SlideShare a Scribd company logo
Dipesh Patel
Mobile No: 09755023982, 09794030387
E-mail: dspatelec87@gmail.com
Objective
To secure a challenging position where I can effectively contribute my skills as Telecom
Professional, possessing competent Technical Skills.
Academic Credentials
Degree Year Board/University
Percentage
Class
B.E. (EC) 2009 RGPV, Bhopal 70.1%
First Class
12th
2004 MP Board 62.4%
First Class
10th
2002 MP Board 42.4%
Third class
Current work experience
 Material dispatch transportation and dump at site for idea project.
 Per day maintain DPR.
 Coordination of team on field.
 Installation and commissioning of traffic node (2P, 6P, 20P).
 Configuration of electrical and optical LTU.
 Configuration of IP Address and DCN in TN.
 Configuration of ABR and PPP address in TN
 Hands on experience in MLE and Traffic node (2P, 6P, 20P).
 Experience on MMU 2C to MMU 2D migrations as per plan.
 Experience on MMU 2D to MMU 2H migrations as per plan.
 Work on deference modulation of MMU 2C, MMU 2D MMU 2H configuration.
 Electrical E-1 hand over NEC to traffic node.
 Experience in Traffic routing and Traffic node migration
 Work done on Ericsson A-port threw E1 (MMU and SMU, BMC panel smz panel
crone modules)
 Corrective and Preventive maintenance of PDH , SDH,
 Work done on Nokia Flexi hybrid (1+0, 2+0).
 SDH & PDH Ring Protection done of Flexi Hybrid.
 Follow safety procedures while on work.
Past Work Experience
 Reliance 4G project in Chhattisgarh under HFCL as a Sr. Mast executive
Engineer.
 Coordination with vendor team on Field for Electrical, civil, tower erection work
related.
 I was managed electrical SME work. Absence to electrical SME.
 Electrical MIN, MDR create for electrical material issue from warehouse to vendor
for electrical work at site .
 Tower foundation Site layout mark as per drawing.
 Acceptance testing of new sites.
 Quality checking of completes site and hand over the site to customer.
 Site visit with O&M team and hand over site.
 Completion of hoto Document for new site handover O&M team.
 I do solve problem on the field.
Work Experience
 5+ year Experiences of Telecom Field as a BTS Commissioning Engineer.
 Zeppelin Mobile system pvt. Ltd. Indore july.09 to june2011.
 Stream teleservices Ltd. Indore June 2011 to dec.2013.
 Mangalam Advisory pvt Ltd. Indore January 2014 to 19-02-14
 Himachal Futuristic communications Ltd (HFCL) Gurgaon 20-feb-14 to 17-03-2015.
 Stream Televentures Pvt Ltd Indore. 18-03-2015 to till date.
Job Profile
 Aircel Project Working in Rajasthan under Zeppelin Mobile system pvt. Ltd
Indore.
 Idea project working in Chhattisgarh under Stream teleservices Ltd Indore
 Idea project working in Chhattisgarh under Mangalam Advisory pvt Ltd.
Indore. As a Project coordinator.
 Reliance 4G project in Chhattisgarh under HFCL as a Sr. Mast executive
Engineer.
 Idea project working in Madhya Pradesh under Stream Televentures pvt Ltd.
As a Project coordinator.
Transmission Profile
 Installation and commissioning of traffic node (2P, 6P, 20P).
 Configuration of electrical and optical LTU.
 Configuration of IP Address and DCN in TN.
 Configuration of ABR and PPP address in TN
 Hands on experience in MLE and Traffic node (2P, 6P, 20P).
 Experience on MMU 2C to MMU 2D migrations as per plan.
 Experience on MMU 2D to MMU 2H migrations as per plan.
 Work on deference modulation of MMU 2C, MMU 2D MMU 2H configuration.
 Electrical E-1 hand over NEC to traffic node.
 Experience in Traffic routing and Traffic node migration
 Work done on Ericsson A-port threw E1 (MMU and SMU, BMC panel smz panel
crone modules)
 Corrective and Preventive maintenance of PDH , SDH,
 Work done on Nokia Flexi hybrid (1+0, 2+0).
 SDH & PDH Ring Protection done of Flexi Hybrid.
 Follow safety procedures while on work.
BTS Profile
 BTS commissioning and installation (Ericsson 2954v2, 2964v2 2954 6101 indoor,
6202 outdoor all varies bts type).
 3G BTS 6601 mu installation ericsson equipment.
 Trx exposition as per customer requires.
 Bts swapping (Ericsson 2954v2, 2964v2 2954 6101 2202 2204 indoor, outdoor all
varies bts type.
 Co-location differences bts(Ericsson 2954v2, 2964v2 2954 6101 2202 2204 indoor,
6202 outdoor all varies bts type).
 Coordination team in field.
 Coordination omcr switch.
Acceptance testing Profile
• Follow safety procedures while on work.
• Rectification of Quality Alarms.
 Integration of external alarm of BTS.
 Acceptance testing of new sites.
 VSWR measurement.
 Quality checking of completes site and handing over the site to customer.
 Site visit with O&M team and hand over site.
Electrical Profile
 Battery bank power plant installation
 Power maintains and utility.
 Electrical earthling of new tower indoor outdoor.
 Electrical installation of mast tower with drawing guideline.
 Smps installation and power measure single phase, three phase and rectifier
modules power measure.
 Phase to phase power measure and phase to neutral power measure.
 Check EGB, IGB TGB Earthing pit resistant.
Civil Profile
 Tower foundation Site layout mark as per drawing.
 Work on Y – safe T – safe tower foundation of ramboll-40, 30 meter tower Rcom-
40.
 ODC Foundation construction work.
 Steel checking and m20 used of material at site.
Technical Skills
Languages
Basic of C , C++ PHP5.2,
Operating Systems Windows 2000/98/XP.
Databases My-SQL
Tools
MapInfo, Nokia flexi edge BTS Manager 3.0 , Reflection 5.0,
OMT R37A OMT R45A, mini-link service manager 6.5, 6.3,
6.8, mini-link craft 2.10 and 2.16, 2.19.
Personal Information:
Name Dipesh Patel
Date Of Birth 03.03.1987
Languages Known English, Hindi
Gender Male
Marital Status Single
Hobbies Listening Music and Playing Cricket.
Permanent Address Village:–Jethway
Teh.:- Barwaha
Dist.:-Khargone (MP)
Pin Code -45115
Declaration
I hereby certify that all the information provided above is true to the best of my knowledge
PLACE: ……………. Dipesh Patel
Date:……………….. ………………….

More Related Content

What's hot

Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiswatantra tripathi
 
ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman aliayman ali
 
Cv faisal mehmood-telecommunication
Cv faisal mehmood-telecommunicationCv faisal mehmood-telecommunication
Cv faisal mehmood-telecommunication
Faisal Mehmood
 
Mohamed osama
Mohamed osamaMohamed osama
Mohamed osama
mohamed osama
 
Vehicle Power Line Channel Modelling under CST Microwave Studio
Vehicle Power Line Channel Modelling under CST Microwave StudioVehicle Power Line Channel Modelling under CST Microwave Studio
Vehicle Power Line Channel Modelling under CST Microwave Studio
IJCSIS Research Publications
 
The Power Behind The Power
The Power Behind The PowerThe Power Behind The Power
The Power Behind The Power
Vinay Pravidhi
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBala G
 
BSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMABSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMAGaurav Sharma
 
Muditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineerMuditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineer
Muditha Dasanayake
 
Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16Ranjan Roy
 

What's hot (20)

Resume_L&T
Resume_L&TResume_L&T
Resume_L&T
 
CV SUBHASH
CV SUBHASHCV SUBHASH
CV SUBHASH
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
 
JOVIN RESUME
JOVIN RESUMEJOVIN RESUME
JOVIN RESUME
 
ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman ali
 
my Resume
my Resumemy Resume
my Resume
 
Cv faisal mehmood-telecommunication
Cv faisal mehmood-telecommunicationCv faisal mehmood-telecommunication
Cv faisal mehmood-telecommunication
 
Mohamed osama
Mohamed osamaMohamed osama
Mohamed osama
 
sumit CV
sumit CVsumit CV
sumit CV
 
Resume
ResumeResume
Resume
 
Abhishek CV
Abhishek CVAbhishek CV
Abhishek CV
 
Vehicle Power Line Channel Modelling under CST Microwave Studio
Vehicle Power Line Channel Modelling under CST Microwave StudioVehicle Power Line Channel Modelling under CST Microwave Studio
Vehicle Power Line Channel Modelling under CST Microwave Studio
 
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
 
The Power Behind The Power
The Power Behind The PowerThe Power Behind The Power
The Power Behind The Power
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical Designer
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
BSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMABSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMA
 
Muditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineerMuditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineer
 
Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 

Viewers also liked

Presentació pràcticum II Psicopedagogia
Presentació pràcticum II PsicopedagogiaPresentació pràcticum II Psicopedagogia
Presentació pràcticum II Psicopedagogia
icirianavarro
 
автоматикакотла 2 (1)
автоматикакотла 2 (1)автоматикакотла 2 (1)
автоматикакотла 2 (1)
Serghei Buciuceanu
 
Spieren en pezen
Spieren en pezenSpieren en pezen
Spieren en pezen
Jasper Vreugdenhil
 
Natal final sol(1)
Natal final sol(1)Natal final sol(1)
Natal final sol(1)solymar
 
Apresentação de Patrícia Sales de Oliveira Costa sobre Previdência Pública e ...
Apresentação de Patrícia Sales de Oliveira Costa sobre Previdência Pública e ...Apresentação de Patrícia Sales de Oliveira Costa sobre Previdência Pública e ...
Apresentação de Patrícia Sales de Oliveira Costa sobre Previdência Pública e ...
Sylvio Micelli
 
Unit 1 natural science living beings
Unit 1 natural science living beingsUnit 1 natural science living beings
Unit 1 natural science living beings
mayoresdelgoznalo
 
RUE - Capítulo X - Do Processo de Atualização
RUE - Capítulo X - Do Processo de AtualizaçãoRUE - Capítulo X - Do Processo de Atualização
RUE - Capítulo X - Do Processo de Atualização
Falcão Brasil
 
Cultura.espana.vacaciones espana
Cultura.espana.vacaciones espanaCultura.espana.vacaciones espana
Cultura.espana.vacaciones espana
Profe Polaca
 
RUE - Capítulo II - Dos Uniformes
RUE - Capítulo II - Dos UniformesRUE - Capítulo II - Dos Uniformes
RUE - Capítulo II - Dos Uniformes
Falcão Brasil
 
RUE - Capítulo IV - Das Insígnias
RUE - Capítulo IV - Das InsígniasRUE - Capítulo IV - Das Insígnias
RUE - Capítulo IV - Das Insígnias
Falcão Brasil
 

Viewers also liked (13)

Por4
Por4Por4
Por4
 
Presentació pràcticum II Psicopedagogia
Presentació pràcticum II PsicopedagogiaPresentació pràcticum II Psicopedagogia
Presentació pràcticum II Psicopedagogia
 
Vf077
Vf077Vf077
Vf077
 
webentic portfolio
webentic portfoliowebentic portfolio
webentic portfolio
 
автоматикакотла 2 (1)
автоматикакотла 2 (1)автоматикакотла 2 (1)
автоматикакотла 2 (1)
 
Spieren en pezen
Spieren en pezenSpieren en pezen
Spieren en pezen
 
Natal final sol(1)
Natal final sol(1)Natal final sol(1)
Natal final sol(1)
 
Apresentação de Patrícia Sales de Oliveira Costa sobre Previdência Pública e ...
Apresentação de Patrícia Sales de Oliveira Costa sobre Previdência Pública e ...Apresentação de Patrícia Sales de Oliveira Costa sobre Previdência Pública e ...
Apresentação de Patrícia Sales de Oliveira Costa sobre Previdência Pública e ...
 
Unit 1 natural science living beings
Unit 1 natural science living beingsUnit 1 natural science living beings
Unit 1 natural science living beings
 
RUE - Capítulo X - Do Processo de Atualização
RUE - Capítulo X - Do Processo de AtualizaçãoRUE - Capítulo X - Do Processo de Atualização
RUE - Capítulo X - Do Processo de Atualização
 
Cultura.espana.vacaciones espana
Cultura.espana.vacaciones espanaCultura.espana.vacaciones espana
Cultura.espana.vacaciones espana
 
RUE - Capítulo II - Dos Uniformes
RUE - Capítulo II - Dos UniformesRUE - Capítulo II - Dos Uniformes
RUE - Capítulo II - Dos Uniformes
 
RUE - Capítulo IV - Das Insígnias
RUE - Capítulo IV - Das InsígniasRUE - Capítulo IV - Das Insígnias
RUE - Capítulo IV - Das Insígnias
 

Similar to dipesh_resume

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
resume_anjuln
resume_anjulnresume_anjuln
resume_anjulnANJUL N
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission EngineerEsrar Khan
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27abdul jabbar
 
CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ Nitin Niwariya
 
CV- Vinu Kumar
CV- Vinu KumarCV- Vinu Kumar
CV- Vinu KumarViNu Kumar
 
anil goswami 2016 cv
anil goswami 2016 cvanil goswami 2016 cv
anil goswami 2016 cvanil goswami
 
Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeNavdeep Thaman
 
Jawad Ali Khan
Jawad Ali KhanJawad Ali Khan
Jawad Ali KhanJawad Khan
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 

Similar to dipesh_resume (20)

Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
suresh resume
suresh resumesuresh resume
suresh resume
 
KUNAL CV jan
KUNAL CV janKUNAL CV jan
KUNAL CV jan
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
pravendra -cv
pravendra -cvpravendra -cv
pravendra -cv
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
resume_anjuln
resume_anjulnresume_anjuln
resume_anjuln
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
Muhammad Faisal
Muhammad FaisalMuhammad Faisal
Muhammad Faisal
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _
 
CV- Vinu Kumar
CV- Vinu KumarCV- Vinu Kumar
CV- Vinu Kumar
 
anil goswami 2016 cv
anil goswami 2016 cvanil goswami 2016 cv
anil goswami 2016 cv
 
Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-Resume
 
Jawad Ali Khan
Jawad Ali KhanJawad Ali Khan
Jawad Ali Khan
 
shriram2016
shriram2016shriram2016
shriram2016
 
noorCV
noorCVnoorCV
noorCV
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
arun kumar
arun kumararun kumar
arun kumar
 

dipesh_resume

  • 1. Dipesh Patel Mobile No: 09755023982, 09794030387 E-mail: dspatelec87@gmail.com Objective To secure a challenging position where I can effectively contribute my skills as Telecom Professional, possessing competent Technical Skills. Academic Credentials Degree Year Board/University Percentage Class B.E. (EC) 2009 RGPV, Bhopal 70.1% First Class 12th 2004 MP Board 62.4% First Class 10th 2002 MP Board 42.4% Third class Current work experience  Material dispatch transportation and dump at site for idea project.  Per day maintain DPR.  Coordination of team on field.  Installation and commissioning of traffic node (2P, 6P, 20P).  Configuration of electrical and optical LTU.  Configuration of IP Address and DCN in TN.  Configuration of ABR and PPP address in TN  Hands on experience in MLE and Traffic node (2P, 6P, 20P).  Experience on MMU 2C to MMU 2D migrations as per plan.  Experience on MMU 2D to MMU 2H migrations as per plan.  Work on deference modulation of MMU 2C, MMU 2D MMU 2H configuration.  Electrical E-1 hand over NEC to traffic node.  Experience in Traffic routing and Traffic node migration  Work done on Ericsson A-port threw E1 (MMU and SMU, BMC panel smz panel crone modules)  Corrective and Preventive maintenance of PDH , SDH,  Work done on Nokia Flexi hybrid (1+0, 2+0).  SDH & PDH Ring Protection done of Flexi Hybrid.  Follow safety procedures while on work.
  • 2. Past Work Experience  Reliance 4G project in Chhattisgarh under HFCL as a Sr. Mast executive Engineer.  Coordination with vendor team on Field for Electrical, civil, tower erection work related.  I was managed electrical SME work. Absence to electrical SME.  Electrical MIN, MDR create for electrical material issue from warehouse to vendor for electrical work at site .  Tower foundation Site layout mark as per drawing.  Acceptance testing of new sites.  Quality checking of completes site and hand over the site to customer.  Site visit with O&M team and hand over site.  Completion of hoto Document for new site handover O&M team.  I do solve problem on the field. Work Experience  5+ year Experiences of Telecom Field as a BTS Commissioning Engineer.  Zeppelin Mobile system pvt. Ltd. Indore july.09 to june2011.  Stream teleservices Ltd. Indore June 2011 to dec.2013.  Mangalam Advisory pvt Ltd. Indore January 2014 to 19-02-14  Himachal Futuristic communications Ltd (HFCL) Gurgaon 20-feb-14 to 17-03-2015.  Stream Televentures Pvt Ltd Indore. 18-03-2015 to till date. Job Profile  Aircel Project Working in Rajasthan under Zeppelin Mobile system pvt. Ltd Indore.  Idea project working in Chhattisgarh under Stream teleservices Ltd Indore  Idea project working in Chhattisgarh under Mangalam Advisory pvt Ltd. Indore. As a Project coordinator.  Reliance 4G project in Chhattisgarh under HFCL as a Sr. Mast executive Engineer.  Idea project working in Madhya Pradesh under Stream Televentures pvt Ltd. As a Project coordinator. Transmission Profile  Installation and commissioning of traffic node (2P, 6P, 20P).  Configuration of electrical and optical LTU.  Configuration of IP Address and DCN in TN.  Configuration of ABR and PPP address in TN  Hands on experience in MLE and Traffic node (2P, 6P, 20P).  Experience on MMU 2C to MMU 2D migrations as per plan.
  • 3.  Experience on MMU 2D to MMU 2H migrations as per plan.  Work on deference modulation of MMU 2C, MMU 2D MMU 2H configuration.  Electrical E-1 hand over NEC to traffic node.  Experience in Traffic routing and Traffic node migration  Work done on Ericsson A-port threw E1 (MMU and SMU, BMC panel smz panel crone modules)  Corrective and Preventive maintenance of PDH , SDH,  Work done on Nokia Flexi hybrid (1+0, 2+0).  SDH & PDH Ring Protection done of Flexi Hybrid.  Follow safety procedures while on work. BTS Profile  BTS commissioning and installation (Ericsson 2954v2, 2964v2 2954 6101 indoor, 6202 outdoor all varies bts type).  3G BTS 6601 mu installation ericsson equipment.  Trx exposition as per customer requires.  Bts swapping (Ericsson 2954v2, 2964v2 2954 6101 2202 2204 indoor, outdoor all varies bts type.  Co-location differences bts(Ericsson 2954v2, 2964v2 2954 6101 2202 2204 indoor, 6202 outdoor all varies bts type).  Coordination team in field.  Coordination omcr switch. Acceptance testing Profile • Follow safety procedures while on work. • Rectification of Quality Alarms.  Integration of external alarm of BTS.  Acceptance testing of new sites.  VSWR measurement.  Quality checking of completes site and handing over the site to customer.  Site visit with O&M team and hand over site. Electrical Profile  Battery bank power plant installation  Power maintains and utility.  Electrical earthling of new tower indoor outdoor.  Electrical installation of mast tower with drawing guideline.  Smps installation and power measure single phase, three phase and rectifier modules power measure.  Phase to phase power measure and phase to neutral power measure.  Check EGB, IGB TGB Earthing pit resistant.
  • 4. Civil Profile  Tower foundation Site layout mark as per drawing.  Work on Y – safe T – safe tower foundation of ramboll-40, 30 meter tower Rcom- 40.  ODC Foundation construction work.  Steel checking and m20 used of material at site. Technical Skills Languages Basic of C , C++ PHP5.2, Operating Systems Windows 2000/98/XP. Databases My-SQL Tools MapInfo, Nokia flexi edge BTS Manager 3.0 , Reflection 5.0, OMT R37A OMT R45A, mini-link service manager 6.5, 6.3, 6.8, mini-link craft 2.10 and 2.16, 2.19. Personal Information: Name Dipesh Patel Date Of Birth 03.03.1987 Languages Known English, Hindi Gender Male Marital Status Single Hobbies Listening Music and Playing Cricket. Permanent Address Village:–Jethway Teh.:- Barwaha Dist.:-Khargone (MP) Pin Code -45115 Declaration I hereby certify that all the information provided above is true to the best of my knowledge PLACE: ……………. Dipesh Patel Date:……………….. ………………….