SlideShare a Scribd company logo
1 of 2
Facility Plant Mechanical Engineer
DOUGLAS HAN
1430 W. Casino Rd. Everett, WA 98204 | 425.343.5151 | doughan0522@yahoo.com
U.S. Citizen
CAPABILITIES:
15+ years of experience in industrial and commercial design developing in plant modification of
mechanical systems, HVAC, ECS, Energy Conservation, process piping, CM&CS application,
UV fire detection and protection systems engineering with broad experience in commercial,
military industrial projects of domestic and international programs. Prepared bid estimating and
proposals to provide installation and detailed documentation. Managed supplier development,
test and production activities, and directed the supplier to optimize integration and achieve
program goals. Design, Analysis, Integration, Test, and Project Management experience.
Extensive knowledge of AutoCAD 2014.
PC usage: proficient in MS Word, Excel.
WORK EXPERIENCE:
Mechanical Engineer | Boeing Company, Bellevue, WA | 07.2013-12.23.2015
Made conceptual designs developing in whole site building mechanical system and modification
of data center HVAC, Energy Conservation, CM&CS and mechanical systems analysis, and
trouble-shooting. Developed and implemented testing and acceptance of HVAC, CM&CS and
mechanical system to validate performance and perform condition code analysis. Worked with
team members to develop and improve handling plans for data center HVAC, CM&CS and site
mechanical systems.
Mechanical Engineer |AMERICAN ORDNANCE LLC, Middle Town, IA | 08.2010-12.2012
Conceptual, design developing in plant HVAC, ECS, Energy Conservation, process piping,
CM&CS application, UV fire detection and protection systems to establish in the system design
analysis assay, install designs and trouble shooting for the IOWAArmy Ammunition Plant
Projects include Hellfire, X-Cal liver, Javelin, Hawk, Tow Missile Warhead, 40MM, Mortars,
Energetic, Artillery and Tank Ammunition. Performed system layout and sizing, code compliance
and assist others with engineering related problems & solutions. Prioritized, delegated and
tracked performance and documentation of analyses of mechanisms/ ordnance components and
systems selecting appropriate methods to validate or assess the design. Completion of detailed
engineering-designing-drafting with AutoCAD. Prepared bid estimating to provide installation
and detailed documentation.
Mechanical Engineer | BOEING COMPANY, Seattle, WA | 04.2007-12.2008
Provided HVAC, piping, plumbing and fire protection system design with 2008 AutoCAD
support for IDS F-22 plant mechanical system projects. Performed system layout and sizing,
code compliance and assist others with engineering related problems. Responsible for
developing plant mechanical system designs, equipment’s selection, schedule and supporting
calculations used toward producing construction drawings for piping and HVAC. Reviewed
proposals and/or design providing direction and recommendations for manufacturing process
equipment. Developed specifications to purchase equipment’s, reviewed conceptual and final
design, estimating equipment costs for the modification of equipment systems.
General Partner | P & H Co. Inc., Kirkland, WA | 10.1996-06.2007
Prepared bid estimating and proposals to provide installation and detailed documentation for
industrial and commercial buildings. Provides overall design and project management from the
initial project development stage through the completion of construction. Prepare specification
and equipment schedule preparation for HVAC, piping, plumbing and fire protection system.
Projects included a new computer chip manufacture of Cardiff Plant of Wales in England.
Mechanical Engineer | BOEING COMPANY, Auburn, WA | 1992-1996
Prepared engineering designs, specification, cost estimates of mechanical systems.
Conceptual design to establish the system design analysis, install designs and troubleshooting.
Performed system layout, code compliance and assist others with engineering related problems
& solutions. Reviewed proposals and/or design providing direction and recommendations for
manufacturing process equipment.
EDUCATION:
Bachelor's Degree | University of Washington, Seattle, Washington | Major: Mechanical
Engineering
Associate Degree | Green River Community College, Auburn, Washington | Major: Mechanical
Engineering
Bachelor's Degree | In Ha University, Inchon S. Korea | Major: Mechanical Engineering

More Related Content

What's hot

Baher mohamed ali ahmed resume ###
Baher mohamed ali ahmed resume ###Baher mohamed ali ahmed resume ###
Baher mohamed ali ahmed resume ###Baher Elziady
 
Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad
 
Jessica_Cabral_Resume1i
Jessica_Cabral_Resume1iJessica_Cabral_Resume1i
Jessica_Cabral_Resume1iJessica Cabral
 
Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer Lee
 
Rishi.Purohit Resume
Rishi.Purohit ResumeRishi.Purohit Resume
Rishi.Purohit ResumeRishi Purohit
 
Estimation&Proposal Manager
Estimation&Proposal  ManagerEstimation&Proposal  Manager
Estimation&Proposal Manageryasir arafath
 
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo
 
Taha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum
 
Ankur Pandey, Mechanical Project Engineer
Ankur Pandey, Mechanical Project EngineerAnkur Pandey, Mechanical Project Engineer
Ankur Pandey, Mechanical Project EngineerAnkur Pandey
 

What's hot (20)

RESUME98[1]. (1)
RESUME98[1]. (1)RESUME98[1]. (1)
RESUME98[1]. (1)
 
Xyntech Training Services
Xyntech Training ServicesXyntech Training Services
Xyntech Training Services
 
Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)
 
Perminder Kaur
Perminder KaurPerminder Kaur
Perminder Kaur
 
Baher mohamed ali ahmed resume ###
Baher mohamed ali ahmed resume ###Baher mohamed ali ahmed resume ###
Baher mohamed ali ahmed resume ###
 
Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_Cv
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 
Jessica_Cabral_Resume1i
Jessica_Cabral_Resume1iJessica_Cabral_Resume1i
Jessica_Cabral_Resume1i
 
Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)
 
New Resume
New ResumeNew Resume
New Resume
 
IRY-PC Water_Design
IRY-PC Water_DesignIRY-PC Water_Design
IRY-PC Water_Design
 
Resume JULY 2016
Resume JULY 2016Resume JULY 2016
Resume JULY 2016
 
sjtcv_2016
sjtcv_2016sjtcv_2016
sjtcv_2016
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
updated habeeb cv
updated habeeb cvupdated habeeb cv
updated habeeb cv
 
Rishi.Purohit Resume
Rishi.Purohit ResumeRishi.Purohit Resume
Rishi.Purohit Resume
 
Estimation&Proposal Manager
Estimation&Proposal  ManagerEstimation&Proposal  Manager
Estimation&Proposal Manager
 
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
 
Taha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum Updated CV
Taha Anjum Updated CV
 
Ankur Pandey, Mechanical Project Engineer
Ankur Pandey, Mechanical Project EngineerAnkur Pandey, Mechanical Project Engineer
Ankur Pandey, Mechanical Project Engineer
 

Similar to Facility Plant Mechanical Engineer Resume

Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVMOHAMMED ABDUL AZEEM
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)Shiraz khan
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerCHETAN SHARMA
 
PipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumePipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumeSharon Haddix
 
Perez Jay_Resume_
Perez Jay_Resume_Perez Jay_Resume_
Perez Jay_Resume_Jay Perez
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussainZahir Hussain
 
Eli J McElwain Professional Resume
Eli J McElwain Professional ResumeEli J McElwain Professional Resume
Eli J McElwain Professional ResumeEli McElwain
 
CV_RIO_ MECH. PIPING DESIGN ENGINEER
CV_RIO_ MECH. PIPING DESIGN ENGINEERCV_RIO_ MECH. PIPING DESIGN ENGINEER
CV_RIO_ MECH. PIPING DESIGN ENGINEERRio Afriyoldi
 
McKee_Arthur 2016
McKee_Arthur 2016McKee_Arthur 2016
McKee_Arthur 2016SKIP MCKEE
 

Similar to Facility Plant Mechanical Engineer Resume (20)

CV - Kelum Hemka Siriwardhena
CV - Kelum Hemka SiriwardhenaCV - Kelum Hemka Siriwardhena
CV - Kelum Hemka Siriwardhena
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CV
 
Bio - Resume
Bio - ResumeBio - Resume
Bio - Resume
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)
 
Hiroshi a sugathan
Hiroshi a sugathanHiroshi a sugathan
Hiroshi a sugathan
 
cv new
cv newcv new
cv new
 
JCC RESUME 12.15.2015
JCC RESUME 12.15.2015JCC RESUME 12.15.2015
JCC RESUME 12.15.2015
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
PipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumePipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix Resume
 
Perez Jay_Resume_
Perez Jay_Resume_Perez Jay_Resume_
Perez Jay_Resume_
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Eli J McElwain Professional Resume
Eli J McElwain Professional ResumeEli J McElwain Professional Resume
Eli J McElwain Professional Resume
 
CV_RIO_ MECH. PIPING DESIGN ENGINEER
CV_RIO_ MECH. PIPING DESIGN ENGINEERCV_RIO_ MECH. PIPING DESIGN ENGINEER
CV_RIO_ MECH. PIPING DESIGN ENGINEER
 
McKee_Arthur 2016
McKee_Arthur 2016McKee_Arthur 2016
McKee_Arthur 2016
 
updated cv 2015
updated cv 2015updated cv 2015
updated cv 2015
 
Nithin-CV
Nithin-CVNithin-CV
Nithin-CV
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 

Facility Plant Mechanical Engineer Resume

  • 1. Facility Plant Mechanical Engineer DOUGLAS HAN 1430 W. Casino Rd. Everett, WA 98204 | 425.343.5151 | doughan0522@yahoo.com U.S. Citizen CAPABILITIES: 15+ years of experience in industrial and commercial design developing in plant modification of mechanical systems, HVAC, ECS, Energy Conservation, process piping, CM&CS application, UV fire detection and protection systems engineering with broad experience in commercial, military industrial projects of domestic and international programs. Prepared bid estimating and proposals to provide installation and detailed documentation. Managed supplier development, test and production activities, and directed the supplier to optimize integration and achieve program goals. Design, Analysis, Integration, Test, and Project Management experience. Extensive knowledge of AutoCAD 2014. PC usage: proficient in MS Word, Excel. WORK EXPERIENCE: Mechanical Engineer | Boeing Company, Bellevue, WA | 07.2013-12.23.2015 Made conceptual designs developing in whole site building mechanical system and modification of data center HVAC, Energy Conservation, CM&CS and mechanical systems analysis, and trouble-shooting. Developed and implemented testing and acceptance of HVAC, CM&CS and mechanical system to validate performance and perform condition code analysis. Worked with team members to develop and improve handling plans for data center HVAC, CM&CS and site mechanical systems. Mechanical Engineer |AMERICAN ORDNANCE LLC, Middle Town, IA | 08.2010-12.2012 Conceptual, design developing in plant HVAC, ECS, Energy Conservation, process piping, CM&CS application, UV fire detection and protection systems to establish in the system design analysis assay, install designs and trouble shooting for the IOWAArmy Ammunition Plant Projects include Hellfire, X-Cal liver, Javelin, Hawk, Tow Missile Warhead, 40MM, Mortars, Energetic, Artillery and Tank Ammunition. Performed system layout and sizing, code compliance and assist others with engineering related problems & solutions. Prioritized, delegated and tracked performance and documentation of analyses of mechanisms/ ordnance components and systems selecting appropriate methods to validate or assess the design. Completion of detailed engineering-designing-drafting with AutoCAD. Prepared bid estimating to provide installation and detailed documentation.
  • 2. Mechanical Engineer | BOEING COMPANY, Seattle, WA | 04.2007-12.2008 Provided HVAC, piping, plumbing and fire protection system design with 2008 AutoCAD support for IDS F-22 plant mechanical system projects. Performed system layout and sizing, code compliance and assist others with engineering related problems. Responsible for developing plant mechanical system designs, equipment’s selection, schedule and supporting calculations used toward producing construction drawings for piping and HVAC. Reviewed proposals and/or design providing direction and recommendations for manufacturing process equipment. Developed specifications to purchase equipment’s, reviewed conceptual and final design, estimating equipment costs for the modification of equipment systems. General Partner | P & H Co. Inc., Kirkland, WA | 10.1996-06.2007 Prepared bid estimating and proposals to provide installation and detailed documentation for industrial and commercial buildings. Provides overall design and project management from the initial project development stage through the completion of construction. Prepare specification and equipment schedule preparation for HVAC, piping, plumbing and fire protection system. Projects included a new computer chip manufacture of Cardiff Plant of Wales in England. Mechanical Engineer | BOEING COMPANY, Auburn, WA | 1992-1996 Prepared engineering designs, specification, cost estimates of mechanical systems. Conceptual design to establish the system design analysis, install designs and troubleshooting. Performed system layout, code compliance and assist others with engineering related problems & solutions. Reviewed proposals and/or design providing direction and recommendations for manufacturing process equipment. EDUCATION: Bachelor's Degree | University of Washington, Seattle, Washington | Major: Mechanical Engineering Associate Degree | Green River Community College, Auburn, Washington | Major: Mechanical Engineering Bachelor's Degree | In Ha University, Inchon S. Korea | Major: Mechanical Engineering