Prasenjit Chaliha 
Mobile: +91-9958199128 E-Mail: prasenjitchaliha@gmail.com 
PIPING –DESIGN ENGINEER 
SYNOPSIS 
 An experienced professional with 5.5 years of experience as Design Engineer in Power Plant and Oil 
& Gas Sector while implementing various Engineering and LSTK projects. 
 Significant experience in Piping Material, Isometric checking, Equipment Checking, Nozzle orientation 
of Tanks, vessels. Liaising of vendor and carry out detailed analysis about piping related issues. 
Proficient in MTO extraction from P&ID, accomplished in Piping Materials – detailing of Piping Material 
specifications, preparing of Valve datasheets, Pipe Wall Thickness Calculation, 3D-Modelling in PDMS. 
Stress Analysis using CAESAR II. 
 Good knowledge in using PDMS, Caesar II & Navisworks. 
 Good knowledge of ASTM standards, ASME codes. 
 An effective communicator with demonstrated ease in coordinating with team members & sharing 
resources during project till final delivery. 
 Design Vetting/Review of various E&M equipment's such as Turbines, MIV, Cooling Water System, 
Drainage & Dewatering system, Compressed Air System, Fire-fighting System, EOT etc. 
 Finalizing of Piping Layout for Cooling water system, Drainage & Dewatering System and Fire Fighting 
System. 
 Preparation of DPR Report-: Selection of Turbine, Sizing of Power House, Preparation of layout 
Drawing, Preparation of technical specification & Bill of materials. 
 Preparation of BIDS (Technical)/ (Financial), Preparation of work plan, manning schedule, 
methodology, etc. 
ACADEMICS 
 Diploma in Piping Engineering (includes PDMS, Caesar II, Navisworks) from Concept Institute for 
Design Engineers, Noida in 2014. 
 Post Graduate Diploma in Hydro Power Plant Engineering from NPTI, Nangle in 2010. 
 B-Tech Mechanical from Dr MGR Educational and Research Institute, Chennai in 2007. 
 Class 12th: Delhi Public School, Dhaligaon, Assam 
 Class 10th: Delhi Public School, Dhaligaon, Assam 
SOFTWARE SKILLS 
 Technical Software : Navisworks, PDMS, CAESAR-II, Auto Cad 
 General Software : MS-Office, MS Project 
ORGANIZATIONAL EXPERIENCE 
Concept Consulting & Infra Pvt Ltd July 2014-till date 
Key Responsibilities: Working as Design Engineer and responsible for following activities: 
 Manual MTO from P&ID. 
 Preparation of Valve data sheet. 
 3D modelling of DM water plant in PDMS. 
 Comments on pump vendor drawings. 
 Stress Analysis of heat exchanger lines using CAESAR II.
JACOBS-CES, Gurgaon December 2010 – June 2014 
Project : 2x48 MW Rongni-chu Hydroelectric Project, Sikkim, India. 
Client : Madhya Bharat Power Corporation Limited 
Key Responsibilities: Worked as Sr. Engineer/Engineer and responsible for following activities: 
 Design Vetting/Review of various E&M equipment's such as Turbines, MIV, Cooling Water System, 
Drainage & Dewatering system, Compressed Air System, Fire-fighting System, EOT etc. 
 Finalizing of Piping Layout for Cooling water system, D&D System and Fire Fighting System 
 Monitoring of milestone chart and achieving of targets. 
 Coordination with Engineering, Procurement & construction department for preparation of Civil 
Drawing. 
 Attending project review meetings with Clients / Consultants 
Project : 2x22 MW Meyong Hydro Electric Project, Arunachal Pradesh, India 
Client : Patel Energy Limited 
Project : 2x23.5 MW Digin Hydro Electric Project, Arunachal Pradesh, India 
Client : Patel Energy Limited 
Project : 3x7.7 MW Gopalpur Hydro Electric project, Madhya Pradesh, India 
Client : Narmada Valley Development Authority (NVDA) 
Project : 3x7 MW Amring Hydro Electric Project, Assam, India 
Client : Assam Power Generation Corporation Limited 
Key Responsibilities: Worked as Sr. Engineer/Engineer/Asst. Engineer and responsible for following 
activities: 
 Preparation of DPR Report which include Selection of Turbine, Sizing of Power House, Preparation of 
layout Drawing. 
 Preparation of technical specification & Bill of materials 
IOT Engineering Projects Limited, Mumbai March 2008- June 2009 
Project : Ambuja Cement Limited 
Client : Ambuja Cement Limited 
And 
Project : Murli Industries Limited (Cement Division) 
Client : Murli Industries Limited 
Key Responsibilities: Worked as GET and responsible for following major activities: 
 Erection, Commissioning, Fabrication and Execution of various activities 
 Preparation of milestone charts and achieving the targets 
 Project Planning and monitoring of projects at project site 
 Planning and allocation of resources in an efficient way 
 Co-ordination at site and resolving various issues 
 Preparation of review reports 
 Ensuring timely completion of projects, quality monitoring. 
Lucas Indian Service Limited, Chennai Oct2007- Feb 2008 
Key Responsibilities: Worked as Trainee Engineer and responsible for following major activities: 
 Maintenance and servicing of Delphi Pumps and Injectors 
 Testing of Pumps and Injectors 
PERSONAL DETAILS 
Date of Birth : 19th November, 1985 
Nationality : Indian 
Present Address : House no 359, Room No-108, Gali no-2, Village- Chalera, Sector 44, Noida.
Passport : K5159561, valid up to- 11.06.2023

Prasenjit Chaliha 2014

  • 1.
    Prasenjit Chaliha Mobile:+91-9958199128 E-Mail: prasenjitchaliha@gmail.com PIPING –DESIGN ENGINEER SYNOPSIS  An experienced professional with 5.5 years of experience as Design Engineer in Power Plant and Oil & Gas Sector while implementing various Engineering and LSTK projects.  Significant experience in Piping Material, Isometric checking, Equipment Checking, Nozzle orientation of Tanks, vessels. Liaising of vendor and carry out detailed analysis about piping related issues. Proficient in MTO extraction from P&ID, accomplished in Piping Materials – detailing of Piping Material specifications, preparing of Valve datasheets, Pipe Wall Thickness Calculation, 3D-Modelling in PDMS. Stress Analysis using CAESAR II.  Good knowledge in using PDMS, Caesar II & Navisworks.  Good knowledge of ASTM standards, ASME codes.  An effective communicator with demonstrated ease in coordinating with team members & sharing resources during project till final delivery.  Design Vetting/Review of various E&M equipment's such as Turbines, MIV, Cooling Water System, Drainage & Dewatering system, Compressed Air System, Fire-fighting System, EOT etc.  Finalizing of Piping Layout for Cooling water system, Drainage & Dewatering System and Fire Fighting System.  Preparation of DPR Report-: Selection of Turbine, Sizing of Power House, Preparation of layout Drawing, Preparation of technical specification & Bill of materials.  Preparation of BIDS (Technical)/ (Financial), Preparation of work plan, manning schedule, methodology, etc. ACADEMICS  Diploma in Piping Engineering (includes PDMS, Caesar II, Navisworks) from Concept Institute for Design Engineers, Noida in 2014.  Post Graduate Diploma in Hydro Power Plant Engineering from NPTI, Nangle in 2010.  B-Tech Mechanical from Dr MGR Educational and Research Institute, Chennai in 2007.  Class 12th: Delhi Public School, Dhaligaon, Assam  Class 10th: Delhi Public School, Dhaligaon, Assam SOFTWARE SKILLS  Technical Software : Navisworks, PDMS, CAESAR-II, Auto Cad  General Software : MS-Office, MS Project ORGANIZATIONAL EXPERIENCE Concept Consulting & Infra Pvt Ltd July 2014-till date Key Responsibilities: Working as Design Engineer and responsible for following activities:  Manual MTO from P&ID.  Preparation of Valve data sheet.  3D modelling of DM water plant in PDMS.  Comments on pump vendor drawings.  Stress Analysis of heat exchanger lines using CAESAR II.
  • 2.
    JACOBS-CES, Gurgaon December2010 – June 2014 Project : 2x48 MW Rongni-chu Hydroelectric Project, Sikkim, India. Client : Madhya Bharat Power Corporation Limited Key Responsibilities: Worked as Sr. Engineer/Engineer and responsible for following activities:  Design Vetting/Review of various E&M equipment's such as Turbines, MIV, Cooling Water System, Drainage & Dewatering system, Compressed Air System, Fire-fighting System, EOT etc.  Finalizing of Piping Layout for Cooling water system, D&D System and Fire Fighting System  Monitoring of milestone chart and achieving of targets.  Coordination with Engineering, Procurement & construction department for preparation of Civil Drawing.  Attending project review meetings with Clients / Consultants Project : 2x22 MW Meyong Hydro Electric Project, Arunachal Pradesh, India Client : Patel Energy Limited Project : 2x23.5 MW Digin Hydro Electric Project, Arunachal Pradesh, India Client : Patel Energy Limited Project : 3x7.7 MW Gopalpur Hydro Electric project, Madhya Pradesh, India Client : Narmada Valley Development Authority (NVDA) Project : 3x7 MW Amring Hydro Electric Project, Assam, India Client : Assam Power Generation Corporation Limited Key Responsibilities: Worked as Sr. Engineer/Engineer/Asst. Engineer and responsible for following activities:  Preparation of DPR Report which include Selection of Turbine, Sizing of Power House, Preparation of layout Drawing.  Preparation of technical specification & Bill of materials IOT Engineering Projects Limited, Mumbai March 2008- June 2009 Project : Ambuja Cement Limited Client : Ambuja Cement Limited And Project : Murli Industries Limited (Cement Division) Client : Murli Industries Limited Key Responsibilities: Worked as GET and responsible for following major activities:  Erection, Commissioning, Fabrication and Execution of various activities  Preparation of milestone charts and achieving the targets  Project Planning and monitoring of projects at project site  Planning and allocation of resources in an efficient way  Co-ordination at site and resolving various issues  Preparation of review reports  Ensuring timely completion of projects, quality monitoring. Lucas Indian Service Limited, Chennai Oct2007- Feb 2008 Key Responsibilities: Worked as Trainee Engineer and responsible for following major activities:  Maintenance and servicing of Delphi Pumps and Injectors  Testing of Pumps and Injectors PERSONAL DETAILS Date of Birth : 19th November, 1985 Nationality : Indian Present Address : House no 359, Room No-108, Gali no-2, Village- Chalera, Sector 44, Noida.
  • 3.
    Passport : K5159561,valid up to- 11.06.2023