SlideShare a Scribd company logo
1 of 20
www.georgeprep.com
0
Time and Work
Concept Session 1 &
Practice Session
www.georgeprep.com
1
Time and Work Basics
Groups at Work
Wage Distribution
Pipes and Cisterns
Chapter Pathway
www.georgeprep.com
2
Time and Work Basics
www.georgeprep.com
3
Work and Efficiency
𝑊𝑜𝑟𝑘 = 𝑇𝑖𝑚𝑒 × 𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
Amount of work
done per unit
time
www.georgeprep.com
4
Always work with Efficiency
𝑡 𝐴 + 𝑡 𝐵 ≠ 𝑡 𝐴&𝐵
𝑒 𝐴 + 𝑒 𝐵 = 𝑒 𝐴&𝐵
www.georgeprep.com
5
A takes 10 days to finish a job and B takes 20 days to finish the same job. In how
many days will A and B finish the work if they work together?
T&W Problems
Answer: 20/3
www.georgeprep.com
6
P and Q can do a work in 15 days, Q and R can do the same work in 20 days and
P and R can do the same work in 12 days. If all three of them work together, in
how many days will the work be completed?
1) 6
2) 5
3) 10
4) None of these
T&W Problems
Answer: Option 3
www.georgeprep.com
7
A can complete a work in 12 days, B in 15 days. Find the time they would take to
complete the work
1) When A and B work together on alternate days starting with A
2) When A and B work together on alternate days starting with B
3) If A joined the work two days after B started?
4) If B leaves two days before the actual completion of the work?
5) If A leaves two days before the scheduled completion of the work?
6) If B does negative work at the same rate?
T&W Problems
www.georgeprep.com
8
Akbar takes 16 days to complete a job and Anthony takes D days to complete
the same job. Akbar and Anthony work on alternate days. If they take exactly
the same time irrespective of who starts the job, how many positive integer
values are possible for D?
1) 3
2) 4
3) 5
4) Cannot be determined
T&W Problems
Answer: Option 2
www.georgeprep.com
9
Groups at Work
www.georgeprep.com
10
Problems – Groups involving ‘and’
2 men and 3 boys can do a piece of work in 10 days while 3 men and 2 boys
can do the same work in 8 days. In how many days can 2 men and 1 boy do
the work?
1) 13.5
2) 14.5
3) 11.5
4) 12.5
5) None of these
Answer: option 4
www.georgeprep.com
11
Problems – Groups involving ‘or’
6 men or 10 boys can do a piece of work in 15 days. How many days will 12
men and 5 boys take to reap a field that is 4 times the area?
1) 6
2) 12
3) 15
4) 24
5) None of these
Answer: option 4
www.georgeprep.com
12
Time and Work
Practice Session
www.georgeprep.com
13
A can lay railway track between two given stations in 15 days and B can do the
same job in 20 days. With help of C, they did the job in 5 days. Then, C alone
can do the job in:
1) 12 days
2) 15 days
3) 10 days
4) 16 days
Practice Problems
Answer: Option 1
www.georgeprep.com
14
8 men and 4 women together can complete a piece of work in 6 days. The work
done by a man in one day is double the work done by a woman in one day. If 8
men and 4 women started working and after 2 days 4 men left and 4 new
women joined, in how many more days will the work be completed?
1) 5 days
2) 8 days
3) 6 days
4) 4 days
Practice Problems
Answer: Option 1
www.georgeprep.com
15
A, B and C can do a piece of work in 15, 30 and 60 days respectively. First day A
works alone, on the second day he is accompanied by only B and on the third
day he is accompanied by only C and on the fourth day A works alone, the next
day he is accompanied by only B, and the next day by only C. If they continue to
work in this fashion, In how many days will the work get over?
Practice Problems
Answer: 12
www.georgeprep.com
16
A is thrice as good as workman as B and therefore is able to finish a job in 30
days less than B. Working together, in how many days can they do a similar job?
Practice Problems
Answer: 11.25
www.georgeprep.com
17
A is thrice as good as workman as B and therefore is able to finish a job in 30
days less than B. Working on alternate days beginning with B, in how many days
can they do a similar job?
Practice Problems
Answer: 23
www.georgeprep.com
18
A can do a piece of work in 4 hours; B and C together can do it in 3 hours, while
A and C together can do it in 2 hours. How many hours will A and B take to do
the same work?
Practice Problems
Answer: 3
www.georgeprep.com
19
Humans and robots can both perform a job but at different efficiencies. Fifteen
humans and five robots working together take thirty days to finish the job,
whereas five humans and fifteen robots working together take sixty days to
finish it. How many days will fifteen humans working together (without any
robot) take to finish it?
1) 36
2) 32
3) 45
4) 40
Practice Problems
Answer: Option 2
CAT 2018
(Morning Slot)

More Related Content

What's hot (6)

Time and work
Time and workTime and work
Time and work
 
TRW
TRWTRW
TRW
 
C11
C11C11
C11
 
Time and work rbi
Time and work rbiTime and work rbi
Time and work rbi
 
Time and work ea #2
Time and work  ea #2Time and work  ea #2
Time and work ea #2
 
Inverse proportion
Inverse proportionInverse proportion
Inverse proportion
 

Similar to Time and work session 1

UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.pptDeependra46
 
Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfRishabRoy10
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_priya mega
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxMRUNALSHETHIYA1
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptxgoud10
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfAsfawosen Dingama
 
Google aptitude-test
Google aptitude-testGoogle aptitude-test
Google aptitude-testAnkit Dubey
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition GurukulCompetition Gurukul
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdLearningHomeBD.com
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...SOURAV DAS
 
Algebra1 Item #78
Algebra1 Item #78Algebra1 Item #78
Algebra1 Item #78Lappy Doods
 

Similar to Time and work session 1 (20)

TIME & WORK.pptx
TIME & WORK.pptxTIME & WORK.pptx
TIME & WORK.pptx
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.ppt
 
3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
 
Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdf
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptx
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdf
 
Doc
DocDoc
Doc
 
Google aptitude-test
Google aptitude-testGoogle aptitude-test
Google aptitude-test
 
maths set-01.pptx
maths set-01.pptxmaths set-01.pptx
maths set-01.pptx
 
Numerical reasoning II
Numerical reasoning IINumerical reasoning II
Numerical reasoning II
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition Gurukul
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
 
AMCAT time work pipes cisterns
 AMCAT time  work pipes cisterns AMCAT time  work pipes cisterns
AMCAT time work pipes cisterns
 
Algebra1 Item #78
Algebra1 Item #78Algebra1 Item #78
Algebra1 Item #78
 
Timeandwork
TimeandworkTimeandwork
Timeandwork
 
Time and work
Time and workTime and work
Time and work
 

More from George Prep

CAT Time and distance session 2 and session 3
CAT Time and distance session 2 and session 3CAT Time and distance session 2 and session 3
CAT Time and distance session 2 and session 3George Prep
 
CAT Functions and Graphs basics
CAT Functions and Graphs basicsCAT Functions and Graphs basics
CAT Functions and Graphs basicsGeorge Prep
 
CAT Quadratic and Higher Order Equations
CAT Quadratic and Higher Order EquationsCAT Quadratic and Higher Order Equations
CAT Quadratic and Higher Order EquationsGeorge Prep
 
GRE - Geometry Session 2
GRE - Geometry Session 2GRE - Geometry Session 2
GRE - Geometry Session 2George Prep
 
GRE - Geometry Session 1
GRE - Geometry Session 1GRE - Geometry Session 1
GRE - Geometry Session 1George Prep
 
GRE - Rates and Work
GRE - Rates and WorkGRE - Rates and Work
GRE - Rates and WorkGeorge Prep
 
CAT Time and Distance Concept Session 1
CAT Time and Distance Concept Session 1CAT Time and Distance Concept Session 1
CAT Time and Distance Concept Session 1George Prep
 
Non performing assets
Non performing assetsNon performing assets
Non performing assetsGeorge Prep
 
Banks and SSC - Syllogisms-1
Banks and SSC - Syllogisms-1Banks and SSC - Syllogisms-1
Banks and SSC - Syllogisms-1George Prep
 
Banks SSC - Monetary Policy Tools
Banks SSC - Monetary Policy ToolsBanks SSC - Monetary Policy Tools
Banks SSC - Monetary Policy ToolsGeorge Prep
 
Banks SSC -Venn diagrams
Banks SSC -Venn diagramsBanks SSC -Venn diagrams
Banks SSC -Venn diagramsGeorge Prep
 
Banks SSC - Ranking and ordering
Banks SSC - Ranking and orderingBanks SSC - Ranking and ordering
Banks SSC - Ranking and orderingGeorge Prep
 
Banks SSC - Input output
Banks SSC - Input outputBanks SSC - Input output
Banks SSC - Input outputGeorge Prep
 
Banks SSC - Cubes and dice
Banks SSC - Cubes and diceBanks SSC - Cubes and dice
Banks SSC - Cubes and diceGeorge Prep
 
Banks SSC - Classification
Banks SSC - ClassificationBanks SSC - Classification
Banks SSC - ClassificationGeorge Prep
 
Banks SSC - Analogies
Banks SSC - AnalogiesBanks SSC - Analogies
Banks SSC - AnalogiesGeorge Prep
 
CAT - Ratio, Proportion and Variation
CAT - Ratio, Proportion and VariationCAT - Ratio, Proportion and Variation
CAT - Ratio, Proportion and VariationGeorge Prep
 
Banks and SSC - Time and Distance Concept Class
Banks and SSC -  Time and Distance Concept ClassBanks and SSC -  Time and Distance Concept Class
Banks and SSC - Time and Distance Concept ClassGeorge Prep
 

More from George Prep (20)

CAT Time and distance session 2 and session 3
CAT Time and distance session 2 and session 3CAT Time and distance session 2 and session 3
CAT Time and distance session 2 and session 3
 
CAT Functions and Graphs basics
CAT Functions and Graphs basicsCAT Functions and Graphs basics
CAT Functions and Graphs basics
 
CAT Quadratic and Higher Order Equations
CAT Quadratic and Higher Order EquationsCAT Quadratic and Higher Order Equations
CAT Quadratic and Higher Order Equations
 
GRE - Geometry Session 2
GRE - Geometry Session 2GRE - Geometry Session 2
GRE - Geometry Session 2
 
GRE - Geometry Session 1
GRE - Geometry Session 1GRE - Geometry Session 1
GRE - Geometry Session 1
 
GRE - Rates and Work
GRE - Rates and WorkGRE - Rates and Work
GRE - Rates and Work
 
CAT Syllogisms
CAT SyllogismsCAT Syllogisms
CAT Syllogisms
 
CAT Probability
CAT ProbabilityCAT Probability
CAT Probability
 
CAT Time and Distance Concept Session 1
CAT Time and Distance Concept Session 1CAT Time and Distance Concept Session 1
CAT Time and Distance Concept Session 1
 
Non performing assets
Non performing assetsNon performing assets
Non performing assets
 
Banks and SSC - Syllogisms-1
Banks and SSC - Syllogisms-1Banks and SSC - Syllogisms-1
Banks and SSC - Syllogisms-1
 
Banks SSC - Monetary Policy Tools
Banks SSC - Monetary Policy ToolsBanks SSC - Monetary Policy Tools
Banks SSC - Monetary Policy Tools
 
Banks SSC -Venn diagrams
Banks SSC -Venn diagramsBanks SSC -Venn diagrams
Banks SSC -Venn diagrams
 
Banks SSC - Ranking and ordering
Banks SSC - Ranking and orderingBanks SSC - Ranking and ordering
Banks SSC - Ranking and ordering
 
Banks SSC - Input output
Banks SSC - Input outputBanks SSC - Input output
Banks SSC - Input output
 
Banks SSC - Cubes and dice
Banks SSC - Cubes and diceBanks SSC - Cubes and dice
Banks SSC - Cubes and dice
 
Banks SSC - Classification
Banks SSC - ClassificationBanks SSC - Classification
Banks SSC - Classification
 
Banks SSC - Analogies
Banks SSC - AnalogiesBanks SSC - Analogies
Banks SSC - Analogies
 
CAT - Ratio, Proportion and Variation
CAT - Ratio, Proportion and VariationCAT - Ratio, Proportion and Variation
CAT - Ratio, Proportion and Variation
 
Banks and SSC - Time and Distance Concept Class
Banks and SSC -  Time and Distance Concept ClassBanks and SSC -  Time and Distance Concept Class
Banks and SSC - Time and Distance Concept Class
 

Recently uploaded

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 

Recently uploaded (20)

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 

Time and work session 1

  • 1. www.georgeprep.com 0 Time and Work Concept Session 1 & Practice Session
  • 2. www.georgeprep.com 1 Time and Work Basics Groups at Work Wage Distribution Pipes and Cisterns Chapter Pathway
  • 4. www.georgeprep.com 3 Work and Efficiency 𝑊𝑜𝑟𝑘 = 𝑇𝑖𝑚𝑒 × 𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦 Amount of work done per unit time
  • 5. www.georgeprep.com 4 Always work with Efficiency 𝑡 𝐴 + 𝑡 𝐵 ≠ 𝑡 𝐴&𝐵 𝑒 𝐴 + 𝑒 𝐵 = 𝑒 𝐴&𝐵
  • 6. www.georgeprep.com 5 A takes 10 days to finish a job and B takes 20 days to finish the same job. In how many days will A and B finish the work if they work together? T&W Problems Answer: 20/3
  • 7. www.georgeprep.com 6 P and Q can do a work in 15 days, Q and R can do the same work in 20 days and P and R can do the same work in 12 days. If all three of them work together, in how many days will the work be completed? 1) 6 2) 5 3) 10 4) None of these T&W Problems Answer: Option 3
  • 8. www.georgeprep.com 7 A can complete a work in 12 days, B in 15 days. Find the time they would take to complete the work 1) When A and B work together on alternate days starting with A 2) When A and B work together on alternate days starting with B 3) If A joined the work two days after B started? 4) If B leaves two days before the actual completion of the work? 5) If A leaves two days before the scheduled completion of the work? 6) If B does negative work at the same rate? T&W Problems
  • 9. www.georgeprep.com 8 Akbar takes 16 days to complete a job and Anthony takes D days to complete the same job. Akbar and Anthony work on alternate days. If they take exactly the same time irrespective of who starts the job, how many positive integer values are possible for D? 1) 3 2) 4 3) 5 4) Cannot be determined T&W Problems Answer: Option 2
  • 11. www.georgeprep.com 10 Problems – Groups involving ‘and’ 2 men and 3 boys can do a piece of work in 10 days while 3 men and 2 boys can do the same work in 8 days. In how many days can 2 men and 1 boy do the work? 1) 13.5 2) 14.5 3) 11.5 4) 12.5 5) None of these Answer: option 4
  • 12. www.georgeprep.com 11 Problems – Groups involving ‘or’ 6 men or 10 boys can do a piece of work in 15 days. How many days will 12 men and 5 boys take to reap a field that is 4 times the area? 1) 6 2) 12 3) 15 4) 24 5) None of these Answer: option 4
  • 14. www.georgeprep.com 13 A can lay railway track between two given stations in 15 days and B can do the same job in 20 days. With help of C, they did the job in 5 days. Then, C alone can do the job in: 1) 12 days 2) 15 days 3) 10 days 4) 16 days Practice Problems Answer: Option 1
  • 15. www.georgeprep.com 14 8 men and 4 women together can complete a piece of work in 6 days. The work done by a man in one day is double the work done by a woman in one day. If 8 men and 4 women started working and after 2 days 4 men left and 4 new women joined, in how many more days will the work be completed? 1) 5 days 2) 8 days 3) 6 days 4) 4 days Practice Problems Answer: Option 1
  • 16. www.georgeprep.com 15 A, B and C can do a piece of work in 15, 30 and 60 days respectively. First day A works alone, on the second day he is accompanied by only B and on the third day he is accompanied by only C and on the fourth day A works alone, the next day he is accompanied by only B, and the next day by only C. If they continue to work in this fashion, In how many days will the work get over? Practice Problems Answer: 12
  • 17. www.georgeprep.com 16 A is thrice as good as workman as B and therefore is able to finish a job in 30 days less than B. Working together, in how many days can they do a similar job? Practice Problems Answer: 11.25
  • 18. www.georgeprep.com 17 A is thrice as good as workman as B and therefore is able to finish a job in 30 days less than B. Working on alternate days beginning with B, in how many days can they do a similar job? Practice Problems Answer: 23
  • 19. www.georgeprep.com 18 A can do a piece of work in 4 hours; B and C together can do it in 3 hours, while A and C together can do it in 2 hours. How many hours will A and B take to do the same work? Practice Problems Answer: 3
  • 20. www.georgeprep.com 19 Humans and robots can both perform a job but at different efficiencies. Fifteen humans and five robots working together take thirty days to finish the job, whereas five humans and fifteen robots working together take sixty days to finish it. How many days will fifteen humans working together (without any robot) take to finish it? 1) 36 2) 32 3) 45 4) 40 Practice Problems Answer: Option 2 CAT 2018 (Morning Slot)