This document summarizes a student capstone project that involved developing a protective device coordination for a wastewater treatment plant's power system using modeling software. Key aspects of the project included:
1) Creating a one-line diagram of the plant's electrical system without any protective devices.
2) Simulating faults at different points in the system and observing the sequence and timing of protective device operations.
3) Verifying coordination between devices by ensuring operation times differed by 23-25 cycles.
4) Repeating simulations with the plant running on emergency generators to coordinate devices under that scenario.