36 men can complete a piece of work
in 18 days. In how many days will 27
men complete the same work ?
1 : 12
2 : 18
3 : 22
4 : 24
5 : None of these
39 persons can repair a road in 12
days, working 5 hours a day. In how
many days will 30 persons, working 6
hours a day, complete the work ?
1 : 10
2 : 13
3 : 14
4 : 15
If 7 spiders make 7 webs in 7 days,
then 1 spider will make 1 web in how
many days ?
1 : 1
2 : 7/2
3 : 7
4 : 49
Some persons can do a piece of work
in 12 days. Two times the number of
such persons will do half of that work
in:
1 : 6 days
2 : 4 days
3 : 3 days
4 : 12 days
Ronald and Elan are working on an assignment.
Ronald takes 6 hours to type 32 pages on a
computer, while Elan takes 5 hours to type 40
pages. How much time will they take, working
together on two different computers
to type an assignment of 110 pages ?
1 : 7 hours 30 minutes
2 : 8 hours
3 : 8 hours 15 minutes
4 : 8 hours 25 minutes
A and B can do a work in 12 days, B
and C in 15 days, C and A in 20 days. If
A, B and C work together, they will
complete the work in:
1 : 5 days
2 : 47/6 days
3 : 10 days
4 : 47/3 days
A and B can do a job together in 7
days. A is 7/4 times as efficient as B.
The same job can be done by A alone
in:
1 : 28/3 days
2 : 11 days
3 : 49/4 days
4 : 49/3 days
A and B can complete a work in 15 days
and 10 days respectively. They started
doing the work together but after 2 days
B had to leave and A alone completed
the remaining work. The whole work was
completed in:
1 : 8 days
2 : 10 days
3 : 12 days
A, B and C together can complete a piece
of work in 10 days. All the three started
working at it together and after 4 days A
left. Then B and C together completed the
work in 10 more days. A alone could
complete the work in:
1 : 15 days
2 : 16 days
3 : 25 days
4 : 50 days
One pipe can fill a tank three times as
fast as another pipe. If together the
two pipes can fill the tank in 36
minutes, then the slower pipe alone
will be able to fill the tank in:
1 : 81 min
2 : 108 min
3 : 144 min
4 : 192 min
A large tanker can be filled by two pipes A and
B in 60 minutes and 40 minutes respectively.
How many minutes will it take to fill the tanker
from empty state if B is used for half the time
and A and B fill it together for the other half ?
1 : 15 min
2 : 20 min
3 : 27.5 min
4 : 30 min
Three taps A, B and C can fill a tank in 12, 15
and 20 hours respectively. If A is open all
the time and B and C are open for one hour
each alternately, the tank will be full in:
1 : 6 hrs.
2 : 20/3 hrs
3 : 7 hrs
4 : 15/2 hrs
Two pipes can fill a tank in 20 and 24
minutes respectively and a waste pipe can
empty 3 gallons per minute. All the three
pipes working together can fill the tank in
15 minutes. The capacity of the tank is:
1 : 60 gallons
2 : 100 gallons
3 : 120 gallons
4 : 180 gallons
Ram and Shyam together do a work in 8
days. Both of them began to work. After 3
days Ram fell ill. Shyam completed the
remaining work in 15 days. In how many
days can Ram complete the whole work?
1 : 12
2 : 17
3 : 16
4 : 15
Two workers A and B were employed for a
work. A takes 8 hour more than the time taken
by A and B together. If B takes 4.5 hours more
than the time taken by A and B together, how
long would A and B take together to
complete the work?
1 : 7 hours
2 : 6 hours
3: 5 hours
4 : 4 hours
If 5 persons can do 5 times of a work
in 5 days, then 10 persons can do 10
times of that work in:
1 : 10 days
2 : 8 days
3 : 5 days
4 : 2 days
Two taps can fill a cistern in 6 min. and 7
min. respectively. If these taps are opened
alternatively for a minute, in what time
will the cistern be filled?
1 : 5.67 min
2 : 6.25 min
3 : 5 min
4 : 45/7 min
Two taps A and B can fill a cistern in
28 min. and 42 min. respectively.
Third tap C can empty it in 42 min. If
all the three taps are opened, the
time taken to fill the cistern is:
1 : 30 min
2 : 35 min
3 : 28 min
4 : 42 min
49 pumps can empty a reservoir in 6½
days, working 8 hours a day. If 196
pumps are used for 5 hours a day,
then the same work will be
completed in:
1 : 2.6 days
2 : 3 days
3 : 2.5 days
4 : 2 days
16 men complete one-fourth of a
piece of work in 12 days. What is the
additional number of men required to
complete the work in 12 more days ?
1 : 48
2 : 36
3 : 30
4 : 16
A takes thrice as long to do a piece of
work, as B takes. A and B together can
do a piece of work in 7.5 days. A
alone can do in:
1 : 30 days
2 : 40 days
3 : 50 days
4 : 60 days
A cistern can be filled by two pipes A
and B in 10 and 15 hours respectively
and is then emptied by a tap in 8
hours. If all the taps are opened, the
cistern will be fill in:
1 : 21 hours
2 : 22 hours
3 : 23 hours
4 : 24 hours
 AMCAT time  work pipes cisterns

More Related Content

Similar to AMCAT time work pipes cisterns

Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfRishabRoy10
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxMRUNALSHETHIYA1
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfAsfawosen Dingama
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.pptDeependra46
 
Time and work session 1
Time and work session 1Time and work session 1
Time and work session 1George Prep
 
Upcat review
Upcat reviewUpcat review
Upcat reviewjas_ann
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_priya mega
 
Aptitude time and work
Aptitude time and workAptitude time and work
Aptitude time and workMaria Yesudass
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdfalphared4
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...SOURAV DAS
 
Google aptitude-test
Google aptitude-testGoogle aptitude-test
Google aptitude-testAnkit Dubey
 

Similar to AMCAT time work pipes cisterns (20)

C11
C11C11
C11
 
Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdf
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
 
Time and work
Time and workTime and work
Time and work
 
Work problems
Work problems Work problems
Work problems
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdf
 
3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.ppt
 
Time and work session 1
Time and work session 1Time and work session 1
Time and work session 1
 
Upcat review
Upcat reviewUpcat review
Upcat review
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
Time and work standard level
Time and work standard levelTime and work standard level
Time and work standard level
 
Timeandwork
TimeandworkTimeandwork
Timeandwork
 
Time and work
Time and workTime and work
Time and work
 
Aptitude time and work
Aptitude time and workAptitude time and work
Aptitude time and work
 
Doc
DocDoc
Doc
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdf
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
 
Google aptitude-test
Google aptitude-testGoogle aptitude-test
Google aptitude-test
 

Recently uploaded

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 

Recently uploaded (20)

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 

AMCAT time work pipes cisterns

  • 2. 36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work ? 1 : 12 2 : 18 3 : 22 4 : 24 5 : None of these
  • 3. 39 persons can repair a road in 12 days, working 5 hours a day. In how many days will 30 persons, working 6 hours a day, complete the work ? 1 : 10 2 : 13 3 : 14 4 : 15
  • 4. If 7 spiders make 7 webs in 7 days, then 1 spider will make 1 web in how many days ? 1 : 1 2 : 7/2 3 : 7 4 : 49
  • 5. Some persons can do a piece of work in 12 days. Two times the number of such persons will do half of that work in: 1 : 6 days 2 : 4 days 3 : 3 days 4 : 12 days
  • 6. Ronald and Elan are working on an assignment. Ronald takes 6 hours to type 32 pages on a computer, while Elan takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages ? 1 : 7 hours 30 minutes 2 : 8 hours 3 : 8 hours 15 minutes 4 : 8 hours 25 minutes
  • 7. A and B can do a work in 12 days, B and C in 15 days, C and A in 20 days. If A, B and C work together, they will complete the work in: 1 : 5 days 2 : 47/6 days 3 : 10 days 4 : 47/3 days
  • 8. A and B can do a job together in 7 days. A is 7/4 times as efficient as B. The same job can be done by A alone in: 1 : 28/3 days 2 : 11 days 3 : 49/4 days 4 : 49/3 days
  • 9. A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in: 1 : 8 days 2 : 10 days 3 : 12 days
  • 10. A, B and C together can complete a piece of work in 10 days. All the three started working at it together and after 4 days A left. Then B and C together completed the work in 10 more days. A alone could complete the work in: 1 : 15 days 2 : 16 days 3 : 25 days 4 : 50 days
  • 11. One pipe can fill a tank three times as fast as another pipe. If together the two pipes can fill the tank in 36 minutes, then the slower pipe alone will be able to fill the tank in: 1 : 81 min 2 : 108 min 3 : 144 min 4 : 192 min
  • 12. A large tanker can be filled by two pipes A and B in 60 minutes and 40 minutes respectively. How many minutes will it take to fill the tanker from empty state if B is used for half the time and A and B fill it together for the other half ? 1 : 15 min 2 : 20 min 3 : 27.5 min 4 : 30 min
  • 13. Three taps A, B and C can fill a tank in 12, 15 and 20 hours respectively. If A is open all the time and B and C are open for one hour each alternately, the tank will be full in: 1 : 6 hrs. 2 : 20/3 hrs 3 : 7 hrs 4 : 15/2 hrs
  • 14. Two pipes can fill a tank in 20 and 24 minutes respectively and a waste pipe can empty 3 gallons per minute. All the three pipes working together can fill the tank in 15 minutes. The capacity of the tank is: 1 : 60 gallons 2 : 100 gallons 3 : 120 gallons 4 : 180 gallons
  • 15. Ram and Shyam together do a work in 8 days. Both of them began to work. After 3 days Ram fell ill. Shyam completed the remaining work in 15 days. In how many days can Ram complete the whole work? 1 : 12 2 : 17 3 : 16 4 : 15
  • 16. Two workers A and B were employed for a work. A takes 8 hour more than the time taken by A and B together. If B takes 4.5 hours more than the time taken by A and B together, how long would A and B take together to complete the work? 1 : 7 hours 2 : 6 hours 3: 5 hours 4 : 4 hours
  • 17. If 5 persons can do 5 times of a work in 5 days, then 10 persons can do 10 times of that work in: 1 : 10 days 2 : 8 days 3 : 5 days 4 : 2 days
  • 18. Two taps can fill a cistern in 6 min. and 7 min. respectively. If these taps are opened alternatively for a minute, in what time will the cistern be filled? 1 : 5.67 min 2 : 6.25 min 3 : 5 min 4 : 45/7 min
  • 19. Two taps A and B can fill a cistern in 28 min. and 42 min. respectively. Third tap C can empty it in 42 min. If all the three taps are opened, the time taken to fill the cistern is: 1 : 30 min 2 : 35 min 3 : 28 min 4 : 42 min
  • 20. 49 pumps can empty a reservoir in 6½ days, working 8 hours a day. If 196 pumps are used for 5 hours a day, then the same work will be completed in: 1 : 2.6 days 2 : 3 days 3 : 2.5 days 4 : 2 days
  • 21. 16 men complete one-fourth of a piece of work in 12 days. What is the additional number of men required to complete the work in 12 more days ? 1 : 48 2 : 36 3 : 30 4 : 16
  • 22. A takes thrice as long to do a piece of work, as B takes. A and B together can do a piece of work in 7.5 days. A alone can do in: 1 : 30 days 2 : 40 days 3 : 50 days 4 : 60 days
  • 23. A cistern can be filled by two pipes A and B in 10 and 15 hours respectively and is then emptied by a tap in 8 hours. If all the taps are opened, the cistern will be fill in: 1 : 21 hours 2 : 22 hours 3 : 23 hours 4 : 24 hours