Time and Work
Time and Work & Pipes and Cisterns
www.georgeprep.com
2
Basic of Time and Work
www.georgeprep.com
3
Work and Efficiency
𝑊𝑜𝑟𝑘 = 𝑇𝑖𝑚𝑒 × 𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
Amount of work
done per unit
time
www.georgeprep.com
4
Always work with Efficiency
𝑡 𝐴 + 𝑡 𝐵 ≠ 𝑡 𝐴&𝐵
𝑒 𝐴 + 𝑒 𝐵 = 𝑒 𝐴&𝐵
www.georgeprep.com
5
Problems
A takes 10 days to finish a job and B takes 15 days to finish the same
job. In how many days will A and B finish the work if they work
together?
1) 9
2) 8
3) 7
4) 6
5) None of these
Answer: option 4
www.georgeprep.com
6
Problems
P and Q can do a work in 15 days, Q and R can do the same work in
20 days and P and R can do the same work in 12 days. If all three of
them work together, in how many days will the work be completed?
1) 6
2) 5
3) 10
4) 11
5) None of these
Answer: option 3
www.georgeprep.com
7
Problems
A and B together can do a piece of work in 6 days. If A can alone do
the work in 18 days, then the number of days required for B to finish
the work is
1) 12
2) 9
3) 15
4) 10
5) None of these
Answer: option 2
SBI Clerk
(2014)
www.georgeprep.com
8
Problems
A can complete a piece of work in 18 days, B in 20 days and C in 30
days, B and C together start the work and are forced to leave after 2
days. The time taken by A alone to complete the remaining work is
1) 10 days
2) 12 days
3) 15 days
4) 16 days
Answer: option 3
SSC CGL
(2010)
www.georgeprep.com
9
Problems
A is twice as good as B and together they finish a piece of work in 16
days. The number of days taken by A alone to finish the work is
1) 20 days
2) 21 days
3) 22 days
4) 24 days
Answer: option 4
SSC CGL
(2016)
www.georgeprep.com
10
Groups at Work
www.georgeprep.com
11
Problems – Groups involving ‘and’
2 men and 3 boys can do a piece of work in 10 days while 3 men and
2 boys can do the same work in 8 days. In how many days can 2 men
and 1 boy do the work?
1) 13.5
2) 14.5
3) 11.5
4) 12.5
5) None of these
Answer: option 4
www.georgeprep.com
12
Problems – Groups involving ‘and’
8 men and 4 women together can complete a piece of work in 6 days.
The work done by a man in one day is double the work done by a
woman in one day. If 8 men and 4 women started working and after 2
days 4 men left and 4 new women joined, in how many more days will
the work be completed?
1) 5 days
2) 8 days
3) 6 days
4) 4 days
5) 9 days
Answer: option 1
IBPS PO
(2013)
www.georgeprep.com
13
Problems – Groups involving ‘or’
6 men or 10 boys can do a piece of work in 15 days. How many days
will 12 men and 5 boys take to reap a field that is 4 times the area?
1) 6
2) 12
3) 15
4) 24
5) None of these
Answer: option 4
www.georgeprep.com
14
Pipes and Cisterns
www.georgeprep.com
15
Problems
A tap can empty a tank in 30 minutes. A second tap can empty it in 45
minutes. If both the taps operate simultaneously, how much time is
needed to empty the tank?
1) 14 minutes
2) 30 minutes
3) 18 minutes
4) 15 minutes
5) None of these
Answer: option 3
SBI Clerks
(2014)
www.georgeprep.com
16
Problems
There are 4 filling pipes and 3 emptying pipes capable of filling and
emptying in 12 minutes and 15 minutes respectively. If all the pipes
are opened together and as a result they fill 10 litres of water per
minute. Find the capacity of the tank.
1) 65 ltr
2) 70 ltr
3) 75 ltr
4) 80 ltr
5) None of these Answer: option 3
SBI PO Prelims
(2016)
www.georgeprep.com
17
Problems
Pipe A can fill a tank in 20 minutes. Pipe B can empty it in 40 minutes.
Both were opened at noon on a certain day. After some time, B was
closed. A completed filling the remaining part of the tank. The tank was
full at 12.25 pm. Find the time at which pipe B was closed?
1) 12:05PM
2) 12:07PM
3) 12:10PM
4) None of these
Answer: option 3
www.georgeprep.com
18
Wages and Work
www.georgeprep.com
19
Problems – Wage proportional to efficiency
A and B can do a project in 12 and 15 days respectively. They were
told to complete the project in 5 days and were paid Rs. 1440. They
took the help of C and completed the work in time. Find C’s share(in
Rs.) in the total money earned by them.
1) 250
2) 360
3) 390
4) 450
Answer: option 2
www.georgeprep.com
20
Problems – Wage proportional to work
A, B and C can complete a work in 10, 20 and 30 days respectively
when they work individually. All three started simultaneously. After 3
days A left, After two more days B left and C completed the remaining
work alone. If the total work is for Rs. 6000. Find the amount received
by C(in Rs.)
1) 2700
2) 2500
3) 3500
4) 550 Answer: option 1

More Related Content

What's hot (7)

Time and work
Time and workTime and work
Time and work
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
TRW
TRWTRW
TRW
 
C11
C11C11
C11
 
Time and work rbi
Time and work rbiTime and work rbi
Time and work rbi
 
AMCAT time work pipes cisterns
 AMCAT time  work pipes cisterns AMCAT time  work pipes cisterns
AMCAT time work pipes cisterns
 
Doc
DocDoc
Doc
 

Similar to Banks and SSC Time and Work

Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfRishabRoy10
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxMRUNALSHETHIYA1
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptxgoud10
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.pptDeependra46
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
 
Google aptitude-test
Google aptitude-testGoogle aptitude-test
Google aptitude-testAnkit Dubey
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition GurukulCompetition Gurukul
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdfalphared4
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfAsfawosen Dingama
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdLearningHomeBD.com
 
Algebra1 Item #78
Algebra1 Item #78Algebra1 Item #78
Algebra1 Item #78Lappy Doods
 
Upcat review
Upcat reviewUpcat review
Upcat reviewjas_ann
 
Compound Proportion
Compound ProportionCompound Proportion
Compound ProportionNadeem Uddin
 

Similar to Banks and SSC Time and Work (20)

Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdf
 
TIME & WORK.pptx
TIME & WORK.pptxTIME & WORK.pptx
TIME & WORK.pptx
 
maths set-01.pptx
maths set-01.pptxmaths set-01.pptx
maths set-01.pptx
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptx
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.ppt
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 
Google aptitude-test
Google aptitude-testGoogle aptitude-test
Google aptitude-test
 
3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
 
Inverse proportion
Inverse proportionInverse proportion
Inverse proportion
 
Time and work
Time and workTime and work
Time and work
 
Numerical reasoning II
Numerical reasoning IINumerical reasoning II
Numerical reasoning II
 
Timeandwork
TimeandworkTimeandwork
Timeandwork
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition Gurukul
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdf
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdf
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
 
Algebra1 Item #78
Algebra1 Item #78Algebra1 Item #78
Algebra1 Item #78
 
Upcat review
Upcat reviewUpcat review
Upcat review
 
Compound Proportion
Compound ProportionCompound Proportion
Compound Proportion
 

More from George Prep

CAT Time and distance session 2 and session 3
CAT Time and distance session 2 and session 3CAT Time and distance session 2 and session 3
CAT Time and distance session 2 and session 3George Prep
 
CAT Functions and Graphs basics
CAT Functions and Graphs basicsCAT Functions and Graphs basics
CAT Functions and Graphs basicsGeorge Prep
 
CAT Quadratic and Higher Order Equations
CAT Quadratic and Higher Order EquationsCAT Quadratic and Higher Order Equations
CAT Quadratic and Higher Order EquationsGeorge Prep
 
GRE - Geometry Session 2
GRE - Geometry Session 2GRE - Geometry Session 2
GRE - Geometry Session 2George Prep
 
GRE - Geometry Session 1
GRE - Geometry Session 1GRE - Geometry Session 1
GRE - Geometry Session 1George Prep
 
GRE - Rates and Work
GRE - Rates and WorkGRE - Rates and Work
GRE - Rates and WorkGeorge Prep
 
CAT Time and Distance Concept Session 1
CAT Time and Distance Concept Session 1CAT Time and Distance Concept Session 1
CAT Time and Distance Concept Session 1George Prep
 
Non performing assets
Non performing assetsNon performing assets
Non performing assetsGeorge Prep
 
Banks and SSC - Syllogisms-1
Banks and SSC - Syllogisms-1Banks and SSC - Syllogisms-1
Banks and SSC - Syllogisms-1George Prep
 
Banks SSC - Monetary Policy Tools
Banks SSC - Monetary Policy ToolsBanks SSC - Monetary Policy Tools
Banks SSC - Monetary Policy ToolsGeorge Prep
 
Banks SSC -Venn diagrams
Banks SSC -Venn diagramsBanks SSC -Venn diagrams
Banks SSC -Venn diagramsGeorge Prep
 
Banks SSC - Ranking and ordering
Banks SSC - Ranking and orderingBanks SSC - Ranking and ordering
Banks SSC - Ranking and orderingGeorge Prep
 
Banks SSC - Input output
Banks SSC - Input outputBanks SSC - Input output
Banks SSC - Input outputGeorge Prep
 
Banks SSC - Cubes and dice
Banks SSC - Cubes and diceBanks SSC - Cubes and dice
Banks SSC - Cubes and diceGeorge Prep
 
Banks SSC - Classification
Banks SSC - ClassificationBanks SSC - Classification
Banks SSC - ClassificationGeorge Prep
 
Banks SSC - Analogies
Banks SSC - AnalogiesBanks SSC - Analogies
Banks SSC - AnalogiesGeorge Prep
 
CAT - Ratio, Proportion and Variation
CAT - Ratio, Proportion and VariationCAT - Ratio, Proportion and Variation
CAT - Ratio, Proportion and VariationGeorge Prep
 
Banks and SSC - Time and Distance Concept Class
Banks and SSC -  Time and Distance Concept ClassBanks and SSC -  Time and Distance Concept Class
Banks and SSC - Time and Distance Concept ClassGeorge Prep
 

More from George Prep (20)

CAT Time and distance session 2 and session 3
CAT Time and distance session 2 and session 3CAT Time and distance session 2 and session 3
CAT Time and distance session 2 and session 3
 
CAT Functions and Graphs basics
CAT Functions and Graphs basicsCAT Functions and Graphs basics
CAT Functions and Graphs basics
 
CAT Quadratic and Higher Order Equations
CAT Quadratic and Higher Order EquationsCAT Quadratic and Higher Order Equations
CAT Quadratic and Higher Order Equations
 
GRE - Geometry Session 2
GRE - Geometry Session 2GRE - Geometry Session 2
GRE - Geometry Session 2
 
GRE - Geometry Session 1
GRE - Geometry Session 1GRE - Geometry Session 1
GRE - Geometry Session 1
 
GRE - Rates and Work
GRE - Rates and WorkGRE - Rates and Work
GRE - Rates and Work
 
CAT Syllogisms
CAT SyllogismsCAT Syllogisms
CAT Syllogisms
 
CAT Probability
CAT ProbabilityCAT Probability
CAT Probability
 
CAT Time and Distance Concept Session 1
CAT Time and Distance Concept Session 1CAT Time and Distance Concept Session 1
CAT Time and Distance Concept Session 1
 
Non performing assets
Non performing assetsNon performing assets
Non performing assets
 
Banks and SSC - Syllogisms-1
Banks and SSC - Syllogisms-1Banks and SSC - Syllogisms-1
Banks and SSC - Syllogisms-1
 
Banks SSC - Monetary Policy Tools
Banks SSC - Monetary Policy ToolsBanks SSC - Monetary Policy Tools
Banks SSC - Monetary Policy Tools
 
Banks SSC -Venn diagrams
Banks SSC -Venn diagramsBanks SSC -Venn diagrams
Banks SSC -Venn diagrams
 
Banks SSC - Ranking and ordering
Banks SSC - Ranking and orderingBanks SSC - Ranking and ordering
Banks SSC - Ranking and ordering
 
Banks SSC - Input output
Banks SSC - Input outputBanks SSC - Input output
Banks SSC - Input output
 
Banks SSC - Cubes and dice
Banks SSC - Cubes and diceBanks SSC - Cubes and dice
Banks SSC - Cubes and dice
 
Banks SSC - Classification
Banks SSC - ClassificationBanks SSC - Classification
Banks SSC - Classification
 
Banks SSC - Analogies
Banks SSC - AnalogiesBanks SSC - Analogies
Banks SSC - Analogies
 
CAT - Ratio, Proportion and Variation
CAT - Ratio, Proportion and VariationCAT - Ratio, Proportion and Variation
CAT - Ratio, Proportion and Variation
 
Banks and SSC - Time and Distance Concept Class
Banks and SSC -  Time and Distance Concept ClassBanks and SSC -  Time and Distance Concept Class
Banks and SSC - Time and Distance Concept Class
 

Recently uploaded

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Recently uploaded (20)

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

Banks and SSC Time and Work

  • 1. www.georgeprep.com 1 Time and Work Time and Work & Pipes and Cisterns
  • 3. www.georgeprep.com 3 Work and Efficiency 𝑊𝑜𝑟𝑘 = 𝑇𝑖𝑚𝑒 × 𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦 Amount of work done per unit time
  • 4. www.georgeprep.com 4 Always work with Efficiency 𝑡 𝐴 + 𝑡 𝐵 ≠ 𝑡 𝐴&𝐵 𝑒 𝐴 + 𝑒 𝐵 = 𝑒 𝐴&𝐵
  • 5. www.georgeprep.com 5 Problems A takes 10 days to finish a job and B takes 15 days to finish the same job. In how many days will A and B finish the work if they work together? 1) 9 2) 8 3) 7 4) 6 5) None of these Answer: option 4
  • 6. www.georgeprep.com 6 Problems P and Q can do a work in 15 days, Q and R can do the same work in 20 days and P and R can do the same work in 12 days. If all three of them work together, in how many days will the work be completed? 1) 6 2) 5 3) 10 4) 11 5) None of these Answer: option 3
  • 7. www.georgeprep.com 7 Problems A and B together can do a piece of work in 6 days. If A can alone do the work in 18 days, then the number of days required for B to finish the work is 1) 12 2) 9 3) 15 4) 10 5) None of these Answer: option 2 SBI Clerk (2014)
  • 8. www.georgeprep.com 8 Problems A can complete a piece of work in 18 days, B in 20 days and C in 30 days, B and C together start the work and are forced to leave after 2 days. The time taken by A alone to complete the remaining work is 1) 10 days 2) 12 days 3) 15 days 4) 16 days Answer: option 3 SSC CGL (2010)
  • 9. www.georgeprep.com 9 Problems A is twice as good as B and together they finish a piece of work in 16 days. The number of days taken by A alone to finish the work is 1) 20 days 2) 21 days 3) 22 days 4) 24 days Answer: option 4 SSC CGL (2016)
  • 11. www.georgeprep.com 11 Problems – Groups involving ‘and’ 2 men and 3 boys can do a piece of work in 10 days while 3 men and 2 boys can do the same work in 8 days. In how many days can 2 men and 1 boy do the work? 1) 13.5 2) 14.5 3) 11.5 4) 12.5 5) None of these Answer: option 4
  • 12. www.georgeprep.com 12 Problems – Groups involving ‘and’ 8 men and 4 women together can complete a piece of work in 6 days. The work done by a man in one day is double the work done by a woman in one day. If 8 men and 4 women started working and after 2 days 4 men left and 4 new women joined, in how many more days will the work be completed? 1) 5 days 2) 8 days 3) 6 days 4) 4 days 5) 9 days Answer: option 1 IBPS PO (2013)
  • 13. www.georgeprep.com 13 Problems – Groups involving ‘or’ 6 men or 10 boys can do a piece of work in 15 days. How many days will 12 men and 5 boys take to reap a field that is 4 times the area? 1) 6 2) 12 3) 15 4) 24 5) None of these Answer: option 4
  • 15. www.georgeprep.com 15 Problems A tap can empty a tank in 30 minutes. A second tap can empty it in 45 minutes. If both the taps operate simultaneously, how much time is needed to empty the tank? 1) 14 minutes 2) 30 minutes 3) 18 minutes 4) 15 minutes 5) None of these Answer: option 3 SBI Clerks (2014)
  • 16. www.georgeprep.com 16 Problems There are 4 filling pipes and 3 emptying pipes capable of filling and emptying in 12 minutes and 15 minutes respectively. If all the pipes are opened together and as a result they fill 10 litres of water per minute. Find the capacity of the tank. 1) 65 ltr 2) 70 ltr 3) 75 ltr 4) 80 ltr 5) None of these Answer: option 3 SBI PO Prelims (2016)
  • 17. www.georgeprep.com 17 Problems Pipe A can fill a tank in 20 minutes. Pipe B can empty it in 40 minutes. Both were opened at noon on a certain day. After some time, B was closed. A completed filling the remaining part of the tank. The tank was full at 12.25 pm. Find the time at which pipe B was closed? 1) 12:05PM 2) 12:07PM 3) 12:10PM 4) None of these Answer: option 3
  • 19. www.georgeprep.com 19 Problems – Wage proportional to efficiency A and B can do a project in 12 and 15 days respectively. They were told to complete the project in 5 days and were paid Rs. 1440. They took the help of C and completed the work in time. Find C’s share(in Rs.) in the total money earned by them. 1) 250 2) 360 3) 390 4) 450 Answer: option 2
  • 20. www.georgeprep.com 20 Problems – Wage proportional to work A, B and C can complete a work in 10, 20 and 30 days respectively when they work individually. All three started simultaneously. After 3 days A left, After two more days B left and C completed the remaining work alone. If the total work is for Rs. 6000. Find the amount received by C(in Rs.) 1) 2700 2) 2500 3) 3500 4) 550 Answer: option 1