An Introduction to Aggreko
          Version 6 05/11
Truly a world leader

•    Aggreko is the world leader in the supply of temporary power and temperature
     control solutions to companies around the world.
•    We have approximately 3,800 highly skilled and experienced permanent
     employees operating from over 148 locations based in over 34 countries
•    In 2010, we served customers in over 100 countries using over £1,660m (Euros
     €1.9bn) of rental fleet
       – In 2010, revenues of approximately £1.2bn (Euros €1.4bn) and operating
          profit of £317m (Euros €371m)
•    Aggreko plc is listed on the London Stock Exchange (AGK.L), is a member of
     the FTSE-100 index, and headquartered in Scotland
•    A truly global company with revenue that is relatively evenly split between North
     America, Europe and the rest of the world.
Aggreko – inspiring confidence in our customers
•    Customers have confidence in us
      –   We are used to supporting customers who depend on us to keep their businesses
          operational
      –   The equipment and services we provide are often mission-critical
      –   Approximately a quarter of our business is as an emergency response
•    Being the biggest in the world means that we have more fleet, more people and
     more know-how to support our customers
•    We design and build much of our own equipment
      –   Perfectly adapted to the demands of our business
•    Outstanding levels of customer and employee satisfaction verified and
     monitored by independent third parties
•    We invest heavily in technology to leverage our global knowledge at the local
     level
      –   Identifying the right solution quickly is a key skill
      –   “Somebody, somewhere in our global organisation has handled a similar customer
          issue before”
Aggreko service support
16 service centres
The 5 Hub locations are:
•Doncaster
•Sutton
•Bristol
•Dumbarton
•Portlaoise


Logistics team based on site, to
organise the transport to and from
sites.
UK and Ireland National Rental Centres

                                            24 Hour operation
                                            365 days per year

                                            Offering:
                                            •   Operational support
                                            •   Sales / Technical support
                                            •   Logistics support
                                            •   Fuel management services
UK Tel: 08458 24 7 365
Northern Ireland Tel: +00 353 57 86 63233   •   Contract administration
Southern Ireland Tel: 1890 200 400          •   Invoicing services
Aggreko service support

Company support
                                           Service engineer capability

•   Global business supported by Aggreko    –   Certified power engineers
    Design & Manufacturing                  –   Project management
•   Most products built within UK at our    –   On-site support
    manufacturing facilities in Scotland    –   Turnkey operation
•   Readily accessibility to spares.        –   Synchronising with the grid
•   Our products: Confident training            supply
•   Combined service team of 112 service
    engineers with broad range of skills    Sales support

                                            –   Sales Engineer (Local sales)
                                            –   Area Sales Manager
                                            –   National Rental Centre Contact
                                            –   National Accounts contact
Typical local service support structure
Global reputation for succeeding where the task is;
    Mission Critical                                         Technically challenging
•    Industrial                                               •   Environmental
      –   Process augmentation for an Oil refinery (Texas)         –   Base load power generation at -40C (Kyrgyzstan) and
      –   Base-load power to a gold mine (Mongolia)                    +46C (Saudi Arabia)
•    Military Support                                              –   Super-silent requirements on film sets
      –   Utility power to bases in Afghanistan and Iraq           –   Extreme emissions requirements in Chile
•    Utilities                                                •   Scale
      –   Base-load power in Kenya, Venezuela, Sri
          Lanka, Greece, Spain, Indonesia, Pakistan                –   500,000 gallons of water cooling per minute to power
      –   Network maintenance support in France, UK and                plant (USA)
          USA                                                      –   700km gas pipeline pressure-test (Norway)
•    Emergency Response                                            –   140 MW temporary power plant (Kenya)
      –   Grid transformer failure (UK)                            –   10km ice-rink (Europe)
      –   Hurricanes Katrina and Rita
                                                              •   Speed of deployment
•    Events                                                        –   Aluminium smelter looses transformer (Africa)
      –   Superbowl, USA
                                                                   –   Total chiller failure in milk processing plant (UK)
      –   FIFA World Cup, South Africa
      –   Olympics (Beijing, Vancouver)                            –   Cooling tower collapse (North America)
      –   Asia games
The world’s largest fleet gives customers the largest choice

•   Power generation
     –   13,500 silenced canopied or containerised generators; Over 5,900 MW capacity
     –   15 kVA – 2000 KVA
     –   Full range of electrical distribution, cabling & accessories
     –   1375 kVA gas generators
           Small                                     Medium                                  Large




     –   15 to 100 kVA 50 Hz                     –   50 to 500 kVA 50 Hz                –   500 to 2100 kVA 50 Hz
     –   Trailer and Skid mounted                –   Silenced                           –   Silenced
     –   24 hr Bunded Fuel Tank                  –   Bunded Fuel Tank                   –   Diesel and Gas fuel
     –   Silenced                                –   Robust and versatile               –   ISO shipping compatible
     –   Versatile power configurations          –   Advanced Digital controls          –   Aggreko Gempac controls
                                                                                        –   Aggreko SCADA
                                                                                            compatible
The world’s largest fleet gives customers the largest choice
•   Temperature Control
     – 2,100 chillers; 950 MW of capacity
     – 2,800 air conditioning and air handling units
     – 1,800 heaters
     – 150 cooling towers


         Air conditioners                                  Chillers                      Cooling Towers




     –   5 to 200 kW (2 to 60 ton)                     –     50 to 3500 kW (15 to 1000   –   1000 to 3500 kW (300 to
     –   High static air supply                              ton)                            1000 tons)
     –   Rental application specific                   –     Modern Screw technology     –   Modular expansion to
         design                                        –     R134A non ODP refrigerant       100000 tons plus
                                                       –     Low Temperature ability     –   Rental specific design
                                                             down to -40C/F              –   Project management and
                                                                                             support services
The world’s largest fleet gives customers the largest choice




Loadbanks                                        Transformers
• Reactive & Resistive set-up                    • 2.5 MVA – 6 MVA
• 600 kW – 6 MVA                                 • 400 V – 25 kV
• AC/DC                                          • Multi-tap sets
• 200 MVA fleet                                  • Built in HV switchgear & protection
• Sigma Data Acquisition and reporting package   • Oil cooled
                                                 • Containerised
Applications: 20 MW temporary power to major zinc mine
  •   Situation the customer faced
       – Wind farm next to zinc mine required connection to
       the National grid
       – Also new transformers needed replacing at mine
       – Without 19 MW of power the mine would flood and
       extraction of €1.5 million/ day of zinc and lead would stop

  •   Task that had to be done
       –   Detailed planning of site requirements
       –   Co-ordination of work with local utility company and mine

  •   Action we took to sort the problem out
       –   Aggreko provided 25 x 1250 kVA generators, 5 x 6.3 MVA transformers, a 6 MW loadbank,
           electrical distribution equipment and 375,000 litres of fuel
       –   Equipment was transported in and commissioned to provide power for 5 continuous days

  •   Result for the customer
       –   The mine shutdown, restarted and ran as normal on 20 MW of temporary Aggreko power,
           with no loss of production
Applications: Utility support

  •   Situation the customer faced
       –   The transformer failed at a sewage treatment works
       –   The existing back up generators failed
       –   Without power to the site it started to flood

  •   Task that had to be done
       – Get temporary power to the site as quickly as possible
       to avoid a potential disaster

  •   Action we took to sort the problem out
       –   We provided 4 x 125 kVA, 1 x 320 kVA, 1 x 1250kVA, 2.1 MVA transformer and fuel
           tanks
       –   We set up the equipment dispersed around the site to provide power directly to critical
           areas such as the control room and pumps

  •   Result for the customer
       –   The sewage works were operational before the flood reached the nearby river
Applications: Utility support
  •   Situation the customer faced
       – The customer was a Scottish power company
       – A 50 year old submarine cable supplying power from mainland
       Scotland to Bressay Island had to be moved as the sea bed was
       being dredged where the cable was laid.
       – The 400 residents and the local fish-meal factory needed a
          power supply while the cable was disconnected

  •   Task that had to be done
       –   Get temporary power to homes on the island and to support the factory which consumes up to
           70% of the island’s power

  •   Action we took to sort the problem out
       –   We supplied transport, ferries and cranes to set up the equipment and cabling to supply the
           entire island
       –   We provided 11 kV high voltage to the island, taking into account the fluctuating load demand of
           the factory. Fuel Management was included for 10,000 litres per day

  •   Result for the customer
       –   The island continued functioning as usual and the new submarine cable was installed without a
           problem
Applications: Industrial

•   Situation the customer faced
     – The customer was a steel processor in Sheffield, UK
     – The floods of 2007 destroyed the cooling tower causing
     other parts of the plant to explode

•   Task that had to be done
     – A temporary cooling tower was required to get production up
     and running

•   Action we took to sort the problem out
     –   We supplied and installed a 900 kW rental cooling system made up of a 600 kW chiller
         and a 300 kW chiller and provided a 800 kVA generator to power the equipment

•   Result for the customer
     –   Downtime was kept to a minimum, reducing loss of profit and revenue
     –   The plant’s customers were kept happy and no business was lost
Applications: Industrial

•   Situation the customer faced
     – The customer was a chemical plant on Teeside, UK
     – Shut-down was required by law for preventative maintenance
     and servicing work

•   Task that had to be done
     – Power was needed to supply the temporary village set up for the
     maintenance workers

•   Action we took to sort the problem out
     –   We supplied 2x350 kVA generators to power the 72 cabins

•   Result for the customer
     –   The shut-down was a success and maintenance was finished within the time frame so
         that production could continue and profits were unaffected
Applications: Petrochemical, oil & gas
•   Situation the customer faced
     – The customer was a oil company looking to increase its commercial oil
     supplies. It was building an accommodation platform in the UK, which was
     then going to be shipped to Qatar to be bolted onto an existing platform

•   Task that had to be done
     – Provide a reliable source of power during the build and then modify
     equipment for it to be taken on the platform while it was being moved

•   Action we took to sort the problem out
     –   We supplied a 500 kVA generator and a loadbank, which sat on the dock to provide power to all
         the new equipment as it was being thoroughly tested
     –   We supplied a 800 kVA generator and 2 x 14000 ltr fuel tanks, which were located on top of the
         1,700 tonne platform as it sailed by barge to Qatar
     –   The fuel tanks had to be bottom fed
     –    We placed a heat detector within the generator on the platform

•   Result for the customer
     –   The project ran smoothly and was successfully handed over to the Aggreko international team in
         Qatar for the commissioning stages
Applications: Petrochemical, oil & gas

•   Situation the customer faced
     –   The customer was an offshore oil company based in the North Sea.
     –   An engine fire on one of their rigs stopped production completely

•   Task that had to be done
     – Provide a reliable supply of power to the rig so that operations could
     continue

•   Action we took to sort the problem out
     –   We supplied 2x 1250 kVA generators
     –   To save valuable deck space, we changed the alternators to specialist 600/690V, which
         removed the need for a separate TX transformer

•   Result for the customer
     –   Production on the oil rig could commence with minimum disruption
     –   Success has lead to further projects with the company
Applications: Films and events

•   Situation the customer faced
     – The customer was the world’s premier aerospace event –
     Farnborough air show
     – More than 1,200 global companies exhibit at the show
     – It is broadcast across the world

•   Task that had to be done
     –   Provide a reliable source of power for the show including the broadcasting facilities,
         concessions and big screens
     –   Ensure the equipment was installed without intruding on the show

•   Action we took to sort the problem out
     –   We provided 15 MVA of power and 120,000 litres of fuel management
     –   We set up watchkeep staff around the clock

•   Result for the customer
     –   The event ran smoothly with no loss of power at any point during the week long event
Applications: Films and events

•   Situation the customer faced
     – The customer was an events organiser in Dublin, Ireland
     – They were setting up a temporary ice rink for the Christmas
     period and needed power and chillers

•   Task that had to be done
     –   To preserve the quality of the ice, a chiller operating at -12 degrees centigrade 24/7
         was required

•   Action we took to sort the problem out
     –   We provided a 750 kW chiller which was powered by a 200 kVA twinpack
     –   We also provided 2 x 400 kVA generators to power the themed market, café, viewing
         area and reception area at the rink

•   Result for the customer
     –   The event ran smoothly throughout November, December and January with no
         problems at all
Applications: Telecommunications

  •   Situation the customer faced
       – Network Rail is implementing a new rail communications system
       to improve performance and safety



  •   Task that had to be done
       –   Network Rail is constructing more than 2,000 masts
       –   Each location needed power but in some situations the DNO couldn’t provide power,
           there were areas which had wayleave issues or there was no existing track side source

  •   Action we took to sort the problem out
       –   We supplied silenced canopied generators between 15 kVA and 45 kVA to recharge
           the signal masts’ UPS and provide backup

  •   Result for the customer
       –   Our national presence has meant Network Rail needs to only liaise with one supplier
           for its temporary power needs, helping to make the project run smoothly
Applications: Military

 •   Situation the customer faced
      – Twice a year, the Royal Navy takes its vessels on sea trials to
      prove they’re fit for purpose, which is necessary to achieve Lloyds
      insurance accreditation

      –   The trial process involves simulating loss of power to the carrying ship

 •   Task that had to be done
      –   a rescue operation is implemented with the generator kicking in to provide emergency
          back-up power, allowing all equipment to continue to function

 •   Action we took to sort the problem out
      –   We provided a 500 kVA generator, distribution board and cables to ensure the Navy had
          a reliable source of power while out at sea on the trials

 •   Result for the customer
      –   By providing quality and reliable back-up equipment, the Royal Navy now has full
          confidence that in the event of power failure, the rescue mission can be completed
Applications: Shipping
 •   Situation the customer faced
      – A cargo ship was departing Belfast en route for South Africa
      when inspections discovered that both the on board generator and
      the back up generator were faulty
      – If the problem was not solved the ship would have had a delayed
      start resulting in fines and would have had to stop in France for repair
      work delaying them further

 •   Task that had to be done
      –   A temporary generator was required to supply power to the ship and due to maritime law a
          back up generator was required also

 •   Action we took to sort the problem out
      –   We supplied 800 kVA containerised unit and 100 metres of cable to supply the control room
          with power

 •   Result for the customer
      –   By working throughout the night Aggreko ensured that the ship departed on time and no
          fines were received
Outstanding reputation amongst our own customers
                                                                                                        Net Promoter Score
•     We have built a reputation for outstanding                                                         USAA                                                  82%
                                                                                                         Homebanc*                                             81%
      customer service
                                                                                                         Harley-Davidson                                       81%
        –     85% of our customers would recommend us to a friend *
                                                                                                         Costco                                                79%
        –     90% of our customers were extremely/very satisfied **
                                                                                                         Amazon.com                                            73%
•     What our customer’s say (Taken from customer                                                       Chick-fill-A*                                         72%
      satisfaction surveys)                                                                              eBay                                                  71%
        –     “Aggreko have now and in the past provided us with excellent                               Vanguard                                              70%
              service which we hope to be able to continue with in the                                   SAS                                                   66%
              future.”
                                                                                                         Apple                                                 66%
        –     “I don't know of any other sales person or company that I can
                                                                                                         Aggreko                                               60%
              call at 11 PM at night and have a generator onsite by 10:00
              AM the next morning.”                                                                      Intuit(TurboTax)*                                     58%
        –     “We can only say again many thanks to the whole team they                                  Cisco                                                 57%
              helped us keep our train service moving. And the greatest                                  FedEx                                                 56%
              testament to that was our customers never noticed”                                         Southwest Airlines                                    51%
        –     “Aggreko responded at a difficult time of the year ( 2 days                                American Express                                      50%
              before Christmas and extreme weather conditions ) to provide                               Commerce Bank                                         50%
              us with heat and power to thaw frozen pipe work, the service
                                                                                                         Dell                                                  50%
              was second to none, a site visit by an engineer to spec the
              job, followed by a quote 1 hour later and next day delivery of                             Adobe                                                 48%
              the equipment and installation.”                                                           Electronic Arts                                       48%
• All NPS statistics are based on Bain or Satmetrix surveys, with the exceptions of Intuit, Chick-fill-A and HomeBanc. For these firms, data was used that they provided.
         | 24
Their data was gathered in a reasonable (but not perfectly equivalent) fashion. *Based on scoring of 8 or more on customer data received in 2010 **Based on scoring of 7
or more on customer data received in 2010.

Aggreko Corporate Overview 2012

  • 1.
    An Introduction toAggreko Version 6 05/11
  • 2.
    Truly a worldleader • Aggreko is the world leader in the supply of temporary power and temperature control solutions to companies around the world. • We have approximately 3,800 highly skilled and experienced permanent employees operating from over 148 locations based in over 34 countries • In 2010, we served customers in over 100 countries using over £1,660m (Euros €1.9bn) of rental fleet – In 2010, revenues of approximately £1.2bn (Euros €1.4bn) and operating profit of £317m (Euros €371m) • Aggreko plc is listed on the London Stock Exchange (AGK.L), is a member of the FTSE-100 index, and headquartered in Scotland • A truly global company with revenue that is relatively evenly split between North America, Europe and the rest of the world.
  • 3.
    Aggreko – inspiringconfidence in our customers • Customers have confidence in us – We are used to supporting customers who depend on us to keep their businesses operational – The equipment and services we provide are often mission-critical – Approximately a quarter of our business is as an emergency response • Being the biggest in the world means that we have more fleet, more people and more know-how to support our customers • We design and build much of our own equipment – Perfectly adapted to the demands of our business • Outstanding levels of customer and employee satisfaction verified and monitored by independent third parties • We invest heavily in technology to leverage our global knowledge at the local level – Identifying the right solution quickly is a key skill – “Somebody, somewhere in our global organisation has handled a similar customer issue before”
  • 4.
    Aggreko service support 16service centres The 5 Hub locations are: •Doncaster •Sutton •Bristol •Dumbarton •Portlaoise Logistics team based on site, to organise the transport to and from sites.
  • 5.
    UK and IrelandNational Rental Centres 24 Hour operation 365 days per year Offering: • Operational support • Sales / Technical support • Logistics support • Fuel management services UK Tel: 08458 24 7 365 Northern Ireland Tel: +00 353 57 86 63233 • Contract administration Southern Ireland Tel: 1890 200 400 • Invoicing services
  • 6.
    Aggreko service support Companysupport Service engineer capability • Global business supported by Aggreko – Certified power engineers Design & Manufacturing – Project management • Most products built within UK at our – On-site support manufacturing facilities in Scotland – Turnkey operation • Readily accessibility to spares. – Synchronising with the grid • Our products: Confident training supply • Combined service team of 112 service engineers with broad range of skills Sales support – Sales Engineer (Local sales) – Area Sales Manager – National Rental Centre Contact – National Accounts contact
  • 7.
    Typical local servicesupport structure
  • 8.
    Global reputation forsucceeding where the task is; Mission Critical Technically challenging • Industrial • Environmental – Process augmentation for an Oil refinery (Texas) – Base load power generation at -40C (Kyrgyzstan) and – Base-load power to a gold mine (Mongolia) +46C (Saudi Arabia) • Military Support – Super-silent requirements on film sets – Utility power to bases in Afghanistan and Iraq – Extreme emissions requirements in Chile • Utilities • Scale – Base-load power in Kenya, Venezuela, Sri Lanka, Greece, Spain, Indonesia, Pakistan – 500,000 gallons of water cooling per minute to power – Network maintenance support in France, UK and plant (USA) USA – 700km gas pipeline pressure-test (Norway) • Emergency Response – 140 MW temporary power plant (Kenya) – Grid transformer failure (UK) – 10km ice-rink (Europe) – Hurricanes Katrina and Rita • Speed of deployment • Events – Aluminium smelter looses transformer (Africa) – Superbowl, USA – Total chiller failure in milk processing plant (UK) – FIFA World Cup, South Africa – Olympics (Beijing, Vancouver) – Cooling tower collapse (North America) – Asia games
  • 9.
    The world’s largestfleet gives customers the largest choice • Power generation – 13,500 silenced canopied or containerised generators; Over 5,900 MW capacity – 15 kVA – 2000 KVA – Full range of electrical distribution, cabling & accessories – 1375 kVA gas generators Small Medium Large – 15 to 100 kVA 50 Hz – 50 to 500 kVA 50 Hz – 500 to 2100 kVA 50 Hz – Trailer and Skid mounted – Silenced – Silenced – 24 hr Bunded Fuel Tank – Bunded Fuel Tank – Diesel and Gas fuel – Silenced – Robust and versatile – ISO shipping compatible – Versatile power configurations – Advanced Digital controls – Aggreko Gempac controls – Aggreko SCADA compatible
  • 10.
    The world’s largestfleet gives customers the largest choice • Temperature Control – 2,100 chillers; 950 MW of capacity – 2,800 air conditioning and air handling units – 1,800 heaters – 150 cooling towers Air conditioners Chillers Cooling Towers – 5 to 200 kW (2 to 60 ton) – 50 to 3500 kW (15 to 1000 – 1000 to 3500 kW (300 to – High static air supply ton) 1000 tons) – Rental application specific – Modern Screw technology – Modular expansion to design – R134A non ODP refrigerant 100000 tons plus – Low Temperature ability – Rental specific design down to -40C/F – Project management and support services
  • 11.
    The world’s largestfleet gives customers the largest choice Loadbanks Transformers • Reactive & Resistive set-up • 2.5 MVA – 6 MVA • 600 kW – 6 MVA • 400 V – 25 kV • AC/DC • Multi-tap sets • 200 MVA fleet • Built in HV switchgear & protection • Sigma Data Acquisition and reporting package • Oil cooled • Containerised
  • 12.
    Applications: 20 MWtemporary power to major zinc mine • Situation the customer faced – Wind farm next to zinc mine required connection to the National grid – Also new transformers needed replacing at mine – Without 19 MW of power the mine would flood and extraction of €1.5 million/ day of zinc and lead would stop • Task that had to be done – Detailed planning of site requirements – Co-ordination of work with local utility company and mine • Action we took to sort the problem out – Aggreko provided 25 x 1250 kVA generators, 5 x 6.3 MVA transformers, a 6 MW loadbank, electrical distribution equipment and 375,000 litres of fuel – Equipment was transported in and commissioned to provide power for 5 continuous days • Result for the customer – The mine shutdown, restarted and ran as normal on 20 MW of temporary Aggreko power, with no loss of production
  • 13.
    Applications: Utility support • Situation the customer faced – The transformer failed at a sewage treatment works – The existing back up generators failed – Without power to the site it started to flood • Task that had to be done – Get temporary power to the site as quickly as possible to avoid a potential disaster • Action we took to sort the problem out – We provided 4 x 125 kVA, 1 x 320 kVA, 1 x 1250kVA, 2.1 MVA transformer and fuel tanks – We set up the equipment dispersed around the site to provide power directly to critical areas such as the control room and pumps • Result for the customer – The sewage works were operational before the flood reached the nearby river
  • 14.
    Applications: Utility support • Situation the customer faced – The customer was a Scottish power company – A 50 year old submarine cable supplying power from mainland Scotland to Bressay Island had to be moved as the sea bed was being dredged where the cable was laid. – The 400 residents and the local fish-meal factory needed a power supply while the cable was disconnected • Task that had to be done – Get temporary power to homes on the island and to support the factory which consumes up to 70% of the island’s power • Action we took to sort the problem out – We supplied transport, ferries and cranes to set up the equipment and cabling to supply the entire island – We provided 11 kV high voltage to the island, taking into account the fluctuating load demand of the factory. Fuel Management was included for 10,000 litres per day • Result for the customer – The island continued functioning as usual and the new submarine cable was installed without a problem
  • 15.
    Applications: Industrial • Situation the customer faced – The customer was a steel processor in Sheffield, UK – The floods of 2007 destroyed the cooling tower causing other parts of the plant to explode • Task that had to be done – A temporary cooling tower was required to get production up and running • Action we took to sort the problem out – We supplied and installed a 900 kW rental cooling system made up of a 600 kW chiller and a 300 kW chiller and provided a 800 kVA generator to power the equipment • Result for the customer – Downtime was kept to a minimum, reducing loss of profit and revenue – The plant’s customers were kept happy and no business was lost
  • 16.
    Applications: Industrial • Situation the customer faced – The customer was a chemical plant on Teeside, UK – Shut-down was required by law for preventative maintenance and servicing work • Task that had to be done – Power was needed to supply the temporary village set up for the maintenance workers • Action we took to sort the problem out – We supplied 2x350 kVA generators to power the 72 cabins • Result for the customer – The shut-down was a success and maintenance was finished within the time frame so that production could continue and profits were unaffected
  • 17.
    Applications: Petrochemical, oil& gas • Situation the customer faced – The customer was a oil company looking to increase its commercial oil supplies. It was building an accommodation platform in the UK, which was then going to be shipped to Qatar to be bolted onto an existing platform • Task that had to be done – Provide a reliable source of power during the build and then modify equipment for it to be taken on the platform while it was being moved • Action we took to sort the problem out – We supplied a 500 kVA generator and a loadbank, which sat on the dock to provide power to all the new equipment as it was being thoroughly tested – We supplied a 800 kVA generator and 2 x 14000 ltr fuel tanks, which were located on top of the 1,700 tonne platform as it sailed by barge to Qatar – The fuel tanks had to be bottom fed – We placed a heat detector within the generator on the platform • Result for the customer – The project ran smoothly and was successfully handed over to the Aggreko international team in Qatar for the commissioning stages
  • 18.
    Applications: Petrochemical, oil& gas • Situation the customer faced – The customer was an offshore oil company based in the North Sea. – An engine fire on one of their rigs stopped production completely • Task that had to be done – Provide a reliable supply of power to the rig so that operations could continue • Action we took to sort the problem out – We supplied 2x 1250 kVA generators – To save valuable deck space, we changed the alternators to specialist 600/690V, which removed the need for a separate TX transformer • Result for the customer – Production on the oil rig could commence with minimum disruption – Success has lead to further projects with the company
  • 19.
    Applications: Films andevents • Situation the customer faced – The customer was the world’s premier aerospace event – Farnborough air show – More than 1,200 global companies exhibit at the show – It is broadcast across the world • Task that had to be done – Provide a reliable source of power for the show including the broadcasting facilities, concessions and big screens – Ensure the equipment was installed without intruding on the show • Action we took to sort the problem out – We provided 15 MVA of power and 120,000 litres of fuel management – We set up watchkeep staff around the clock • Result for the customer – The event ran smoothly with no loss of power at any point during the week long event
  • 20.
    Applications: Films andevents • Situation the customer faced – The customer was an events organiser in Dublin, Ireland – They were setting up a temporary ice rink for the Christmas period and needed power and chillers • Task that had to be done – To preserve the quality of the ice, a chiller operating at -12 degrees centigrade 24/7 was required • Action we took to sort the problem out – We provided a 750 kW chiller which was powered by a 200 kVA twinpack – We also provided 2 x 400 kVA generators to power the themed market, café, viewing area and reception area at the rink • Result for the customer – The event ran smoothly throughout November, December and January with no problems at all
  • 21.
    Applications: Telecommunications • Situation the customer faced – Network Rail is implementing a new rail communications system to improve performance and safety • Task that had to be done – Network Rail is constructing more than 2,000 masts – Each location needed power but in some situations the DNO couldn’t provide power, there were areas which had wayleave issues or there was no existing track side source • Action we took to sort the problem out – We supplied silenced canopied generators between 15 kVA and 45 kVA to recharge the signal masts’ UPS and provide backup • Result for the customer – Our national presence has meant Network Rail needs to only liaise with one supplier for its temporary power needs, helping to make the project run smoothly
  • 22.
    Applications: Military • Situation the customer faced – Twice a year, the Royal Navy takes its vessels on sea trials to prove they’re fit for purpose, which is necessary to achieve Lloyds insurance accreditation – The trial process involves simulating loss of power to the carrying ship • Task that had to be done – a rescue operation is implemented with the generator kicking in to provide emergency back-up power, allowing all equipment to continue to function • Action we took to sort the problem out – We provided a 500 kVA generator, distribution board and cables to ensure the Navy had a reliable source of power while out at sea on the trials • Result for the customer – By providing quality and reliable back-up equipment, the Royal Navy now has full confidence that in the event of power failure, the rescue mission can be completed
  • 23.
    Applications: Shipping • Situation the customer faced – A cargo ship was departing Belfast en route for South Africa when inspections discovered that both the on board generator and the back up generator were faulty – If the problem was not solved the ship would have had a delayed start resulting in fines and would have had to stop in France for repair work delaying them further • Task that had to be done – A temporary generator was required to supply power to the ship and due to maritime law a back up generator was required also • Action we took to sort the problem out – We supplied 800 kVA containerised unit and 100 metres of cable to supply the control room with power • Result for the customer – By working throughout the night Aggreko ensured that the ship departed on time and no fines were received
  • 24.
    Outstanding reputation amongstour own customers Net Promoter Score • We have built a reputation for outstanding USAA 82% Homebanc* 81% customer service Harley-Davidson 81% – 85% of our customers would recommend us to a friend * Costco 79% – 90% of our customers were extremely/very satisfied ** Amazon.com 73% • What our customer’s say (Taken from customer Chick-fill-A* 72% satisfaction surveys) eBay 71% – “Aggreko have now and in the past provided us with excellent Vanguard 70% service which we hope to be able to continue with in the SAS 66% future.” Apple 66% – “I don't know of any other sales person or company that I can Aggreko 60% call at 11 PM at night and have a generator onsite by 10:00 AM the next morning.” Intuit(TurboTax)* 58% – “We can only say again many thanks to the whole team they Cisco 57% helped us keep our train service moving. And the greatest FedEx 56% testament to that was our customers never noticed” Southwest Airlines 51% – “Aggreko responded at a difficult time of the year ( 2 days American Express 50% before Christmas and extreme weather conditions ) to provide Commerce Bank 50% us with heat and power to thaw frozen pipe work, the service Dell 50% was second to none, a site visit by an engineer to spec the job, followed by a quote 1 hour later and next day delivery of Adobe 48% the equipment and installation.” Electronic Arts 48% • All NPS statistics are based on Bain or Satmetrix surveys, with the exceptions of Intuit, Chick-fill-A and HomeBanc. For these firms, data was used that they provided. | 24 Their data was gathered in a reasonable (but not perfectly equivalent) fashion. *Based on scoring of 8 or more on customer data received in 2010 **Based on scoring of 7 or more on customer data received in 2010.