The document summarizes information about several different animal species. It describes the Andean condor as a large flying bird with wings up to 3 meters wide. It notes that camels are herbivores that can go long periods without drinking water by storing it in their humps. The leopard is described as elegant, strong, and comfortable living in trees and swimming. The document expresses concern that polar bears, which depend on sea ice to hunt seals, and green sea turtles, threatened by fishing and beach destruction, could disappear within 50 years.