SlideShare a Scribd company logo
1 of 5
Download to read offline
Application Letter
Bernard Hasoloan Butar Butar
Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147
+6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com
December 07, 2016
Dear Sir or Madam,
Enclosed with my Application Letter and Curriculum Vitae, I would like to applied in the
company you are leading and become one of your staff.
I am Bernard Hasoloan Butar Butar, and I had been graduated from University of
Lampung as a Bachelor of Engineering Program (S1) since 2006, majoring in
Mechanical Engineering with my concentration is Mechanical - Energy Conversion,
in Department of Mechanical Engineering, with GPA is 2.77 (scale 4.00). I had been
worked at PT. Suri Tani Pemuka Unit Aquafeed Lampung in Way Lunik for ten months
as a Supervisor Shift. I had been worked at PT. Perusahaan Gas Negara (Persero) Tbk.
SBU TSJ Regional Operation and Maintenance II in Labuhan Maringgai for six years as
a Pipeline Staff Operation and Maintenance. I had been worked at PT. PGN Solution
Regional Operation and Maintenance II at Section 4 Belitang for one year six months as
a Pipeline Staff Operation and Maintenance, I had worked at PT Permata Karya Jasa for
five months as a Pipeline Staff Operation and Maintenance at Section 4 Belitang.
I dedicate my trainings and aplicate my knowledges to your company. I believe this will
be a positive contributions for your company. I am discipline, honest, good in analytic,
always keep learning new methods and systems, enthusiastic, hard working, highly
responsible, enjoy working with many people as team or individual, and easy to adapt
with new environment.
I would be pleased to be called for an interview at any time convenient to you. Please let
me know if there is any further information you required, by contact number
+6281272234321 and +6281310466060. Thank you for your kind attention and I look
forward hearing from you soon.
Sincerely Yours,
Bernard Hasoloan Butar Butar
Bernard Hasoloan Butar Butar
Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147
+6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com
CURRICULUM VITAE
PERSONAL DATA
Name Bernard Hasoloan Butar Butar
Place of Birth Teluk Betung
Date of Birth October 14, 1981
Age 35 years old
Sex Male
Religion Christian Protestant
Marital Status Single
Nationality Indonesia
Address Galaxy Residence Blok C-9 No. 6
Grand Galaxy City
Bekasi Selatan 17147
Handphone Number +6281272234321, +6281310466060
Email bernard.hasoloan.butarbutar@gmail.com
hasoloan.bernardbb@gmail.com
OBJECTIVES
My goals are work and build good organization within solid team in the company, bring the company
into reach a world class company, to have a settled career which can raise up my life’s prosperity.
I. WORK EXPERIENCES
PERIOD COMPANY
August 2015 –
January 2016
PT. Permata Karya Jasa (Subsidiary of PT PGN MAS)
POSITION
Pipeline Staff Operation and Maintenance (Pipeline Operator)
II. WORK EXPERIENCES
PERIOD COMPANY
February 2014 –
August 2015
PT. Sumberdaya Dian Mandiri (Manpower Management) for PT PGN Solution
POSITION
Pipeline Staff Operation and Maintenance (Pipeline Operator)
III. WORK EXPERIENCES
PERIOD COMPANY
February 2012 –
February 2014
PT. Personel Alih Daya (Manpower Management) for PT. PGN (Persero) Tbk.,
SBU TSJ Regional Operation and Maintenance II
POSITION
Pipeline Staff Operation and Maintenance (Pipeline Operator)
IV. WORK EXPERIENCES
PERIOD COMPANY
April 2008 –
February 2012
PT. Sumberdaya Dian Mandiri (Manpower Management) for PT. PGN (Persero) Tbk.,
SBU TSJ Regional Operation and Maintenance II
POSITION
Pipeline Staff Operation and Maintenance (Pipeline Operator)
V. WORK EXPERIENCES
PERIOD COMPANY
May 2007 –
March 2008
PT. Suri Tani Pemuka Unit Aquafeed
POSITION
Supervisor Shift
Bernard Hasoloan Butar Butar
Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147
+6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com
JOB’S RESPONSIBILITIES AS A PIPELINE STAFF OPERATION AND MAINTENANCE
1. Operations :
- Land patrol activities every day, include monitoring ROW’s crossing, whether existing crossings
or unexisting crossings,
- Air patrol using helicopter during four times in one year,
- Operating Ball Valve 32”, Plug Valve 6”, Ball Valve 2”,
- Operating Transmitter Rectifier for Protection Cathodic,
- Monitoring third parties’s activities arround Pipeline ROW, include checking civils or companies
vegetations around Pipeline ROW,
- Give socialization Pipeline ROW to the third parties,
- Checking Pipeline markers’s quantities and conditions
- For Examples : Aerial Markers, KM Markers, Warning Sign Markers,
Sign Direction Markers, Class Location Markers, Prohibition Markers,
Boundary Markers, Portals, Barricades) whether in good, broken or lost
Conditions,
- Measuring depth of pipe in ditches and water ways using bar,
- Check the conditions of Test Points Protection Cathodics,
- Measuring Protection Cathodics and Transmitter Rectifier (TR) using Digital Multimeter and
Clamp Meter,
- Operating Tellecomunication Radio VSAT.
2. Maintenance :
- Maintaining broken Markers,
- Maintaining Pipeline ROW and ROW Patrol, include cleaning ROW,
- Maintaining Sectional Valves and Future Connections,
- Maintaining Ball Valve 32”, Ball Valve 2”, Plug Valve 6”, Drain Valve, Vent Valve,
- Maintaining Test Point Protection Cathodics,
- Maintaining Box Culverts,
- Maintaining brigdes,
- Maintaining portals,
- Maintaining Trainsmitter Rectifier
- Maintaining Tellecomunication Radio VSAT.
- Cleaning Pigging activity.
3. Engineering :
- Pipeline ROW Assessment (2008 until 2015),
- CIPS DCVG (2008 until 2015),
- Pipeline Soil Assessment (2015),
4. Procurement :
- Procurement Mechanical Tools,
- Procurement Electrical Tools,
- Procurement Chemical tools,
- Procurement Safety Tools,
- Procurement Office Tools,
5. Construction Projects :
- Monitoring ROW gas Pipeline Phase I Project PT PGN SBU TSJ from (2008-2009),
- Brush Control Project in order to clean Pipeline ROW from vegetations (2008-2015)
- Supervising, monitoring fabrication and installation Bridges Projects (2008-2015),
- Supervising, monitoring fabrication and installation Box Culvert Projects (2008-2015),
- Supervising, monitoring fabrication and installation Concrete Slab Projects (2008-2015),
- Supervising, monitoring fabrication and installation Arial Marker Projects (2008-2015),
- Supervising, monitoring fabrication and installation Warning Sign Projects (2008-2015),
- Supervising, monitoring fabrication and installation Boundary Marker Projects (2008-2015),
- Supervising, monitoring fabrication and installation Sign Direction Projects (2008-2015),
- Supervising, monitoring fabrication and installation Class Location Projects (2008-2015),
- Supervising, monitoring fabrication and installation Portal Projects (2008-2015),
- Supervising, monitoring fabrication and installation Concrete Wall Projects (2008-2015),
- Supervising, monitoring fabrication and installation Test Point Protection Cathodic Projects
(2008-2015),
- CIPS DCVG Projects (2008-2015)
- Supervising, monitoring Painting Project of Sectional Valve and Future Connection
(2011-2015),
- Supervising, monitoring ROW patrol Reinforcement (2014-2015)
Bernard Hasoloan Butar Butar
Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147
+6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com
JOB’S RESPONSIBILITIES AS A PIPELINE STAFF OPERATION AND MAINTENANCE
6. Administration :
- Make Daily Reports, For Example : ROW Patrol Report, Maintenance Report, Protection
Cathodic Report,
- Make Weekly Reports,
- Make Monthly Reports,
- Make Monthly ROW Database facilities report,
- Make RCA (Risk Containment Audit) Report every month,
- Make JCC Report every month,
- Collect and update Permit To Work if there are Third Parties Project,
- Collect and check Third Parties Project’s reports
7. Safety :
- Understand and implement Risk Contaiment Audit (RCA)
- Understand and implement Permit To Work (PTW)
- Understand and implement Job Safety Analysis (JSA)
- Understand and implement Lockout Tagout (LOTO)
- Understand and implement First Aid
- Understand and implement Safety Prosedur
- Understand and implement Safety Riding and Safety Driving
8. Financial :
- Make Financial Report every day, week and month,
- Collect and check bill notes, and send to accounting,
- Make proposal to request logistics and fund to accounting,
9. Corporate Social Responsibility (CSR) :
- Give donation and educational fund for elementary school, junior high school, and senior high
school,
- Give donation and religion fund to religion places every year,
- Make events for health or medical every year
JOB’S RESPONSIBILITIES AS A SUPERVISOR SHIFT
1. Running the work instructions based on Standard Operational Procedures.
2. Planning and scheduling the production target by coordinating with Division of PPIC.
3. Monitoring and controlling the production process so that the production process can be finished on
time.
4. Reporting to the Manager based on production’s operational problems and give Solutions.
FORMAL EDUCATION
PERIOD UNIVERSITY
2000-2006 University of Lampung.
Faculty / Major : Technique / Mechanical Engineering (Energy Conversion)
GPA : 2.77 (Scale 4.00).
PERIOD SENIOR HIGH SCHOOL
1997-2000 SMUN 9 Bandar Lampung.
PERIOD JUNIOR HIGH SCHOOL
1994-1997 Xaverius Tanjungkarang.
PERIOD ELEMENTARY SCHOOL
1988-1994 Xaverius Tanjungkarang.
PERIOD KINDERGARTEN SCHOOL
1986-1988 Xaverius Tanjungkarang.
SKILLS
LANGUAGE
TYPE OF LANGUAGE WRITTEN ORAL
English Active Active
Indonesia Active Active
COMPUTER
SOFTWARE MS Office (Word, Excel, Power Point), Microsoft Office Picture Manager,
AUTOCAD
TECHNICAL Installation Valves, Operate and Maintenance Valves, Installation Protection
Cathodic Cables, Measure Protection Cathodics, First Aid Level Two, Authorized
Gas Tester, Measure Transmitter Rectifier, Set and plot Global Positioning
Systems (GPS) coordinates, Fire Fighting (APAR and APAB), Safety Riding
(Motorcycle) and Safety Driving (Car).
Bernard Hasoloan Butar Butar
Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147
+6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com
SUPPORT COURSE / TRAINING / CERTIFICATES
PERIOD COMPANY / INSTANCE COURSE / TRAINING
/ CERTIFICATES
PLACE
November 26-
28, 2015
KOMANDO DAERAH MILITER II /
SRIWIJAYA AJUDAN JENDRAL –
PT PERMATA KARYA JASA
Pendidikan Dasar
Kedisiplinan dan
Kepemimpinan
Gelombang II
Palembang
February 07,
2015
PT. PGN SOLUTION, PT SAMSON TIARA Jungle Survival Jakarta
August 23,
2013
PT. Perusahaan Gas Negara (Persero) Tbk Certificate of Operator
Training
Bandar Lampung
July 19, 2012 PT. Perusahan Gas Negara (Persero) Tbk. Risk Containment
Audit (RCA) Training
Bandar Lampung
March
19-20, 2012
PT. Perusahaan Gas Negara (Persero) Tbk.,
Jakarta Defensive Driving Consulting (JDDC)
Certificate of Ride Like
a Master Motorcycle
Training (Defensive
Riding).
Jakarta
December 18,
2010
PT. Perusahaan Gas Negara (Persero) Tbk.,
The American Whitewater Affiliations (AWA)
International Scale or River Difficulty
Certificate of Arus Liar
- Level III
Citarik -
Sukabumi
February
26-27, 2009
PT. Perusahaan Gas Negara (Persero) Tbk.,
International SOS Jakarta, Indonesia –
An AEA Company
Certificate of
Competence - First
Aid Training Level
Two. Certificate No. :
1027342
Bandar Lampung
August 20,
2008
PT. Perusahaan Gas Negara (Persero) Tbk. Certificate of
Authorized Gas Tester
(AGT). Certificate
No. :
SBUTSJ-Agt-08-07
Bandar Lampung
November,
2007
HRM-Corp TrainComm Japfa Comfeed
Indonesia, PT. Suri Tani Pemuka Unit
Aquafeed Lampung.
K3 and 5S PTBMB Bandar Lampung
ORGANIZATION ACTIVITY
PERIOD ORGANIZATIONS
2002 – 2003 Member of HIMATEM (Mechanical Engineering Society), at Department of Mechanical
Engineering University of Lampung.
FINAL PROJET
PERIOD TITLE
December 19,
2006
Performance of Flat Plate Longitudinal Fins of Solar Collector With Forced Flow.
PERSONAL INTERESTS
Reading, travelling, watching movies, listening musics, playing games on computer, browsing internet, sports,
automotives, adventures, photography, playing musics, singing.

More Related Content

Viewers also liked

Ministry burden
Ministry burdenMinistry burden
Ministry burdenyxyyaz
 
Immigration, Language Barriers, and the American Education System
Immigration, Language Barriers, and the American Education System Immigration, Language Barriers, and the American Education System
Immigration, Language Barriers, and the American Education System Taylor Sprague
 
Design Portfolio - Comm 125
Design Portfolio - Comm 125Design Portfolio - Comm 125
Design Portfolio - Comm 125Kaia Joos
 
Rinitis vasomotora 2016
Rinitis vasomotora 2016Rinitis vasomotora 2016
Rinitis vasomotora 2016Elissa Ag-Me
 
Summer 2016 Newsletter FINAL pdf
Summer 2016 Newsletter FINAL pdfSummer 2016 Newsletter FINAL pdf
Summer 2016 Newsletter FINAL pdfGloria Fann
 
Unit 4 Example interseismic data from Japan
Unit 4 Example interseismic data from JapanUnit 4 Example interseismic data from Japan
Unit 4 Example interseismic data from JapanSERC at Carleton College
 
Día típico
Día típicoDía típico
Día típicoAlex Wu
 
Analisis aktivitas investasi
Analisis aktivitas investasiAnalisis aktivitas investasi
Analisis aktivitas investasirian malureng
 
Nicola - Initiation Report V2 (June 2016)
Nicola - Initiation Report V2 (June 2016)Nicola - Initiation Report V2 (June 2016)
Nicola - Initiation Report V2 (June 2016)Alex Cutulenco
 

Viewers also liked (17)

Final Draft
Final DraftFinal Draft
Final Draft
 
Ministry burden
Ministry burdenMinistry burden
Ministry burden
 
Niveles de Prevencion
Niveles de PrevencionNiveles de Prevencion
Niveles de Prevencion
 
Final Portfolio
Final PortfolioFinal Portfolio
Final Portfolio
 
Immigration, Language Barriers, and the American Education System
Immigration, Language Barriers, and the American Education System Immigration, Language Barriers, and the American Education System
Immigration, Language Barriers, and the American Education System
 
Google maps
Google mapsGoogle maps
Google maps
 
Design Portfolio - Comm 125
Design Portfolio - Comm 125Design Portfolio - Comm 125
Design Portfolio - Comm 125
 
Rinitis vasomotora 2016
Rinitis vasomotora 2016Rinitis vasomotora 2016
Rinitis vasomotora 2016
 
Summer 2016 Newsletter FINAL pdf
Summer 2016 Newsletter FINAL pdfSummer 2016 Newsletter FINAL pdf
Summer 2016 Newsletter FINAL pdf
 
Thesis-Final-561549
Thesis-Final-561549Thesis-Final-561549
Thesis-Final-561549
 
Caso clínico
Caso clínicoCaso clínico
Caso clínico
 
Unit 4 Example interseismic data from Japan
Unit 4 Example interseismic data from JapanUnit 4 Example interseismic data from Japan
Unit 4 Example interseismic data from Japan
 
Act1 mmsy
Act1 mmsyAct1 mmsy
Act1 mmsy
 
Ict
IctIct
Ict
 
Día típico
Día típicoDía típico
Día típico
 
Analisis aktivitas investasi
Analisis aktivitas investasiAnalisis aktivitas investasi
Analisis aktivitas investasi
 
Nicola - Initiation Report V2 (June 2016)
Nicola - Initiation Report V2 (June 2016)Nicola - Initiation Report V2 (June 2016)
Nicola - Initiation Report V2 (June 2016)
 

Similar to Application Letter Engineer Seeks Pipeline Job

Similar to Application Letter Engineer Seeks Pipeline Job (20)

Radhuan CV 2015 latest
Radhuan CV 2015 latestRadhuan CV 2015 latest
Radhuan CV 2015 latest
 
Resume of mr. villasis nelson p. 2016 r1
Resume of mr. villasis nelson p. 2016 r1Resume of mr. villasis nelson p. 2016 r1
Resume of mr. villasis nelson p. 2016 r1
 
Resume of Mr. Villasis Nelson P. 2016 r1
Resume of Mr. Villasis Nelson P. 2016 r1Resume of Mr. Villasis Nelson P. 2016 r1
Resume of Mr. Villasis Nelson P. 2016 r1
 
Gusyahri hidayat (cm)
Gusyahri hidayat (cm)Gusyahri hidayat (cm)
Gusyahri hidayat (cm)
 
Engineer salman
Engineer salmanEngineer salman
Engineer salman
 
Qs
QsQs
Qs
 
CV. sigit purboyo
CV. sigit purboyoCV. sigit purboyo
CV. sigit purboyo
 
CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)
 
CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)
 
CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)
 
CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)
 
Srinivas Naidu Rakula new (1)
Srinivas Naidu Rakula new (1)Srinivas Naidu Rakula new (1)
Srinivas Naidu Rakula new (1)
 
M.Saravanan - Resume
M.Saravanan - ResumeM.Saravanan - Resume
M.Saravanan - Resume
 
Wp 241016
Wp 241016Wp 241016
Wp 241016
 
TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
RESUME FIKRI 2014 WELDER (1) (1)
RESUME FIKRI 2014 WELDER (1) (1)RESUME FIKRI 2014 WELDER (1) (1)
RESUME FIKRI 2014 WELDER (1) (1)
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptx
 
keliew CV
keliew CVkeliew CV
keliew CV
 
CV_Tri Budhy_HSE
CV_Tri Budhy_HSECV_Tri Budhy_HSE
CV_Tri Budhy_HSE
 

Application Letter Engineer Seeks Pipeline Job

  • 1. Application Letter Bernard Hasoloan Butar Butar Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147 +6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com December 07, 2016 Dear Sir or Madam, Enclosed with my Application Letter and Curriculum Vitae, I would like to applied in the company you are leading and become one of your staff. I am Bernard Hasoloan Butar Butar, and I had been graduated from University of Lampung as a Bachelor of Engineering Program (S1) since 2006, majoring in Mechanical Engineering with my concentration is Mechanical - Energy Conversion, in Department of Mechanical Engineering, with GPA is 2.77 (scale 4.00). I had been worked at PT. Suri Tani Pemuka Unit Aquafeed Lampung in Way Lunik for ten months as a Supervisor Shift. I had been worked at PT. Perusahaan Gas Negara (Persero) Tbk. SBU TSJ Regional Operation and Maintenance II in Labuhan Maringgai for six years as a Pipeline Staff Operation and Maintenance. I had been worked at PT. PGN Solution Regional Operation and Maintenance II at Section 4 Belitang for one year six months as a Pipeline Staff Operation and Maintenance, I had worked at PT Permata Karya Jasa for five months as a Pipeline Staff Operation and Maintenance at Section 4 Belitang. I dedicate my trainings and aplicate my knowledges to your company. I believe this will be a positive contributions for your company. I am discipline, honest, good in analytic, always keep learning new methods and systems, enthusiastic, hard working, highly responsible, enjoy working with many people as team or individual, and easy to adapt with new environment. I would be pleased to be called for an interview at any time convenient to you. Please let me know if there is any further information you required, by contact number +6281272234321 and +6281310466060. Thank you for your kind attention and I look forward hearing from you soon. Sincerely Yours, Bernard Hasoloan Butar Butar
  • 2. Bernard Hasoloan Butar Butar Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147 +6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com CURRICULUM VITAE PERSONAL DATA Name Bernard Hasoloan Butar Butar Place of Birth Teluk Betung Date of Birth October 14, 1981 Age 35 years old Sex Male Religion Christian Protestant Marital Status Single Nationality Indonesia Address Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147 Handphone Number +6281272234321, +6281310466060 Email bernard.hasoloan.butarbutar@gmail.com hasoloan.bernardbb@gmail.com OBJECTIVES My goals are work and build good organization within solid team in the company, bring the company into reach a world class company, to have a settled career which can raise up my life’s prosperity. I. WORK EXPERIENCES PERIOD COMPANY August 2015 – January 2016 PT. Permata Karya Jasa (Subsidiary of PT PGN MAS) POSITION Pipeline Staff Operation and Maintenance (Pipeline Operator) II. WORK EXPERIENCES PERIOD COMPANY February 2014 – August 2015 PT. Sumberdaya Dian Mandiri (Manpower Management) for PT PGN Solution POSITION Pipeline Staff Operation and Maintenance (Pipeline Operator) III. WORK EXPERIENCES PERIOD COMPANY February 2012 – February 2014 PT. Personel Alih Daya (Manpower Management) for PT. PGN (Persero) Tbk., SBU TSJ Regional Operation and Maintenance II POSITION Pipeline Staff Operation and Maintenance (Pipeline Operator) IV. WORK EXPERIENCES PERIOD COMPANY April 2008 – February 2012 PT. Sumberdaya Dian Mandiri (Manpower Management) for PT. PGN (Persero) Tbk., SBU TSJ Regional Operation and Maintenance II POSITION Pipeline Staff Operation and Maintenance (Pipeline Operator) V. WORK EXPERIENCES PERIOD COMPANY May 2007 – March 2008 PT. Suri Tani Pemuka Unit Aquafeed POSITION Supervisor Shift
  • 3. Bernard Hasoloan Butar Butar Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147 +6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com JOB’S RESPONSIBILITIES AS A PIPELINE STAFF OPERATION AND MAINTENANCE 1. Operations : - Land patrol activities every day, include monitoring ROW’s crossing, whether existing crossings or unexisting crossings, - Air patrol using helicopter during four times in one year, - Operating Ball Valve 32”, Plug Valve 6”, Ball Valve 2”, - Operating Transmitter Rectifier for Protection Cathodic, - Monitoring third parties’s activities arround Pipeline ROW, include checking civils or companies vegetations around Pipeline ROW, - Give socialization Pipeline ROW to the third parties, - Checking Pipeline markers’s quantities and conditions - For Examples : Aerial Markers, KM Markers, Warning Sign Markers, Sign Direction Markers, Class Location Markers, Prohibition Markers, Boundary Markers, Portals, Barricades) whether in good, broken or lost Conditions, - Measuring depth of pipe in ditches and water ways using bar, - Check the conditions of Test Points Protection Cathodics, - Measuring Protection Cathodics and Transmitter Rectifier (TR) using Digital Multimeter and Clamp Meter, - Operating Tellecomunication Radio VSAT. 2. Maintenance : - Maintaining broken Markers, - Maintaining Pipeline ROW and ROW Patrol, include cleaning ROW, - Maintaining Sectional Valves and Future Connections, - Maintaining Ball Valve 32”, Ball Valve 2”, Plug Valve 6”, Drain Valve, Vent Valve, - Maintaining Test Point Protection Cathodics, - Maintaining Box Culverts, - Maintaining brigdes, - Maintaining portals, - Maintaining Trainsmitter Rectifier - Maintaining Tellecomunication Radio VSAT. - Cleaning Pigging activity. 3. Engineering : - Pipeline ROW Assessment (2008 until 2015), - CIPS DCVG (2008 until 2015), - Pipeline Soil Assessment (2015), 4. Procurement : - Procurement Mechanical Tools, - Procurement Electrical Tools, - Procurement Chemical tools, - Procurement Safety Tools, - Procurement Office Tools, 5. Construction Projects : - Monitoring ROW gas Pipeline Phase I Project PT PGN SBU TSJ from (2008-2009), - Brush Control Project in order to clean Pipeline ROW from vegetations (2008-2015) - Supervising, monitoring fabrication and installation Bridges Projects (2008-2015), - Supervising, monitoring fabrication and installation Box Culvert Projects (2008-2015), - Supervising, monitoring fabrication and installation Concrete Slab Projects (2008-2015), - Supervising, monitoring fabrication and installation Arial Marker Projects (2008-2015), - Supervising, monitoring fabrication and installation Warning Sign Projects (2008-2015), - Supervising, monitoring fabrication and installation Boundary Marker Projects (2008-2015), - Supervising, monitoring fabrication and installation Sign Direction Projects (2008-2015), - Supervising, monitoring fabrication and installation Class Location Projects (2008-2015), - Supervising, monitoring fabrication and installation Portal Projects (2008-2015), - Supervising, monitoring fabrication and installation Concrete Wall Projects (2008-2015), - Supervising, monitoring fabrication and installation Test Point Protection Cathodic Projects (2008-2015), - CIPS DCVG Projects (2008-2015) - Supervising, monitoring Painting Project of Sectional Valve and Future Connection (2011-2015), - Supervising, monitoring ROW patrol Reinforcement (2014-2015)
  • 4. Bernard Hasoloan Butar Butar Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147 +6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com JOB’S RESPONSIBILITIES AS A PIPELINE STAFF OPERATION AND MAINTENANCE 6. Administration : - Make Daily Reports, For Example : ROW Patrol Report, Maintenance Report, Protection Cathodic Report, - Make Weekly Reports, - Make Monthly Reports, - Make Monthly ROW Database facilities report, - Make RCA (Risk Containment Audit) Report every month, - Make JCC Report every month, - Collect and update Permit To Work if there are Third Parties Project, - Collect and check Third Parties Project’s reports 7. Safety : - Understand and implement Risk Contaiment Audit (RCA) - Understand and implement Permit To Work (PTW) - Understand and implement Job Safety Analysis (JSA) - Understand and implement Lockout Tagout (LOTO) - Understand and implement First Aid - Understand and implement Safety Prosedur - Understand and implement Safety Riding and Safety Driving 8. Financial : - Make Financial Report every day, week and month, - Collect and check bill notes, and send to accounting, - Make proposal to request logistics and fund to accounting, 9. Corporate Social Responsibility (CSR) : - Give donation and educational fund for elementary school, junior high school, and senior high school, - Give donation and religion fund to religion places every year, - Make events for health or medical every year JOB’S RESPONSIBILITIES AS A SUPERVISOR SHIFT 1. Running the work instructions based on Standard Operational Procedures. 2. Planning and scheduling the production target by coordinating with Division of PPIC. 3. Monitoring and controlling the production process so that the production process can be finished on time. 4. Reporting to the Manager based on production’s operational problems and give Solutions. FORMAL EDUCATION PERIOD UNIVERSITY 2000-2006 University of Lampung. Faculty / Major : Technique / Mechanical Engineering (Energy Conversion) GPA : 2.77 (Scale 4.00). PERIOD SENIOR HIGH SCHOOL 1997-2000 SMUN 9 Bandar Lampung. PERIOD JUNIOR HIGH SCHOOL 1994-1997 Xaverius Tanjungkarang. PERIOD ELEMENTARY SCHOOL 1988-1994 Xaverius Tanjungkarang. PERIOD KINDERGARTEN SCHOOL 1986-1988 Xaverius Tanjungkarang. SKILLS LANGUAGE TYPE OF LANGUAGE WRITTEN ORAL English Active Active Indonesia Active Active COMPUTER SOFTWARE MS Office (Word, Excel, Power Point), Microsoft Office Picture Manager, AUTOCAD TECHNICAL Installation Valves, Operate and Maintenance Valves, Installation Protection Cathodic Cables, Measure Protection Cathodics, First Aid Level Two, Authorized Gas Tester, Measure Transmitter Rectifier, Set and plot Global Positioning Systems (GPS) coordinates, Fire Fighting (APAR and APAB), Safety Riding (Motorcycle) and Safety Driving (Car).
  • 5. Bernard Hasoloan Butar Butar Galaxy Residence Blok C-9 No. 6 Grand Galaxy City Bekasi Selatan 17147 +6281272234321 ; +6281310466060 / hasoloan.bernardbb@gmail.com / bernard.hasoloan.butarbutar@gmail.com SUPPORT COURSE / TRAINING / CERTIFICATES PERIOD COMPANY / INSTANCE COURSE / TRAINING / CERTIFICATES PLACE November 26- 28, 2015 KOMANDO DAERAH MILITER II / SRIWIJAYA AJUDAN JENDRAL – PT PERMATA KARYA JASA Pendidikan Dasar Kedisiplinan dan Kepemimpinan Gelombang II Palembang February 07, 2015 PT. PGN SOLUTION, PT SAMSON TIARA Jungle Survival Jakarta August 23, 2013 PT. Perusahaan Gas Negara (Persero) Tbk Certificate of Operator Training Bandar Lampung July 19, 2012 PT. Perusahan Gas Negara (Persero) Tbk. Risk Containment Audit (RCA) Training Bandar Lampung March 19-20, 2012 PT. Perusahaan Gas Negara (Persero) Tbk., Jakarta Defensive Driving Consulting (JDDC) Certificate of Ride Like a Master Motorcycle Training (Defensive Riding). Jakarta December 18, 2010 PT. Perusahaan Gas Negara (Persero) Tbk., The American Whitewater Affiliations (AWA) International Scale or River Difficulty Certificate of Arus Liar - Level III Citarik - Sukabumi February 26-27, 2009 PT. Perusahaan Gas Negara (Persero) Tbk., International SOS Jakarta, Indonesia – An AEA Company Certificate of Competence - First Aid Training Level Two. Certificate No. : 1027342 Bandar Lampung August 20, 2008 PT. Perusahaan Gas Negara (Persero) Tbk. Certificate of Authorized Gas Tester (AGT). Certificate No. : SBUTSJ-Agt-08-07 Bandar Lampung November, 2007 HRM-Corp TrainComm Japfa Comfeed Indonesia, PT. Suri Tani Pemuka Unit Aquafeed Lampung. K3 and 5S PTBMB Bandar Lampung ORGANIZATION ACTIVITY PERIOD ORGANIZATIONS 2002 – 2003 Member of HIMATEM (Mechanical Engineering Society), at Department of Mechanical Engineering University of Lampung. FINAL PROJET PERIOD TITLE December 19, 2006 Performance of Flat Plate Longitudinal Fins of Solar Collector With Forced Flow. PERSONAL INTERESTS Reading, travelling, watching movies, listening musics, playing games on computer, browsing internet, sports, automotives, adventures, photography, playing musics, singing.