 Structure : 81-5159 : Clark Street/ Van Horne Tunnel underpass
 Ownership/Responsibility: City of Montreal (Municipal)
 Major and minor Structural components:
 36 Beams : single span, running along the width of the underpass
 Walls
 Deck
 Retaining walls
 Overpass
 Elevated Sidewalk
 Parapets
 Drainage Systems : middle of the tunnel near the side walls.
 Bike Path
 NJ barrier
 Lights on side walls.
 Materials Used:
 Concrete
 Asphalt
 Steel
 How is the structure used:
 2 lanes for traffic
 2 lanes for bikes
 1 pedestrian elevated sidewalk
 No weight restrictions
 Height restriction of 4.40m
 Conditions exposed to:
 Car exhaust
 De-icing salts
 Freeze-thaw
 Vandalism: Graffiti
 Water runoff
 Water accumulation due to
inadequate drainage
DATE COTE DE DÉTÉRIORATION RANKING
February 13 2007 18.7[1] ---
October 3 2011 53.0[2] # 41[4]
October 3 2012 108.0[3] # 13[5]
History of Inspections:
Deteriorated very quickly
over the past couple of
years!
Recommendations after 2012 inspection [6]
• Prior records
81-5159 Pont d’étagement
Avenue Van
Horne/ Rue Clark
108 Critique (1) Passées
-Correction les éléments de dispositif de retenue (Debut 2013)
En Cours
- Aucune action en cours
Future
- Élbaoration d’un projet de réfection de la structure
High Priority Concern #1 : Retaining Wall
Video :
 Exposed Rebar
 Extreme Corrosion of rebar
 Softening of Cement paste
High Priority Concern #2 : Wide Cracks on Ceiling
 Exposed steel
reinforcement
 Severe
concrete
spalling
High Priority Concern #3 :
Excessive rebar exposure and corrosion
 Severe exposed Steel
Reinforcement
 Visible corrosion damage
Efflorescence
Damage at joints
Damage to the pave way
Concrete Spalling and Exposed Steel Reinforcement
 Miscellaneous visible corrosion damage
 Findings confirm the inspection report.
 The tunnel is in critical condition.
 Three regions that require immediate
attention:
 Retaining Walls
 Wide Cracks on Ceiling
 Excessive rebar exposure and corrosion
 Three possible Non-Destructive Testing Methods
 Schmidt Rebound Hammer
 Windsor Pin
 Windsor Probe
 The group recommends using the
Schmidt Rebound hammer,
as it is the easier one to use.
 Furthermore, The Windsor Pin and Probe are sensitive to
carbonation (which the structure is exposed to from daily
traffic)
 The group recommends using
coring as a cored sample may be
tested for its compressive strength
from which the flexure, tensile and
shear strength can then be
determined.
 From the non-destructive tests, the
relative difference in strength
between multiple points of interest
will be obtained.
 Locations with the highest relative
strengths will then be selected for
coring purposes.
 Using the measured strength of the
cored samples, a correlation can be
developed which will allow a better
estimation of the strength at
different locations.
Possible Destructive Methods: Coring, Pullout and Break-out Tests
 Half Cell Electrode and
Pachometer
 These methods are
recommended as they
determine the location and
assess the condition of the
existing steel reinforcement as
well as the corrosion potential.
 Impact Echo
 Less prone to human errors
 No transmitters required
 No need to determine
shape/support factors
 No need for expensive
radioactive methods
http://www.injectionsolutions.com/Impact%20echo%20ph
otos%20001cropped.jpg
Half Cell Electrode
 Phenolphthalein Test
 Determines acidity and
carbonation via color change
 Help determine potential
Acid Attack and/or
Carbonation
 Uranyl Acetate
Florescence
 Detects Alkali-Silicate
Reaction (ASR)
 The chemical solution
bonds with the ASR gel
and glows under UV light
 Moisture Content Meter
 Affected by chlorides
 Surface Resistivity Meter
 Sensitive to chlorides
 Sensitive to carbonation
 Initial Surface Absorption Properties and Figgs
absorption
 Poroscope
 Semi-destructive
As the underpass is exposed
to CO2 and chlorides, these
two are eliminated as the
results from these test may
be misleading.
Requires a lot of preparation (lab + field)
Despite being semi-destructive, the
group suggests using a Poroscope .
Method Justification
Affected
Members
Partial Depth Removal using 15#
Pneumatic Chipping Hammer of
Concrete.
•Extensive cracking and corrosion
of the steel rebar and its affect on
surrounding concrete
•15# Hammer is light enough to be
used on overhead surfaces.
•Practical for removal of sulphate
attacked concrete.
•Tunnel Ceiling
•Retaining Walls
Replace corroded steel
reinforcement
•Extensive corrosion damage
Overhead Concrete replacement
using Form and Pump Technique
•Efficient pumping
•Good for overhead repair Tunnel Ceiling
Side wall concrete replacement
using Form + Cast-in place
Technique
•Simple method
•Common construction practice
•Good for vertical surfaces
Retaining Walls
 Most of the deterioration damage of the
underpass is caused by Sulphate or Corrosion
 Preventive Measures
 Installation of sacrificial anodes to prevent future corrosion damage.
 Use concrete with low C3A to minimize future sulphate attack
Method Justification Affected Members
Concrete removal :
Pneumatic
Chipping Hammer
•Simple and cost effective
•Easy to use
•Ceiling
•Side walls
Concrete Patching:
Trowel
•Use to patch small
affected areas (pop-outs)
•Easy and Efficient for
small areas
 Patching of Concrete in ASR deteriorated areas.
 Preventive Measures
 Lithium treatment is not recommended due to cost.
 Inspect and monitor patch work instead
Type of Repair Remediation
Method
Justification Affected Members
Crack Repair Rout and Seal •Simple
•Cost and labour
effective
•Beams
•Side walls
Type of
Repair
Potential
Remediation
method
Advantages Disadvantages Final
Recommendations
Carbonate
Damage
Repair
Realkalinization •Restores pH
balance of the
concrete
•Extends service life
•Requires
specialised labour
force
•High cost of
material
•Since the cost of
renovation exceeds
the risks of damage,
we recommend
withholding any
remediation
techniques.
•However, actions will
be taken if the
situation changes.
Chlorides
Damage
Repair
ECE •Restores
passivation film
•Extends service life
 Preventive Measures : Annual inspection to monitor
and assess damage.
 Inspection strategy
 Continue Annual Inspections
 City of Montreal
 Interim Inspection
 Inspections on repaired members
 Chloride and carbonation damage
1) Inspection report from 2007
http://ville.montreal.qc.ca/pls/portal/docs/page/transport_v2_fr/media/documents/81_5159_
Inspection_generale_2007_02_13_web.pdf
2) Inspection report from 2011
http://ville.montreal.qc.ca/pls/portal/docs/page/transports_fr/media/documents/81-
5159_inspection_generale_2011-10-03.pdf
3) Inspection report from 2012
http://www.ville.montreal.qc.ca/pls/portal/docs/PAGE/M_CHANTIER_FR/MEDIA/DOCUME
NTS/PONTS_ET_TUNNELS/PONTS_ETAGEMENT/81-
5159_inspection_generale_2012-10-03.pdf
4) Ranking 2012
http://ville.montreal.qc.ca/pls/portal/docs/page/transport_v2_fr/media/documents/2012_Tabl
eau_587_structures.pdf
5) Ranking 2013
http://ville.montreal.qc.ca/pls/portal/docs/page/m_chantier_fr/media/documents/statut_fonct
ionnel_589_structures.pdf
6) Tableau Synthese
http://ville.montreal.qc.ca/pls/portal/docs/page/m_chantier_fr/media/documents/tableau_sy
nthese_24_structures.pdf
7) CIVE 527 Lecture Notes, McGill University, Fall 2013
8) Impact-Echo
http://www.injectionsolutions.com/Impact%20echo%20photos%20001cropped.jpg

More Related Content

What's hot

Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering)
laxman singh
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
GAURAV. H .TANDON
 
Underwater construction
Underwater construction Underwater construction
Underwater construction
Pranay Kumar
 
Under water concreting
Under water concretingUnder water concreting
Under water concreting
Agnesh Shetty
 
Inspection and maintenance of bridges In India
Inspection and maintenance of bridges In IndiaInspection and maintenance of bridges In India
Inspection and maintenance of bridges In India
Khyati Saggu
 
Inspection and maintenance of bridge
Inspection and maintenance of bridgeInspection and maintenance of bridge
Inspection and maintenance of bridge
AKASH SHAH
 
Fabrication of steel plate girder r
Fabrication of steel plate girder rFabrication of steel plate girder r
Fabrication of steel plate girder r
VISHAL SINGH
 
Avoid turbulent entrainment
Avoid turbulent entrainmentAvoid turbulent entrainment
Avoid turbulent entrainment
Sateesh Kumar
 
Pumping of concrete
Pumping of concretePumping of concrete
Pumping of concrete
Yaswanth Reddy
 
SEAFARER’S CENTER PEDESTRIAN BRIDGE_PRESENTATION
SEAFARER’S CENTER PEDESTRIAN BRIDGE_PRESENTATIONSEAFARER’S CENTER PEDESTRIAN BRIDGE_PRESENTATION
SEAFARER’S CENTER PEDESTRIAN BRIDGE_PRESENTATION
Maha Al Soufi
 
DRILLING METHODS
DRILLING METHODSDRILLING METHODS
DRILLING METHODS
Annamalai University
 
Concrete
ConcreteConcrete
Concrete
Bhim Kharel
 
Tremie concreting
Tremie concretingTremie concreting
Tremie concreting
priyank 59
 
3 tunnel
3 tunnel3 tunnel
3 tunnel
SUKANTA MONDAL
 
pipes fittings &valves
 pipes fittings &valves pipes fittings &valves
pipes fittings &valves
Yoga Sathish
 
Fabrication of steel plate girder
Fabrication of steel plate girderFabrication of steel plate girder
Fabrication of steel plate girder
Rajesh Maurya
 
Construction of tunnel
Construction of tunnelConstruction of tunnel
Construction of tunnel
Abdul Rehman
 
precast manholes
precast manholesprecast manholes
precast manholes
Engineer Imtiaz Rehman
 
Drilling in mining
Drilling in miningDrilling in mining
Drilling in mining
Eder Reyes
 
underwater repair
underwater repairunderwater repair
underwater repair
Kris Kiran
 

What's hot (20)

Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering)
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
 
Underwater construction
Underwater construction Underwater construction
Underwater construction
 
Under water concreting
Under water concretingUnder water concreting
Under water concreting
 
Inspection and maintenance of bridges In India
Inspection and maintenance of bridges In IndiaInspection and maintenance of bridges In India
Inspection and maintenance of bridges In India
 
Inspection and maintenance of bridge
Inspection and maintenance of bridgeInspection and maintenance of bridge
Inspection and maintenance of bridge
 
Fabrication of steel plate girder r
Fabrication of steel plate girder rFabrication of steel plate girder r
Fabrication of steel plate girder r
 
Avoid turbulent entrainment
Avoid turbulent entrainmentAvoid turbulent entrainment
Avoid turbulent entrainment
 
Pumping of concrete
Pumping of concretePumping of concrete
Pumping of concrete
 
SEAFARER’S CENTER PEDESTRIAN BRIDGE_PRESENTATION
SEAFARER’S CENTER PEDESTRIAN BRIDGE_PRESENTATIONSEAFARER’S CENTER PEDESTRIAN BRIDGE_PRESENTATION
SEAFARER’S CENTER PEDESTRIAN BRIDGE_PRESENTATION
 
DRILLING METHODS
DRILLING METHODSDRILLING METHODS
DRILLING METHODS
 
Concrete
ConcreteConcrete
Concrete
 
Tremie concreting
Tremie concretingTremie concreting
Tremie concreting
 
3 tunnel
3 tunnel3 tunnel
3 tunnel
 
pipes fittings &valves
 pipes fittings &valves pipes fittings &valves
pipes fittings &valves
 
Fabrication of steel plate girder
Fabrication of steel plate girderFabrication of steel plate girder
Fabrication of steel plate girder
 
Construction of tunnel
Construction of tunnelConstruction of tunnel
Construction of tunnel
 
precast manholes
precast manholesprecast manholes
precast manholes
 
Drilling in mining
Drilling in miningDrilling in mining
Drilling in mining
 
underwater repair
underwater repairunderwater repair
underwater repair
 

Viewers also liked

AutoCAD Design Project
AutoCAD Design ProjectAutoCAD Design Project
AutoCAD Design Project
Michael Masi, Jr. Eng.
 
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisDesign Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Michael Masi, Jr. Eng.
 
Design Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost AnalysisDesign Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost Analysis
Michael Masi, Jr. Eng.
 
Final Project Presentation
Final Project PresentationFinal Project Presentation
Final Project Presentation
Syed Muhammad Tayyab
 
Parking Lots to Parks Kansas City
Parking Lots to Parks Kansas CityParking Lots to Parks Kansas City
Parking Lots to Parks Kansas City
Green Parking Council
 
Tunnel & Underpass Lighting based on CIE 88: 2004
Tunnel & Underpass Lighting based on CIE 88: 2004Tunnel & Underpass Lighting based on CIE 88: 2004
Tunnel & Underpass Lighting based on CIE 88: 2004
Michael Santiago
 
Capacity analysis Of Highways
Capacity analysis Of HighwaysCapacity analysis Of Highways
Capacity analysis Of Highways
Latif Hyder Wadho
 
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Hossam Shafiq I
 
Road Junctions and Intersections
Road Junctions and IntersectionsRoad Junctions and Intersections
Road Junctions and Intersections
Oshin Deshmukh
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
Sowjanya Gannoju
 
Mmoloki Lebatle CV
Mmoloki Lebatle CVMmoloki Lebatle CV
Mmoloki Lebatle CV
Godwin Lebatle
 
Cursusmap harderwijk event academy
Cursusmap harderwijk event academyCursusmap harderwijk event academy
Cursusmap harderwijk event academy
Roeland Tameling
 
El poder-y-sus-conflictos
El poder-y-sus-conflictosEl poder-y-sus-conflictos
El poder-y-sus-conflictos
Soffy_Villacis26
 
Draaiboek citymarketing innovatiedag versie 2
Draaiboek citymarketing innovatiedag versie 2Draaiboek citymarketing innovatiedag versie 2
Draaiboek citymarketing innovatiedag versie 2
Roeland Tameling
 
Tri Benh Phong Thap
Tri Benh Phong ThapTri Benh Phong Thap
Tri Benh Phong Thapfoster281
 
SME ORDNANCE SDN SLIDE
SME ORDNANCE SDN SLIDESME ORDNANCE SDN SLIDE
SME ORDNANCE SDN SLIDE
Siti Nuramanah Mohd Shakor
 
Основные тенденции развития мирового хозяйства в XXIв
Основные тенденции развития мирового хозяйства в XXIвОсновные тенденции развития мирового хозяйства в XXIв
Основные тенденции развития мирового хозяйства в XXIв
adam93
 
Recommendation system
Recommendation systemRecommendation system
Recommendation system
光明 赵
 
Transparent Object Proxies for JavaScript
Transparent Object Proxies for JavaScriptTransparent Object Proxies for JavaScript
Transparent Object Proxies for JavaScript
Matthias Keil
 

Viewers also liked (20)

AutoCAD Design Project
AutoCAD Design ProjectAutoCAD Design Project
AutoCAD Design Project
 
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisDesign Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost Analysis
 
Design Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost AnalysisDesign Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost Analysis
 
Final Project Presentation
Final Project PresentationFinal Project Presentation
Final Project Presentation
 
Parking Lots to Parks Kansas City
Parking Lots to Parks Kansas CityParking Lots to Parks Kansas City
Parking Lots to Parks Kansas City
 
Type of Junctions
Type of JunctionsType of Junctions
Type of Junctions
 
Tunnel & Underpass Lighting based on CIE 88: 2004
Tunnel & Underpass Lighting based on CIE 88: 2004Tunnel & Underpass Lighting based on CIE 88: 2004
Tunnel & Underpass Lighting based on CIE 88: 2004
 
Capacity analysis Of Highways
Capacity analysis Of HighwaysCapacity analysis Of Highways
Capacity analysis Of Highways
 
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
 
Road Junctions and Intersections
Road Junctions and IntersectionsRoad Junctions and Intersections
Road Junctions and Intersections
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
 
Mmoloki Lebatle CV
Mmoloki Lebatle CVMmoloki Lebatle CV
Mmoloki Lebatle CV
 
Cursusmap harderwijk event academy
Cursusmap harderwijk event academyCursusmap harderwijk event academy
Cursusmap harderwijk event academy
 
El poder-y-sus-conflictos
El poder-y-sus-conflictosEl poder-y-sus-conflictos
El poder-y-sus-conflictos
 
Draaiboek citymarketing innovatiedag versie 2
Draaiboek citymarketing innovatiedag versie 2Draaiboek citymarketing innovatiedag versie 2
Draaiboek citymarketing innovatiedag versie 2
 
Tri Benh Phong Thap
Tri Benh Phong ThapTri Benh Phong Thap
Tri Benh Phong Thap
 
SME ORDNANCE SDN SLIDE
SME ORDNANCE SDN SLIDESME ORDNANCE SDN SLIDE
SME ORDNANCE SDN SLIDE
 
Основные тенденции развития мирового хозяйства в XXIв
Основные тенденции развития мирового хозяйства в XXIвОсновные тенденции развития мирового хозяйства в XXIв
Основные тенденции развития мирового хозяйства в XXIв
 
Recommendation system
Recommendation systemRecommendation system
Recommendation system
 
Transparent Object Proxies for JavaScript
Transparent Object Proxies for JavaScriptTransparent Object Proxies for JavaScript
Transparent Object Proxies for JavaScript
 

Similar to Assessment of Underpass on Clark Street and Van Horne

Rehabilitation of concrete structures, surface treatment
Rehabilitation of concrete structures, surface treatmentRehabilitation of concrete structures, surface treatment
Rehabilitation of concrete structures, surface treatment
ShivRam G Krishnan
 
Sadr elevated-expressway
Sadr elevated-expresswaySadr elevated-expressway
Sadr elevated-expressway
Yousef Bertina
 
Half-Cell-Potential-Measurement-for-Concrete.ppt
Half-Cell-Potential-Measurement-for-Concrete.pptHalf-Cell-Potential-Measurement-for-Concrete.ppt
Half-Cell-Potential-Measurement-for-Concrete.ppt
rajaqammar2
 
Mistras l&l hidden defects rev2 mistras
Mistras l&l hidden defects rev2 mistrasMistras l&l hidden defects rev2 mistras
Mistras l&l hidden defects rev2 mistras
Kelly Jervis
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefit
Perwez Ahmad
 
Poster_BTP
Poster_BTPPoster_BTP
Poster_BTP
Prakash Singh
 
Special structure
Special structureSpecial structure
11.01.04 Trench Drains
11.01.04    Trench  Drains11.01.04    Trench  Drains
11.01.04 Trench Drains
TheJoyceAgencyInc
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
atchitect and design
 
Weld Defects
Weld DefectsWeld Defects
Weld Defects
adminn2
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
Vineeshkumar K V
 
Railway over bridge
Railway over bridgeRailway over bridge
Railway over bridge
SaurabhSingh20590
 
Recent Advancements in Piping industry and Piping materials.
Recent Advancements in Piping industry and Piping materials.Recent Advancements in Piping industry and Piping materials.
Recent Advancements in Piping industry and Piping materials.
Asheesh Padiyar
 
Production of tubes and pipes
Production of tubes and pipesProduction of tubes and pipes
Production of tubes and pipes
Mahesh Bang
 
Concrete technology ndt methods
Concrete technology   ndt methodsConcrete technology   ndt methods
Concrete technology ndt methods
nilesh rajput
 
Maintenance & repair of steel bridges
Maintenance & repair of steel bridgesMaintenance & repair of steel bridges
Maintenance & repair of steel bridges
naveen kumar
 
ADK_Structural Health Monitoring power point
ADK_Structural Health Monitoring power pointADK_Structural Health Monitoring power point
ADK_Structural Health Monitoring power point
ssuserd7b2f1
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
JenilPatel22
 
Coating presentation tp bangkok 23 jan 2014
Coating presentation tp bangkok   23 jan 2014Coating presentation tp bangkok   23 jan 2014
Coating presentation tp bangkok 23 jan 2014
Thongchai Phanyasahachart
 
REBOUND Hammer Test
REBOUND Hammer Test REBOUND Hammer Test
REBOUND Hammer Test
engomar84
 

Similar to Assessment of Underpass on Clark Street and Van Horne (20)

Rehabilitation of concrete structures, surface treatment
Rehabilitation of concrete structures, surface treatmentRehabilitation of concrete structures, surface treatment
Rehabilitation of concrete structures, surface treatment
 
Sadr elevated-expressway
Sadr elevated-expresswaySadr elevated-expressway
Sadr elevated-expressway
 
Half-Cell-Potential-Measurement-for-Concrete.ppt
Half-Cell-Potential-Measurement-for-Concrete.pptHalf-Cell-Potential-Measurement-for-Concrete.ppt
Half-Cell-Potential-Measurement-for-Concrete.ppt
 
Mistras l&l hidden defects rev2 mistras
Mistras l&l hidden defects rev2 mistrasMistras l&l hidden defects rev2 mistras
Mistras l&l hidden defects rev2 mistras
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefit
 
Poster_BTP
Poster_BTPPoster_BTP
Poster_BTP
 
Special structure
Special structureSpecial structure
Special structure
 
11.01.04 Trench Drains
11.01.04    Trench  Drains11.01.04    Trench  Drains
11.01.04 Trench Drains
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
Weld Defects
Weld DefectsWeld Defects
Weld Defects
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
 
Railway over bridge
Railway over bridgeRailway over bridge
Railway over bridge
 
Recent Advancements in Piping industry and Piping materials.
Recent Advancements in Piping industry and Piping materials.Recent Advancements in Piping industry and Piping materials.
Recent Advancements in Piping industry and Piping materials.
 
Production of tubes and pipes
Production of tubes and pipesProduction of tubes and pipes
Production of tubes and pipes
 
Concrete technology ndt methods
Concrete technology   ndt methodsConcrete technology   ndt methods
Concrete technology ndt methods
 
Maintenance & repair of steel bridges
Maintenance & repair of steel bridgesMaintenance & repair of steel bridges
Maintenance & repair of steel bridges
 
ADK_Structural Health Monitoring power point
ADK_Structural Health Monitoring power pointADK_Structural Health Monitoring power point
ADK_Structural Health Monitoring power point
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Coating presentation tp bangkok 23 jan 2014
Coating presentation tp bangkok   23 jan 2014Coating presentation tp bangkok   23 jan 2014
Coating presentation tp bangkok 23 jan 2014
 
REBOUND Hammer Test
REBOUND Hammer Test REBOUND Hammer Test
REBOUND Hammer Test
 

Assessment of Underpass on Clark Street and Van Horne

  • 1. Group 4 : Christy Jesurajah, Lloyd Linton 260429440 Masi, Michael 260379971 Moradi, Milad 260399628 Pakpour, Farbod 260298074 Torikian, Aram 260429332
  • 2.  Structure : 81-5159 : Clark Street/ Van Horne Tunnel underpass  Ownership/Responsibility: City of Montreal (Municipal)  Major and minor Structural components:  36 Beams : single span, running along the width of the underpass  Walls  Deck  Retaining walls  Overpass  Elevated Sidewalk  Parapets  Drainage Systems : middle of the tunnel near the side walls.  Bike Path  NJ barrier  Lights on side walls.  Materials Used:  Concrete  Asphalt  Steel
  • 3.  How is the structure used:  2 lanes for traffic  2 lanes for bikes  1 pedestrian elevated sidewalk  No weight restrictions  Height restriction of 4.40m  Conditions exposed to:  Car exhaust  De-icing salts  Freeze-thaw  Vandalism: Graffiti  Water runoff  Water accumulation due to inadequate drainage
  • 4. DATE COTE DE DÉTÉRIORATION RANKING February 13 2007 18.7[1] --- October 3 2011 53.0[2] # 41[4] October 3 2012 108.0[3] # 13[5] History of Inspections: Deteriorated very quickly over the past couple of years! Recommendations after 2012 inspection [6] • Prior records 81-5159 Pont d’étagement Avenue Van Horne/ Rue Clark 108 Critique (1) Passées -Correction les éléments de dispositif de retenue (Debut 2013) En Cours - Aucune action en cours Future - Élbaoration d’un projet de réfection de la structure
  • 5. High Priority Concern #1 : Retaining Wall Video :  Exposed Rebar  Extreme Corrosion of rebar  Softening of Cement paste
  • 6. High Priority Concern #2 : Wide Cracks on Ceiling  Exposed steel reinforcement  Severe concrete spalling
  • 7. High Priority Concern #3 : Excessive rebar exposure and corrosion  Severe exposed Steel Reinforcement  Visible corrosion damage
  • 9. Damage at joints Damage to the pave way
  • 10. Concrete Spalling and Exposed Steel Reinforcement  Miscellaneous visible corrosion damage
  • 11.  Findings confirm the inspection report.  The tunnel is in critical condition.  Three regions that require immediate attention:  Retaining Walls  Wide Cracks on Ceiling  Excessive rebar exposure and corrosion
  • 12.  Three possible Non-Destructive Testing Methods  Schmidt Rebound Hammer  Windsor Pin  Windsor Probe  The group recommends using the Schmidt Rebound hammer, as it is the easier one to use.  Furthermore, The Windsor Pin and Probe are sensitive to carbonation (which the structure is exposed to from daily traffic)
  • 13.  The group recommends using coring as a cored sample may be tested for its compressive strength from which the flexure, tensile and shear strength can then be determined.  From the non-destructive tests, the relative difference in strength between multiple points of interest will be obtained.  Locations with the highest relative strengths will then be selected for coring purposes.  Using the measured strength of the cored samples, a correlation can be developed which will allow a better estimation of the strength at different locations. Possible Destructive Methods: Coring, Pullout and Break-out Tests
  • 14.  Half Cell Electrode and Pachometer  These methods are recommended as they determine the location and assess the condition of the existing steel reinforcement as well as the corrosion potential.  Impact Echo  Less prone to human errors  No transmitters required  No need to determine shape/support factors  No need for expensive radioactive methods http://www.injectionsolutions.com/Impact%20echo%20ph otos%20001cropped.jpg Half Cell Electrode
  • 15.  Phenolphthalein Test  Determines acidity and carbonation via color change  Help determine potential Acid Attack and/or Carbonation  Uranyl Acetate Florescence  Detects Alkali-Silicate Reaction (ASR)  The chemical solution bonds with the ASR gel and glows under UV light
  • 16.  Moisture Content Meter  Affected by chlorides  Surface Resistivity Meter  Sensitive to chlorides  Sensitive to carbonation  Initial Surface Absorption Properties and Figgs absorption  Poroscope  Semi-destructive As the underpass is exposed to CO2 and chlorides, these two are eliminated as the results from these test may be misleading. Requires a lot of preparation (lab + field) Despite being semi-destructive, the group suggests using a Poroscope .
  • 17. Method Justification Affected Members Partial Depth Removal using 15# Pneumatic Chipping Hammer of Concrete. •Extensive cracking and corrosion of the steel rebar and its affect on surrounding concrete •15# Hammer is light enough to be used on overhead surfaces. •Practical for removal of sulphate attacked concrete. •Tunnel Ceiling •Retaining Walls Replace corroded steel reinforcement •Extensive corrosion damage Overhead Concrete replacement using Form and Pump Technique •Efficient pumping •Good for overhead repair Tunnel Ceiling Side wall concrete replacement using Form + Cast-in place Technique •Simple method •Common construction practice •Good for vertical surfaces Retaining Walls  Most of the deterioration damage of the underpass is caused by Sulphate or Corrosion  Preventive Measures  Installation of sacrificial anodes to prevent future corrosion damage.  Use concrete with low C3A to minimize future sulphate attack
  • 18. Method Justification Affected Members Concrete removal : Pneumatic Chipping Hammer •Simple and cost effective •Easy to use •Ceiling •Side walls Concrete Patching: Trowel •Use to patch small affected areas (pop-outs) •Easy and Efficient for small areas  Patching of Concrete in ASR deteriorated areas.  Preventive Measures  Lithium treatment is not recommended due to cost.  Inspect and monitor patch work instead
  • 19. Type of Repair Remediation Method Justification Affected Members Crack Repair Rout and Seal •Simple •Cost and labour effective •Beams •Side walls
  • 20. Type of Repair Potential Remediation method Advantages Disadvantages Final Recommendations Carbonate Damage Repair Realkalinization •Restores pH balance of the concrete •Extends service life •Requires specialised labour force •High cost of material •Since the cost of renovation exceeds the risks of damage, we recommend withholding any remediation techniques. •However, actions will be taken if the situation changes. Chlorides Damage Repair ECE •Restores passivation film •Extends service life  Preventive Measures : Annual inspection to monitor and assess damage.
  • 21.  Inspection strategy  Continue Annual Inspections  City of Montreal  Interim Inspection  Inspections on repaired members  Chloride and carbonation damage
  • 22. 1) Inspection report from 2007 http://ville.montreal.qc.ca/pls/portal/docs/page/transport_v2_fr/media/documents/81_5159_ Inspection_generale_2007_02_13_web.pdf 2) Inspection report from 2011 http://ville.montreal.qc.ca/pls/portal/docs/page/transports_fr/media/documents/81- 5159_inspection_generale_2011-10-03.pdf 3) Inspection report from 2012 http://www.ville.montreal.qc.ca/pls/portal/docs/PAGE/M_CHANTIER_FR/MEDIA/DOCUME NTS/PONTS_ET_TUNNELS/PONTS_ETAGEMENT/81- 5159_inspection_generale_2012-10-03.pdf 4) Ranking 2012 http://ville.montreal.qc.ca/pls/portal/docs/page/transport_v2_fr/media/documents/2012_Tabl eau_587_structures.pdf 5) Ranking 2013 http://ville.montreal.qc.ca/pls/portal/docs/page/m_chantier_fr/media/documents/statut_fonct ionnel_589_structures.pdf 6) Tableau Synthese http://ville.montreal.qc.ca/pls/portal/docs/page/m_chantier_fr/media/documents/tableau_sy nthese_24_structures.pdf 7) CIVE 527 Lecture Notes, McGill University, Fall 2013 8) Impact-Echo http://www.injectionsolutions.com/Impact%20echo%20photos%20001cropped.jpg