqas Ali Tunio (07ME34)
Coal fired power plants by Waqas Ali Tunio (07ME34)
 

Similar to Asia's biggest oil and gas pipelines

Pipeline Transportation 123
Pipeline  Transportation 123Pipeline  Transportation 123
Pipeline Transportation 123
kamlesh
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
Saad Raja
 
Kashmirrailproject
KashmirrailprojectKashmirrailproject
Kashmirrailproject
pankaj kumar
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
Rubnawaz Bhatti
 
Project report
Project reportProject report
Project report
ZeeshanManzoor10
 
Sui Northern Gas Pipelines Limited
Sui Northern Gas Pipelines LimitedSui Northern Gas Pipelines Limited
Sui Northern Gas Pipelines Limited
Mark Peterson
 
Kazakhstan china
Kazakhstan china Kazakhstan china
Kazakhstan china Lau Nina
 
Usbrlp at a glance
Usbrlp at a glanceUsbrlp at a glance
Usbrlp at a glance
Lakhwant Singh Khalsa
 
Coal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueCoal Logistic Challenges in Mozambique
Coal Logistic Challenges in Mozambique
Tristan Wiggill
 
The Next Steps in Creating Export Capacity
The Next Steps in Creating Export CapacityThe Next Steps in Creating Export Capacity
The Next Steps in Creating Export Capacity
Tristan Wiggill
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & IndiaVR M
 
EIA POWER PLANT.pptx
EIA POWER PLANT.pptxEIA POWER PLANT.pptx
EIA POWER PLANT.pptx
sunilghosh11
 
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4Mihai Dragne
 
CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...
Global CCS Institute
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
Aglaia Connect
 
Impact of Thar Coal on Electricity Generation & Economic Growth of Pakistan
Impact of Thar Coal on Electricity Generation & Economic Growth of PakistanImpact of Thar Coal on Electricity Generation & Economic Growth of Pakistan
Impact of Thar Coal on Electricity Generation & Economic Growth of Pakistan
Sandeep Kumar
 
ENERGY SCENARIO IN PAKISTAN.Ali Raza
ENERGY SCENARIO IN PAKISTAN.Ali RazaENERGY SCENARIO IN PAKISTAN.Ali Raza
ENERGY SCENARIO IN PAKISTAN.Ali RazaAli Raza
 
Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ult...
Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ult...Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ult...
Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ult...
Manoj Vyas , MBA (Power Management )
 

Similar to Asia's biggest oil and gas pipelines (20)

Pipeline Transportation 123
Pipeline  Transportation 123Pipeline  Transportation 123
Pipeline Transportation 123
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
Kashmirrailproject
KashmirrailprojectKashmirrailproject
Kashmirrailproject
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Project report
Project reportProject report
Project report
 
Kashmir rail project
Kashmir rail projectKashmir rail project
Kashmir rail project
 
API CNG LNG
API CNG LNGAPI CNG LNG
API CNG LNG
 
Sui Northern Gas Pipelines Limited
Sui Northern Gas Pipelines LimitedSui Northern Gas Pipelines Limited
Sui Northern Gas Pipelines Limited
 
Kazakhstan china
Kazakhstan china Kazakhstan china
Kazakhstan china
 
Usbrlp at a glance
Usbrlp at a glanceUsbrlp at a glance
Usbrlp at a glance
 
Coal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueCoal Logistic Challenges in Mozambique
Coal Logistic Challenges in Mozambique
 
The Next Steps in Creating Export Capacity
The Next Steps in Creating Export CapacityThe Next Steps in Creating Export Capacity
The Next Steps in Creating Export Capacity
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & India
 
EIA POWER PLANT.pptx
EIA POWER PLANT.pptxEIA POWER PLANT.pptx
EIA POWER PLANT.pptx
 
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
 
CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
Impact of Thar Coal on Electricity Generation & Economic Growth of Pakistan
Impact of Thar Coal on Electricity Generation & Economic Growth of PakistanImpact of Thar Coal on Electricity Generation & Economic Growth of Pakistan
Impact of Thar Coal on Electricity Generation & Economic Growth of Pakistan
 
ENERGY SCENARIO IN PAKISTAN.Ali Raza
ENERGY SCENARIO IN PAKISTAN.Ali RazaENERGY SCENARIO IN PAKISTAN.Ali Raza
ENERGY SCENARIO IN PAKISTAN.Ali Raza
 
Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ult...
Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ult...Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ult...
Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ult...
 

More from NES Global Talent

Benefits of working for NES Fircroft
Benefits of working for NES FircroftBenefits of working for NES Fircroft
Benefits of working for NES Fircroft
NES Global Talent
 
LinkedIn - LNG and Midstream Jobs through NES Fircroft.pptx
LinkedIn - LNG and Midstream Jobs through NES Fircroft.pptxLinkedIn - LNG and Midstream Jobs through NES Fircroft.pptx
LinkedIn - LNG and Midstream Jobs through NES Fircroft.pptx
NES Global Talent
 
LinkedIn - Life Sciences Job Opportunities.pptx
LinkedIn - Life Sciences Job Opportunities.pptxLinkedIn - Life Sciences Job Opportunities.pptx
LinkedIn - Life Sciences Job Opportunities.pptx
NES Global Talent
 
LinkedIn - Power Generation and T&D Opportunities for Engineers.pptx
LinkedIn - Power Generation and T&D Opportunities for Engineers.pptxLinkedIn - Power Generation and T&D Opportunities for Engineers.pptx
LinkedIn - Power Generation and T&D Opportunities for Engineers.pptx
NES Global Talent
 
Recycled plastics.pptx
Recycled plastics.pptxRecycled plastics.pptx
Recycled plastics.pptx
NES Global Talent
 
LinkedIn - Alternative Energy Job Opportunities for Engineers.pptx
LinkedIn - Alternative Energy Job Opportunities for Engineers.pptxLinkedIn - Alternative Energy Job Opportunities for Engineers.pptx
LinkedIn - Alternative Energy Job Opportunities for Engineers.pptx
NES Global Talent
 
LinkedIn - Renewable Energy Job Opportunities for Engineers.pptx
LinkedIn - Renewable Energy Job Opportunities for Engineers.pptxLinkedIn - Renewable Energy Job Opportunities for Engineers.pptx
LinkedIn - Renewable Energy Job Opportunities for Engineers.pptx
NES Global Talent
 
LinkedIn - Opportunities within Energy for Engineers.pptx
LinkedIn - Opportunities within Energy for Engineers.pptxLinkedIn - Opportunities within Energy for Engineers.pptx
LinkedIn - Opportunities within Energy for Engineers.pptx
NES Global Talent
 
LinkedIn - Mining Job Opportunities for Engineers.pptx
LinkedIn - Mining Job Opportunities for Engineers.pptxLinkedIn - Mining Job Opportunities for Engineers.pptx
LinkedIn - Mining Job Opportunities for Engineers.pptx
NES Global Talent
 
COREPPT1_NES Fircroft Global Overview.pptx
COREPPT1_NES Fircroft Global Overview.pptxCOREPPT1_NES Fircroft Global Overview.pptx
COREPPT1_NES Fircroft Global Overview.pptx
NES Global Talent
 
COREPPT1_NES Fircroft Global Overview.pptx
COREPPT1_NES Fircroft Global Overview.pptxCOREPPT1_NES Fircroft Global Overview.pptx
COREPPT1_NES Fircroft Global Overview.pptx
NES Global Talent
 
Power Generation, Transmission and Distribution Opportunities for Engineers
Power Generation, Transmission and Distribution Opportunities for EngineersPower Generation, Transmission and Distribution Opportunities for Engineers
Power Generation, Transmission and Distribution Opportunities for Engineers
NES Global Talent
 
Oil and Gas opportunities for Engineers
Oil and Gas opportunities for EngineersOil and Gas opportunities for Engineers
Oil and Gas opportunities for Engineers
NES Global Talent
 
Life Science job opportunities
Life Science job opportunitiesLife Science job opportunities
Life Science job opportunities
NES Global Talent
 
Stay Safety Savvy in the Power Industry
Stay Safety Savvy in the Power IndustryStay Safety Savvy in the Power Industry
Stay Safety Savvy in the Power Industry
NES Global Talent
 
How a Fusion Reactor Works
How a Fusion Reactor WorksHow a Fusion Reactor Works
How a Fusion Reactor Works
NES Global Talent
 

More from NES Global Talent (16)

Benefits of working for NES Fircroft
Benefits of working for NES FircroftBenefits of working for NES Fircroft
Benefits of working for NES Fircroft
 
LinkedIn - LNG and Midstream Jobs through NES Fircroft.pptx
LinkedIn - LNG and Midstream Jobs through NES Fircroft.pptxLinkedIn - LNG and Midstream Jobs through NES Fircroft.pptx
LinkedIn - LNG and Midstream Jobs through NES Fircroft.pptx
 
LinkedIn - Life Sciences Job Opportunities.pptx
LinkedIn - Life Sciences Job Opportunities.pptxLinkedIn - Life Sciences Job Opportunities.pptx
LinkedIn - Life Sciences Job Opportunities.pptx
 
LinkedIn - Power Generation and T&D Opportunities for Engineers.pptx
LinkedIn - Power Generation and T&D Opportunities for Engineers.pptxLinkedIn - Power Generation and T&D Opportunities for Engineers.pptx
LinkedIn - Power Generation and T&D Opportunities for Engineers.pptx
 
Recycled plastics.pptx
Recycled plastics.pptxRecycled plastics.pptx
Recycled plastics.pptx
 
LinkedIn - Alternative Energy Job Opportunities for Engineers.pptx
LinkedIn - Alternative Energy Job Opportunities for Engineers.pptxLinkedIn - Alternative Energy Job Opportunities for Engineers.pptx
LinkedIn - Alternative Energy Job Opportunities for Engineers.pptx
 
LinkedIn - Renewable Energy Job Opportunities for Engineers.pptx
LinkedIn - Renewable Energy Job Opportunities for Engineers.pptxLinkedIn - Renewable Energy Job Opportunities for Engineers.pptx
LinkedIn - Renewable Energy Job Opportunities for Engineers.pptx
 
LinkedIn - Opportunities within Energy for Engineers.pptx
LinkedIn - Opportunities within Energy for Engineers.pptxLinkedIn - Opportunities within Energy for Engineers.pptx
LinkedIn - Opportunities within Energy for Engineers.pptx
 
LinkedIn - Mining Job Opportunities for Engineers.pptx
LinkedIn - Mining Job Opportunities for Engineers.pptxLinkedIn - Mining Job Opportunities for Engineers.pptx
LinkedIn - Mining Job Opportunities for Engineers.pptx
 
COREPPT1_NES Fircroft Global Overview.pptx
COREPPT1_NES Fircroft Global Overview.pptxCOREPPT1_NES Fircroft Global Overview.pptx
COREPPT1_NES Fircroft Global Overview.pptx
 
COREPPT1_NES Fircroft Global Overview.pptx
COREPPT1_NES Fircroft Global Overview.pptxCOREPPT1_NES Fircroft Global Overview.pptx
COREPPT1_NES Fircroft Global Overview.pptx
 
Power Generation, Transmission and Distribution Opportunities for Engineers
Power Generation, Transmission and Distribution Opportunities for EngineersPower Generation, Transmission and Distribution Opportunities for Engineers
Power Generation, Transmission and Distribution Opportunities for Engineers
 
Oil and Gas opportunities for Engineers
Oil and Gas opportunities for EngineersOil and Gas opportunities for Engineers
Oil and Gas opportunities for Engineers
 
Life Science job opportunities
Life Science job opportunitiesLife Science job opportunities
Life Science job opportunities
 
Stay Safety Savvy in the Power Industry
Stay Safety Savvy in the Power IndustryStay Safety Savvy in the Power Industry
Stay Safety Savvy in the Power Industry
 
How a Fusion Reactor Works
How a Fusion Reactor WorksHow a Fusion Reactor Works
How a Fusion Reactor Works
 

Recently uploaded

The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 

Recently uploaded (20)

The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 

Asia's biggest oil and gas pipelines

  • 2. 01 WEST-EAST PIPELINE PROECT (WEPP)// CHINA, NATURAL GAS designed to connect the eastern markets of China with western resources Petrochina / CNPC
  • 3. The pipelines traverse plateaus, mountains, deserts and rivers in order to link the 560,000 square kilometre Tarim Basin in Xinjiang Autonomous Region and Turkmenistan with the Yangtze Delta and Pearl Delta regions. The basin has enormous gas resources with proven reserves of 532.9 billion cubic metres and prospective reserves of up to one trillion cubic metres. 01 | WEPP
  • 4. 01 | WEPP 15+ years 45+ bn 20,000 km (12,427 miles) 4 pipelines
  • 5. • 9,000km+ (5,592 miles) • 15 provinces • linking 10 major pipelines • $22+bn alone • 30bcm transmission capacity 01 | WEPP WEPP II// WORLD’S LONGEST NATURAL GAS PIPELINE
  • 6. The pipelines have reduced coal usage by over 75 million tons, meaning that China’s greenhouse gas emissions have reduced by 130 million tons of CO2 and 1.44 million tons of SO2. 01 | WEPP
  • 7. Want to work on exciting Oil & Gas projects? NES recruit international technical and specialist personnel for some of the biggest engineering projects on the planet. View our latest jobs here WWW.NESGLOBALTALENT.COM
  • 8. 02 EASTERN SIBERIA– PACIFIC OCEAN PIPELINE (ESPO)// SIBERIA, OIL Transeft A pipeline system for exporting Russian crude oil to major Asian markets
  • 9. There are two phases to the pipeline: PHASE 1 • 2,757km (1,713 miles) • Annual crude oil transfer capacities of 80m tonnes • 32 pumping stations • $14+bn cost PHASE 2 • 1,963km (1,210 miles) • location chosen because of the proximity of the Trans-Siberian railway 02 | ESPO
  • 10. 02 | ESPO 4,188 km (2,602 miles)
  • 11. In areas of seismic activity pipes have a three-layer coating of extruded polyethylene to prevent spillage 02 | ESPO
  • 12. 02 | ESPO In 2014, an additional three oil pumping stations were added to the pipeline, bringing the oil pumping capacity of the first phase stations to an enormous 58 million tonnes a year.
  • 13. Our international Oil & Gas opportunities could help you take your career to the next level. Find your next role here WWW.NESGLOBALTALENT.COM
  • 14. 03 KAZAKHSTAN-CHINA PIPELINE, OIL Transports crude oil from western kazakhstan to the Dushanzi refinery located in the Xinjiang province of China CNPC / Kazmunaigaz
  • 15. Oil from Kazakhstan enters China via an oil meterage station in Alanshankou 03 | K-C
  • 16. CHALLENGING CLIMATE It is a seismically active area with a lack of infrastructure, extreme temperatures and heavy floods. 03 | K-C
  • 17. 03 | K-C • capacity of ten million tons a year (mt/y) • 813mm diameter pipeline • 5 years after construction the pipeline had transported more than 30mt of crude oil • the pipeline helps to support the growing energy demand within China KEY POINTS
  • 18. 4+ years 3+ bn 2,798 km (1,738 miles) 03 | K-C
  • 19. Fancy working in the Oil & Gas industry? NES has operations across the globe managing international personnel for some of the biggest engineering projects on the planet. View our latest O&G jobs here WWW.NESGLOBALTALENT.COM