Backflow from Flare to Biodigester
2
Condition # 1 : Morning Time
HDPE
baffle
sludge layer
mixer
Biogas flow to flare
T1
T3
T2
Morning time, T1 = T2, T3 depend on
Temp from POME
1. Flare ON
2. Dampener OPEN
3. Biogas valve OPEN
4. Gas relief pipe CLOSE ( lock by
water )
3
Condition # 2 : Day Time before backflow
HDPE
baffle
sludge layer
mixer
Biogas flow to flare
T1
T3
T2
Day time, T2 = 60 deg C, T1 = 35
deg C, T3 depend on Temp from
POME
1. Flare ON
2. Dampener OPEN
3. Biogas valve OPEN
4. Gas relief pipe CLOSE ( lock by
water )
5. Membrane will start inflate due
to biogas production is higher
during mill operation and
expansion from temperature
increament
4
Condition # 3 : Day Time when Backflow happen
HDPE
baffle
sludge layer
mixer
Biogas + air + flame
suck to digester
T1
T3
T2
Day time, T2 = 60 deg C, T1 = 35
deg C, T3 depend on Temp from
POME
1. Flare ON
2. Dampener OPEN
3. Biogas valve OPEN
4. Gas relief pipeOPEN ( when
membrane lift up suddently )
5. Membrane will lift up some of
gas relief pipe. Most of biogas
will release from this pipe and
make a vacuum effect to flame
and air on flare area. This is
when the flowback (back
pressure) started.
The flow to biodigester
is stuck in demister
because of fill media
and an equilibrium
between the pressure
and then BOOM

More Related Content

Viewers also liked

Texas oil refinary explosion
Texas oil refinary explosionTexas oil refinary explosion
Texas oil refinary explosion
Neha Baheti
 
Common misconceptions and pitfalls in alarm management
Common misconceptions and pitfalls in alarm managementCommon misconceptions and pitfalls in alarm management
Common misconceptions and pitfalls in alarm management
Mary Claire Simoneaux
 
Alarm Rationalization Workshop - Tips, Tricks and Traps
Alarm Rationalization Workshop - Tips, Tricks and Traps Alarm Rationalization Workshop - Tips, Tricks and Traps
Alarm Rationalization Workshop - Tips, Tricks and Traps
Mary Claire Simoneaux
 
Case Study: Column Relief Study
Case Study: Column Relief StudyCase Study: Column Relief Study
Case Study: Column Relief Study
Flex Process
 
Plan Design Enable WS Atkins plc
Plan Design Enable WS Atkins plcPlan Design Enable WS Atkins plc
Plan Design Enable WS Atkins plc
GBSNetworks
 
Novec 1230
Novec 1230Novec 1230
Novec 1230
Vinod Kumar Nehta
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and design
Héctor Nguema Ondo
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
Amol Dudhate
 
Lessons learned in implementing a QRA capability - Egan Naidoo
Lessons learned in implementing a QRA capability - Egan NaidooLessons learned in implementing a QRA capability - Egan Naidoo
Lessons learned in implementing a QRA capability - Egan Naidoo
Association for Project Management
 
QRA throughout the project lifecycle - Val Jonas, Risk Decisions
QRA throughout the project lifecycle - Val Jonas, Risk DecisionsQRA throughout the project lifecycle - Val Jonas, Risk Decisions
QRA throughout the project lifecycle - Val Jonas, Risk Decisions
Association for Project Management
 
Systems engineering for project managers - what you need to know
Systems engineering for project managers - what you need to knowSystems engineering for project managers - what you need to know
Systems engineering for project managers - what you need to know
Association for Project Management
 

Viewers also liked (11)

Texas oil refinary explosion
Texas oil refinary explosionTexas oil refinary explosion
Texas oil refinary explosion
 
Common misconceptions and pitfalls in alarm management
Common misconceptions and pitfalls in alarm managementCommon misconceptions and pitfalls in alarm management
Common misconceptions and pitfalls in alarm management
 
Alarm Rationalization Workshop - Tips, Tricks and Traps
Alarm Rationalization Workshop - Tips, Tricks and Traps Alarm Rationalization Workshop - Tips, Tricks and Traps
Alarm Rationalization Workshop - Tips, Tricks and Traps
 
Case Study: Column Relief Study
Case Study: Column Relief StudyCase Study: Column Relief Study
Case Study: Column Relief Study
 
Plan Design Enable WS Atkins plc
Plan Design Enable WS Atkins plcPlan Design Enable WS Atkins plc
Plan Design Enable WS Atkins plc
 
Novec 1230
Novec 1230Novec 1230
Novec 1230
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and design
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
Lessons learned in implementing a QRA capability - Egan Naidoo
Lessons learned in implementing a QRA capability - Egan NaidooLessons learned in implementing a QRA capability - Egan Naidoo
Lessons learned in implementing a QRA capability - Egan Naidoo
 
QRA throughout the project lifecycle - Val Jonas, Risk Decisions
QRA throughout the project lifecycle - Val Jonas, Risk DecisionsQRA throughout the project lifecycle - Val Jonas, Risk Decisions
QRA throughout the project lifecycle - Val Jonas, Risk Decisions
 
Systems engineering for project managers - what you need to know
Systems engineering for project managers - what you need to knowSystems engineering for project managers - what you need to know
Systems engineering for project managers - what you need to know
 

Similar to Backflow with scenario

Retort pouch packaging
Retort pouch packaging Retort pouch packaging
Retort pouch packaging
prakash shirahatti
 
Retort Processing and Equipment's for it
Retort Processing and Equipment's for itRetort Processing and Equipment's for it
Retort Processing and Equipment's for it
SasiK25
 
HTR Lab - Exp-02a - G-A2.pdf
HTR Lab - Exp-02a - G-A2.pdfHTR Lab - Exp-02a - G-A2.pdf
HTR Lab - Exp-02a - G-A2.pdf
Safeen Yaseen Ja'far
 
Food Processing and preservation 3 - Sterilization.pdf
Food Processing and preservation 3 - Sterilization.pdfFood Processing and preservation 3 - Sterilization.pdf
Food Processing and preservation 3 - Sterilization.pdf
PeterJofilisi
 
Food Processing and preservation 3 - Sterilization.pdf
Food Processing and preservation 3 - Sterilization.pdfFood Processing and preservation 3 - Sterilization.pdf
Food Processing and preservation 3 - Sterilization.pdf
PeterJofilisi
 
Catalyst Catastrophes in Syngas Production - I
Catalyst Catastrophes in Syngas Production - ICatalyst Catastrophes in Syngas Production - I
Catalyst Catastrophes in Syngas Production - I
Gerard B. Hawkins
 
Coking
CokingCoking
Coking
Kumar
 
Freeze drying
Freeze dryingFreeze drying
Freeze drying
Aarti Nimesh
 

Similar to Backflow with scenario (8)

Retort pouch packaging
Retort pouch packaging Retort pouch packaging
Retort pouch packaging
 
Retort Processing and Equipment's for it
Retort Processing and Equipment's for itRetort Processing and Equipment's for it
Retort Processing and Equipment's for it
 
HTR Lab - Exp-02a - G-A2.pdf
HTR Lab - Exp-02a - G-A2.pdfHTR Lab - Exp-02a - G-A2.pdf
HTR Lab - Exp-02a - G-A2.pdf
 
Food Processing and preservation 3 - Sterilization.pdf
Food Processing and preservation 3 - Sterilization.pdfFood Processing and preservation 3 - Sterilization.pdf
Food Processing and preservation 3 - Sterilization.pdf
 
Food Processing and preservation 3 - Sterilization.pdf
Food Processing and preservation 3 - Sterilization.pdfFood Processing and preservation 3 - Sterilization.pdf
Food Processing and preservation 3 - Sterilization.pdf
 
Catalyst Catastrophes in Syngas Production - I
Catalyst Catastrophes in Syngas Production - ICatalyst Catastrophes in Syngas Production - I
Catalyst Catastrophes in Syngas Production - I
 
Coking
CokingCoking
Coking
 
Freeze drying
Freeze dryingFreeze drying
Freeze drying
 

More from sakti_siregar

Anaerobic Process For Cdm Project
Anaerobic Process For Cdm ProjectAnaerobic Process For Cdm Project
Anaerobic Process For Cdm Project
sakti_siregar
 
Biogas Flammability Sakti Siregar
Biogas Flammability Sakti SiregarBiogas Flammability Sakti Siregar
Biogas Flammability Sakti Siregar
sakti_siregar
 
Electroplating Paper
Electroplating PaperElectroplating Paper
Electroplating Papersakti_siregar
 
Daf 60 M3
Daf 60 M3Daf 60 M3
Daf 60 M3
sakti_siregar
 
Osec
OsecOsec
Recycling Water Opportunity W O Attachment
Recycling Water Opportunity W O AttachmentRecycling Water Opportunity W O Attachment
Recycling Water Opportunity W O Attachment
sakti_siregar
 

More from sakti_siregar (7)

Anaerobic Process For Cdm Project
Anaerobic Process For Cdm ProjectAnaerobic Process For Cdm Project
Anaerobic Process For Cdm Project
 
Biogas Flammability Sakti Siregar
Biogas Flammability Sakti SiregarBiogas Flammability Sakti Siregar
Biogas Flammability Sakti Siregar
 
Msg
MsgMsg
Msg
 
Electroplating Paper
Electroplating PaperElectroplating Paper
Electroplating Paper
 
Daf 60 M3
Daf 60 M3Daf 60 M3
Daf 60 M3
 
Osec
OsecOsec
Osec
 
Recycling Water Opportunity W O Attachment
Recycling Water Opportunity W O AttachmentRecycling Water Opportunity W O Attachment
Recycling Water Opportunity W O Attachment
 

Backflow with scenario

  • 1. 1 Backflow from Flare to Biodigester
  • 2. 2 Condition # 1 : Morning Time HDPE baffle sludge layer mixer Biogas flow to flare T1 T3 T2 Morning time, T1 = T2, T3 depend on Temp from POME 1. Flare ON 2. Dampener OPEN 3. Biogas valve OPEN 4. Gas relief pipe CLOSE ( lock by water )
  • 3. 3 Condition # 2 : Day Time before backflow HDPE baffle sludge layer mixer Biogas flow to flare T1 T3 T2 Day time, T2 = 60 deg C, T1 = 35 deg C, T3 depend on Temp from POME 1. Flare ON 2. Dampener OPEN 3. Biogas valve OPEN 4. Gas relief pipe CLOSE ( lock by water ) 5. Membrane will start inflate due to biogas production is higher during mill operation and expansion from temperature increament
  • 4. 4 Condition # 3 : Day Time when Backflow happen HDPE baffle sludge layer mixer Biogas + air + flame suck to digester T1 T3 T2 Day time, T2 = 60 deg C, T1 = 35 deg C, T3 depend on Temp from POME 1. Flare ON 2. Dampener OPEN 3. Biogas valve OPEN 4. Gas relief pipeOPEN ( when membrane lift up suddently ) 5. Membrane will lift up some of gas relief pipe. Most of biogas will release from this pipe and make a vacuum effect to flame and air on flare area. This is when the flowback (back pressure) started. The flow to biodigester is stuck in demister because of fill media and an equilibrium between the pressure and then BOOM