Navigating Safety Obstacles - Installation of Roof top UnitsMcKenney's Inc
McKenney's successfully installed new roof top units and chilled water piping at a medical center kitchen despite safety challenges. Piping had to be run through areas with asbestos and tight clearances for lifting the large, heavy roof top units. McKenney's conducted hazard analysis and training and worked with partners to develop a safe crane lift plan including added supports to facilitate the installation and complete the project safely within budget and schedule.
Jim Benge has overseen hundreds of industrial and commercial construction projects ranging from $7,000 to $700 million as a project manager, engineer, and construction manager. Some of the notable projects he oversaw include expansions of power plants, chemical plants, food processing facilities, and aluminum production facilities. He has extensive experience managing all aspects of complex construction projects from engineering, scheduling, installation, and start-up while minimizing disruptions to existing operations.
McKenney’s designed and installed mechanical systems for Balfour Beatty’s 15th floor office relocation in Atlanta, Georgia. The Old Reader is free for up to 100 feeds.
Jonathan Champagne is a self-motivated field supervisor with over 15 years of experience in oil and gas operations, insurance damage assessment, and project management. He has a track record of leading teams to complete offshore and land-based projects ahead of schedule and under budget. Champagne is proficient in well completion, workover rig operations, and overseeing repair facilities. He holds a Bachelor's degree in Industrial Technology and is skilled in Microsoft Office, OpenWells, and coordinating global shipments and tool manufacturing.
The Oxley Creek Sewage Treatment Plant in Queensland, Australia underwent two major projects to upgrade its facilities and increase flood resilience after being devastated by floods in 2011. The $38 million projects involved replacing assets damaged in the floods, raising critical systems above flood lines, and upgrading stages 1-4 of the plant. The projects faced challenges like constructing upgrades in an operating plant and unforeseen issues on the brownfield site. However, through collaboration between the project team and partners, the upgrades were completed successfully and have increased the plant's ability to withstand future floods.
Navigating Safety Obstacles - Installation of Roof top UnitsMcKenney's Inc
McKenney's successfully installed new roof top units and chilled water piping at a medical center kitchen despite safety challenges. Piping had to be run through areas with asbestos and tight clearances for lifting the large, heavy roof top units. McKenney's conducted hazard analysis and training and worked with partners to develop a safe crane lift plan including added supports to facilitate the installation and complete the project safely within budget and schedule.
Jim Benge has overseen hundreds of industrial and commercial construction projects ranging from $7,000 to $700 million as a project manager, engineer, and construction manager. Some of the notable projects he oversaw include expansions of power plants, chemical plants, food processing facilities, and aluminum production facilities. He has extensive experience managing all aspects of complex construction projects from engineering, scheduling, installation, and start-up while minimizing disruptions to existing operations.
McKenney’s designed and installed mechanical systems for Balfour Beatty’s 15th floor office relocation in Atlanta, Georgia. The Old Reader is free for up to 100 feeds.
Jonathan Champagne is a self-motivated field supervisor with over 15 years of experience in oil and gas operations, insurance damage assessment, and project management. He has a track record of leading teams to complete offshore and land-based projects ahead of schedule and under budget. Champagne is proficient in well completion, workover rig operations, and overseeing repair facilities. He holds a Bachelor's degree in Industrial Technology and is skilled in Microsoft Office, OpenWells, and coordinating global shipments and tool manufacturing.
The Oxley Creek Sewage Treatment Plant in Queensland, Australia underwent two major projects to upgrade its facilities and increase flood resilience after being devastated by floods in 2011. The $38 million projects involved replacing assets damaged in the floods, raising critical systems above flood lines, and upgrading stages 1-4 of the plant. The projects faced challenges like constructing upgrades in an operating plant and unforeseen issues on the brownfield site. However, through collaboration between the project team and partners, the upgrades were completed successfully and have increased the plant's ability to withstand future floods.
McKajj Services Design and Management examples of Project Experience - Further information, contact Michael Haugh on (+61) 0412 406 938 or email mhaugh@mckajj.com.au
McKenney’s made significant upgrades to the mechanical systems infrastructure—including chillers, piping and pumps—without interrupting data center operations.
The document contains the resume of Jeremy Todd Smith, who has over 20 years of experience in electrical and instrumentation work, including roles as an estimator, foreman, and superintendent on industrial construction projects. Smith lists his skills in areas such as communication, planning, budgeting, and safety. He also provides his work history, education, training, and certifications.
Australian Catholic University Package AOd Solutions
The Australian Catholic University (ACU) engaged SHAPE to complete an extensive fitout and refurbishment that comprised a number of separate portions across two buildings. This was a complex multi-faceted project with various separable portions and scopes. The key client value was to ensure minimal disruption to university operations and a seamless transition
for ACU into their new premises by the university.
Jamie Allen has over 9 years of experience working in the electrical industry, having worked his way up from an entry level position to his current role as a Field Engineer/Project Manager. He has extensive experience managing civil works and high voltage cable installation projects for various utility companies. Jamie holds numerous safety and technical qualifications for his role.
Planning, Working in Lock Step - Corporate Campus Mechanical Systems Upfit an...McKenney's Inc
McKenney's completed the mechanical systems and controls for a nearly 400,000 square foot new corporate campus in Charlotte, North Carolina. The project involved working on three buildings simultaneously under an aggressive timeline with many new crew members. McKenney's broke each project into small chunks and closely tracked progress to stay on schedule. Through consistent communication and collaboration, they helped resolve hundreds of issues that emerged during the project. As a result, the customer's large corporate relocation was successful.
Behavioral-Based Safety – Predictive Analytics and a Safe Workplace McKenney's Inc
Companies large and small are using predictive analytics to decrease workplace incidents – by focusing on behavioral trends. Learn more at http://blog.mckenneys.com/2017/02/behavioral-based-safety-predictive-analytics-and-a-safe-workplace/
Maximizing employee productivity on a sustainable basis can be an elusive goal. But a properly designed incentive compensation plan can play a big part in making it happen
Do your employees understand your company's compensation philosophy? That was a question posed to human resource managers in a recent WorldatWork survey, Compensation Programs and Practices.
McKenney’s installed HVAC ductwork and piping at a nanotechnology research and training facility under renovation at the Georgia Institute of Technology.
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center to help the facility meet new emission standards on an expedited schedule. They devised an assembly line approach to efficiently remove each generator enclosure and install the new scrubbers and piping. This allowed them to complete the work in 7 months instead of 11 months, saving costs for the customer while keeping the backup generators operational throughout the project.
Mitigating Installation Risks - Data Center Cooling System Installation in At...McKenney's Inc
McKenney’s installed additional cooling systems and capacity at Internap’s premium colocation facility in Atlanta. For more information visit http://www.mckenneys.com.
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
McKenney's installed mechanical systems at a high-rise office building in downtown Charlotte that faced a tight schedule for completion. Extensive planning and coordination allowed McKenney's to sequence the work and overcome equipment issues to finish installation on time, allowing the owners to lease spaces as scheduled. The project team worked creatively within the compressed timeline for startup and commissioning of key mechanical equipment.
Mastering a New System - IEC HVAC InstallationMcKenney's Inc
McKenney's installed an atypical HVAC system at a Fortune 100 company's data center for their first project with this customer. The team faced rigid quality requirements and had to plan extensively to install the cutting-edge indirect evaporative cooling system on time. Through pre-planning, coordination, and dedicating additional project management, the team exceeded quality standards, project milestones, and built a good relationship with the new customer.
McKajj Services Design and Management examples of Project Experience - Further information, contact Michael Haugh on (+61) 0412 406 938 or email mhaugh@mckajj.com.au
McKenney’s made significant upgrades to the mechanical systems infrastructure—including chillers, piping and pumps—without interrupting data center operations.
The document contains the resume of Jeremy Todd Smith, who has over 20 years of experience in electrical and instrumentation work, including roles as an estimator, foreman, and superintendent on industrial construction projects. Smith lists his skills in areas such as communication, planning, budgeting, and safety. He also provides his work history, education, training, and certifications.
Australian Catholic University Package AOd Solutions
The Australian Catholic University (ACU) engaged SHAPE to complete an extensive fitout and refurbishment that comprised a number of separate portions across two buildings. This was a complex multi-faceted project with various separable portions and scopes. The key client value was to ensure minimal disruption to university operations and a seamless transition
for ACU into their new premises by the university.
Jamie Allen has over 9 years of experience working in the electrical industry, having worked his way up from an entry level position to his current role as a Field Engineer/Project Manager. He has extensive experience managing civil works and high voltage cable installation projects for various utility companies. Jamie holds numerous safety and technical qualifications for his role.
Planning, Working in Lock Step - Corporate Campus Mechanical Systems Upfit an...McKenney's Inc
McKenney's completed the mechanical systems and controls for a nearly 400,000 square foot new corporate campus in Charlotte, North Carolina. The project involved working on three buildings simultaneously under an aggressive timeline with many new crew members. McKenney's broke each project into small chunks and closely tracked progress to stay on schedule. Through consistent communication and collaboration, they helped resolve hundreds of issues that emerged during the project. As a result, the customer's large corporate relocation was successful.
Behavioral-Based Safety – Predictive Analytics and a Safe Workplace McKenney's Inc
Companies large and small are using predictive analytics to decrease workplace incidents – by focusing on behavioral trends. Learn more at http://blog.mckenneys.com/2017/02/behavioral-based-safety-predictive-analytics-and-a-safe-workplace/
Maximizing employee productivity on a sustainable basis can be an elusive goal. But a properly designed incentive compensation plan can play a big part in making it happen
Do your employees understand your company's compensation philosophy? That was a question posed to human resource managers in a recent WorldatWork survey, Compensation Programs and Practices.
McKenney’s installed HVAC ductwork and piping at a nanotechnology research and training facility under renovation at the Georgia Institute of Technology.
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center to help the facility meet new emission standards on an expedited schedule. They devised an assembly line approach to efficiently remove each generator enclosure and install the new scrubbers and piping. This allowed them to complete the work in 7 months instead of 11 months, saving costs for the customer while keeping the backup generators operational throughout the project.
Mitigating Installation Risks - Data Center Cooling System Installation in At...McKenney's Inc
McKenney’s installed additional cooling systems and capacity at Internap’s premium colocation facility in Atlanta. For more information visit http://www.mckenneys.com.
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
McKenney's installed mechanical systems at a high-rise office building in downtown Charlotte that faced a tight schedule for completion. Extensive planning and coordination allowed McKenney's to sequence the work and overcome equipment issues to finish installation on time, allowing the owners to lease spaces as scheduled. The project team worked creatively within the compressed timeline for startup and commissioning of key mechanical equipment.
Mastering a New System - IEC HVAC InstallationMcKenney's Inc
McKenney's installed an atypical HVAC system at a Fortune 100 company's data center for their first project with this customer. The team faced rigid quality requirements and had to plan extensively to install the cutting-edge indirect evaporative cooling system on time. Through pre-planning, coordination, and dedicating additional project management, the team exceeded quality standards, project milestones, and built a good relationship with the new customer.
Soaring Past Obstacles - Design-Assist Services in Davidson, NCMcKenney's Inc
McKenney’s provided design/assist services and installed a condenser water cooling system and controls at MSC’s new corporate headquarters in North Carolina.
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
McKenney’s installed very complex, industry-leading computer room air conditioning (CRAC) units at a new data center under construction in Alpharetta, Georgia.
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center campus to comply with new emission standards. They devised an assembly line approach to quickly lift and move each generator enclosure to install the new scrubbers and piping, finishing the retrofit in 7 months instead of the planned 11 months to minimize downtime for the facility with only N+1 redundancy. Working closely with the customer and crane contractor, the coordinated team was able to keep the backup generators operational throughout the project.
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
McKenney's developed energy conservation measures and overhauled the HVAC system of a landmark municipal building. They replaced hard-to-access air handling units and chillers after hours to ensure no disruptions. Over 30 ECMs were developed and the customer selected projects providing the best ROI. Replacements were done safely, on schedule and budget and the ECMs are beginning to pay for themselves through utility savings.
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
A zero-energy building (ZEB) produces enough renewable energy to meet its own annual energy consumption requirements by using all cost-effective measures to reduce energy usage through energy efficiency. Learn more at http://blog.mckenneys.com/2018/06/reducing-building-energy-consumption-in-zero-energy-buildings-zeb/
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
Through an energy savings performance contract, McKenney’s Building Performance Solutions provided a turnkey solution to an aging, inefficient heating system at a large maximum security prison in Georgia.
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
McKenney’s, Inc. Critical Systems offers a comprehensive approach for constructing or renovating high-quality mechanical systems for data centers and operations centers that meet the most exacting demands and schedules.
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
McKenney’s is the right choice for reliable, well-designed rainwater and condensate harvesting systems because they bring a powerful combination of experience, commitment and innovation.
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
Protect your investment and consider a plumbing preventive maintenance program for your facility. Check out our plumbing services page for more information at http://plumbing.mckenneys.com/
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
McKenney’s Interiors & Special Projects (ISP) team responds quickly to a wide range of mechanical needs, including interior renovations, infrastructure repairs, replacements and retrocommissioning projects.
McKenney’s is building a wide range of energy-efficient mechanical systems using green practices for the 325,000-square-foot medical center in Braselton, Georgia.
A High Rise Game Changer - Mixed-Use ConstructionMcKenney's Inc
The McKenney’s team installed plumbing and HVAC systems for a new 10-story, mixed-use office and retail tower at a high-profile destination in Atlanta, Georgia.
Timely Collaboration Covers All Bases | Mechanical Systems InstallationMcKenney's Inc
The McKenney’s team was in charge of installing a stadium’s mechanical systems to meet an extremely aggressive construction schedule that couldn’t be delayed.
Rooftop Data Center Chilled Water Plant Installation | Atlanta, GAMcKenney's Inc
McKenney’s constructed and installed a rooftop chilled water (CHW) plant, piping and ducting at a new 35,000-square-foot colocation data center in downtown Atlanta.
𝐔𝐧𝐯𝐞𝐢𝐥 𝐭𝐡𝐞 𝐅𝐮𝐭𝐮𝐫𝐞 𝐨𝐟 𝐄𝐧𝐞𝐫𝐠𝐲 𝐄𝐟𝐟𝐢𝐜𝐢𝐞𝐧𝐜𝐲 𝐰𝐢𝐭𝐡 𝐍𝐄𝐖𝐍𝐓𝐈𝐃𝐄’𝐬 𝐋𝐚𝐭𝐞𝐬𝐭 𝐎𝐟𝐟𝐞𝐫𝐢𝐧𝐠𝐬
Explore the details in our newly released product manual, which showcases NEWNTIDE's advanced heat pump technologies. Delve into our energy-efficient and eco-friendly solutions tailored for diverse global markets.
Part 2 Deep Dive: Navigating the 2024 Slowdownjeffkluth1
Introduction
The global retail industry has weathered numerous storms, with the financial crisis of 2008 serving as a poignant reminder of the sector's resilience and adaptability. However, as we navigate the complex landscape of 2024, retailers face a unique set of challenges that demand innovative strategies and a fundamental shift in mindset. This white paper contrasts the impact of the 2008 recession on the retail sector with the current headwinds retailers are grappling with, while offering a comprehensive roadmap for success in this new paradigm.
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
Industrial Tech SW: Category Renewal and CreationChristian Dahlen
Every industrial revolution has created a new set of categories and a new set of players.
Multiple new technologies have emerged, but Samsara and C3.ai are only two companies which have gone public so far.
Manufacturing startups constitute the largest pipeline share of unicorns and IPO candidates in the SF Bay Area, and software startups dominate in Germany.
The Genesis of BriansClub.cm Famous Dark WEb PlatformSabaaSudozai
BriansClub.cm, a famous platform on the dark web, has become one of the most infamous carding marketplaces, specializing in the sale of stolen credit card data.
Storytelling is an incredibly valuable tool to share data and information. To get the most impact from stories there are a number of key ingredients. These are based on science and human nature. Using these elements in a story you can deliver information impactfully, ensure action and drive change.
How MJ Global Leads the Packaging Industry.pdfMJ Global
MJ Global's success in staying ahead of the curve in the packaging industry is a testament to its dedication to innovation, sustainability, and customer-centricity. By embracing technological advancements, leading in eco-friendly solutions, collaborating with industry leaders, and adapting to evolving consumer preferences, MJ Global continues to set new standards in the packaging sector.
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Neil Horowitz
On episode 272 of the Digital and Social Media Sports Podcast, Neil chatted with Brian Fitzsimmons, Director of Licensing and Business Development for Barstool Sports.
What follows is a collection of snippets from the podcast. To hear the full interview and more, check out the podcast on all podcast platforms and at www.dsmsports.net
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This PowerPoint compilation offers a comprehensive overview of 20 leading innovation management frameworks and methodologies, selected for their broad applicability across various industries and organizational contexts. These frameworks are valuable resources for a wide range of users, including business professionals, educators, and consultants.
Each framework is presented with visually engaging diagrams and templates, ensuring the content is both informative and appealing. While this compilation is thorough, please note that the slides are intended as supplementary resources and may not be sufficient for standalone instructional purposes.
This compilation is ideal for anyone looking to enhance their understanding of innovation management and drive meaningful change within their organization. Whether you aim to improve product development processes, enhance customer experiences, or drive digital transformation, these frameworks offer valuable insights and tools to help you achieve your goals.
INCLUDED FRAMEWORKS/MODELS:
1. Stanford’s Design Thinking
2. IDEO’s Human-Centered Design
3. Strategyzer’s Business Model Innovation
4. Lean Startup Methodology
5. Agile Innovation Framework
6. Doblin’s Ten Types of Innovation
7. McKinsey’s Three Horizons of Growth
8. Customer Journey Map
9. Christensen’s Disruptive Innovation Theory
10. Blue Ocean Strategy
11. Strategyn’s Jobs-To-Be-Done (JTBD) Framework with Job Map
12. Design Sprint Framework
13. The Double Diamond
14. Lean Six Sigma DMAIC
15. TRIZ Problem-Solving Framework
16. Edward de Bono’s Six Thinking Hats
17. Stage-Gate Model
18. Toyota’s Six Steps of Kaizen
19. Microsoft’s Digital Transformation Framework
20. Design for Six Sigma (DFSS)
To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations
3 Simple Steps To Buy Verified Payoneer Account In 2024SEOSMMEARTH
Buy Verified Payoneer Account: Quick and Secure Way to Receive Payments
Buy Verified Payoneer Account With 100% secure documents, [ USA, UK, CA ]. Are you looking for a reliable and safe way to receive payments online? Then you need buy verified Payoneer account ! Payoneer is a global payment platform that allows businesses and individuals to send and receive money in over 200 countries.
If You Want To More Information just Contact Now:
Skype: SEOSMMEARTH
Telegram: @seosmmearth
Gmail: seosmmearth@gmail.com
Discover timeless style with the 2022 Vintage Roman Numerals Men's Ring. Crafted from premium stainless steel, this 6mm wide ring embodies elegance and durability. Perfect as a gift, it seamlessly blends classic Roman numeral detailing with modern sophistication, making it an ideal accessory for any occasion.
https://rb.gy/usj1a2
SATTA MATKA SATTA FAST RESULT KALYAN TOP MATKA RESULT KALYAN SATTA MATKA FAST RESULT MILAN RATAN RAJDHANI MAIN BAZAR MATKA FAST TIPS RESULT MATKA CHART JODI CHART PANEL CHART FREE FIX GAME SATTAMATKA ! MATKA MOBI SATTA 143 spboss.in TOP NO1 RESULT FULL RATE MATKA ONLINE GAME PLAY BY APP SPBOSS
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Tastemy Pandit
Know what your zodiac sign says about your taste in food! Explore how the 12 zodiac signs influence your culinary preferences with insights from MyPandit. Dive into astrology and flavors!
Understanding User Needs and Satisfying ThemAggregage
https://www.productmanagementtoday.com/frs/26903918/understanding-user-needs-and-satisfying-them
We know we want to create products which our customers find to be valuable. Whether we label it as customer-centric or product-led depends on how long we've been doing product management. There are three challenges we face when doing this. The obvious challenge is figuring out what our users need; the non-obvious challenges are in creating a shared understanding of those needs and in sensing if what we're doing is meeting those needs.
In this webinar, we won't focus on the research methods for discovering user-needs. We will focus on synthesis of the needs we discover, communication and alignment tools, and how we operationalize addressing those needs.
Industry expert Scott Sehlhorst will:
• Introduce a taxonomy for user goals with real world examples
• Present the Onion Diagram, a tool for contextualizing task-level goals
• Illustrate how customer journey maps capture activity-level and task-level goals
• Demonstrate the best approach to selection and prioritization of user-goals to address
• Highlight the crucial benchmarks, observable changes, in ensuring fulfillment of customer needs