SlideShare a Scribd company logo
1 of 14
210 men working 12 hours a day can finish a job in 18
days. How many men are required to finish the job in 20
days working 14 hours a day?
1
156 men
2
162 men
3
168 men
4
172 men
5
Answer not known
A is 20% more efficient than B. How much time will they
working together take complete a job which B alone could
have done in 22 days?
1
11 days
2
10 days
3
15 days
4
12 days
5
None of these
Sunita can finish a project in 21 days and Sarita can finish
the same project in 15 days. Sarita worked for 10 days and
left the job. How many days would it take Sunita to finish
the remaining work alone?
1
10 days
2
7 days
3
12 days
4
11 days
5
8 days
A is able to do a piece of work in 25 days and B can do the
same work in 35 days. If they work together for 10 days,
what is the fraction of work left?
1
11/35
2
17/35
3
19/35
4
24/35
5
13/35
B is 25% more efficient than A and C is 40% less efficient
than B. A, B and C together can complete the whole work
in 5 days, then find in how many days B alone can
complete the whole work?
1
12 days
2
10 days
3
15 days
4
20 days
5
23 days
A and B both can complete the work in 16 days. In how
many days A alone can complete the work if efficiency of
B and A are in ratio 3 : 4 respectively?
1
28 days
2
26 days
3
24 days
4
12 days
5
None
A and B can do a piece of work in 12 days. B and C can do
it in 15 days while C and A can do it in 20 days. In how
long will they complete it cooperating?
1
25
2
10
3
30
4
20
5
26
A tank has two inlet pipe which can fill the tank in 3 hours
and 4 hours respectively and has one outlet pipe which
can empty the tank in 6 hours. If all the pipes work
together then in how many hours the tank will be filled?
1
5/12 hours
2
11/12 hours
3
12/5 hours
4
5/9 hours
5
7/12 hours
6 outlets working 3 hours a day can empty a filled cistern
in 12 days. How much such outlets working 4 hours a day
will empty the same cistern in 6 days?
1
4
2
5
3
8
4
9
5
2
Pipe A fill a cistern in 9 hours and pipe B empty the cistern
in 12 hours. How much time will be taken to fill the empty
cistern, if both the pipes are opened simultaneously?
1
36 hours​
2
39 hours
3
42 hours
4
45 hours
5
30 hours
Pipes A and B together take 20 hours, B and C together
take 15 hours, and C and A together take 12 hours to fill a
tank. In what time will the tank be filled if all 3 pipes work
together?
1
10 hours
2
15 hours
3
12.5 hours
4
5 hours
5
7.5 hours
Pipe A can fill a tank in 6 hours. Due to a leak at the
bottom, it takes 9 hours for the pipe A to fill the tank. In
what time can the leak alone empty the full tank.
1
54
2
20
3
15
4
18
5
None
Pipe A can fill the tank in 3 hours and pipe B can fill the
tank in 5 hours pipe C can empty tank 15 hours then find
in how many hours tank will be filled when they work
alternatively starting from B?
1
11/3
2
19/3
3
25/9
4
12/5
5
None
A can do the work in 20 days, while B alone can assemble
it in 30 days. If they construct it together and get an
installment of Rs. 6300. What is B's offer?
1
Rs. 5620
2
Rs. 4520
3
Rs. 6750
4
Rs. 1850
5
Rs. 2520

More Related Content

Similar to maths set-01.pptx

Time and work questins FOR COMPETATIVE EXAMS
Time and work questins FOR COMPETATIVE EXAMS Time and work questins FOR COMPETATIVE EXAMS
Time and work questins FOR COMPETATIVE EXAMS Aradhana Kumari
 
Banks and SSC Time and Work
Banks and SSC Time and WorkBanks and SSC Time and Work
Banks and SSC Time and WorkGeorge Prep
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition GurukulCompetition Gurukul
 
Arithmetic 13 _ Class Notes __ MBA Pioneer 2024 Batch.pdf
Arithmetic 13 _ Class Notes __ MBA Pioneer 2024 Batch.pdfArithmetic 13 _ Class Notes __ MBA Pioneer 2024 Batch.pdf
Arithmetic 13 _ Class Notes __ MBA Pioneer 2024 Batch.pdfnoobgaming62
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfAsfawosen Dingama
 
Time and work session 1
Time and work session 1Time and work session 1
Time and work session 1George Prep
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.pptDeependra46
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_priya mega
 
Google aptitude-test
Google aptitude-testGoogle aptitude-test
Google aptitude-testAnkit Dubey
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdLearningHomeBD.com
 
Upcat review
Upcat reviewUpcat review
Upcat reviewjas_ann
 

Similar to maths set-01.pptx (20)

Time and work questins FOR COMPETATIVE EXAMS
Time and work questins FOR COMPETATIVE EXAMS Time and work questins FOR COMPETATIVE EXAMS
Time and work questins FOR COMPETATIVE EXAMS
 
Banks and SSC Time and Work
Banks and SSC Time and WorkBanks and SSC Time and Work
Banks and SSC Time and Work
 
Time and work
Time and workTime and work
Time and work
 
C11
C11C11
C11
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition Gurukul
 
Arithmetic 13 _ Class Notes __ MBA Pioneer 2024 Batch.pdf
Arithmetic 13 _ Class Notes __ MBA Pioneer 2024 Batch.pdfArithmetic 13 _ Class Notes __ MBA Pioneer 2024 Batch.pdf
Arithmetic 13 _ Class Notes __ MBA Pioneer 2024 Batch.pdf
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdf
 
Time and work session 1
Time and work session 1Time and work session 1
Time and work session 1
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.ppt
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 
Inverse proportion
Inverse proportionInverse proportion
Inverse proportion
 
TRW
TRWTRW
TRW
 
Time and work standard level
Time and work standard levelTime and work standard level
Time and work standard level
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
Google aptitude-test
Google aptitude-testGoogle aptitude-test
Google aptitude-test
 
3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
 
Time and work
Time and workTime and work
Time and work
 
Time and work
Time and workTime and work
Time and work
 
Upcat review
Upcat reviewUpcat review
Upcat review
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 

Recently uploaded (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 

maths set-01.pptx

  • 1. 210 men working 12 hours a day can finish a job in 18 days. How many men are required to finish the job in 20 days working 14 hours a day? 1 156 men 2 162 men 3 168 men 4 172 men 5 Answer not known
  • 2. A is 20% more efficient than B. How much time will they working together take complete a job which B alone could have done in 22 days? 1 11 days 2 10 days 3 15 days 4 12 days 5 None of these
  • 3. Sunita can finish a project in 21 days and Sarita can finish the same project in 15 days. Sarita worked for 10 days and left the job. How many days would it take Sunita to finish the remaining work alone? 1 10 days 2 7 days 3 12 days 4 11 days 5 8 days
  • 4. A is able to do a piece of work in 25 days and B can do the same work in 35 days. If they work together for 10 days, what is the fraction of work left? 1 11/35 2 17/35 3 19/35 4 24/35 5 13/35
  • 5. B is 25% more efficient than A and C is 40% less efficient than B. A, B and C together can complete the whole work in 5 days, then find in how many days B alone can complete the whole work? 1 12 days 2 10 days 3 15 days 4 20 days 5 23 days
  • 6. A and B both can complete the work in 16 days. In how many days A alone can complete the work if efficiency of B and A are in ratio 3 : 4 respectively? 1 28 days 2 26 days 3 24 days 4 12 days 5 None
  • 7. A and B can do a piece of work in 12 days. B and C can do it in 15 days while C and A can do it in 20 days. In how long will they complete it cooperating? 1 25 2 10 3 30 4 20 5 26
  • 8. A tank has two inlet pipe which can fill the tank in 3 hours and 4 hours respectively and has one outlet pipe which can empty the tank in 6 hours. If all the pipes work together then in how many hours the tank will be filled? 1 5/12 hours 2 11/12 hours 3 12/5 hours 4 5/9 hours 5 7/12 hours
  • 9. 6 outlets working 3 hours a day can empty a filled cistern in 12 days. How much such outlets working 4 hours a day will empty the same cistern in 6 days? 1 4 2 5 3 8 4 9 5 2
  • 10. Pipe A fill a cistern in 9 hours and pipe B empty the cistern in 12 hours. How much time will be taken to fill the empty cistern, if both the pipes are opened simultaneously? 1 36 hours​ 2 39 hours 3 42 hours 4 45 hours 5 30 hours
  • 11. Pipes A and B together take 20 hours, B and C together take 15 hours, and C and A together take 12 hours to fill a tank. In what time will the tank be filled if all 3 pipes work together? 1 10 hours 2 15 hours 3 12.5 hours 4 5 hours 5 7.5 hours
  • 12. Pipe A can fill a tank in 6 hours. Due to a leak at the bottom, it takes 9 hours for the pipe A to fill the tank. In what time can the leak alone empty the full tank. 1 54 2 20 3 15 4 18 5 None
  • 13. Pipe A can fill the tank in 3 hours and pipe B can fill the tank in 5 hours pipe C can empty tank 15 hours then find in how many hours tank will be filled when they work alternatively starting from B? 1 11/3 2 19/3 3 25/9 4 12/5 5 None
  • 14. A can do the work in 20 days, while B alone can assemble it in 30 days. If they construct it together and get an installment of Rs. 6300. What is B's offer? 1 Rs. 5620 2 Rs. 4520 3 Rs. 6750 4 Rs. 1850 5 Rs. 2520