The document discusses a holistic assessment of dam operations in Southeast Queensland that balanced flood mitigation and water supply functions. It describes developing an integrated assessment methodology to evaluate costs and benefits of different dam operation strategies. The methodology considered factors like flood damage, infrastructure costs, and water security. The study found that modifying operations to reduce one risk increased the other, with minimal overall benefit. Maintaining a balanced approach between flood mitigation and water storage was concluded to be best.