SlideShare a Scribd company logo
1 of 26
Traffic Study
For the Rosemont Copper Project




By Kekoa Anderson, P.E.,
David Bost &
Seri Park, Ph.D.
Presentation Agenda

 § Traffic Study Elements
     • Traffic Analysis
     • Study Site
     • Traffic Data
 § Level of Service Analysis
     • Simulations
 § Roadway Assessment
     • Safety Analysis
     • Geometric Analysis
 § Findings
 § Q&A

                         Traffic Study
Traffic Study Elements – Traffic Analysis

                     Current Traffic
                     Data Collection


                         Traffic Forecasts
                        • Construction Year
              • Interim Mine Operation (Year 5)
                 •  Ultimate Mine Life (Year 20)


             Traffic Operation/LOS Analysis
                      • Intersections
                          • Corridor


                  Need improvements?


                      Traffic Study
Traffic Study Elements – Study Site




                   Traffic Study
Traffic Study Elements – Key Intersections




                   Traffic Study
Traffic Study Elements – Traffic Data

 § Traffic Data
   • Current Traffic Counts
   • Traffic Forecasts
     • Construction Year
     • Interim Mine Operation (Year 5)
     • Ultimate Mine (Year 20)




                         Traffic Study
Current Traffic Counts

 § Data collection
   • Seasonal – peak season, non-peak season
   • Day – weekday, weekend
   • Time – AM and PM peak period
     • 6:30-8:00 AM, 5:00-7:00 PM
   • Seven (7) major intersections
 § Method
   • Manual traffic count
   • Video recording


                        Traffic Study
Current Traffic Counts

 § 5 Different vehicle types
   • Motorcycle
   • Light duty vehicles (autos, pickup trucks, SUVs, etc.)
   • Buses
   • Median trucks (2-axle, 6-tire)
   • Heavy trucks (3 or more axles)
 § Truck traffic
   • Convert into the passenger car equivalent (PCE)
     factors for accurate Level of Service (LOS) analysis


                          Traffic Study
Current Traffic Counts




                   Traffic Study
Truck Volumes




                                Study Site




                Traffic Study
Traffic Forecasts

 § Future land use
 § Update origin destination matrix
 § Assignment of trips




                          Traffic Study
Traffic Forecasts

 § Traffic Forecasts
   • Project trip
     • Mine operation trip
   • Background trip
     • Regional growth
     • Pima Association of Governments (PAG) travel
       demand model
     • ADOT major projects




                         Traffic Study
Level of Service Analysis

§ Four analysis years
  • Current year (2008)
  • Construction year (2010)
  • Interim mine year (5 years)
  • Ultimate mine year (20 years)




                          Traffic Study
Level of Service Analysis

               Current Year   Construction Year   Interim Mine       Ultimate Mine
                                                  Year (Year 5)      Year (Year 20)



Intersection   LOS A-B        LOS A-B             LOS A-B            LOS A-B
LOS

Segment LOS    LOS B          LOS C               LOS C,D            LOS C, D


Findings       Acceptable     Acceptable LOS      § Left turn issue § Left turn issue
               LOS                                § Non passing     § Non passing
                                                  zone issue         zone issue
                                                  § Need for        § Need for
                                                  roadway            roadway
                                                  geometric          geometric
                                                  modification       modification



                               Traffic Study
SimTraffic

 § SimTraffic Simulation




                            Traffic Study
Roadway Assessment

                           • Vehicle Type
                          •  Vehicle Speed




                             SAFETY
ROAD GEOMETRY
                                              •  Lane changing
     •  Lane width                                  •  Speed
    • Shoulder Width                           •  Reaction time
   • Traffic separation
      • Refuge Lane
      • Intersections                     DRIVER S BEHAVIOR


                          Traffic Study
Roadway Assessment

 § Safety analysis
 § Geometric analysis




                         Traffic Study
Roadway Assessment – Safety analysis

 § ADOT accident data
   • Past 5 years accident data (8/1/2003 - 7/31/2008)
   • SR 83 from I-10 on-off ramps to SR 82




                         Traffic Study
Roadway Assessment – Safety analysis

 §  Federal Requirement
   •  Each state describe at least 5 percent of its locations currently exhibiting
      the most severe highway safety needs, in accordance with Sections 148
      (c)(1)(D) and 148(g)(3)(A), of Title 23, United States Code
   •  Location should have at least one crash (fatal, any type of injury or
      property damage only) in each of the three years.
   •  Location should have at least one fatal crash in three years.
   •  At least one crash should be run-off-road, intersection, or pedestrian
      related. It should be noted that the intersection-related crashes
      considered here are the crashes in which the first harmful event
      occurred on an approach to or exit from an intersection, and resulted
      from an activity, behavior or control related to the movement of traffic
      units through the intersection (as defined by the American National
      Standard D16.1-1996, ANSI D16.1-1996).
   •  Total number of fatal or incapacitating injury crashes equal to or greater
      than three in those three years.



                                Traffic Study
Roadway Assessment – Safety analysis

 § State Route 83, Post Mile 44
   • Classified as top five percent
 § Any correlation on
   • Seasonal effect?
   • Traffic volume?
   • Roadway geometry?




                         Traffic Study
Roadway Assessment – Safety analysis




                 Traffic Study
Roadway Assessment – Geometric analysis

           Narrow shoulder (1 )




    Steep curvature without guard rail next
              to downhill slope




                                  Traffic Study
Roadway Assessment – Geometric analysis




                                                   Contributing poor
                                                     sight distance




 Steep horizontal curvature with narrow
    shoulder and poor sight distance
         No median/refuge lane




                                   Traffic Study
Roadway Assessment – Geometric analysis

 § Safety elements
   • Curvature
   • Shoulder width
   • Lane configuration – maybe suggest the refuge lane
     or median
   • Provide sufficient
     • Stopping sight distance
     • Passing sight distance
     • Curve radius
     • Superelevation


                          Traffic Study
Findings

 § Load of additional truck
   • Does not necessarily worsen traffic operation based
     on LOS
   • Does affect corridor delay
   • Need to correct with geometry improvements
 § Accident analysis
   • High correlation with roadway geometry rather than
     truck traffic
 § Few items to suggest for alternatives???



                         Traffic Study
Questions

Kekoa Anderson, P.E.
kekoa.anderson@tetratech.com
949.887.0731




                        Traffic Study

More Related Content

What's hot

Dynamics Kinematics Curvilinear Motion
Dynamics Kinematics Curvilinear MotionDynamics Kinematics Curvilinear Motion
Dynamics Kinematics Curvilinear MotionNikolai Priezjev
 
Rubrics for IPCRF of Teachers per Objective of their KRAs
Rubrics for IPCRF of Teachers per Objective of their KRAsRubrics for IPCRF of Teachers per Objective of their KRAs
Rubrics for IPCRF of Teachers per Objective of their KRAsDIEGO Pomarca
 
fabrication,erection and repairing oF Dam's Gate
fabrication,erection and repairing oF Dam's Gatefabrication,erection and repairing oF Dam's Gate
fabrication,erection and repairing oF Dam's GateTushar Dholakia
 
Motor Grader inspection checklist
Motor Grader inspection checklistMotor Grader inspection checklist
Motor Grader inspection checklistWolfgang Bühn
 

What's hot (8)

Dynamics Kinematics Curvilinear Motion
Dynamics Kinematics Curvilinear MotionDynamics Kinematics Curvilinear Motion
Dynamics Kinematics Curvilinear Motion
 
RPMS 2021-2022 Free Template.pptx
RPMS 2021-2022 Free Template.pptxRPMS 2021-2022 Free Template.pptx
RPMS 2021-2022 Free Template.pptx
 
Rubrics for IPCRF of Teachers per Objective of their KRAs
Rubrics for IPCRF of Teachers per Objective of their KRAsRubrics for IPCRF of Teachers per Objective of their KRAs
Rubrics for IPCRF of Teachers per Objective of their KRAs
 
Carnot cycle
Carnot cycleCarnot cycle
Carnot cycle
 
Module 6 updated
Module 6 updatedModule 6 updated
Module 6 updated
 
Buoyancy & Stability
Buoyancy & StabilityBuoyancy & Stability
Buoyancy & Stability
 
fabrication,erection and repairing oF Dam's Gate
fabrication,erection and repairing oF Dam's Gatefabrication,erection and repairing oF Dam's Gate
fabrication,erection and repairing oF Dam's Gate
 
Motor Grader inspection checklist
Motor Grader inspection checklistMotor Grader inspection checklist
Motor Grader inspection checklist
 

Similar to Baseline Traffic Study

Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.RAJENDRAKUMARSHETTAR
 
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...YAHAMPATHARACHCHIGEP
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Barry Scott
 
raiway
raiwayraiway
raiwayself
 
Geometric Design of highway
Geometric Design of highway Geometric Design of highway
Geometric Design of highway RAMPRASAD KUMAWAT
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering IGAURAV. H .TANDON
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportUGPTI
 
Geometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptxGeometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptxCHETTIKULAMNATHAMpro
 
Kashyap Pandya - Portfolio of Planning Works
Kashyap Pandya - Portfolio of Planning WorksKashyap Pandya - Portfolio of Planning Works
Kashyap Pandya - Portfolio of Planning WorksKashyapPandya3
 
Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)Civil Zone
 
February21st esp179-traffic
February21st esp179-trafficFebruary21st esp179-traffic
February21st esp179-trafficKevin Fang
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESDavinderpal Singh
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportUGPTI
 
Total road asset management
Total road asset managementTotal road asset management
Total road asset managementsuhaimi talib
 
2018 STS - OS/OW Uniform Permit Transport 2021: Specialized Transportation Co...
2018 STS - OS/OW Uniform Permit Transport 2021: Specialized Transportation Co...2018 STS - OS/OW Uniform Permit Transport 2021: Specialized Transportation Co...
2018 STS - OS/OW Uniform Permit Transport 2021: Specialized Transportation Co...Specialized Carriers & Rigging Association
 
Economics of upgrading a gravel road to Otta seal surface
Economics of upgrading a gravel road to Otta seal surfaceEconomics of upgrading a gravel road to Otta seal surface
Economics of upgrading a gravel road to Otta seal surfaceAliNahvi
 

Similar to Baseline Traffic Study (20)

Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.
 
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015
 
raiway
raiwayraiway
raiway
 
Geometric Design of highway
Geometric Design of highway Geometric Design of highway
Geometric Design of highway
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering I
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status Report
 
Geometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptxGeometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptx
 
Steve Marvin: Pavement smoothness, acceptance and testing
Steve Marvin: Pavement smoothness, acceptance and testingSteve Marvin: Pavement smoothness, acceptance and testing
Steve Marvin: Pavement smoothness, acceptance and testing
 
Kashyap Pandya - Portfolio of Planning Works
Kashyap Pandya - Portfolio of Planning WorksKashyap Pandya - Portfolio of Planning Works
Kashyap Pandya - Portfolio of Planning Works
 
Safety Performance of WorkZone Devices under MASH Testing
Safety Performance of WorkZone Devices under MASH TestingSafety Performance of WorkZone Devices under MASH Testing
Safety Performance of WorkZone Devices under MASH Testing
 
Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)
 
February21st esp179-traffic
February21st esp179-trafficFebruary21st esp179-traffic
February21st esp179-traffic
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIES
 
23a_IRC582015_RP_Design(1).pdf
23a_IRC582015_RP_Design(1).pdf23a_IRC582015_RP_Design(1).pdf
23a_IRC582015_RP_Design(1).pdf
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status Report
 
Total road asset management
Total road asset managementTotal road asset management
Total road asset management
 
2018 STS - OS/OW Uniform Permit Transport 2021: Specialized Transportation Co...
2018 STS - OS/OW Uniform Permit Transport 2021: Specialized Transportation Co...2018 STS - OS/OW Uniform Permit Transport 2021: Specialized Transportation Co...
2018 STS - OS/OW Uniform Permit Transport 2021: Specialized Transportation Co...
 
Economics of upgrading a gravel road to Otta seal surface
Economics of upgrading a gravel road to Otta seal surfaceEconomics of upgrading a gravel road to Otta seal surface
Economics of upgrading a gravel road to Otta seal surface
 
Proving grounds(Automobile)
Proving grounds(Automobile)Proving grounds(Automobile)
Proving grounds(Automobile)
 

More from Hudbay Minerals Inc.

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationHudbay Minerals Inc.
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Hudbay Minerals Inc.
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Hudbay Minerals Inc.
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockHudbay Minerals Inc.
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Hudbay Minerals Inc.
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Hudbay Minerals Inc.
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and AfterHudbay Minerals Inc.
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelHudbay Minerals Inc.
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Hudbay Minerals Inc.
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyHudbay Minerals Inc.
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering PresentationHudbay Minerals Inc.
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont MineHudbay Minerals Inc.
 

More from Hudbay Minerals Inc. (20)

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Dry Stack Tailings Overview
Dry Stack Tailings OverviewDry Stack Tailings Overview
Dry Stack Tailings Overview
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
 
Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
 
Heap Leach Facilities
Heap Leach FacilitiesHeap Leach Facilities
Heap Leach Facilities
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont Mine
 

Recently uploaded

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 

Recently uploaded (20)

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 

Baseline Traffic Study

  • 1. Traffic Study For the Rosemont Copper Project By Kekoa Anderson, P.E., David Bost & Seri Park, Ph.D.
  • 2. Presentation Agenda § Traffic Study Elements • Traffic Analysis • Study Site • Traffic Data § Level of Service Analysis • Simulations § Roadway Assessment • Safety Analysis • Geometric Analysis § Findings § Q&A Traffic Study
  • 3. Traffic Study Elements – Traffic Analysis Current Traffic Data Collection Traffic Forecasts • Construction Year • Interim Mine Operation (Year 5) •  Ultimate Mine Life (Year 20) Traffic Operation/LOS Analysis • Intersections • Corridor Need improvements? Traffic Study
  • 4. Traffic Study Elements – Study Site Traffic Study
  • 5. Traffic Study Elements – Key Intersections Traffic Study
  • 6. Traffic Study Elements – Traffic Data § Traffic Data • Current Traffic Counts • Traffic Forecasts • Construction Year • Interim Mine Operation (Year 5) • Ultimate Mine (Year 20) Traffic Study
  • 7. Current Traffic Counts § Data collection • Seasonal – peak season, non-peak season • Day – weekday, weekend • Time – AM and PM peak period • 6:30-8:00 AM, 5:00-7:00 PM • Seven (7) major intersections § Method • Manual traffic count • Video recording Traffic Study
  • 8. Current Traffic Counts § 5 Different vehicle types • Motorcycle • Light duty vehicles (autos, pickup trucks, SUVs, etc.) • Buses • Median trucks (2-axle, 6-tire) • Heavy trucks (3 or more axles) § Truck traffic • Convert into the passenger car equivalent (PCE) factors for accurate Level of Service (LOS) analysis Traffic Study
  • 9. Current Traffic Counts Traffic Study
  • 10. Truck Volumes Study Site Traffic Study
  • 11. Traffic Forecasts § Future land use § Update origin destination matrix § Assignment of trips Traffic Study
  • 12. Traffic Forecasts § Traffic Forecasts • Project trip • Mine operation trip • Background trip • Regional growth • Pima Association of Governments (PAG) travel demand model • ADOT major projects Traffic Study
  • 13. Level of Service Analysis § Four analysis years • Current year (2008) • Construction year (2010) • Interim mine year (5 years) • Ultimate mine year (20 years) Traffic Study
  • 14. Level of Service Analysis Current Year Construction Year Interim Mine Ultimate Mine Year (Year 5) Year (Year 20) Intersection LOS A-B LOS A-B LOS A-B LOS A-B LOS Segment LOS LOS B LOS C LOS C,D LOS C, D Findings Acceptable Acceptable LOS § Left turn issue § Left turn issue LOS § Non passing § Non passing zone issue zone issue § Need for § Need for roadway roadway geometric geometric modification modification Traffic Study
  • 16. Roadway Assessment • Vehicle Type •  Vehicle Speed SAFETY ROAD GEOMETRY •  Lane changing •  Lane width •  Speed • Shoulder Width •  Reaction time • Traffic separation • Refuge Lane • Intersections DRIVER S BEHAVIOR Traffic Study
  • 17. Roadway Assessment § Safety analysis § Geometric analysis Traffic Study
  • 18. Roadway Assessment – Safety analysis § ADOT accident data • Past 5 years accident data (8/1/2003 - 7/31/2008) • SR 83 from I-10 on-off ramps to SR 82 Traffic Study
  • 19. Roadway Assessment – Safety analysis §  Federal Requirement •  Each state describe at least 5 percent of its locations currently exhibiting the most severe highway safety needs, in accordance with Sections 148 (c)(1)(D) and 148(g)(3)(A), of Title 23, United States Code •  Location should have at least one crash (fatal, any type of injury or property damage only) in each of the three years. •  Location should have at least one fatal crash in three years. •  At least one crash should be run-off-road, intersection, or pedestrian related. It should be noted that the intersection-related crashes considered here are the crashes in which the first harmful event occurred on an approach to or exit from an intersection, and resulted from an activity, behavior or control related to the movement of traffic units through the intersection (as defined by the American National Standard D16.1-1996, ANSI D16.1-1996). •  Total number of fatal or incapacitating injury crashes equal to or greater than three in those three years. Traffic Study
  • 20. Roadway Assessment – Safety analysis § State Route 83, Post Mile 44 • Classified as top five percent § Any correlation on • Seasonal effect? • Traffic volume? • Roadway geometry? Traffic Study
  • 21. Roadway Assessment – Safety analysis Traffic Study
  • 22. Roadway Assessment – Geometric analysis Narrow shoulder (1 ) Steep curvature without guard rail next to downhill slope Traffic Study
  • 23. Roadway Assessment – Geometric analysis Contributing poor sight distance Steep horizontal curvature with narrow shoulder and poor sight distance No median/refuge lane Traffic Study
  • 24. Roadway Assessment – Geometric analysis § Safety elements • Curvature • Shoulder width • Lane configuration – maybe suggest the refuge lane or median • Provide sufficient • Stopping sight distance • Passing sight distance • Curve radius • Superelevation Traffic Study
  • 25. Findings § Load of additional truck • Does not necessarily worsen traffic operation based on LOS • Does affect corridor delay • Need to correct with geometry improvements § Accident analysis • High correlation with roadway geometry rather than truck traffic § Few items to suggest for alternatives??? Traffic Study