ABATEMENT
OF POLLUTION
IN
VIJAYAWADA
CANALS
Existing Typical Cross section
Proposed Typical Cross section
option-1
• 2M Wide Greenery
• 2M wide walking track
Proposed Typical Cross section
option-2
• 2M wide greenery
• 8M wide food zone
Proposed Drawings of ELURU Canal - option 2
• 2M wide greenery
• 2M wide walking track
• 2 no.s Food courts
(2.5m x 2.5m each)
Proposed Drawings of ELURU Canal - option 2
• 2M wide greenery
• 2M wide walking track
• 2 no.s Seating
benches
Proposed Drawings of ELURU Canal - option 2
• 2M wide greenery
• 2M wide walking track
• Art installations (selfie point)
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Fencing (between roads & canals) - MS Railing, Bamboo, Green Fence, CC Design
MS Railing Fence
Green Fence
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Landscaping (2M Wide) - Hedge plants (Aralia, Bougainville)
Hedge Planting Hedge Planting
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Seating Benches & Trees - Stone, Cast Iron, Brick, C.C
Brick & Wooden Seating Cement Concrete Cast Iron
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Walking Track (2M Wide) - Murram, EPDM, Pebbles
Green pathway
Murram Walking Track
Pebbles Walking
Track
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Grass Pitching (3M) - Wedelia Trilobata, Buffalo Grass, Fountain Grass, Carpet Grass
Carpet Grass Buffalo Grass
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Selfie/ViewPoint - FRP Art installations, Selfie points
Art Installations Selfie point Selfie point
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Food Court - Food courts, Seating Area
Food Court with Seating Food Kiosks
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Entry / Exit Plaza - Parking, Watchman Room etc
Entrance Plaza
Entrance/Exit Plaza with Ticket
Counter and Watchmen Room
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Lighting - Lamp Posts, Streetlights, Focus Lights near Bridges
Lamp Posts & Streetlights Strip Lighting
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Signages / Sign Boards
Sign Boards
Informatory
Boards
Signages
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Outside
Plantation
Outside Plantation Outside Plantation
CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN
Bio fence (Fence between bund and canal)
M.S Railing Bamboo Fence
- Bamboo fence, M.S Railing, Green fence
LIQUID WASTE MANAGEMENT – CANAL CENTRIC ACTION PLAN
SI. No Name of Canal
Outfall
Drains
BoD < 20 BoD > 20
Action Plan for Drains BOD > 20
Divert to
UGD
Reduce
BOD
Bio-
Remediation
Pumping
1 Eluru Canal 27 12 15 0 0 6 9
2 Ryves Canal 30 22 8 0 0 2 6
3 Bandar Canal 32 6 26 7 3 9 7
GRAND TOTAL
89 40 49 7 3 17 22
(40 MLD) (5 MLD) (35 MLD) (4.5 MLD) (1.5 MLD) (9.0 MLD) (20 MLD)
Diversion to UGD Proposed
S.N
o.
Name of
Canal
Location
1 Bandar Pakeergudam - Greenland1
2 Bandar Pakeergudam - Greenland2
3 Bandar Pakeergudam - Greenland3
4 Bandar Pakeergudam - Greenland4
5 Bandar Pakeergudam - Greenland5
6 Bandar
Garikapativari Street in
Patamatalanka
7 Bandar
Sitharama Colony in Patamata Area
Reduce to BOD
1
Bandar
Yanamalkuduru Main Bridge
2 Bandar
Chruch Indira Colony
3
Bandar
Yanamalkuduru Lakulu
Bioremediation Proposed
S.
No
Name of Canal Location
1 Bandar Screw Bridge
2 Bandar Foundation School
3 Bandar Masid Street
4 Bandar Jaasthivari street
5 Bandar Lambadipeta Water Tank
6 Bandar Yanamalakuduru Chinnavanthana
7 Bandar Yanamalakuduru Chinnavanthana - Chaitra
English Medium School
8 Bandar Andhrajyoti press, Ratnadeep drain
9 Bandar Yanamalakuduru Regulator
10 Eluru 5th Town Police station
11 Eluru Bagiratha maharshi statue
12 Eluru Madhura Nagar Reservoir Substation
13 Eluru Madhura Nagar Flyover Right side
14 Eluru Madhura Nagar Gunadala Police station
15 Eluru Madhura Nagar Sai Nilayam
16 Ryves Durga Agaraharam Indian Traders
17 Ryves SDMS Staff Quarters
Pumping Proposed
S.
No.
Name of
Canal
Location
1 Bandar Bandar Lakulu
2 Bandar Bapu Museam
3 Bandar Veternary Hospital
4 Bandar R&B Quarters
5 Bandar Y V Rao Hospital
6 Bandar Pakeergudam
7 Bandar Fish Market
8 Eluru Alluri Sitaramaraju Kalyanamandapam
9 Eluru Dhobi Khana at Satyanarayana puram
10 Eluru Satyanarayanapuram Sivalayam
11 Eluru Hindu Smasanavatika
12 Eluru Madhuranagar Flyover Leftside
13 Eluru Madhuranagar Emanual Estates
14 Eluru Madhuranagar Saibalaji Iron Works
15 Eluru Vehicle Depot
16 Eluru Messala Rajarao Bridge
17 Ryves Durga Agraharam Zilla Resource Center
18 Ryves
Durga Agraharam Sri Akammatalli
Dvesthanam
19 Ryves Maruthi Nagar Power Station
20 Ryves Maruthi Nagar Dhanayyavari Street
21 Ryves Madhura Nagar Bridge
22 Ryves Pulleti Drain
DIVERSION OF DRAIN TO
SUMP AT VEHICLE DEPOT
(ELURU CANAL - 11.5 MLD)
AYODHYANAGAR
DP STATION
DEVINAGAR
DP STATION
AJIT SINGH NAGAR
STP – 40 MLD
Pumping of drain water flowing into canals to the nearest DP stations/STPs from vehicle
depot to Ajith Singh Nagar STP
ESTIMATES & TIMELINE – Liquid Waste Management
ACTIVITY
TIMELINE
EXECUTION
DEPARTMENT
Cost
Rs. In Crores
Preparation of DPR by M/s
NCPE Infrastructure Pvt. Ltd.
4 weeks VMC
21.00 Cr.
Fund Sanction & Tender
Process
1-2 months Andhra Pradesh
Greening and
Beautification
Corporation
(APUGBC) & VMC
Construction of Sumps, Pump
sets & Pumping mains
8-12 months
Bioremediation – 7.5 MLD 1.00 Cr.
TOTAL COST OF THE PROJECT 22.00 Crores
ESTIMATES & TIMELINE – Solid Waste Management
ACTIVITY
TIMELINE
EXECUTION
DEPARTMENT
Cost
Rs. In Crores
Preparation of DPR for
Beautification by M/s Kshetra
1 month
MCKGC
36.00
Fund Sanction & Tender
Process
1 month
VMC
Execution of Beautification
Works
8-12 months
Machinery for Cleaning of
Canals including O&M
3-4 months
VMC
6.30
TOTAL COST OF THE PROJECT 42.30 Crores
THANK
YOU

More Related Content

Similar to ABATEMENT OF POLLUTION IN VIJAYAWADA (1).pptx

Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanLakshman R
 
Presentation for public information centres
Presentation for public information centresPresentation for public information centres
Presentation for public information centresknelischer
 
River front development
River front developmentRiver front development
River front developmentBismi S
 
4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...Environmental Protection Agency, Ireland
 
S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015Naoise
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdfAKASHICWORLD
 
Project 1a Report - Ahmad Qhalis
Project 1a Report - Ahmad QhalisProject 1a Report - Ahmad Qhalis
Project 1a Report - Ahmad QhalisAhmad Qhalis
 
Industrial Orientation Report
Industrial Orientation ReportIndustrial Orientation Report
Industrial Orientation ReportAnuj Kumar
 
Vinh_Le_Work_Samples
Vinh_Le_Work_SamplesVinh_Le_Work_Samples
Vinh_Le_Work_SamplesVinh Le
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesEkonnect Knowledge Foundation
 
Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1Riddhi Dash
 
Indore street study
Indore street studyIndore street study
Indore street studyPrachi Gupta
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxShyamPrasadThiraviam
 
IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.Gitanjali Singh
 
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...Hanna Stahlberg
 
Construction of joka majherhat phase-i metro corridor considering the requir...
Construction of joka  majherhat phase-i metro corridor considering the requir...Construction of joka  majherhat phase-i metro corridor considering the requir...
Construction of joka majherhat phase-i metro corridor considering the requir...Rajesh Prasad
 
Yanamadurru Drain Water Quality Assessment during 12-13 March, 2016
Yanamadurru Drain Water Quality Assessment during 12-13 March, 2016Yanamadurru Drain Water Quality Assessment during 12-13 March, 2016
Yanamadurru Drain Water Quality Assessment during 12-13 March, 2016theijes
 

Similar to ABATEMENT OF POLLUTION IN VIJAYAWADA (1).pptx (20)

Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
 
Presentation for public information centres
Presentation for public information centresPresentation for public information centres
Presentation for public information centres
 
River front development
River front developmentRiver front development
River front development
 
4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...
 
S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015
 
Daniel Whatley, APLD Portfolio
Daniel Whatley, APLD PortfolioDaniel Whatley, APLD Portfolio
Daniel Whatley, APLD Portfolio
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
 
WET IC brochure
WET IC brochureWET IC brochure
WET IC brochure
 
Project 1a Report - Ahmad Qhalis
Project 1a Report - Ahmad QhalisProject 1a Report - Ahmad Qhalis
Project 1a Report - Ahmad Qhalis
 
Industrial Orientation Report
Industrial Orientation ReportIndustrial Orientation Report
Industrial Orientation Report
 
Vinh_Le_Work_Samples
Vinh_Le_Work_SamplesVinh_Le_Work_Samples
Vinh_Le_Work_Samples
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
 
Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1
 
Indore street study
Indore street studyIndore street study
Indore street study
 
Maverick park presentation
Maverick park presentationMaverick park presentation
Maverick park presentation
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.
 
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
 
Construction of joka majherhat phase-i metro corridor considering the requir...
Construction of joka  majherhat phase-i metro corridor considering the requir...Construction of joka  majherhat phase-i metro corridor considering the requir...
Construction of joka majherhat phase-i metro corridor considering the requir...
 
Yanamadurru Drain Water Quality Assessment during 12-13 March, 2016
Yanamadurru Drain Water Quality Assessment during 12-13 March, 2016Yanamadurru Drain Water Quality Assessment during 12-13 March, 2016
Yanamadurru Drain Water Quality Assessment during 12-13 March, 2016
 

More from EEPD1

Anesthesia for Cataract Surgery DR PPS.pptx
Anesthesia for Cataract Surgery DR PPS.pptxAnesthesia for Cataract Surgery DR PPS.pptx
Anesthesia for Cataract Surgery DR PPS.pptxEEPD1
 
CGR PPT by DrPPS PRABHAKRA SASTRY-10-2023.pptx
CGR PPT by DrPPS PRABHAKRA SASTRY-10-2023.pptxCGR PPT by DrPPS PRABHAKRA SASTRY-10-2023.pptx
CGR PPT by DrPPS PRABHAKRA SASTRY-10-2023.pptxEEPD1
 
Blue and White Minimalistic Medical Technology Breakthroughts Presentation.pptx
Blue and White Minimalistic Medical Technology Breakthroughts Presentation.pptxBlue and White Minimalistic Medical Technology Breakthroughts Presentation.pptx
Blue and White Minimalistic Medical Technology Breakthroughts Presentation.pptxEEPD1
 
Presentation SSC.pptx
Presentation SSC.pptxPresentation SSC.pptx
Presentation SSC.pptxEEPD1
 
glaucoma.pptx
glaucoma.pptxglaucoma.pptx
glaucoma.pptxEEPD1
 
ACG _final 2023.pptx
ACG _final 2023.pptxACG _final 2023.pptx
ACG _final 2023.pptxEEPD1
 
STRABISMUS.pptx
STRABISMUS.pptxSTRABISMUS.pptx
STRABISMUS.pptxEEPD1
 
MCQ _ Questions.pptx
MCQ _ Questions.pptxMCQ _ Questions.pptx
MCQ _ Questions.pptxEEPD1
 
VMC City inovation 2nd dec.ppt
VMC City inovation 2nd dec.pptVMC City inovation 2nd dec.ppt
VMC City inovation 2nd dec.pptEEPD1
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptxEEPD1
 
Macular Edema.pptx
Macular Edema.pptxMacular Edema.pptx
Macular Edema.pptxEEPD1
 

More from EEPD1 (11)

Anesthesia for Cataract Surgery DR PPS.pptx
Anesthesia for Cataract Surgery DR PPS.pptxAnesthesia for Cataract Surgery DR PPS.pptx
Anesthesia for Cataract Surgery DR PPS.pptx
 
CGR PPT by DrPPS PRABHAKRA SASTRY-10-2023.pptx
CGR PPT by DrPPS PRABHAKRA SASTRY-10-2023.pptxCGR PPT by DrPPS PRABHAKRA SASTRY-10-2023.pptx
CGR PPT by DrPPS PRABHAKRA SASTRY-10-2023.pptx
 
Blue and White Minimalistic Medical Technology Breakthroughts Presentation.pptx
Blue and White Minimalistic Medical Technology Breakthroughts Presentation.pptxBlue and White Minimalistic Medical Technology Breakthroughts Presentation.pptx
Blue and White Minimalistic Medical Technology Breakthroughts Presentation.pptx
 
Presentation SSC.pptx
Presentation SSC.pptxPresentation SSC.pptx
Presentation SSC.pptx
 
glaucoma.pptx
glaucoma.pptxglaucoma.pptx
glaucoma.pptx
 
ACG _final 2023.pptx
ACG _final 2023.pptxACG _final 2023.pptx
ACG _final 2023.pptx
 
STRABISMUS.pptx
STRABISMUS.pptxSTRABISMUS.pptx
STRABISMUS.pptx
 
MCQ _ Questions.pptx
MCQ _ Questions.pptxMCQ _ Questions.pptx
MCQ _ Questions.pptx
 
VMC City inovation 2nd dec.ppt
VMC City inovation 2nd dec.pptVMC City inovation 2nd dec.ppt
VMC City inovation 2nd dec.ppt
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Macular Edema.pptx
Macular Edema.pptxMacular Edema.pptx
Macular Edema.pptx
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 

Recently uploaded (20)

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 

ABATEMENT OF POLLUTION IN VIJAYAWADA (1).pptx

  • 3. Proposed Typical Cross section option-1 • 2M Wide Greenery • 2M wide walking track
  • 4. Proposed Typical Cross section option-2 • 2M wide greenery • 8M wide food zone
  • 5. Proposed Drawings of ELURU Canal - option 2 • 2M wide greenery • 2M wide walking track • 2 no.s Food courts (2.5m x 2.5m each)
  • 6. Proposed Drawings of ELURU Canal - option 2 • 2M wide greenery • 2M wide walking track • 2 no.s Seating benches
  • 7. Proposed Drawings of ELURU Canal - option 2 • 2M wide greenery • 2M wide walking track • Art installations (selfie point)
  • 8. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Fencing (between roads & canals) - MS Railing, Bamboo, Green Fence, CC Design MS Railing Fence Green Fence
  • 9. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Landscaping (2M Wide) - Hedge plants (Aralia, Bougainville) Hedge Planting Hedge Planting
  • 10. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Seating Benches & Trees - Stone, Cast Iron, Brick, C.C Brick & Wooden Seating Cement Concrete Cast Iron
  • 11. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Walking Track (2M Wide) - Murram, EPDM, Pebbles Green pathway Murram Walking Track Pebbles Walking Track
  • 12. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Grass Pitching (3M) - Wedelia Trilobata, Buffalo Grass, Fountain Grass, Carpet Grass Carpet Grass Buffalo Grass
  • 13. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Selfie/ViewPoint - FRP Art installations, Selfie points Art Installations Selfie point Selfie point
  • 14. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Food Court - Food courts, Seating Area Food Court with Seating Food Kiosks
  • 15. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Entry / Exit Plaza - Parking, Watchman Room etc Entrance Plaza Entrance/Exit Plaza with Ticket Counter and Watchmen Room
  • 16. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Lighting - Lamp Posts, Streetlights, Focus Lights near Bridges Lamp Posts & Streetlights Strip Lighting
  • 17. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Signages / Sign Boards Sign Boards Informatory Boards Signages
  • 18. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Outside Plantation Outside Plantation Outside Plantation
  • 19. CANAL BEAUTIFICATION– CANAL CENTRIC ACTION PLAN Bio fence (Fence between bund and canal) M.S Railing Bamboo Fence - Bamboo fence, M.S Railing, Green fence
  • 20. LIQUID WASTE MANAGEMENT – CANAL CENTRIC ACTION PLAN SI. No Name of Canal Outfall Drains BoD < 20 BoD > 20 Action Plan for Drains BOD > 20 Divert to UGD Reduce BOD Bio- Remediation Pumping 1 Eluru Canal 27 12 15 0 0 6 9 2 Ryves Canal 30 22 8 0 0 2 6 3 Bandar Canal 32 6 26 7 3 9 7 GRAND TOTAL 89 40 49 7 3 17 22 (40 MLD) (5 MLD) (35 MLD) (4.5 MLD) (1.5 MLD) (9.0 MLD) (20 MLD)
  • 21. Diversion to UGD Proposed S.N o. Name of Canal Location 1 Bandar Pakeergudam - Greenland1 2 Bandar Pakeergudam - Greenland2 3 Bandar Pakeergudam - Greenland3 4 Bandar Pakeergudam - Greenland4 5 Bandar Pakeergudam - Greenland5 6 Bandar Garikapativari Street in Patamatalanka 7 Bandar Sitharama Colony in Patamata Area Reduce to BOD 1 Bandar Yanamalkuduru Main Bridge 2 Bandar Chruch Indira Colony 3 Bandar Yanamalkuduru Lakulu
  • 22. Bioremediation Proposed S. No Name of Canal Location 1 Bandar Screw Bridge 2 Bandar Foundation School 3 Bandar Masid Street 4 Bandar Jaasthivari street 5 Bandar Lambadipeta Water Tank 6 Bandar Yanamalakuduru Chinnavanthana 7 Bandar Yanamalakuduru Chinnavanthana - Chaitra English Medium School 8 Bandar Andhrajyoti press, Ratnadeep drain 9 Bandar Yanamalakuduru Regulator 10 Eluru 5th Town Police station 11 Eluru Bagiratha maharshi statue 12 Eluru Madhura Nagar Reservoir Substation 13 Eluru Madhura Nagar Flyover Right side 14 Eluru Madhura Nagar Gunadala Police station 15 Eluru Madhura Nagar Sai Nilayam 16 Ryves Durga Agaraharam Indian Traders 17 Ryves SDMS Staff Quarters
  • 23. Pumping Proposed S. No. Name of Canal Location 1 Bandar Bandar Lakulu 2 Bandar Bapu Museam 3 Bandar Veternary Hospital 4 Bandar R&B Quarters 5 Bandar Y V Rao Hospital 6 Bandar Pakeergudam 7 Bandar Fish Market 8 Eluru Alluri Sitaramaraju Kalyanamandapam 9 Eluru Dhobi Khana at Satyanarayana puram 10 Eluru Satyanarayanapuram Sivalayam 11 Eluru Hindu Smasanavatika 12 Eluru Madhuranagar Flyover Leftside 13 Eluru Madhuranagar Emanual Estates 14 Eluru Madhuranagar Saibalaji Iron Works 15 Eluru Vehicle Depot 16 Eluru Messala Rajarao Bridge 17 Ryves Durga Agraharam Zilla Resource Center 18 Ryves Durga Agraharam Sri Akammatalli Dvesthanam 19 Ryves Maruthi Nagar Power Station 20 Ryves Maruthi Nagar Dhanayyavari Street 21 Ryves Madhura Nagar Bridge 22 Ryves Pulleti Drain
  • 24. DIVERSION OF DRAIN TO SUMP AT VEHICLE DEPOT (ELURU CANAL - 11.5 MLD) AYODHYANAGAR DP STATION DEVINAGAR DP STATION AJIT SINGH NAGAR STP – 40 MLD Pumping of drain water flowing into canals to the nearest DP stations/STPs from vehicle depot to Ajith Singh Nagar STP
  • 25. ESTIMATES & TIMELINE – Liquid Waste Management ACTIVITY TIMELINE EXECUTION DEPARTMENT Cost Rs. In Crores Preparation of DPR by M/s NCPE Infrastructure Pvt. Ltd. 4 weeks VMC 21.00 Cr. Fund Sanction & Tender Process 1-2 months Andhra Pradesh Greening and Beautification Corporation (APUGBC) & VMC Construction of Sumps, Pump sets & Pumping mains 8-12 months Bioremediation – 7.5 MLD 1.00 Cr. TOTAL COST OF THE PROJECT 22.00 Crores
  • 26. ESTIMATES & TIMELINE – Solid Waste Management ACTIVITY TIMELINE EXECUTION DEPARTMENT Cost Rs. In Crores Preparation of DPR for Beautification by M/s Kshetra 1 month MCKGC 36.00 Fund Sanction & Tender Process 1 month VMC Execution of Beautification Works 8-12 months Machinery for Cleaning of Canals including O&M 3-4 months VMC 6.30 TOTAL COST OF THE PROJECT 42.30 Crores