Project Name:
Additional Conveyor and Motor
Current Problem(s):
When switchingfillers,thereis a 30-45 minute change
over due to the removal and resetting of the two star
wheels.
Suggested Solutions(s):
The process of fillingbottles can be greatly improved
through the addition of a secondary conveyor and two
star wheels. With an additional conveyor and second
set of star wheels, bottles can be diverted to one of
the two fillers withoutthe required change over time.
The only time requirement would be shiftingthe rails
to directthe bottles towards the other filler.
Suggested Products & Quotes:
Leeson #110048.00 (Motor) - $282.91
Premium Efficient(Motor) #114638.00 - $471.88
Part#20Q25H56 (Gearbox) - $828.95
Conveyor #MCE56772 - $5,314.00
Savings/Results:
With the addition of the two star wheels and new
conveyor (includingmotor), itis estimated that we can
saveapproximately 40 minutes per change over. In
addition to reducingchange over time, Travis can
begin testing concentrations so that the linedoes not
have to stop production. This saves an additional 5-10
minutes per change over when switchingfillers.
ROI Calculation:
25 changes X 40 minutes per change X $200/hour =
$3,333.33
 Estimated Cost: $6,500 (Approximately)
 ROI: 6,500/3,333 = 2 years (Approximately)
Current Design
Capper
Filler #1 Filler #2
* *
Both re-enter to Capper
Divert for Filler #2
Suggested Design
Capper
Filler
#1
Filler
#2
Re-enter for Filler #2
Divert for Filler #1
* * * *
Additional Conveyor Project

More Related Content

What's hot

Transformer manufacturing3 1
Transformer manufacturing3 1Transformer manufacturing3 1
Transformer manufacturing3 1
nil7769984348
 
Sales Presentation: MJB India Gas Turbine Services
Sales Presentation: MJB India Gas Turbine ServicesSales Presentation: MJB India Gas Turbine Services
Sales Presentation: MJB India Gas Turbine ServicesSunil Kumar
 
2015 Fall Natural Gas Roundtable - Kwik Trip Presentation
2015 Fall Natural Gas Roundtable - Kwik Trip Presentation2015 Fall Natural Gas Roundtable - Kwik Trip Presentation
2015 Fall Natural Gas Roundtable - Kwik Trip Presentation
Wisconsin Clean Cities
 
Julius job details report
Julius job details report Julius job details report
Julius job details report
Olusegun Julius Adegboyega
 
Dumper Cycle Study
Dumper Cycle StudyDumper Cycle Study
Dumper Cycle Study
Mousom Singha
 
Oee mining
Oee miningOee mining
Oee mining
piyawut
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009
Shaun West
 
Comparing Replacement Components to Extend the Life of Gearboxes
Comparing Replacement Components to Extend the Life of GearboxesComparing Replacement Components to Extend the Life of Gearboxes
Comparing Replacement Components to Extend the Life of Gearboxes
Sentient Science
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
Manohar Tatwawadi
 
MSM project reference in Crane_Oct 2015
MSM project reference in Crane_Oct 2015MSM project reference in Crane_Oct 2015
MSM project reference in Crane_Oct 2015Sergelen Byamba
 
Internal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental ConceptsInternal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental Concepts
Hassan Raza
 
Ousep abstract
Ousep  abstractOusep  abstract
Ousep abstract
tp jayamohan
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship PortfolioNicole Ripperda
 
Civil work
Civil workCivil work
Civil work
teiplgroup
 
KAVI JOSHI PRESENTATION
KAVI JOSHI PRESENTATIONKAVI JOSHI PRESENTATION
KAVI JOSHI PRESENTATIONKavi Joshi
 
Tech481_ProjectPresentation_GroupB - Copy
Tech481_ProjectPresentation_GroupB - CopyTech481_ProjectPresentation_GroupB - Copy
Tech481_ProjectPresentation_GroupB - CopyKyle Malec
 

What's hot (20)

Transformer manufacturing3 1
Transformer manufacturing3 1Transformer manufacturing3 1
Transformer manufacturing3 1
 
Sales Presentation: MJB India Gas Turbine Services
Sales Presentation: MJB India Gas Turbine ServicesSales Presentation: MJB India Gas Turbine Services
Sales Presentation: MJB India Gas Turbine Services
 
2015 Fall Natural Gas Roundtable - Kwik Trip Presentation
2015 Fall Natural Gas Roundtable - Kwik Trip Presentation2015 Fall Natural Gas Roundtable - Kwik Trip Presentation
2015 Fall Natural Gas Roundtable - Kwik Trip Presentation
 
Julius job details report
Julius job details report Julius job details report
Julius job details report
 
IGTEC Presentation1
IGTEC Presentation1IGTEC Presentation1
IGTEC Presentation1
 
Dumper Cycle Study
Dumper Cycle StudyDumper Cycle Study
Dumper Cycle Study
 
Oee mining
Oee miningOee mining
Oee mining
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009
 
Comparing Replacement Components to Extend the Life of Gearboxes
Comparing Replacement Components to Extend the Life of GearboxesComparing Replacement Components to Extend the Life of Gearboxes
Comparing Replacement Components to Extend the Life of Gearboxes
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
Foundation Presentation .pptx
Foundation Presentation .pptxFoundation Presentation .pptx
Foundation Presentation .pptx
 
my resume
my resumemy resume
my resume
 
MSM project reference in Crane_Oct 2015
MSM project reference in Crane_Oct 2015MSM project reference in Crane_Oct 2015
MSM project reference in Crane_Oct 2015
 
Internal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental ConceptsInternal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental Concepts
 
Ousep abstract
Ousep  abstractOusep  abstract
Ousep abstract
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship Portfolio
 
Civil work
Civil workCivil work
Civil work
 
KAVI JOSHI PRESENTATION
KAVI JOSHI PRESENTATIONKAVI JOSHI PRESENTATION
KAVI JOSHI PRESENTATION
 
ME 515 Design Project
ME 515 Design ProjectME 515 Design Project
ME 515 Design Project
 
Tech481_ProjectPresentation_GroupB - Copy
Tech481_ProjectPresentation_GroupB - CopyTech481_ProjectPresentation_GroupB - Copy
Tech481_ProjectPresentation_GroupB - Copy
 

Viewers also liked

Absorbibles8.5x11
Absorbibles8.5x11Absorbibles8.5x11
Absorbibles8.5x11
J SL
 
Why The Tyrants Want Your Guns 6th Issue Infowars Magazine
Why The Tyrants Want Your Guns 6th Issue Infowars MagazineWhy The Tyrants Want Your Guns 6th Issue Infowars Magazine
Why The Tyrants Want Your Guns 6th Issue Infowars Magazine
infowarrior78
 
YouthFirst V1-1002
YouthFirst V1-1002YouthFirst V1-1002
YouthFirst V1-1002R R Apache
 
Designing Brand-Project Alt
Designing Brand-Project AltDesigning Brand-Project Alt
Designing Brand-Project Alt
Sema Aksu
 
How to travel like James Bond
How to travel like James BondHow to travel like James Bond
How to travel like James Bond
silbatron
 
Feedback on pitch
Feedback on pitchFeedback on pitch
Feedback on pitch
Arshyarn
 
Design in Japan and US
Design in Japan and USDesign in Japan and US
Design in Japan and US
Seiko Itakura
 
The role of additives in crystal growth control
The role of additives in crystal growth control The role of additives in crystal growth control
The role of additives in crystal growth control
K_Bodnar
 
Travel Wise Accounting Case
Travel Wise Accounting CaseTravel Wise Accounting Case
Travel Wise Accounting Case
Chamuel Michael Santiago
 
澳门饮食文化及行为调研-优秀作品3 連勝風行茶餐廳調研報告冊
澳门饮食文化及行为调研-优秀作品3 連勝風行茶餐廳調研報告冊澳门饮食文化及行为调研-优秀作品3 連勝風行茶餐廳調研報告冊
澳门饮食文化及行为调研-优秀作品3 連勝風行茶餐廳調研報告冊
Chiyu Zan
 
产品研发设计 优秀作品4-withu
产品研发设计 优秀作品4-withu产品研发设计 优秀作品4-withu
产品研发设计 优秀作品4-withu
Chiyu Zan
 

Viewers also liked (19)

Wael CV Latest1
Wael CV Latest1Wael CV Latest1
Wael CV Latest1
 
CV Jamal S
CV Jamal SCV Jamal S
CV Jamal S
 
Absorbibles8.5x11
Absorbibles8.5x11Absorbibles8.5x11
Absorbibles8.5x11
 
Why The Tyrants Want Your Guns 6th Issue Infowars Magazine
Why The Tyrants Want Your Guns 6th Issue Infowars MagazineWhy The Tyrants Want Your Guns 6th Issue Infowars Magazine
Why The Tyrants Want Your Guns 6th Issue Infowars Magazine
 
YouthFirst V1-1002
YouthFirst V1-1002YouthFirst V1-1002
YouthFirst V1-1002
 
Designing Brand-Project Alt
Designing Brand-Project AltDesigning Brand-Project Alt
Designing Brand-Project Alt
 
Nowotny Ltr of Rec
Nowotny Ltr of RecNowotny Ltr of Rec
Nowotny Ltr of Rec
 
SD2016-07)SIP
SD2016-07)SIPSD2016-07)SIP
SD2016-07)SIP
 
BUS 315 Group Project-2
BUS 315 Group Project-2BUS 315 Group Project-2
BUS 315 Group Project-2
 
How to travel like James Bond
How to travel like James BondHow to travel like James Bond
How to travel like James Bond
 
Feedback on pitch
Feedback on pitchFeedback on pitch
Feedback on pitch
 
Segunda sesion zaragoza
Segunda sesion zaragozaSegunda sesion zaragoza
Segunda sesion zaragoza
 
Alaa CV M
Alaa CV MAlaa CV M
Alaa CV M
 
Design in Japan and US
Design in Japan and USDesign in Japan and US
Design in Japan and US
 
The role of additives in crystal growth control
The role of additives in crystal growth control The role of additives in crystal growth control
The role of additives in crystal growth control
 
Travel Wise Accounting Case
Travel Wise Accounting CaseTravel Wise Accounting Case
Travel Wise Accounting Case
 
澳门饮食文化及行为调研-优秀作品3 連勝風行茶餐廳調研報告冊
澳门饮食文化及行为调研-优秀作品3 連勝風行茶餐廳調研報告冊澳门饮食文化及行为调研-优秀作品3 連勝風行茶餐廳調研報告冊
澳门饮食文化及行为调研-优秀作品3 連勝風行茶餐廳調研報告冊
 
CV
CVCV
CV
 
产品研发设计 优秀作品4-withu
产品研发设计 优秀作品4-withu产品研发设计 优秀作品4-withu
产品研发设计 优秀作品4-withu
 

Similar to Additional Conveyor Project

Bombas Centrifugas
Bombas Centrifugas Bombas Centrifugas
CENTRIFUGAL PUMPS.pdf
CENTRIFUGAL PUMPS.pdfCENTRIFUGAL PUMPS.pdf
CENTRIFUGAL PUMPS.pdf
eldoctol
 
CENTRIFUGAL PUMPS.pdf
CENTRIFUGAL PUMPS.pdfCENTRIFUGAL PUMPS.pdf
CENTRIFUGAL PUMPS.pdf
eldoctol
 
Design and development of hst transmission system @tafe
Design and development of hst transmission system @tafeDesign and development of hst transmission system @tafe
Design and development of hst transmission system @tafeAbhimanyu Jayakanth
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
inventionjournals
 
Study on power_transmission_system
Study on power_transmission_systemStudy on power_transmission_system
Study on power_transmission_system
Md. Sumon Ahmed
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxAnkan Dey
 
Bala IEEE formate conference
Bala IEEE formate conferenceBala IEEE formate conference
Bala IEEE formate conference
Bala SB
 
TA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulTA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulMuhammad Asad Ullah
 
Proposal Wide Blower No.1 & 2 with inverter
Proposal Wide Blower No.1 & 2  with inverterProposal Wide Blower No.1 & 2  with inverter
Proposal Wide Blower No.1 & 2 with inverter
RidhoIrawan12
 
Радиально-поршневые гидромоторы Hägglunds CA Bosch Rexroth
Радиально-поршневые гидромоторы Hägglunds CA Bosch RexrothРадиально-поршневые гидромоторы Hägglunds CA Bosch Rexroth
Радиально-поршневые гидромоторы Hägglunds CA Bosch Rexroth
Arve
 
Voith Offshore Solutions
Voith Offshore SolutionsVoith Offshore Solutions
Voith Offshore SolutionsAndrea Venora
 
Use and effectiveness of Hydraulic Retarders
Use and effectiveness of Hydraulic RetardersUse and effectiveness of Hydraulic Retarders
Use and effectiveness of Hydraulic Retarders
IRJET Journal
 
Increased Pulverizer Performance with Loesche’s High Efficiency Dynamic Class...
Increased Pulverizer Performance with Loesche’s High Efficiency Dynamic Class...Increased Pulverizer Performance with Loesche’s High Efficiency Dynamic Class...
Increased Pulverizer Performance with Loesche’s High Efficiency Dynamic Class...
LOESCHE
 
Analysis and Optimization of Mechanical Utility System
Analysis and Optimization of Mechanical Utility SystemAnalysis and Optimization of Mechanical Utility System
Analysis and Optimization of Mechanical Utility SystemDeeptej Kolambkar
 
Final senior design project report
Final senior design project report Final senior design project report
Final senior design project report
kerubel Kebede
 
Attachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection reportAttachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection reportCangTo Cheah
 

Similar to Additional Conveyor Project (20)

Bombas Centrifugas
Bombas Centrifugas Bombas Centrifugas
Bombas Centrifugas
 
CENTRIFUGAL PUMPS.pdf
CENTRIFUGAL PUMPS.pdfCENTRIFUGAL PUMPS.pdf
CENTRIFUGAL PUMPS.pdf
 
CENTRIFUGAL PUMPS.pdf
CENTRIFUGAL PUMPS.pdfCENTRIFUGAL PUMPS.pdf
CENTRIFUGAL PUMPS.pdf
 
Design and development of hst transmission system @tafe
Design and development of hst transmission system @tafeDesign and development of hst transmission system @tafe
Design and development of hst transmission system @tafe
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
Study on power_transmission_system
Study on power_transmission_systemStudy on power_transmission_system
Study on power_transmission_system
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptx
 
Bala IEEE formate conference
Bala IEEE formate conferenceBala IEEE formate conference
Bala IEEE formate conference
 
TA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulTA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation Overhaul
 
Proposal Wide Blower No.1 & 2 with inverter
Proposal Wide Blower No.1 & 2  with inverterProposal Wide Blower No.1 & 2  with inverter
Proposal Wide Blower No.1 & 2 with inverter
 
Радиально-поршневые гидромоторы Hägglunds CA Bosch Rexroth
Радиально-поршневые гидромоторы Hägglunds CA Bosch RexrothРадиально-поршневые гидромоторы Hägglunds CA Bosch Rexroth
Радиально-поршневые гидромоторы Hägglunds CA Bosch Rexroth
 
Voith Offshore Solutions
Voith Offshore SolutionsVoith Offshore Solutions
Voith Offshore Solutions
 
Use and effectiveness of Hydraulic Retarders
Use and effectiveness of Hydraulic RetardersUse and effectiveness of Hydraulic Retarders
Use and effectiveness of Hydraulic Retarders
 
Lick Creek Wastewater Treatment Plant
Lick Creek Wastewater Treatment PlantLick Creek Wastewater Treatment Plant
Lick Creek Wastewater Treatment Plant
 
Increased Pulverizer Performance with Loesche’s High Efficiency Dynamic Class...
Increased Pulverizer Performance with Loesche’s High Efficiency Dynamic Class...Increased Pulverizer Performance with Loesche’s High Efficiency Dynamic Class...
Increased Pulverizer Performance with Loesche’s High Efficiency Dynamic Class...
 
Analysis and Optimization of Mechanical Utility System
Analysis and Optimization of Mechanical Utility SystemAnalysis and Optimization of Mechanical Utility System
Analysis and Optimization of Mechanical Utility System
 
Final senior design project report
Final senior design project report Final senior design project report
Final senior design project report
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
Dissertation.1
Dissertation.1Dissertation.1
Dissertation.1
 
Attachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection reportAttachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection report
 

Additional Conveyor Project

  • 1. Project Name: Additional Conveyor and Motor Current Problem(s): When switchingfillers,thereis a 30-45 minute change over due to the removal and resetting of the two star wheels. Suggested Solutions(s): The process of fillingbottles can be greatly improved through the addition of a secondary conveyor and two star wheels. With an additional conveyor and second set of star wheels, bottles can be diverted to one of the two fillers withoutthe required change over time. The only time requirement would be shiftingthe rails to directthe bottles towards the other filler. Suggested Products & Quotes: Leeson #110048.00 (Motor) - $282.91 Premium Efficient(Motor) #114638.00 - $471.88 Part#20Q25H56 (Gearbox) - $828.95 Conveyor #MCE56772 - $5,314.00 Savings/Results: With the addition of the two star wheels and new conveyor (includingmotor), itis estimated that we can saveapproximately 40 minutes per change over. In addition to reducingchange over time, Travis can begin testing concentrations so that the linedoes not have to stop production. This saves an additional 5-10 minutes per change over when switchingfillers. ROI Calculation: 25 changes X 40 minutes per change X $200/hour = $3,333.33  Estimated Cost: $6,500 (Approximately)  ROI: 6,500/3,333 = 2 years (Approximately)
  • 2. Current Design Capper Filler #1 Filler #2 * * Both re-enter to Capper Divert for Filler #2 Suggested Design Capper Filler #1 Filler #2 Re-enter for Filler #2 Divert for Filler #1 * * * *