The Arab Dairy Products Company (03.2015 – Present)
Planning Manager
• Creating the weekly plan according to the forecast achievement and finished
product stocks.
• Follows up the deviations of materials consumption rate and take corrective action
where necessary.
• Follows up the monthly requisition for local materials and foreign materials on
daily basis.
• Issues requisition and maintain inventories of imported materials and supplies
necessary to meet the production plans.
• Manages the materials requirements with the Purchasing and Warehouse
departments.
• Monitors the flow of scrap materials and slow-moving items.
• Evaluates the Performance of Section by calculating the turnover ratio and
availability of materials and days of supplies.
• Manage the use of components not included in the bill of materials, such as: lack of
material, low inventory in the warehouse, quality issues.
Experience
Education
Amir Nabil Abdo Sourial
EL Zawia EL Hamera.
B. 120 M. 2 F. 6 Home : (+202) 426-67-27
Cairo. Cell :( +2) 0120-678-2071
E-mail: amir.nabil88@yahoo.com
___________________________________________________________________
Edita food industries S.A.E (07.2007 – 02.2015 )
Planning and Logistic Section Head
• Calculating CRP (Capacity Requirement Planning).
• Calculating RCCP (Rough Cut Capacity Planning).
• Establishing the MPS (Master Production Scheduling).
• ABC inventory analysis.
• Establishing MRP (Material Requirement Planning) techniques to minimize
inventories while assuring product availability based on Lead-time, Safety stock,
Re-order point, Inventory on hand & Material on the way.
• Establishing & revising the production Job Order and Crew-Shifts.
• Follow up the productivity from warehouse and the production.
• Follow up the production lines breakdowns.
• Establishing presentation daily reports to clarify the productivity and the
breakdowns and the MTD (Month -To Date) Productivity.
• Establishing comparison between the MTD Productivity and the MPS (Master
Production Scheduling).
• Monitoring sales and export orders fulfillment.
• Receiving and check the lead -time and Export forecast for the Export orders.
• Distribution the Export order to departments (production, quality).
• Follow up the Export orders production and the Export orders certification.
• Establishing presentation daily reports to clarify the status the Export orders.
• Establishing presentation daily report to clarify the total stock of finish goods.
• Follow up the production plan.
• Monitoring physical count & report the discrepancies if found.
• Monitoring production program fulfillment.
• Establishing & revising report (daily productions follow up).
• Monitoring & revising the planning of the orders or claims.
• Establishing & revising procedures, formats, work instructions and all related
documents.
Amir Nabil Abdo Sourial
EL Zawia EL Hamera.
B. 120 M. 2 F. 6 Home : (+202) 426-67-27
Cairo. Cell :( +2) 0120-678-2071
E-mail: amir.nabil88@yahoo.com
___________________________________________________________________
Al ASKA (07.2004 – 06.2007)
Deputy Logistic Manager
• Plans and prepares production schedules for manufacture of industrial products
(MPS).
• Draws up master schedule to establish sequence and lead time of each operation to
meet shipping dates according to sales forecasts FAS (final assembly schedule).
• Compare between the Actual production and plant capacity data and performs
mathematical calculations to procurement the requirement materials.
• Establishing conference with department supervisors to determine status of assigned
projects. Expedites operations that delay schedules and alters schedules to meet
challenging conditions.
• Establishing daily production follow up reports.
• All tasks MRP.
El Gouna (Sheraton Hotel, Paradiso Hotel) (06.2002 – 06.2004)
Cost Control
• Apply principles of cost accounting to conduct studies which provide detailed cost
information.
• Plans study and collects data to determine costs of business activity, such as
purchasing, inventory.
• Analyze data obtained and records results, using computer.
• Analyze changes in purchasing, materials, services provided, to determine effects
on costs.
• Analyzes actual costs and prepare periodic report comparing standard costs to
actual costs.
• Provide the management with reports and comparing factors affecting prices and
profitability of services.
Amir Nabil Abdo Sourial
EL Zawia EL Hamera.
B. 120 M. 2 F. 6 Home : (+202) 426-67-27
Cairo. Cell :( +2) 0120-678-2071
E-mail: amir.nabil88@yahoo.com
________________________________________________________________________________
Achievements
• Decreased warehouse rent space from 4k m down to 2k m, with cost reduction of 50k EGP
per month.
• Decreased damaged raw material percentage from 10% down to 2.5%, which impacted the
process in two ways:
Increasing line capacity by 20%.
Cost saving of 100k per month.
• Establishment of Zayed warehouse from scratch to fully operated.[Layout, equipment,
barcodes as well as rack system installation].
• Increased warehouse capacity by 15% through re-layout as well as installation of racks.
• Fleet loading/downloading time reduction down from 30 minutes to 20 minutes through
ramping raw material to and from trucks .
• Increased transportation efficiency by 20% [4tons] per transportation as well as reduction
in cost by 50%.
• Increased material handling efficiency between plants by 20%[48 carton per pallet from
40 carton per pallet].
• Lead the project of great planes logistics phase launching.
• Decreased changeover frequency from 3x to one changeover per week which resulted in
increment in capacity by 24 hrs [400k EGP per month].
• Minimize the stock level of Raw and packing by 35% during 4 months which impacted the
process in three was:
Increasing the cash flow by 18% .
Increasing the warehouse capacity by 26%.
Cost saving of 38 Million.
Amir Nabil Abdo Sourial
EL Zawia EL Hamera.
B. 120 M. 2 F. 6 Home : (+202) 426-67-27
Cairo. Cell :( +2) 0120-678-2071
E-mail: amir.nabil88@yahoo.com
------------------------------------------------------------------------------------------------------------------------
-
• Arabic: Mother tongue.
• English: Very good speak/write.
• French: Entry level.
• MS Great Planes.
• AX.
• MS office.
• SAP.
• Proven Leadership skills.
• Sound organizing skills.
• Sound communication skills.
• very good analytical skills.
• Super vision from Symbios.
• Six-Sigma (Green B) from Symbios.
• 20 Keys from Symbios.
• English Course from Berlitz.
• Logistics & Supply Chain Management from TOP Business.
• Problem-solving / team leader / Customer Service / communication from Archer.
• Certified Supply Chain Professional (CSCP) from HPA.
• Supply Chain Diploma AIU .
• Birth Date: 03-07-1977.
• Marital Status: Married.
• Nationality: Egyptian.
• Military Status: Completed.
References Available Upon Request
Languages
Software
Soft Skills
Personal Data
Courses

More Related Content

What's hot

ANIL KUMAR G
ANIL KUMAR GANIL KUMAR G
ANIL KUMAR G
Anil Kumar G
 
Noran Hamzawi Resume-Senior Financial Controller - Senior MRP controller
Noran Hamzawi  Resume-Senior Financial Controller - Senior MRP controllerNoran Hamzawi  Resume-Senior Financial Controller - Senior MRP controller
Noran Hamzawi Resume-Senior Financial Controller - Senior MRP controller
Noran Hamzawi
 
sikkemamateria0119
sikkemamateria0119sikkemamateria0119
sikkemamateria0119
loren sikkema
 
SMelanson Resume AAR 2016
SMelanson Resume AAR 2016SMelanson Resume AAR 2016
SMelanson Resume AAR 2016
Scott Melanson
 
Autoparts234
Autoparts234Autoparts234
Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
Aravind Ra
 
16 (1)
16 (1)16 (1)
16 (1)
olenyxa
 
Sap new-business-map
Sap new-business-mapSap new-business-map
Sap new-business-map
vijayprabhu
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
TAMILMECHKIT
 
ACCT 505 Enhance teaching - snaptutorial.com
ACCT 505 Enhance teaching - snaptutorial.comACCT 505 Enhance teaching - snaptutorial.com
ACCT 505 Enhance teaching - snaptutorial.com
donaldzs49
 
Plant location
Plant locationPlant location
Plant location
Ravi Verma
 

What's hot (11)

ANIL KUMAR G
ANIL KUMAR GANIL KUMAR G
ANIL KUMAR G
 
Noran Hamzawi Resume-Senior Financial Controller - Senior MRP controller
Noran Hamzawi  Resume-Senior Financial Controller - Senior MRP controllerNoran Hamzawi  Resume-Senior Financial Controller - Senior MRP controller
Noran Hamzawi Resume-Senior Financial Controller - Senior MRP controller
 
sikkemamateria0119
sikkemamateria0119sikkemamateria0119
sikkemamateria0119
 
SMelanson Resume AAR 2016
SMelanson Resume AAR 2016SMelanson Resume AAR 2016
SMelanson Resume AAR 2016
 
Autoparts234
Autoparts234Autoparts234
Autoparts234
 
Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
 
16 (1)
16 (1)16 (1)
16 (1)
 
Sap new-business-map
Sap new-business-mapSap new-business-map
Sap new-business-map
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 
ACCT 505 Enhance teaching - snaptutorial.com
ACCT 505 Enhance teaching - snaptutorial.comACCT 505 Enhance teaching - snaptutorial.com
ACCT 505 Enhance teaching - snaptutorial.com
 
Plant location
Plant locationPlant location
Plant location
 

Viewers also liked

Yousef Ibrahim - CV . (1)
Yousef Ibrahim - CV . (1)Yousef Ibrahim - CV . (1)
Yousef Ibrahim - CV . (1)
Yousef ibrahim
 
Error and methob Base and foundation L kiem
Error and methob Base and foundation L kiemError and methob Base and foundation L kiem
Error and methob Base and foundation L kiem
ducanh11111
 
8th pre alg -L16--sept20
8th pre alg -L16--sept208th pre alg -L16--sept20
8th pre alg -L16--sept20
jdurst65
 
10. patios productivos adalberto guzman mora (1)
10. patios productivos   adalberto guzman mora (1)10. patios productivos   adalberto guzman mora (1)
10. patios productivos adalberto guzman mora (1)
Adalberto Guzman Guzman Mora
 
Order dated 11-12-15 opinion and order granting MSJ
Order dated 11-12-15 opinion and order granting MSJOrder dated 11-12-15 opinion and order granting MSJ
Order dated 11-12-15 opinion and order granting MSJW. Grant Farrar
 
Volontørtur til jessheim
Volontørtur til jessheimVolontørtur til jessheim
Volontørtur til jessheim
Sta. Katarinahjemmet
 
8.isca rjrs-2012-188 done
8.isca rjrs-2012-188 done8.isca rjrs-2012-188 done
8.isca rjrs-2012-188 done
Mani Maran
 
Diario Resumen 20160220
Diario Resumen 20160220Diario Resumen 20160220
Diario Resumen 20160220
Diario Resumen
 
Swing
SwingSwing
Professional layout and design rubric
Professional layout and design rubricProfessional layout and design rubric
Professional layout and design rubric
tpoynton
 
Presentation
PresentationPresentation
Presentation
Gopalakrishna Bk
 
BLOG UPLOAD
 BLOG UPLOAD BLOG UPLOAD
BLOG UPLOAD
Caroline Brysting
 
Globalization
GlobalizationGlobalization
Globalization
Özgür Gömlekli
 
Enteroviruses and polio
Enteroviruses and polioEnteroviruses and polio
Enteroviruses and polio
Tarek Mahbub Khan
 

Viewers also liked (14)

Yousef Ibrahim - CV . (1)
Yousef Ibrahim - CV . (1)Yousef Ibrahim - CV . (1)
Yousef Ibrahim - CV . (1)
 
Error and methob Base and foundation L kiem
Error and methob Base and foundation L kiemError and methob Base and foundation L kiem
Error and methob Base and foundation L kiem
 
8th pre alg -L16--sept20
8th pre alg -L16--sept208th pre alg -L16--sept20
8th pre alg -L16--sept20
 
10. patios productivos adalberto guzman mora (1)
10. patios productivos   adalberto guzman mora (1)10. patios productivos   adalberto guzman mora (1)
10. patios productivos adalberto guzman mora (1)
 
Order dated 11-12-15 opinion and order granting MSJ
Order dated 11-12-15 opinion and order granting MSJOrder dated 11-12-15 opinion and order granting MSJ
Order dated 11-12-15 opinion and order granting MSJ
 
Volontørtur til jessheim
Volontørtur til jessheimVolontørtur til jessheim
Volontørtur til jessheim
 
8.isca rjrs-2012-188 done
8.isca rjrs-2012-188 done8.isca rjrs-2012-188 done
8.isca rjrs-2012-188 done
 
Diario Resumen 20160220
Diario Resumen 20160220Diario Resumen 20160220
Diario Resumen 20160220
 
Swing
SwingSwing
Swing
 
Professional layout and design rubric
Professional layout and design rubricProfessional layout and design rubric
Professional layout and design rubric
 
Presentation
PresentationPresentation
Presentation
 
BLOG UPLOAD
 BLOG UPLOAD BLOG UPLOAD
BLOG UPLOAD
 
Globalization
GlobalizationGlobalization
Globalization
 
Enteroviruses and polio
Enteroviruses and polioEnteroviruses and polio
Enteroviruses and polio
 

Similar to Amir Nabil Abdo C.V

PedroMendesResume
PedroMendesResumePedroMendesResume
PedroMendesResume
Pedro Mendes
 
Financial Manager
Financial ManagerFinancial Manager
Financial Manager
Mohamed Hussein
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
Elizabeth Rubio
 
TCN_CV_R3ap
TCN_CV_R3apTCN_CV_R3ap
TCN_CV_R3ap
TAPESH NASKAR
 
roldan siao cv
roldan siao cvroldan siao cv
roldan siao cv
Roldan Siao
 
Conversion cycle
Conversion cycleConversion cycle
Conversion cycle
Zoey Zungit
 
Marcus Mansour CV
Marcus Mansour CVMarcus Mansour CV
Marcus Mansour CV
Marcus Mansour
 
Sabapathi Baskaran CV
Sabapathi Baskaran CVSabapathi Baskaran CV
Sabapathi Baskaran CV
baskaran sabapathi
 
Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1
Carmine Incretolli
 
Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015
Mohamed Elsayed
 
SudiptaKar_CV
SudiptaKar_CVSudiptaKar_CV
SudiptaKar_CV
Sudipto Kar
 
George_original
George_originalGeorge_original
George_original
george a
 
Baw-Resume Amnd
Baw-Resume AmndBaw-Resume Amnd
Baw-Resume Amnd
Mohammad Bawazeer
 
Cost accountant
Cost accountantCost accountant
Cost accountant
Ahmad Hamasha
 
Cost accountant
Cost accountantCost accountant
Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016
SAMARTH_KUMAR2002
 
Ah Zakaria CV 15-01-2016 (1)
Ah Zakaria CV 15-01-2016 (1)Ah Zakaria CV 15-01-2016 (1)
Ah Zakaria CV 15-01-2016 (1)
ahmed zakria
 
Resume Richard Gonzalez v3
Resume Richard Gonzalez v3Resume Richard Gonzalez v3
Resume Richard Gonzalez v3
Richard Gonzalez, LSSGB
 
Mr.Mohamed Fouda - CV
Mr.Mohamed Fouda - CVMr.Mohamed Fouda - CV
Mr.Mohamed Fouda - CV
Mohamed Fouda
 
CV Babu
CV BabuCV Babu
CV Babu
Babu S Kanti
 

Similar to Amir Nabil Abdo C.V (20)

PedroMendesResume
PedroMendesResumePedroMendesResume
PedroMendesResume
 
Financial Manager
Financial ManagerFinancial Manager
Financial Manager
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
TCN_CV_R3ap
TCN_CV_R3apTCN_CV_R3ap
TCN_CV_R3ap
 
roldan siao cv
roldan siao cvroldan siao cv
roldan siao cv
 
Conversion cycle
Conversion cycleConversion cycle
Conversion cycle
 
Marcus Mansour CV
Marcus Mansour CVMarcus Mansour CV
Marcus Mansour CV
 
Sabapathi Baskaran CV
Sabapathi Baskaran CVSabapathi Baskaran CV
Sabapathi Baskaran CV
 
Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1
 
Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015
 
SudiptaKar_CV
SudiptaKar_CVSudiptaKar_CV
SudiptaKar_CV
 
George_original
George_originalGeorge_original
George_original
 
Baw-Resume Amnd
Baw-Resume AmndBaw-Resume Amnd
Baw-Resume Amnd
 
Cost accountant
Cost accountantCost accountant
Cost accountant
 
Cost accountant
Cost accountantCost accountant
Cost accountant
 
Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016
 
Ah Zakaria CV 15-01-2016 (1)
Ah Zakaria CV 15-01-2016 (1)Ah Zakaria CV 15-01-2016 (1)
Ah Zakaria CV 15-01-2016 (1)
 
Resume Richard Gonzalez v3
Resume Richard Gonzalez v3Resume Richard Gonzalez v3
Resume Richard Gonzalez v3
 
Mr.Mohamed Fouda - CV
Mr.Mohamed Fouda - CVMr.Mohamed Fouda - CV
Mr.Mohamed Fouda - CV
 
CV Babu
CV BabuCV Babu
CV Babu
 

Amir Nabil Abdo C.V

  • 1. Amir Nabil Abdo Sourial EL Zawia EL Hamera. B. 120 M. 2 F. 6 Home : (+202) 426-67-27 Cairo. Cell :( +2) 0120-678-2071 E-mail: amir.nabil88@yahoo.com _______________________________________________________________________________ Education Ain Shams University Bachelor's of Commerce Major: Accounting Status: May 2000 Grade: Good The Arab Dairy Products Company (03.2015 – Present) Planning Manager • Creating the weekly plan according to the forecast achievement and finished product stocks. • Follows up the deviations of materials consumption rate and take corrective action where necessary. • Follows up the monthly requisition for local materials and foreign materials on daily basis. • Issues requisition and maintain inventories of imported materials and supplies necessary to meet the production plans. • Manages the materials requirements with the Purchasing and Warehouse departments. • Monitors the flow of scrap materials and slow-moving items. • Evaluates the Performance of Section by calculating the turnover ratio and availability of materials and days of supplies. • Manage the use of components not included in the bill of materials, such as: lack of material, low inventory in the warehouse, quality issues. Experience Education
  • 2. Amir Nabil Abdo Sourial EL Zawia EL Hamera. B. 120 M. 2 F. 6 Home : (+202) 426-67-27 Cairo. Cell :( +2) 0120-678-2071 E-mail: amir.nabil88@yahoo.com ___________________________________________________________________ Edita food industries S.A.E (07.2007 – 02.2015 ) Planning and Logistic Section Head • Calculating CRP (Capacity Requirement Planning). • Calculating RCCP (Rough Cut Capacity Planning). • Establishing the MPS (Master Production Scheduling). • ABC inventory analysis. • Establishing MRP (Material Requirement Planning) techniques to minimize inventories while assuring product availability based on Lead-time, Safety stock, Re-order point, Inventory on hand & Material on the way. • Establishing & revising the production Job Order and Crew-Shifts. • Follow up the productivity from warehouse and the production. • Follow up the production lines breakdowns. • Establishing presentation daily reports to clarify the productivity and the breakdowns and the MTD (Month -To Date) Productivity. • Establishing comparison between the MTD Productivity and the MPS (Master Production Scheduling). • Monitoring sales and export orders fulfillment. • Receiving and check the lead -time and Export forecast for the Export orders. • Distribution the Export order to departments (production, quality). • Follow up the Export orders production and the Export orders certification. • Establishing presentation daily reports to clarify the status the Export orders. • Establishing presentation daily report to clarify the total stock of finish goods. • Follow up the production plan. • Monitoring physical count & report the discrepancies if found. • Monitoring production program fulfillment. • Establishing & revising report (daily productions follow up). • Monitoring & revising the planning of the orders or claims. • Establishing & revising procedures, formats, work instructions and all related documents.
  • 3. Amir Nabil Abdo Sourial EL Zawia EL Hamera. B. 120 M. 2 F. 6 Home : (+202) 426-67-27 Cairo. Cell :( +2) 0120-678-2071 E-mail: amir.nabil88@yahoo.com ___________________________________________________________________ Al ASKA (07.2004 – 06.2007) Deputy Logistic Manager • Plans and prepares production schedules for manufacture of industrial products (MPS). • Draws up master schedule to establish sequence and lead time of each operation to meet shipping dates according to sales forecasts FAS (final assembly schedule). • Compare between the Actual production and plant capacity data and performs mathematical calculations to procurement the requirement materials. • Establishing conference with department supervisors to determine status of assigned projects. Expedites operations that delay schedules and alters schedules to meet challenging conditions. • Establishing daily production follow up reports. • All tasks MRP. El Gouna (Sheraton Hotel, Paradiso Hotel) (06.2002 – 06.2004) Cost Control • Apply principles of cost accounting to conduct studies which provide detailed cost information. • Plans study and collects data to determine costs of business activity, such as purchasing, inventory. • Analyze data obtained and records results, using computer. • Analyze changes in purchasing, materials, services provided, to determine effects on costs. • Analyzes actual costs and prepare periodic report comparing standard costs to actual costs. • Provide the management with reports and comparing factors affecting prices and profitability of services.
  • 4. Amir Nabil Abdo Sourial EL Zawia EL Hamera. B. 120 M. 2 F. 6 Home : (+202) 426-67-27 Cairo. Cell :( +2) 0120-678-2071 E-mail: amir.nabil88@yahoo.com ________________________________________________________________________________ Achievements • Decreased warehouse rent space from 4k m down to 2k m, with cost reduction of 50k EGP per month. • Decreased damaged raw material percentage from 10% down to 2.5%, which impacted the process in two ways: Increasing line capacity by 20%. Cost saving of 100k per month. • Establishment of Zayed warehouse from scratch to fully operated.[Layout, equipment, barcodes as well as rack system installation]. • Increased warehouse capacity by 15% through re-layout as well as installation of racks. • Fleet loading/downloading time reduction down from 30 minutes to 20 minutes through ramping raw material to and from trucks . • Increased transportation efficiency by 20% [4tons] per transportation as well as reduction in cost by 50%. • Increased material handling efficiency between plants by 20%[48 carton per pallet from 40 carton per pallet]. • Lead the project of great planes logistics phase launching. • Decreased changeover frequency from 3x to one changeover per week which resulted in increment in capacity by 24 hrs [400k EGP per month]. • Minimize the stock level of Raw and packing by 35% during 4 months which impacted the process in three was: Increasing the cash flow by 18% . Increasing the warehouse capacity by 26%. Cost saving of 38 Million.
  • 5. Amir Nabil Abdo Sourial EL Zawia EL Hamera. B. 120 M. 2 F. 6 Home : (+202) 426-67-27 Cairo. Cell :( +2) 0120-678-2071 E-mail: amir.nabil88@yahoo.com ------------------------------------------------------------------------------------------------------------------------ - • Arabic: Mother tongue. • English: Very good speak/write. • French: Entry level. • MS Great Planes. • AX. • MS office. • SAP. • Proven Leadership skills. • Sound organizing skills. • Sound communication skills. • very good analytical skills. • Super vision from Symbios. • Six-Sigma (Green B) from Symbios. • 20 Keys from Symbios. • English Course from Berlitz. • Logistics & Supply Chain Management from TOP Business. • Problem-solving / team leader / Customer Service / communication from Archer. • Certified Supply Chain Professional (CSCP) from HPA. • Supply Chain Diploma AIU . • Birth Date: 03-07-1977. • Marital Status: Married. • Nationality: Egyptian. • Military Status: Completed. References Available Upon Request Languages Software Soft Skills Personal Data Courses