SlideShare a Scribd company logo
1 of 14
IT All-Hands Meeting
July 12, 2012
What’s Going On?
• Management Review of The Texas A&M
  University System Offices (MGT Report)
• System Comprehensive IT Assessment (RFP)
• Computer Access/Instructional Technology Fee
  Changes

  It’s time to decide how we will respond.
MGT Report
http://www.tamus.edu/offices/marcomm/publications

• TAMUS does not have a system-wide strategic
  vision for IT
  – System CIO should be authorized to ensure that
    major IT projects, services, and purchases are
    coordinated across members
     • Revised System Policy 29.01 IT Policy and new 29.01
       Regulation on agenda for August BoR Meeting
  – Improve the security of System technology
    infrastructure
     • System Internal Audit expressed concerns about IT process
       and control weakness in a white paper to Chancellor
     • IT Security is Phase 1 of System Comprehensive IT
       Assessment RFP
MGT Report (cont)
• Proposed 20,000 sq. ft. data center in TAMU’s strategic
  plan should be removed pending:
   – University-wide assessment of data center consolidation and
     virtualization should be conducted. New data center may not be
     necessary.
• TAMUS SO is not aggressively pursuing opportunities to
  reduce cost. TAMUS IT is decentralized among
  members & at TAMU
   – TAMUS and TAMU should consolidate applications & services in
     a shared environment: RFP to assess governance and potential
     for data center consolidation
      • Comprehensive IT Assessment includes governance in phase 2 and
        Banner Student consolidation in phase 4
   – Security assessment of network infrastructure
      • IT Security Assessment in Phase 1 of Comprehensive IT Assessment
   – Recommends RFP to assess potential and plan for data center
     and server consolidation at TAMU done in three phases
MGT (cont)
• Reduce administrative overhead in SO Business
  Computing Services
   – RIF two positions
   – Eliminate four vacant positions
• TAMUS’ financial management systems do not meet its
  needs, and maintaining multiple systems does not
  comply with BoR directives
   – Evaluate the benefits and costs of rewriting BPP and FAMIS to
     different architectural infrastructures vs. replacing current system
       • BCS Strategic Plan of 2011 includes evaluating these options
       • Phase 4 of RFP includes question about FAMIS upgrade or rewrite
• Many key System Internal Audit staff interviewed believe
  IT Security is the most important issue facing the System
Key takeaways MGT
• MGT recommends more centralized and
  coordinated approach to IT across the System.
  – Save Money
  – Enhance Security
• We have the people and equipment needed to
  provide IT services to the University and
  System.
• The A&M’s System’s BPP, FAMIS, ESI’s many
  applications, Data Warehouse, MAESTRO, and
  TTVN Network are already providing System-
  wide quality and cost effective services
RFP IT Assessment
http://esbd.cpa.state.tx.us/bid_show.cfm?bidid=100948

• Comprehensive IT assessment will be System-
  wide
   – Seeking a vendor with an established history of
     providing high quality and cost effective IT strategic
     services to higher education university systems.
   – Evaluation based on demonstrated: (1) Competence,
     (2) Knowledge, (3) Qualifications, and (4) Cost
• Proposals had to be received yesterday (July 11)
• Seven phase project with initial term of one-year
  with potential one-year extension
RFP IT Assessment Phases
•   Phase 1 – IT Security
•   Phase 2 – IT governance
•   Phase 3 – IT Network & Infrastructure
•   Phase 4 – Applications Management
•   Phase 5 – IT Operations
•   Phase 6 – IT Demand and Project Management
•   Phase 7 – IT Staffing and Support
Key takeaways RFP
• IT leadership is already preparing for the
  assessment.
• We need to convince the consultants we are
  fully capable of handling the IT needs of the
  university and/or System.
• Perform at your BEST.
Computer Access/Instruction
Technology Fee Changes
• Many (13) mandatory student fees will be eliminated for
  FY13 and replaced with a new fee
• Goal is to create the potential for more flexible use of
  fees to meet TAMU’s greatest needs
• The CA/IT Fee is one of the 13 fees affected
• For FY13, TAMU IT will receive our FY12 funding plus
  FY13 CA/IT increase, less funding for 700 student
  increase in FY11
• In future years, there will likely be a university-wide
  council to make recommendations modeled on the CBE
  with sub-councils
   – Recommendations will involve most TAMU funding, not just the
     fees
Key takeaways CA/IT Fee
• We provide critical services to the campus
• Historically, we have been financially sound and
  do a good job of accounting for money spent
• Student and employee surveys show they are
  satisfied with our services
• The new fee should provide us some more
  flexibility
What next?
• We are well positioned for this climate.
  – We provide excellent services to Texas A&M.


• We must be unified and confident.
  – Increases credibility
  – Builds our reputation
Our goal

“We strive to be Texas A&M’s trusted IT leaders
who provide reliable and accessible services to
elevate and enhance Texas A&M’s standing in the
state, nation and world.”
Questions?

More Related Content

Viewers also liked

Unidade 2 internet, hipertexto e hipermídia
Unidade 2   internet, hipertexto e hipermídiaUnidade 2   internet, hipertexto e hipermídia
Unidade 2 internet, hipertexto e hipermídiaKaren Santos
 
Agner Abciber 2011
Agner Abciber 2011Agner Abciber 2011
Agner Abciber 2011Luiz Agner
 
Mo 2 2012 mats carr alimentos
Mo 2 2012 mats carr alimentosMo 2 2012 mats carr alimentos
Mo 2 2012 mats carr alimentosMariela Albornoz
 
Presentation1
Presentation1Presentation1
Presentation1nh1106
 
Eubce 2016 presentation - skreiberg 002_rsk_final_3_ao.3.2
Eubce 2016 presentation - skreiberg 002_rsk_final_3_ao.3.2Eubce 2016 presentation - skreiberg 002_rsk_final_3_ao.3.2
Eubce 2016 presentation - skreiberg 002_rsk_final_3_ao.3.2Rajesh S Kempegowda
 
Phantichcong thuong mai ha noi
Phantichcong thuong mai ha noiPhantichcong thuong mai ha noi
Phantichcong thuong mai ha noiKẹo Đắng
 
Базовые понятия 3D графики (Ден Шергин) - DEBUG TiME #3 2016
Базовые понятия 3D графики (Ден Шергин) - DEBUG TiME #3 2016Базовые понятия 3D графики (Ден Шергин) - DEBUG TiME #3 2016
Базовые понятия 3D графики (Ден Шергин) - DEBUG TiME #3 2016Unigine Corp.
 
αξιολογώντας την πράξη, κεφ. 3
αξιολογώντας την πράξη, κεφ. 3αξιολογώντας την πράξη, κεφ. 3
αξιολογώντας την πράξη, κεφ. 3Athina Georgiadou
 
Eaton_BizDom_03nov2012
Eaton_BizDom_03nov2012Eaton_BizDom_03nov2012
Eaton_BizDom_03nov2012samir2413
 
Transtornoshormonales2012
Transtornoshormonales2012Transtornoshormonales2012
Transtornoshormonales2012sandra_carvajal
 
Carlos loret de mola
Carlos loret de molaCarlos loret de mola
Carlos loret de molaFabian Cruz
 
ropa de danza tribal
ropa de danza  tribalropa de danza  tribal
ropa de danza triballamia17
 
Profesora Itxaso Hernández Zuazua
Profesora Itxaso Hernández ZuazuaProfesora Itxaso Hernández Zuazua
Profesora Itxaso Hernández Zuazuaitxasia
 

Viewers also liked (20)

Unidade 2 internet, hipertexto e hipermídia
Unidade 2   internet, hipertexto e hipermídiaUnidade 2   internet, hipertexto e hipermídia
Unidade 2 internet, hipertexto e hipermídia
 
Agner Abciber 2011
Agner Abciber 2011Agner Abciber 2011
Agner Abciber 2011
 
Mo 2 2012 mats carr alimentos
Mo 2 2012 mats carr alimentosMo 2 2012 mats carr alimentos
Mo 2 2012 mats carr alimentos
 
JazzWorldQuest Featured Musicians
JazzWorldQuest Featured MusiciansJazzWorldQuest Featured Musicians
JazzWorldQuest Featured Musicians
 
Supply and dmand
Supply and dmandSupply and dmand
Supply and dmand
 
Presentation1
Presentation1Presentation1
Presentation1
 
Eubce 2016 presentation - skreiberg 002_rsk_final_3_ao.3.2
Eubce 2016 presentation - skreiberg 002_rsk_final_3_ao.3.2Eubce 2016 presentation - skreiberg 002_rsk_final_3_ao.3.2
Eubce 2016 presentation - skreiberg 002_rsk_final_3_ao.3.2
 
Phantichcong thuong mai ha noi
Phantichcong thuong mai ha noiPhantichcong thuong mai ha noi
Phantichcong thuong mai ha noi
 
Базовые понятия 3D графики (Ден Шергин) - DEBUG TiME #3 2016
Базовые понятия 3D графики (Ден Шергин) - DEBUG TiME #3 2016Базовые понятия 3D графики (Ден Шергин) - DEBUG TiME #3 2016
Базовые понятия 3D графики (Ден Шергин) - DEBUG TiME #3 2016
 
αξιολογώντας την πράξη, κεφ. 3
αξιολογώντας την πράξη, κεφ. 3αξιολογώντας την πράξη, κεφ. 3
αξιολογώντας την πράξη, κεφ. 3
 
Translator
TranslatorTranslator
Translator
 
Eaton_BizDom_03nov2012
Eaton_BizDom_03nov2012Eaton_BizDom_03nov2012
Eaton_BizDom_03nov2012
 
Xiomara y lizeth
Xiomara y lizethXiomara y lizeth
Xiomara y lizeth
 
Transtornoshormonales2012
Transtornoshormonales2012Transtornoshormonales2012
Transtornoshormonales2012
 
Carlos loret de mola
Carlos loret de molaCarlos loret de mola
Carlos loret de mola
 
ropa de danza tribal
ropa de danza  tribalropa de danza  tribal
ropa de danza tribal
 
Trojan
TrojanTrojan
Trojan
 
Profesora Itxaso Hernández Zuazua
Profesora Itxaso Hernández ZuazuaProfesora Itxaso Hernández Zuazua
Profesora Itxaso Hernández Zuazua
 
Presentación1
Presentación1Presentación1
Presentación1
 
Tuberculosis
TuberculosisTuberculosis
Tuberculosis
 

Similar to IT All-Hands Meeting Highlights Texas A&M System Assessment

Replacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phiReplacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phirobgirvan
 
The Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management SystemsThe Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management SystemsBarcoding, Inc.
 
Bim for facility management
Bim for facility managementBim for facility management
Bim for facility managementOmar Selim
 
Complete project on hospital maangement system
Complete project on hospital maangement systemComplete project on hospital maangement system
Complete project on hospital maangement systemRahul Kumar
 
Applicability of Activity-Based Costing and Related Management Tools: The c...
Applicability of Activity-Based Costing and Related Management Tools: The c...Applicability of Activity-Based Costing and Related Management Tools: The c...
Applicability of Activity-Based Costing and Related Management Tools: The c...Faculty of Economics Ljubljana in Skopje
 
ClearCost Introduction 2015
ClearCost Introduction 2015ClearCost Introduction 2015
ClearCost Introduction 2015Mark S. Mahre
 
IT Governance Presentation by omaha 2008
IT Governance Presentation by  omaha 2008IT Governance Presentation by  omaha 2008
IT Governance Presentation by omaha 2008ssusera19f45
 
Session#6; information systems development
Session#6; information systems developmentSession#6; information systems development
Session#6; information systems developmentOmid Aminzadeh Gohari
 
Bending the IT Op-Ex Cost Curve Through IT Simplification
Bending the IT Op-Ex Cost Curve Through IT SimplificationBending the IT Op-Ex Cost Curve Through IT Simplification
Bending the IT Op-Ex Cost Curve Through IT SimplificationCognizant
 
Leveraging Your CMMS - From Selection to Daily Use
Leveraging Your CMMS - From Selection to Daily UseLeveraging Your CMMS - From Selection to Daily Use
Leveraging Your CMMS - From Selection to Daily Usejohnnyg14
 
Kaushik New resume -1 (2)
Kaushik New resume -1 (2)Kaushik New resume -1 (2)
Kaushik New resume -1 (2)Kaushik S
 
Annual%20report%20layout_v42web-2
Annual%20report%20layout_v42web-2Annual%20report%20layout_v42web-2
Annual%20report%20layout_v42web-2Marcee Davis
 
Pulse2012 Trm Battelle Final
Pulse2012 Trm Battelle FinalPulse2012 Trm Battelle Final
Pulse2012 Trm Battelle Finalbrockj
 
UC Ref Group Mar09
UC Ref Group Mar09UC Ref Group Mar09
UC Ref Group Mar09UCUOM
 
Southeast Asia Modular Data Center Market
Southeast Asia Modular Data Center MarketSoutheast Asia Modular Data Center Market
Southeast Asia Modular Data Center MarketAmit Singh
 

Similar to IT All-Hands Meeting Highlights Texas A&M System Assessment (20)

Replacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phiReplacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phi
 
IT and U: Discussion with LSU Transition Advisory Team
IT and U: Discussion with LSU Transition Advisory TeamIT and U: Discussion with LSU Transition Advisory Team
IT and U: Discussion with LSU Transition Advisory Team
 
The Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management SystemsThe Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management Systems
 
IT Planning Methods.pptx
IT Planning Methods.pptxIT Planning Methods.pptx
IT Planning Methods.pptx
 
Bim for facility management
Bim for facility managementBim for facility management
Bim for facility management
 
Complete project on hospital maangement system
Complete project on hospital maangement systemComplete project on hospital maangement system
Complete project on hospital maangement system
 
Applicability of Activity-Based Costing and Related Management Tools: The c...
Applicability of Activity-Based Costing and Related Management Tools: The c...Applicability of Activity-Based Costing and Related Management Tools: The c...
Applicability of Activity-Based Costing and Related Management Tools: The c...
 
ClearCost Introduction 2015
ClearCost Introduction 2015ClearCost Introduction 2015
ClearCost Introduction 2015
 
3 payroll-presentation
3 payroll-presentation3 payroll-presentation
3 payroll-presentation
 
IT Governance Presentation by omaha 2008
IT Governance Presentation by  omaha 2008IT Governance Presentation by  omaha 2008
IT Governance Presentation by omaha 2008
 
Session#6; information systems development
Session#6; information systems developmentSession#6; information systems development
Session#6; information systems development
 
Asset management
Asset managementAsset management
Asset management
 
Bending the IT Op-Ex Cost Curve Through IT Simplification
Bending the IT Op-Ex Cost Curve Through IT SimplificationBending the IT Op-Ex Cost Curve Through IT Simplification
Bending the IT Op-Ex Cost Curve Through IT Simplification
 
Leveraging Your CMMS - From Selection to Daily Use
Leveraging Your CMMS - From Selection to Daily UseLeveraging Your CMMS - From Selection to Daily Use
Leveraging Your CMMS - From Selection to Daily Use
 
Kaushik New resume -1 (2)
Kaushik New resume -1 (2)Kaushik New resume -1 (2)
Kaushik New resume -1 (2)
 
Sadchap02
Sadchap02Sadchap02
Sadchap02
 
Annual%20report%20layout_v42web-2
Annual%20report%20layout_v42web-2Annual%20report%20layout_v42web-2
Annual%20report%20layout_v42web-2
 
Pulse2012 Trm Battelle Final
Pulse2012 Trm Battelle FinalPulse2012 Trm Battelle Final
Pulse2012 Trm Battelle Final
 
UC Ref Group Mar09
UC Ref Group Mar09UC Ref Group Mar09
UC Ref Group Mar09
 
Southeast Asia Modular Data Center Market
Southeast Asia Modular Data Center MarketSoutheast Asia Modular Data Center Market
Southeast Asia Modular Data Center Market
 

Recently uploaded

Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 

Recently uploaded (20)

Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 

IT All-Hands Meeting Highlights Texas A&M System Assessment

  • 2. What’s Going On? • Management Review of The Texas A&M University System Offices (MGT Report) • System Comprehensive IT Assessment (RFP) • Computer Access/Instructional Technology Fee Changes It’s time to decide how we will respond.
  • 3. MGT Report http://www.tamus.edu/offices/marcomm/publications • TAMUS does not have a system-wide strategic vision for IT – System CIO should be authorized to ensure that major IT projects, services, and purchases are coordinated across members • Revised System Policy 29.01 IT Policy and new 29.01 Regulation on agenda for August BoR Meeting – Improve the security of System technology infrastructure • System Internal Audit expressed concerns about IT process and control weakness in a white paper to Chancellor • IT Security is Phase 1 of System Comprehensive IT Assessment RFP
  • 4. MGT Report (cont) • Proposed 20,000 sq. ft. data center in TAMU’s strategic plan should be removed pending: – University-wide assessment of data center consolidation and virtualization should be conducted. New data center may not be necessary. • TAMUS SO is not aggressively pursuing opportunities to reduce cost. TAMUS IT is decentralized among members & at TAMU – TAMUS and TAMU should consolidate applications & services in a shared environment: RFP to assess governance and potential for data center consolidation • Comprehensive IT Assessment includes governance in phase 2 and Banner Student consolidation in phase 4 – Security assessment of network infrastructure • IT Security Assessment in Phase 1 of Comprehensive IT Assessment – Recommends RFP to assess potential and plan for data center and server consolidation at TAMU done in three phases
  • 5. MGT (cont) • Reduce administrative overhead in SO Business Computing Services – RIF two positions – Eliminate four vacant positions • TAMUS’ financial management systems do not meet its needs, and maintaining multiple systems does not comply with BoR directives – Evaluate the benefits and costs of rewriting BPP and FAMIS to different architectural infrastructures vs. replacing current system • BCS Strategic Plan of 2011 includes evaluating these options • Phase 4 of RFP includes question about FAMIS upgrade or rewrite • Many key System Internal Audit staff interviewed believe IT Security is the most important issue facing the System
  • 6. Key takeaways MGT • MGT recommends more centralized and coordinated approach to IT across the System. – Save Money – Enhance Security • We have the people and equipment needed to provide IT services to the University and System. • The A&M’s System’s BPP, FAMIS, ESI’s many applications, Data Warehouse, MAESTRO, and TTVN Network are already providing System- wide quality and cost effective services
  • 7. RFP IT Assessment http://esbd.cpa.state.tx.us/bid_show.cfm?bidid=100948 • Comprehensive IT assessment will be System- wide – Seeking a vendor with an established history of providing high quality and cost effective IT strategic services to higher education university systems. – Evaluation based on demonstrated: (1) Competence, (2) Knowledge, (3) Qualifications, and (4) Cost • Proposals had to be received yesterday (July 11) • Seven phase project with initial term of one-year with potential one-year extension
  • 8. RFP IT Assessment Phases • Phase 1 – IT Security • Phase 2 – IT governance • Phase 3 – IT Network & Infrastructure • Phase 4 – Applications Management • Phase 5 – IT Operations • Phase 6 – IT Demand and Project Management • Phase 7 – IT Staffing and Support
  • 9. Key takeaways RFP • IT leadership is already preparing for the assessment. • We need to convince the consultants we are fully capable of handling the IT needs of the university and/or System. • Perform at your BEST.
  • 10. Computer Access/Instruction Technology Fee Changes • Many (13) mandatory student fees will be eliminated for FY13 and replaced with a new fee • Goal is to create the potential for more flexible use of fees to meet TAMU’s greatest needs • The CA/IT Fee is one of the 13 fees affected • For FY13, TAMU IT will receive our FY12 funding plus FY13 CA/IT increase, less funding for 700 student increase in FY11 • In future years, there will likely be a university-wide council to make recommendations modeled on the CBE with sub-councils – Recommendations will involve most TAMU funding, not just the fees
  • 11. Key takeaways CA/IT Fee • We provide critical services to the campus • Historically, we have been financially sound and do a good job of accounting for money spent • Student and employee surveys show they are satisfied with our services • The new fee should provide us some more flexibility
  • 12. What next? • We are well positioned for this climate. – We provide excellent services to Texas A&M. • We must be unified and confident. – Increases credibility – Builds our reputation
  • 13. Our goal “We strive to be Texas A&M’s trusted IT leaders who provide reliable and accessible services to elevate and enhance Texas A&M’s standing in the state, nation and world.”

Editor's Notes

  1. ESIApplications = including Single Sign-On, TimeTraq, LeaveTraq, iBenefits, Time & Effort, and now HRConnect.
  2. This is how we want to be seen – from the university, to the consultants to the chancellor