SlideShare a Scribd company logo
REDEN L. CA-ADAN
Add: Blk. 8 Lot 2 Holyfield Subdivision U.S.A. Str. Brgy. Sta Ana, Taytay
Rizal, Philippines
Residence: Singapore
Tel #: (+63) (02)654-16-27
Mobile: +639196557479, +6584214082
Email Add: redendolly1013@yahoo.com, reden1013@gmail.com
PROFESSIONAL GOAL/OBJECTIVE
 To be trained and have a continuous improvement on my field of knowledge regarding on
the Design, Installation and Commissioning of Different Transmission, BTS, Switching
and Power Supply Systems and all things regarding Telecommunications.
 To be able to give technical assistance and support to costumers in compliance with their
requirements in accordance with Companies Quality Standards. To exceed costumer’s
expectations regarding on telecommunication products, solutions and services.
SKILLS
 Supervisory experience on Ericsson RBS 2000/3000/6000 series, Minilink E/C/Transport
Node implementation.
 Expertise on installation of Ericsson RBS 2206/2207, 2216/2116, 2302, 2308/2309, 3206,
3216/3116, 6201/6102, 6301, 6601, AIR (LTE), Minilink E/C and Transport Node.
 Adept experience on Transmission Planning using Pathloss IV, TEMS Link Planner 6.2.1,
Installation Engineering and Site survey functions.
 Knowledgeable on usage of test equipment such as Anritsu Site Master, GPS and BER tester.
 Proficient on RBS and Transmission software (OMT and MSM).
 Competent with Ericsson PDH/SDH transmission system.
 Knowledgeable on usage of Ericsson tools such as Site Handler, Rapid Tools
 Can able to repair and maintain PC and set LAN network.
 Computer literate on usage of Microsoft Office, AutoCAD (2D/3D), Adobe and office
required software.
 Strong English communication and inter-personal skills.
WORK EXPERIENCE
Advance Site Engineer: Ericsson Singapore W900 (Singtel Project)
1 Changi Business Park Central 1 One @ Changi City
#06-101 Singapore 486036, Singapore
October 14, 2013 to April 30, 2016
• Checking the TP for ASP site proposals
• Coordinating the customer for further revisions of TP
• Coordinating the ASP for the rectifications of site deficiency materials
• Coordinating the warehouse manager for the available materials in the Warehouse
• Checking the As-Built documents for submission to Singtel
• Reporting the status of all sites to the Project Manager
• Does the services quotations per site for the customer’s PO
• Coordinating the customer for any quotation inaccuracy to be revise
• Monitoring all installed sites and PO's for the preparation of site acceptance paper
(DO)
• Monitoring and supervising the signed acceptance paper for customer’s billing
• Reporting to Project Manager of the financial status of the project on customer side
IE / Material Planner: Ericsson Philippines LTE and Modernization (SMART Project)
21F Net Square Bldg., 3rd. Ave. Cor. 28th St. Cresent Park West,
Bonifacio Global City Taguig, Metro Manila, Philippines 1634
Jan. 7, 2013 to Sept. 30, 2013
DUTIES AND RESPONSIBILITIES
 Does technical site survey for LTE installation plan
 Preparing the RSID for site implementation
 Does the floor plan drawing for LTE installation
 Do the as built documents for final acceptance of the costumer
 Do the material planning and request to the solution department
 Coordinating the Logistic team for LTE materials shipment
 Do the material request/BOQ for MRF/RO preparation for each site
 Coordinating the warehouse personnel for possible material requests
 Reporting to Project Manager for materials concern
 Coordinating the site supervisor for any faulty and replace materials
 Responsible in overall material needs for LTE project
 Coordinating the ASP As-Built documents for Modernization SMART Project
 Supervising, monitoring and checking of all AS-Built documents for SMART Project
 Reporting and coordinating the Line Manager for over all documentation status of
SMART project
IE RBS/TRM AND RAN ENGINEER: LM Ericsson Nigeria (AirTel PROJECT)
17, Walter Carrington Crescent V.I. Lagos, Nigeria
March 14, 2011 to Dec. 22, 2011
DUTIES AND RESPONSIBILITIES
 Does technical site survey for RBS and TRM expansion and upgrade location
 Preparing the site survey check list as survey guide lines.
 Does the site drawing using AutoCAD for site layout
 Preparing the SID for site implementation
 To monitor and report all activities of the ASP to Implementation Manager
 Integrating and upgrading the RBS configuration
 Trouble shoot and clearing all the alarms of the upgraded RBS configuration
 Coordinating all the TRM Engineers for licenses request for each upgraded site.
 Does the TRM software baseline upgrade
 Uploading for the required TRM module Licenses
 Supervising the site installation of ASP
 Installation and integration of RBS 6201, 6102 and 6601.
IE AND SITE SUPERVISOR: Ericsson Ghana (ZAIN GHANA PROJECT)
Gulf House, Tetteh Quarshie Circle, Airport West P.O. Box C 1350
Cantonment Accra, Ghana
March 05, 2009 to September 20, 2009
DUTIES AND RESPONSIBILITIES
 Does technical site survey for collocation of Zain to MTN, Tigo and Vodafone using
Ericsson RBS( 2216/2116,3216/3116,2111,3418)
 Preparing the site survey check list for survey guide lines
 Preparing the AutoCAD drawing for the site layout and proposal.
 Preparing the SID for the access department implementation site binder
 Does the C module documents after the red line marking for documents revision
 Surveying all the equipment installed on the site for equipment inventory of Ericsson
 Coordinating the IM for all possible sites to implement/install
 Coordinating all the ASP for site installation schedules and plan
 Supervising the ASP for the installation of RBS and TRM
 Does the site cleanup and PAT for the site acceptance of Zain from Ericsson
 Preparing the delivery note for the new and for the cleanup sites
 Coordinate and response for Zain quality department installation standard requirements
IE AND 3G TESTER: Ericsson Philippines (Smart HSPA 850 3G Project)
22F Net Square Bldg., 3rd. Ave. Cor. 28th St. Cresent Park West,
Bonifacio Glbal City Taguig, Metro Manila, Philippines 1634
May 16, 2008 to February 28, 2009
DUTIES AND RESPONSIBILITIES
 Does technical site survey for an existing SMART sites for Ericsson 3G Equipment
Location
 Preparing the site survey check list for survey guide lines
 Supervising and distributing the sites to Ericsson team for site survey
 Preparing an AutoCAD drawing for the site layout and proposal.
 Preparing the TSSR report and documents for SMART evaluation.
 Supervising and distributing to Ericsson IE for the preparation of TSSR
 Preparing the RSID documents for installation after the SMART approval
 Coordinating the ESP’s for farther evaluation of installation plan.
 Does the C module documents after the red line marking for documents revision
 Tester and Commissioning of HSPA 850 network
 Trouble shoots of RU/FU defect units.
 Do the call testing of HSPA 850 network coverage.
 Do the Functionality test for Internet and FTP browsing using HSPA 850 3G Network
IE Coordinator AND INSTALLER: Globalet Contractor
A Subcontractor of Commtrend/Ericsson Phillipines
J.P Rizal Ave. Marikina City, Philippines
September 04, 2007 to April 28, 2008
DUTIES AND RESPONSIBILITIES
 Installing the Nokia 3G BTS for Change out of Siemens 3G BTS
 Integration and commissioning of Nokia 3G BTS
 Trouble shooting of E1 from site to Switch via RNC
 Installing Harris TRM indoor / outdoor for Smart project
 Assembling and installing Radomed antenna for repeater sites
 Installation Engineer for Transmission Change out from Alcatel to Ericsson TRM
 Site survey for all necessary proposal for Ericsson, Huawei and Alcatel equipment
 Site survey for all necessary proposal for Ericsson, Huawei and Alcatel Power requirements
 Responsible for RFI signals of TRM required frequencies
 Designing a TRM link up using PL4 with Datum WGS 84
 Installing and Commissioning of Minilink TN for Ericsson equipment
 Installing Ericsson RBS 2206, 2207, 2216 and 2116
 Coordinator for all Ericsson RBS change out and Transmission Implementation
 Responsible for checking and monitoring of all IE documentation
 Does technical site survey including LOS for nominal sites
 Responsible for the preparation of site survey and C-module documentation
 Responsible for checking and editing of TSSR and AutoCAD drawing
IE AND INSTALLATION SUPERVISOR: HIFAB NETCOM NIG. LTD.
A Subcontractor of Ericsson Nigeria
#19 Okotie eboh Str. Awolowo Rd. Ikoyi Lagos Nigeria
Sept. 11, 2005 to Aug. 17, 2007
DUTIES AND RESPONSIBILITIES
 Installation of Ericsson RBS (2206, 2207 and 3206) for Celtel Nigeria on roll-out and swap
out project.
 Installation of Ericsson Minilink TN (2P, 6P & 20P) for Celtel and MTN expansion project.
 Installation Engineer for Ericsson Minilink and RBS C-module.
 Conduct technical site survey for change-out sites.
 Drawn site/location plans, floor plans and update existing mux plans and other related
installation of RBS and transmission documentations using AutoCAD.
 Did as-built plans for completed sites (site location, site plan, tower plans and other
documentations.
 Responsible for preparation of site folders for transmission and RBS acceptance for all sites.
 Create Radio Site cabling design: States of external cabling such as signal, power and
antennas.
 Assembling and Testing of Alarm and power cables.
 Supervised indoor and outdoor installations, antenna alignment and performed
troubleshooting, preliminary testing and commissioning, upgrade and reconfiguration using
Ericsson software. Acted as Hifab representative in the initial acceptance and turnover of
RBS and MW Links
RBS / TRM INSTALLATION SUPERVISOR: LLOYD ANGELA CORP.
29 Ago Palace Way Okota, Isolo Lagos, Nigeria
Sept. 18, 2003 to July 28, 2005
DUTIES AND RESPONSIBILITIES
 Supervising and monitoring of all the installation of RBS2202, 2302, 2308, 2207 and 2206
indoor / outdoor of Ericsson equipment for Celtel Project.
 Supervising the installation of Ericsson Minilink E and TN for Celtel and MTN project.
 Integration of Ericsson BTS sites for Celtel Project.
 Commissioning of Ericsson Transmission equipment (Minilink E and Traffic Node).
 Checking and correcting all improper installation.
 Responsible for the 3G roll out plan and implementation.
 Site coordinator for all new and swap out plan installation
 Coordinating the IM for all updates and changes for site installation plan
AUTOCAD OPERATOR: FREE LANCER
Kampi Compound S. Dela Cuesta St. Muzon Taytay, Rizal,Philippines
January 10, 2002 to July 14, 2003
DUTIES AND RESPONSIBILITIES
 Do the drawing for an Architectural design of an Architect as per layout basis
 Accepting any AutoCAD drawing that will be done on my house
 Par time draftsman for Handy Man design of Robinsons Incorporated
 Makes an AutoCAD drawing of an Electrical layout for building design as contract bases
 Do the the piping layout drawing of the construction contractor per layout basis
AUTOCAD OPERATOR: TELEDESIGN ENGINEERING PHILIPPINES INC
Unit 202 Taipans’ Place, Emerald Avenue,
Ortigas Center, Pasig City, Philippines
April 15, 2001 to October 21, 2001
DUTIES AND RESPONSIBILITIES
 Installation engineer for transmission.
 Drawn site/location plans, floor plans and update existing mux plans and other related
installation/transmission documentations using AutoCAD.
 Did as-built plans for finished sites (site location, site plan, tower plans and other
documentations.
 Produce C-Modules
 Editing AutoCAD Drawing
 Create Radio Site cabling design : States of external cabling such as signal,
power and antennas.
NETWORK ADMINISTRATOR: TRACE COMPUTER AND BUSINESS COLLEGE
Guadalupe Makati City, Philippines
June 15, 1998 to November 21, 2000
DUTIES AND RESPONSIBILITIES
 Setup and configuring of Local Area Network (LAN)
 Setup, assembling and installing network cable
 Assembling, repairing and maintaining personal computer
 Setup and configuring internet (using external and internal modem)
 Supervising and coordinating the network from other branches (using WAN)
 Installing necessary software of the company
EDUCATION
COLLEGE:
BACHELOR OF SCIENCE IN COMPUTER ENGINEERING
TRACE COMPUTER AND BUSINESS COLLEGE
East Cloverleaf Guadalupe, Makati City, Philippines
April 03, 2001
BACHELOR OF SCIENCE IN CUSTOMS ADMINISTRATION
PHILIPPINE MARITIME INSTITUTE
David St., MBB Building Sta. Cruz Manila, Philippines
April 06, 1996
SECONDARY:
ARELLANO UNIVERSITY
Pag-asa St., Caniogan Pasig City, Philippines
March 18, 1991
PRIMARY:
BG. ILOG ELEMENTARY SCHOOL
Bg. Ilog Pasig City, Philippines
March 14, 1987
REFERENCES
Rechie Yap
ENO TPM
Snr. Customer Project Mgr.
RASO CD RAN CPM SGBN
1 Changi Business Park Central 1 One @ Changi City #06-101
Singapore 486036, Singapore
+6596188413
rechie.yap@ericsson.com
Nazmul Alam
Competence Sub-Domain Manager - Deployment,
RASO CD RAN Deployment Mgmt SGBN
Ericsson, Singapore
1 Changi Business Park Central 1 One @ Changi City #06-101
Singapore 486036, Singapore
+6598247651, +6568808658
nazmul.alam@ericsson.com
Beng Lamorena
Deployment & ASP Mgr. CD RAN
Ericsson, Philippines
21th floor Net Square bldg.3rd ave. cor. 28th st
Cresent Park West, Bonifacio Global City
1634 Taguig, Metro Manila, Philippines
+639088804334, +63 (02) 27891904
beng.lamorena@ericsson.com

More Related Content

What's hot

AHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DTAHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DT
Ahsanullah Bhutto
 
Jun-Jun ( my resume )
Jun-Jun ( my resume )Jun-Jun ( my resume )
Jun-Jun ( my resume )
Jun-Jun Alcantara
 
Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_Vitae
Anthony Fan
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
Ahmad Hedib
 
CV R.S.Verma
CV R.S.VermaCV R.S.Verma
CV R.S.Verma
R.S. Verma
 
BOLA RESUME (1)
BOLA RESUME (1)BOLA RESUME (1)
BOLA RESUME (1)
osita chuks johnson
 
CV Joseph Rey C. Marilla
CV Joseph Rey C. MarillaCV Joseph Rey C. Marilla
CV Joseph Rey C. Marilla
Joseph Rey Marilla
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
Deepak Yadav
 
CV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANYCV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANY
Amit Kumar
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
Deepak Pandey
 
J_Resume_CA_112015
J_Resume_CA_112015J_Resume_CA_112015
J_Resume_CA_112015
John Nguyen
 
Resume
ResumeResume
MYDEL BERDIN CV new
MYDEL BERDIN CV newMYDEL BERDIN CV new
MYDEL BERDIN CV new
Mydel Berdin
 
Hardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh Gill_Resume
Hardeep Singh Gill_Resume
Hardeep Singh
 
Curriculum Vitae Fidri Hultari
Curriculum Vitae Fidri Hultari Curriculum Vitae Fidri Hultari
Curriculum Vitae Fidri Hultari
Fidri Hultari
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
apaa simon
 
Cris Jayson Baluyut CV
Cris Jayson Baluyut CVCris Jayson Baluyut CV
Cris Jayson Baluyut CV
Cris Jayson Baluyut
 
Moustafa Kattan- High-Level-Profile-external
Moustafa Kattan- High-Level-Profile-externalMoustafa Kattan- High-Level-Profile-external
Moustafa Kattan- High-Level-Profile-external
Moustafa Kattan
 

What's hot (18)

AHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DTAHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DT
 
Jun-Jun ( my resume )
Jun-Jun ( my resume )Jun-Jun ( my resume )
Jun-Jun ( my resume )
 
Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_Vitae
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
 
CV R.S.Verma
CV R.S.VermaCV R.S.Verma
CV R.S.Verma
 
BOLA RESUME (1)
BOLA RESUME (1)BOLA RESUME (1)
BOLA RESUME (1)
 
CV Joseph Rey C. Marilla
CV Joseph Rey C. MarillaCV Joseph Rey C. Marilla
CV Joseph Rey C. Marilla
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
CV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANYCV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANY
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 
J_Resume_CA_112015
J_Resume_CA_112015J_Resume_CA_112015
J_Resume_CA_112015
 
Resume
ResumeResume
Resume
 
MYDEL BERDIN CV new
MYDEL BERDIN CV newMYDEL BERDIN CV new
MYDEL BERDIN CV new
 
Hardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh Gill_Resume
Hardeep Singh Gill_Resume
 
Curriculum Vitae Fidri Hultari
Curriculum Vitae Fidri Hultari Curriculum Vitae Fidri Hultari
Curriculum Vitae Fidri Hultari
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
 
Cris Jayson Baluyut CV
Cris Jayson Baluyut CVCris Jayson Baluyut CV
Cris Jayson Baluyut CV
 
Moustafa Kattan- High-Level-Profile-external
Moustafa Kattan- High-Level-Profile-externalMoustafa Kattan- High-Level-Profile-external
Moustafa Kattan- High-Level-Profile-external
 

Viewers also liked

Work (Better) In Your Neighborhood: Capitol Hill
Work (Better) In Your Neighborhood: Capitol HillWork (Better) In Your Neighborhood: Capitol Hill
Work (Better) In Your Neighborhood: Capitol Hill
Office Nomads
 
Aliv New Resume
Aliv New ResumeAliv New Resume
Aliv New Resume
Aliv Tripathy
 
Conceito de EAD
Conceito de EADConceito de EAD
Conceito de EAD
LuArrBa
 
Ewrt 1 b class 18
Ewrt 1 b class 18Ewrt 1 b class 18
Ewrt 1 b class 18
jordanlachance
 
Diapositivas mod4
Diapositivas mod4Diapositivas mod4
Amer_Alkurdi_CV
Amer_Alkurdi_CVAmer_Alkurdi_CV
Amer_Alkurdi_CV
Amer Alkurdi
 
Clash of clanes troops
Clash of clanes troopsClash of clanes troops
Clash of clanes troops
Shakil Ahmmad
 
Auditoria del sig
Auditoria del sigAuditoria del sig
Auditoria del sig
Mercedes Tomaylla
 
Parking management system 2015
Parking management system   2015Parking management system   2015
Parking management system 2015
Jakc Labs
 
Gestion de los procesos sh
Gestion de los procesos shGestion de los procesos sh
Gestion de los procesos sh
sergio santucho
 
2015_MST15_PPT_MIC Final
2015_MST15_PPT_MIC Final2015_MST15_PPT_MIC Final
2015_MST15_PPT_MIC Final
Robert OShea, Jr., P.E.
 

Viewers also liked (11)

Work (Better) In Your Neighborhood: Capitol Hill
Work (Better) In Your Neighborhood: Capitol HillWork (Better) In Your Neighborhood: Capitol Hill
Work (Better) In Your Neighborhood: Capitol Hill
 
Aliv New Resume
Aliv New ResumeAliv New Resume
Aliv New Resume
 
Conceito de EAD
Conceito de EADConceito de EAD
Conceito de EAD
 
Ewrt 1 b class 18
Ewrt 1 b class 18Ewrt 1 b class 18
Ewrt 1 b class 18
 
Diapositivas mod4
Diapositivas mod4Diapositivas mod4
Diapositivas mod4
 
Amer_Alkurdi_CV
Amer_Alkurdi_CVAmer_Alkurdi_CV
Amer_Alkurdi_CV
 
Clash of clanes troops
Clash of clanes troopsClash of clanes troops
Clash of clanes troops
 
Auditoria del sig
Auditoria del sigAuditoria del sig
Auditoria del sig
 
Parking management system 2015
Parking management system   2015Parking management system   2015
Parking management system 2015
 
Gestion de los procesos sh
Gestion de los procesos shGestion de los procesos sh
Gestion de los procesos sh
 
2015_MST15_PPT_MIC Final
2015_MST15_PPT_MIC Final2015_MST15_PPT_MIC Final
2015_MST15_PPT_MIC Final
 

Similar to Reden_CV

CV E Atienza new 2 - Copy
CV E Atienza new 2 - CopyCV E Atienza new 2 - Copy
CV E Atienza new 2 - Copy
Edgar Atienza
 
Cv meynard
Cv meynardCv meynard
Cv meynard
Meynardo Gotoman
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
Rizwan Ahmad
 
CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1
SATHASIVAM M PALANIANDY
 
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
Marvani M. GT Estrella
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
Jade Santos ECE
 
alexander Eze
alexander Ezealexander Eze
AVISHESH BHARGAVA resume
AVISHESH BHARGAVA resumeAVISHESH BHARGAVA resume
AVISHESH BHARGAVA resume
avisheshb
 
RichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-TelecomRichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-Telecom
Richard Laca
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
Mohammad saleem
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
SATHASIVAM M PALANIANDY
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
SATHASIVAM M PALANIANDY
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
Krishna Gopal Solanki
 
Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)
Mohallab Shbeeb
 
Hacker Resume IBM
Hacker Resume IBMHacker Resume IBM
Hacker Resume IBM
Aida Jaber
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
Bashir Malik
 
Seymour Gordon Resume
Seymour Gordon ResumeSeymour Gordon Resume
Seymour Gordon Resume
Seymour Gordon
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
Ahmed Osama,PMP
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
Muhammad Ramzan
 
Alia khan1
Alia khan1Alia khan1
Alia khan1
Alia Khan
 

Similar to Reden_CV (20)

CV E Atienza new 2 - Copy
CV E Atienza new 2 - CopyCV E Atienza new 2 - Copy
CV E Atienza new 2 - Copy
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1
 
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 
alexander Eze
alexander Ezealexander Eze
alexander Eze
 
AVISHESH BHARGAVA resume
AVISHESH BHARGAVA resumeAVISHESH BHARGAVA resume
AVISHESH BHARGAVA resume
 
RichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-TelecomRichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-Telecom
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
 
Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)
 
Hacker Resume IBM
Hacker Resume IBMHacker Resume IBM
Hacker Resume IBM
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
Seymour Gordon Resume
Seymour Gordon ResumeSeymour Gordon Resume
Seymour Gordon Resume
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
Alia khan1
Alia khan1Alia khan1
Alia khan1
 

Reden_CV

  • 1. REDEN L. CA-ADAN Add: Blk. 8 Lot 2 Holyfield Subdivision U.S.A. Str. Brgy. Sta Ana, Taytay Rizal, Philippines Residence: Singapore Tel #: (+63) (02)654-16-27 Mobile: +639196557479, +6584214082 Email Add: redendolly1013@yahoo.com, reden1013@gmail.com PROFESSIONAL GOAL/OBJECTIVE  To be trained and have a continuous improvement on my field of knowledge regarding on the Design, Installation and Commissioning of Different Transmission, BTS, Switching and Power Supply Systems and all things regarding Telecommunications.  To be able to give technical assistance and support to costumers in compliance with their requirements in accordance with Companies Quality Standards. To exceed costumer’s expectations regarding on telecommunication products, solutions and services. SKILLS  Supervisory experience on Ericsson RBS 2000/3000/6000 series, Minilink E/C/Transport Node implementation.  Expertise on installation of Ericsson RBS 2206/2207, 2216/2116, 2302, 2308/2309, 3206, 3216/3116, 6201/6102, 6301, 6601, AIR (LTE), Minilink E/C and Transport Node.  Adept experience on Transmission Planning using Pathloss IV, TEMS Link Planner 6.2.1, Installation Engineering and Site survey functions.  Knowledgeable on usage of test equipment such as Anritsu Site Master, GPS and BER tester.  Proficient on RBS and Transmission software (OMT and MSM).  Competent with Ericsson PDH/SDH transmission system.  Knowledgeable on usage of Ericsson tools such as Site Handler, Rapid Tools  Can able to repair and maintain PC and set LAN network.  Computer literate on usage of Microsoft Office, AutoCAD (2D/3D), Adobe and office required software.  Strong English communication and inter-personal skills. WORK EXPERIENCE Advance Site Engineer: Ericsson Singapore W900 (Singtel Project) 1 Changi Business Park Central 1 One @ Changi City #06-101 Singapore 486036, Singapore October 14, 2013 to April 30, 2016 • Checking the TP for ASP site proposals • Coordinating the customer for further revisions of TP • Coordinating the ASP for the rectifications of site deficiency materials
  • 2. • Coordinating the warehouse manager for the available materials in the Warehouse • Checking the As-Built documents for submission to Singtel • Reporting the status of all sites to the Project Manager • Does the services quotations per site for the customer’s PO • Coordinating the customer for any quotation inaccuracy to be revise • Monitoring all installed sites and PO's for the preparation of site acceptance paper (DO) • Monitoring and supervising the signed acceptance paper for customer’s billing • Reporting to Project Manager of the financial status of the project on customer side IE / Material Planner: Ericsson Philippines LTE and Modernization (SMART Project) 21F Net Square Bldg., 3rd. Ave. Cor. 28th St. Cresent Park West, Bonifacio Global City Taguig, Metro Manila, Philippines 1634 Jan. 7, 2013 to Sept. 30, 2013 DUTIES AND RESPONSIBILITIES  Does technical site survey for LTE installation plan  Preparing the RSID for site implementation  Does the floor plan drawing for LTE installation  Do the as built documents for final acceptance of the costumer  Do the material planning and request to the solution department  Coordinating the Logistic team for LTE materials shipment  Do the material request/BOQ for MRF/RO preparation for each site  Coordinating the warehouse personnel for possible material requests  Reporting to Project Manager for materials concern  Coordinating the site supervisor for any faulty and replace materials  Responsible in overall material needs for LTE project  Coordinating the ASP As-Built documents for Modernization SMART Project  Supervising, monitoring and checking of all AS-Built documents for SMART Project  Reporting and coordinating the Line Manager for over all documentation status of SMART project IE RBS/TRM AND RAN ENGINEER: LM Ericsson Nigeria (AirTel PROJECT) 17, Walter Carrington Crescent V.I. Lagos, Nigeria March 14, 2011 to Dec. 22, 2011 DUTIES AND RESPONSIBILITIES  Does technical site survey for RBS and TRM expansion and upgrade location  Preparing the site survey check list as survey guide lines.  Does the site drawing using AutoCAD for site layout  Preparing the SID for site implementation  To monitor and report all activities of the ASP to Implementation Manager  Integrating and upgrading the RBS configuration
  • 3.  Trouble shoot and clearing all the alarms of the upgraded RBS configuration  Coordinating all the TRM Engineers for licenses request for each upgraded site.  Does the TRM software baseline upgrade  Uploading for the required TRM module Licenses  Supervising the site installation of ASP  Installation and integration of RBS 6201, 6102 and 6601. IE AND SITE SUPERVISOR: Ericsson Ghana (ZAIN GHANA PROJECT) Gulf House, Tetteh Quarshie Circle, Airport West P.O. Box C 1350 Cantonment Accra, Ghana March 05, 2009 to September 20, 2009 DUTIES AND RESPONSIBILITIES  Does technical site survey for collocation of Zain to MTN, Tigo and Vodafone using Ericsson RBS( 2216/2116,3216/3116,2111,3418)  Preparing the site survey check list for survey guide lines  Preparing the AutoCAD drawing for the site layout and proposal.  Preparing the SID for the access department implementation site binder  Does the C module documents after the red line marking for documents revision  Surveying all the equipment installed on the site for equipment inventory of Ericsson  Coordinating the IM for all possible sites to implement/install  Coordinating all the ASP for site installation schedules and plan  Supervising the ASP for the installation of RBS and TRM  Does the site cleanup and PAT for the site acceptance of Zain from Ericsson  Preparing the delivery note for the new and for the cleanup sites  Coordinate and response for Zain quality department installation standard requirements IE AND 3G TESTER: Ericsson Philippines (Smart HSPA 850 3G Project) 22F Net Square Bldg., 3rd. Ave. Cor. 28th St. Cresent Park West, Bonifacio Glbal City Taguig, Metro Manila, Philippines 1634 May 16, 2008 to February 28, 2009 DUTIES AND RESPONSIBILITIES  Does technical site survey for an existing SMART sites for Ericsson 3G Equipment Location  Preparing the site survey check list for survey guide lines  Supervising and distributing the sites to Ericsson team for site survey  Preparing an AutoCAD drawing for the site layout and proposal.  Preparing the TSSR report and documents for SMART evaluation.  Supervising and distributing to Ericsson IE for the preparation of TSSR  Preparing the RSID documents for installation after the SMART approval  Coordinating the ESP’s for farther evaluation of installation plan.
  • 4.  Does the C module documents after the red line marking for documents revision  Tester and Commissioning of HSPA 850 network  Trouble shoots of RU/FU defect units.  Do the call testing of HSPA 850 network coverage.  Do the Functionality test for Internet and FTP browsing using HSPA 850 3G Network IE Coordinator AND INSTALLER: Globalet Contractor A Subcontractor of Commtrend/Ericsson Phillipines J.P Rizal Ave. Marikina City, Philippines September 04, 2007 to April 28, 2008 DUTIES AND RESPONSIBILITIES  Installing the Nokia 3G BTS for Change out of Siemens 3G BTS  Integration and commissioning of Nokia 3G BTS  Trouble shooting of E1 from site to Switch via RNC  Installing Harris TRM indoor / outdoor for Smart project  Assembling and installing Radomed antenna for repeater sites  Installation Engineer for Transmission Change out from Alcatel to Ericsson TRM  Site survey for all necessary proposal for Ericsson, Huawei and Alcatel equipment  Site survey for all necessary proposal for Ericsson, Huawei and Alcatel Power requirements  Responsible for RFI signals of TRM required frequencies  Designing a TRM link up using PL4 with Datum WGS 84  Installing and Commissioning of Minilink TN for Ericsson equipment  Installing Ericsson RBS 2206, 2207, 2216 and 2116  Coordinator for all Ericsson RBS change out and Transmission Implementation  Responsible for checking and monitoring of all IE documentation  Does technical site survey including LOS for nominal sites  Responsible for the preparation of site survey and C-module documentation  Responsible for checking and editing of TSSR and AutoCAD drawing IE AND INSTALLATION SUPERVISOR: HIFAB NETCOM NIG. LTD. A Subcontractor of Ericsson Nigeria #19 Okotie eboh Str. Awolowo Rd. Ikoyi Lagos Nigeria Sept. 11, 2005 to Aug. 17, 2007 DUTIES AND RESPONSIBILITIES  Installation of Ericsson RBS (2206, 2207 and 3206) for Celtel Nigeria on roll-out and swap out project.  Installation of Ericsson Minilink TN (2P, 6P & 20P) for Celtel and MTN expansion project.  Installation Engineer for Ericsson Minilink and RBS C-module.  Conduct technical site survey for change-out sites.  Drawn site/location plans, floor plans and update existing mux plans and other related
  • 5. installation of RBS and transmission documentations using AutoCAD.  Did as-built plans for completed sites (site location, site plan, tower plans and other documentations.  Responsible for preparation of site folders for transmission and RBS acceptance for all sites.  Create Radio Site cabling design: States of external cabling such as signal, power and antennas.  Assembling and Testing of Alarm and power cables.  Supervised indoor and outdoor installations, antenna alignment and performed troubleshooting, preliminary testing and commissioning, upgrade and reconfiguration using Ericsson software. Acted as Hifab representative in the initial acceptance and turnover of RBS and MW Links RBS / TRM INSTALLATION SUPERVISOR: LLOYD ANGELA CORP. 29 Ago Palace Way Okota, Isolo Lagos, Nigeria Sept. 18, 2003 to July 28, 2005 DUTIES AND RESPONSIBILITIES  Supervising and monitoring of all the installation of RBS2202, 2302, 2308, 2207 and 2206 indoor / outdoor of Ericsson equipment for Celtel Project.  Supervising the installation of Ericsson Minilink E and TN for Celtel and MTN project.  Integration of Ericsson BTS sites for Celtel Project.  Commissioning of Ericsson Transmission equipment (Minilink E and Traffic Node).  Checking and correcting all improper installation.  Responsible for the 3G roll out plan and implementation.  Site coordinator for all new and swap out plan installation  Coordinating the IM for all updates and changes for site installation plan AUTOCAD OPERATOR: FREE LANCER Kampi Compound S. Dela Cuesta St. Muzon Taytay, Rizal,Philippines January 10, 2002 to July 14, 2003 DUTIES AND RESPONSIBILITIES  Do the drawing for an Architectural design of an Architect as per layout basis  Accepting any AutoCAD drawing that will be done on my house  Par time draftsman for Handy Man design of Robinsons Incorporated  Makes an AutoCAD drawing of an Electrical layout for building design as contract bases  Do the the piping layout drawing of the construction contractor per layout basis
  • 6. AUTOCAD OPERATOR: TELEDESIGN ENGINEERING PHILIPPINES INC Unit 202 Taipans’ Place, Emerald Avenue, Ortigas Center, Pasig City, Philippines April 15, 2001 to October 21, 2001 DUTIES AND RESPONSIBILITIES  Installation engineer for transmission.  Drawn site/location plans, floor plans and update existing mux plans and other related installation/transmission documentations using AutoCAD.  Did as-built plans for finished sites (site location, site plan, tower plans and other documentations.  Produce C-Modules  Editing AutoCAD Drawing  Create Radio Site cabling design : States of external cabling such as signal, power and antennas. NETWORK ADMINISTRATOR: TRACE COMPUTER AND BUSINESS COLLEGE Guadalupe Makati City, Philippines June 15, 1998 to November 21, 2000 DUTIES AND RESPONSIBILITIES  Setup and configuring of Local Area Network (LAN)  Setup, assembling and installing network cable  Assembling, repairing and maintaining personal computer  Setup and configuring internet (using external and internal modem)  Supervising and coordinating the network from other branches (using WAN)  Installing necessary software of the company EDUCATION COLLEGE: BACHELOR OF SCIENCE IN COMPUTER ENGINEERING TRACE COMPUTER AND BUSINESS COLLEGE East Cloverleaf Guadalupe, Makati City, Philippines April 03, 2001 BACHELOR OF SCIENCE IN CUSTOMS ADMINISTRATION PHILIPPINE MARITIME INSTITUTE David St., MBB Building Sta. Cruz Manila, Philippines April 06, 1996
  • 7. SECONDARY: ARELLANO UNIVERSITY Pag-asa St., Caniogan Pasig City, Philippines March 18, 1991 PRIMARY: BG. ILOG ELEMENTARY SCHOOL Bg. Ilog Pasig City, Philippines March 14, 1987 REFERENCES Rechie Yap ENO TPM Snr. Customer Project Mgr. RASO CD RAN CPM SGBN 1 Changi Business Park Central 1 One @ Changi City #06-101 Singapore 486036, Singapore +6596188413 rechie.yap@ericsson.com Nazmul Alam Competence Sub-Domain Manager - Deployment, RASO CD RAN Deployment Mgmt SGBN Ericsson, Singapore 1 Changi Business Park Central 1 One @ Changi City #06-101 Singapore 486036, Singapore +6598247651, +6568808658 nazmul.alam@ericsson.com Beng Lamorena Deployment & ASP Mgr. CD RAN Ericsson, Philippines 21th floor Net Square bldg.3rd ave. cor. 28th st Cresent Park West, Bonifacio Global City 1634 Taguig, Metro Manila, Philippines +639088804334, +63 (02) 27891904 beng.lamorena@ericsson.com