SlideShare a Scribd company logo
1 of 1
Resume
Neal B Bahu
12319 Darlington Ave.
Los Angeles, California 90049-5815
05-20-1950
nbahu@hotmail.com
(310) 210-0341 Cellphone
2016
April 2003- Present
Telsource Corporation
Contract Technician
Demarc extension of new WAN circuits. Cabling new LAN circuits and installation of Routers and Lan
switching equipment
January 2000- April 2003
Telsource Corporation
Field Service Technician
7x24 by pager and cellphone with Company truck and supplies
Installation of new T-1 circuits for various vendors. AT&T, MCI, Qwest, Broadwing. Extending
demarcs from MPOE's to location of Network Equipment, Cisco routers CSU-DSU's, or just RJ48 jacks.
Installation and troubleshooting of Comdial DXP telephone systems for Toys R Us stores in California
and Nevada. Maintenance and installation of Liberty Mutual network systems and circuits.
Maintenance and installation of network equipment for ICG pop and hub sites. (Old Netcom Online sites)
June 1999 - September 1999
Wang Corporation
Gateway Technician
Ames Research Center ( Moffet Field)
Inventory and cleanup of site. Installation of new T-1 and T-3 circuits for vendors that have equipment at
NASA. Site.Maitenance of 56K and T-1 circuits for the various buildings and projects at Moffet Field.
February 1999 - June 1999
Concert Glabal Networks
Site Engineer
Site engineer for build out phase of hubsite. Installation of new T-1 and T-3 circuits for the customers of
CGN that have equipment at the site. Installation and troubleshooting of the equipment in the network
equipment cabinets at the site. Crossconnecting the new circuits from the DSX-1 and DSX-3 panels to the
equipment.
June 1994 - November 1997
Netcom Online and Novadyne Computer Systems
Senior Field Service Engineer
Installation and maintenance of over 250 pop and hub sites nationwide for Netcom Online. Installed Cisco
routers and Livingston intranetwork routers, Digitalink CSU DSU's, 3Com modem racks, Allied Telesis
Hubs, and Chatsworth racks at all the sites and then added new equipment for new customers when they
signed up for the service.

More Related Content

What's hot

PPC-10G Press Release
PPC-10G Press ReleasePPC-10G Press Release
PPC-10G Press ReleaseJohn Stover
 
GPS 12mm Active Microstrip Patch Antenna
GPS 12mm Active Microstrip Patch AntennaGPS 12mm Active Microstrip Patch Antenna
GPS 12mm Active Microstrip Patch AntennaMaxtena
 
GPS 18mm Active Microstrip Patch Antenna
GPS 18mm Active Microstrip Patch AntennaGPS 18mm Active Microstrip Patch Antenna
GPS 18mm Active Microstrip Patch AntennaMaxtena
 
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)victoriovega
 
4G/5G RAN architecture: how a split can make the difference
4G/5G RAN architecture: how a split can make the difference4G/5G RAN architecture: how a split can make the difference
4G/5G RAN architecture: how a split can make the differenceEricsson
 
Tk 23 08-18 rh
Tk 23 08-18 rhTk 23 08-18 rh
Tk 23 08-18 rhZTE
 
GPS 25mm Active Microstrip Patch Antenna
GPS 25mm Active Microstrip Patch AntennaGPS 25mm Active Microstrip Patch Antenna
GPS 25mm Active Microstrip Patch AntennaMaxtena
 
Guy Martel Projects
Guy Martel ProjectsGuy Martel Projects
Guy Martel ProjectsGuy Martel
 
The future of mobile wireless communication networks
The future of mobile wireless communication networksThe future of mobile wireless communication networks
The future of mobile wireless communication networksAanchalKumari4
 
Sdru 10 w-to-20w_9-band_us
Sdru 10 w-to-20w_9-band_usSdru 10 w-to-20w_9-band_us
Sdru 10 w-to-20w_9-band_usZTE
 
Quintel - David Barker CTO Base Station Antenna Evolution and Revolution
Quintel - David Barker CTO Base Station Antenna Evolution and RevolutionQuintel - David Barker CTO Base Station Antenna Evolution and Revolution
Quintel - David Barker CTO Base Station Antenna Evolution and RevolutionNick Walker
 
Sdru 1.25 w-to-2w_9-band-us
Sdru 1.25 w-to-2w_9-band-usSdru 1.25 w-to-2w_9-band-us
Sdru 1.25 w-to-2w_9-band-usZTE
 
3 gpp Document
3 gpp Document3 gpp Document
3 gpp DocumentZTE
 

What's hot (16)

5 g webinar slides
5 g webinar slides5 g webinar slides
5 g webinar slides
 
PPC-10G Press Release
PPC-10G Press ReleasePPC-10G Press Release
PPC-10G Press Release
 
GPS 12mm Active Microstrip Patch Antenna
GPS 12mm Active Microstrip Patch AntennaGPS 12mm Active Microstrip Patch Antenna
GPS 12mm Active Microstrip Patch Antenna
 
GPS 18mm Active Microstrip Patch Antenna
GPS 18mm Active Microstrip Patch AntennaGPS 18mm Active Microstrip Patch Antenna
GPS 18mm Active Microstrip Patch Antenna
 
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
 
4G/5G RAN architecture: how a split can make the difference
4G/5G RAN architecture: how a split can make the difference4G/5G RAN architecture: how a split can make the difference
4G/5G RAN architecture: how a split can make the difference
 
Tk 23 08-18 rh
Tk 23 08-18 rhTk 23 08-18 rh
Tk 23 08-18 rh
 
GPS 25mm Active Microstrip Patch Antenna
GPS 25mm Active Microstrip Patch AntennaGPS 25mm Active Microstrip Patch Antenna
GPS 25mm Active Microstrip Patch Antenna
 
Guy Martel Projects
Guy Martel ProjectsGuy Martel Projects
Guy Martel Projects
 
The future of mobile wireless communication networks
The future of mobile wireless communication networksThe future of mobile wireless communication networks
The future of mobile wireless communication networks
 
Sdru 10 w-to-20w_9-band_us
Sdru 10 w-to-20w_9-band_usSdru 10 w-to-20w_9-band_us
Sdru 10 w-to-20w_9-band_us
 
Quintel - David Barker CTO Base Station Antenna Evolution and Revolution
Quintel - David Barker CTO Base Station Antenna Evolution and RevolutionQuintel - David Barker CTO Base Station Antenna Evolution and Revolution
Quintel - David Barker CTO Base Station Antenna Evolution and Revolution
 
Universal Products Portfolio
Universal Products PortfolioUniversal Products Portfolio
Universal Products Portfolio
 
Sdru 1.25 w-to-2w_9-band-us
Sdru 1.25 w-to-2w_9-band-usSdru 1.25 w-to-2w_9-band-us
Sdru 1.25 w-to-2w_9-band-us
 
W Thompson Cv
W Thompson CvW Thompson Cv
W Thompson Cv
 
3 gpp Document
3 gpp Document3 gpp Document
3 gpp Document
 

Viewers also liked

أخيراً حل مشكلة كتابة الهمزة
أخيراً حل مشكلة كتابة الهمزةأخيراً حل مشكلة كتابة الهمزة
أخيراً حل مشكلة كتابة الهمزةAshraf Abo-omar
 
Cooperative education video
Cooperative education videoCooperative education video
Cooperative education videomqualter
 
Bill Palmteer Book Chapter
Bill Palmteer Book Chapter Bill Palmteer Book Chapter
Bill Palmteer Book Chapter Bill Palmteer
 
Ampliffy - Millennials
Ampliffy - MillennialsAmpliffy - Millennials
Ampliffy - MillennialsAmpliffy
 
Poster Presentation on e-waste management
Poster Presentation on e-waste managementPoster Presentation on e-waste management
Poster Presentation on e-waste managementRaj Sridharan
 
Xiaowen Cheng Resume
Xiaowen Cheng ResumeXiaowen Cheng Resume
Xiaowen Cheng ResumeXiaowen Cheng
 
Small Parts Loom Large in Silicone Molding
Small Parts Loom Large in Silicone MoldingSmall Parts Loom Large in Silicone Molding
Small Parts Loom Large in Silicone MoldingAlbright Technologies
 
Rapid Prototyping with Medical Grade Silicone
Rapid Prototyping with Medical Grade SiliconeRapid Prototyping with Medical Grade Silicone
Rapid Prototyping with Medical Grade SiliconeAlbright Technologies
 

Viewers also liked (13)

SHRUTI_SINGHVI_RESUME
SHRUTI_SINGHVI_RESUMESHRUTI_SINGHVI_RESUME
SHRUTI_SINGHVI_RESUME
 
Ensayo (1)
Ensayo (1)Ensayo (1)
Ensayo (1)
 
Plathan!!!!!!
Plathan!!!!!!Plathan!!!!!!
Plathan!!!!!!
 
أخيراً حل مشكلة كتابة الهمزة
أخيراً حل مشكلة كتابة الهمزةأخيراً حل مشكلة كتابة الهمزة
أخيراً حل مشكلة كتابة الهمزة
 
Cooperative education video
Cooperative education videoCooperative education video
Cooperative education video
 
Bill Palmteer Book Chapter
Bill Palmteer Book Chapter Bill Palmteer Book Chapter
Bill Palmteer Book Chapter
 
Resume june 2016
Resume june 2016Resume june 2016
Resume june 2016
 
Ampliffy - Millennials
Ampliffy - MillennialsAmpliffy - Millennials
Ampliffy - Millennials
 
Poster Presentation on e-waste management
Poster Presentation on e-waste managementPoster Presentation on e-waste management
Poster Presentation on e-waste management
 
VMA - BBA Degree certificate
VMA - BBA Degree certificateVMA - BBA Degree certificate
VMA - BBA Degree certificate
 
Xiaowen Cheng Resume
Xiaowen Cheng ResumeXiaowen Cheng Resume
Xiaowen Cheng Resume
 
Small Parts Loom Large in Silicone Molding
Small Parts Loom Large in Silicone MoldingSmall Parts Loom Large in Silicone Molding
Small Parts Loom Large in Silicone Molding
 
Rapid Prototyping with Medical Grade Silicone
Rapid Prototyping with Medical Grade SiliconeRapid Prototyping with Medical Grade Silicone
Rapid Prototyping with Medical Grade Silicone
 

Similar to Resume

Similar to Resume (20)

Jonathan_Grimmett_Resume
Jonathan_Grimmett_ResumeJonathan_Grimmett_Resume
Jonathan_Grimmett_Resume
 
ALF_TECH02
ALF_TECH02ALF_TECH02
ALF_TECH02
 
resumee H.Santana 2016
resumee H.Santana 2016resumee H.Santana 2016
resumee H.Santana 2016
 
Daniel Steven Brooks Resume
Daniel Steven Brooks ResumeDaniel Steven Brooks Resume
Daniel Steven Brooks Resume
 
New TP
New TPNew TP
New TP
 
Steve Lincoln CV
Steve Lincoln CVSteve Lincoln CV
Steve Lincoln CV
 
Jmnappo resume-102015
Jmnappo resume-102015Jmnappo resume-102015
Jmnappo resume-102015
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
Michael_Magera Resume
Michael_Magera ResumeMichael_Magera Resume
Michael_Magera Resume
 
Michael Magera resume
Michael Magera resumeMichael Magera resume
Michael Magera resume
 
New Carlton Resume1(1)
New Carlton Resume1(1)New Carlton Resume1(1)
New Carlton Resume1(1)
 
jmnappo resume 062015
jmnappo resume 062015jmnappo resume 062015
jmnappo resume 062015
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Thai Tran Resume
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
 
Thai Tran Resume
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
 
A rosario resume_2013_a
A rosario resume_2013_aA rosario resume_2013_a
A rosario resume_2013_a
 
Donald resume new
Donald resume newDonald resume new
Donald resume new
 
STANLEY VAUGHN RESUME MASTER
STANLEY VAUGHN RESUME MASTERSTANLEY VAUGHN RESUME MASTER
STANLEY VAUGHN RESUME MASTER
 

Resume

  • 1. Resume Neal B Bahu 12319 Darlington Ave. Los Angeles, California 90049-5815 05-20-1950 nbahu@hotmail.com (310) 210-0341 Cellphone 2016 April 2003- Present Telsource Corporation Contract Technician Demarc extension of new WAN circuits. Cabling new LAN circuits and installation of Routers and Lan switching equipment January 2000- April 2003 Telsource Corporation Field Service Technician 7x24 by pager and cellphone with Company truck and supplies Installation of new T-1 circuits for various vendors. AT&T, MCI, Qwest, Broadwing. Extending demarcs from MPOE's to location of Network Equipment, Cisco routers CSU-DSU's, or just RJ48 jacks. Installation and troubleshooting of Comdial DXP telephone systems for Toys R Us stores in California and Nevada. Maintenance and installation of Liberty Mutual network systems and circuits. Maintenance and installation of network equipment for ICG pop and hub sites. (Old Netcom Online sites) June 1999 - September 1999 Wang Corporation Gateway Technician Ames Research Center ( Moffet Field) Inventory and cleanup of site. Installation of new T-1 and T-3 circuits for vendors that have equipment at NASA. Site.Maitenance of 56K and T-1 circuits for the various buildings and projects at Moffet Field. February 1999 - June 1999 Concert Glabal Networks Site Engineer Site engineer for build out phase of hubsite. Installation of new T-1 and T-3 circuits for the customers of CGN that have equipment at the site. Installation and troubleshooting of the equipment in the network equipment cabinets at the site. Crossconnecting the new circuits from the DSX-1 and DSX-3 panels to the equipment. June 1994 - November 1997 Netcom Online and Novadyne Computer Systems Senior Field Service Engineer Installation and maintenance of over 250 pop and hub sites nationwide for Netcom Online. Installed Cisco routers and Livingston intranetwork routers, Digitalink CSU DSU's, 3Com modem racks, Allied Telesis Hubs, and Chatsworth racks at all the sites and then added new equipment for new customers when they signed up for the service.