SlideShare a Scribd company logo
8 Wastes To Eliminate
In Order to Lean Out Your
Processes
Lin Fisher, CSM
Defects
Production Examples:
• Unclear customer specifications
• Incapable processes
• Lack of process control
• Unskilled personnel
• Departmental rather than total company
quality improvement initiatives
• Incapable suppliers
Service Examples:
• Rejections in sourcing applications
• Incorrect data entry
Strategies to reduce:
• Design review
• Reduce defective materials
• Train employees
• Maintenance of machines and
equipment
Waiting
Production Examples:
• Unsynchronized processes; line imbalance
• Inflexible workforce
• Over staffing
• Unscheduled machine downtime
• Long setup times
• Material shortage or delay
• Manpower shortage or delay
Service Examples:
• Customers waiting to be served in a
contact centre
• System downtime
Inventory
Production Examples:
• Overproduction
• big batch sizes
• Long lead times
• Local optimization (turf mentality)
• Large minimum order quantities
• High rework rate (ties into defects)
• Just In Time (JIT) incapable suppliers
• Lack of material requisition and issuance
standards
Service Examples:
• Files and documents waiting to be processed
• Excess promotional materials sent to market
• More infrastructure than required
Strategies to reduce:
• Dispose of obsolete material to save
space and avoid confusion
• Do not produce items ahead of
customers delivery requirements
• Do not manufacture products in
excess of customer's requirements
Motion
Production Examples:
• Poor workstation layout - excessive bending, walking
and reaching
• Poor method design - transferring parts from one hand
to another
• Reorientation of materials
• Poor layout and housekeeping
• Disorganized workplace and storage locations
• Unclear, non-standardized work instructions
• Unclear process and materials flow
Service Examples:
• Looking for data and information
• Movement of people to and from office equipment
Strategies to reduce:
• Motion economy principal
• Effective supervision
Over Processing
Production Examples:
• Unclear customer specifications
• Frequent engineering changes
• Excessive quality (refinements, "polishing")
• Inadequate value analysis/value
engineering
• Unclear work instructions
Service Examples:
• Too much paperwork in process
• Same data required in multiple places in a
process
• Follow up coordination costs
• Too many approvals
• Reporting overburden
Strategies to reduce:
• Improve work allocation
• Identify more effective methods
• Limit overproduction
Over Production
Production Examples:
• Volume incentives (sales, pay, purchasing)
• High capacity equipment
• Poor scheduling/shifting
• Poor production planning
• Cost accounting practices that encourage build
up of inventory
Service Examples:
• Information sent automatically even when not
required
• Printing documents before they are required
• Processing items before they are required by the
next person in the process
Strategies to reduce:
• Strong production planning and
control
• Production according to customer
schedule
• Firm delivery requirements
Underutilized Talent
Production Examples:
• Inappropriate policies
• Incomplete measures
• No time made available in operators work schedule
• Problem solving only done with "experts" ignoring
employees
• Top down improvement ideas
Service Examples:
• Limited authority and responsibility
• Person put on a wrong job
Strategies to reduce:
• Give staff ownership of work

More Related Content

What's hot

Lean seminar - Reduce waste, add more value to your customers 20th-jan2014 ...
Lean seminar  -  Reduce waste, add more value to your customers 20th-jan2014 ...Lean seminar  -  Reduce waste, add more value to your customers 20th-jan2014 ...
Lean seminar - Reduce waste, add more value to your customers 20th-jan2014 ...
Andrea Darabos
 
Lean Office 5S : The Next Level
Lean Office 5S : The Next LevelLean Office 5S : The Next Level
Lean Office 5S : The Next Level
opexcreative
 
01 shop floor best practices
01 shop floor best practices01 shop floor best practices
01 shop floor best practices
Dr. Chandan Vichoray
 
Lean office 5S
Lean office 5SLean office 5S
Lean office 5S
opexcreative
 
# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management
Rhonda Kovera
 
Office_5S_sample
Office_5S_sampleOffice_5S_sample
Office_5S_sample
ahmad bassiouny
 
Office ManagementUp dated file office
Office ManagementUp dated file officeOffice ManagementUp dated file office
Office ManagementUp dated file office
Sarfraz irp
 
5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting
Operational Excellence Consulting
 
Lean For Non Profits - Agenda and Activity Printouts
Lean For Non Profits - Agenda and Activity PrintoutsLean For Non Profits - Agenda and Activity Printouts
Lean For Non Profits - Agenda and Activity PrintoutsASQ_Lafayette
 
Applying Lean in Pathology
Applying Lean in PathologyApplying Lean in Pathology
Applying Lean in Pathology
Lean Enterprise Academy
 
Understand 5s in 5 minutes
Understand 5s in 5 minutesUnderstand 5s in 5 minutes
Understand 5s in 5 minutes
Abhishek Bajpai
 
Kaizen PDCA Cycle Process PowerPoint Presentation Slides
Kaizen PDCA Cycle Process PowerPoint Presentation Slides Kaizen PDCA Cycle Process PowerPoint Presentation Slides
Kaizen PDCA Cycle Process PowerPoint Presentation Slides
SlideTeam
 
BASIC OF TRAINING
BASIC OF TRAININGBASIC OF TRAINING
BASIC OF TRAINING
Brahmas Pandey
 
5S Facilitator Guide
5S  Facilitator Guide5S  Facilitator Guide
5S Facilitator GuideRhonda Kovera
 
#1 PPT - Improving Business Performance with Visual Management
#1 PPT - Improving Business Performance with Visual Management#1 PPT - Improving Business Performance with Visual Management
#1 PPT - Improving Business Performance with Visual Management
Rhonda Kovera
 
Visual Mangement & Safety in the Workplace
Visual Mangement & Safety in the WorkplaceVisual Mangement & Safety in the Workplace
Visual Mangement & Safety in the WorkplaceRhonda Kovera
 

What's hot (19)

Lean seminar - Reduce waste, add more value to your customers 20th-jan2014 ...
Lean seminar  -  Reduce waste, add more value to your customers 20th-jan2014 ...Lean seminar  -  Reduce waste, add more value to your customers 20th-jan2014 ...
Lean seminar - Reduce waste, add more value to your customers 20th-jan2014 ...
 
Lean Office 5S : The Next Level
Lean Office 5S : The Next LevelLean Office 5S : The Next Level
Lean Office 5S : The Next Level
 
Lean and 5 s
Lean and 5 sLean and 5 s
Lean and 5 s
 
01 shop floor best practices
01 shop floor best practices01 shop floor best practices
01 shop floor best practices
 
Lean office 5S
Lean office 5SLean office 5S
Lean office 5S
 
5S
5S5S
5S
 
# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management
 
Office_5S_sample
Office_5S_sampleOffice_5S_sample
Office_5S_sample
 
Office ManagementUp dated file office
Office ManagementUp dated file officeOffice ManagementUp dated file office
Office ManagementUp dated file office
 
5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting
 
Lean For Non Profits - Agenda and Activity Printouts
Lean For Non Profits - Agenda and Activity PrintoutsLean For Non Profits - Agenda and Activity Printouts
Lean For Non Profits - Agenda and Activity Printouts
 
Applying Lean in Pathology
Applying Lean in PathologyApplying Lean in Pathology
Applying Lean in Pathology
 
Understand 5s in 5 minutes
Understand 5s in 5 minutesUnderstand 5s in 5 minutes
Understand 5s in 5 minutes
 
Kaizen PDCA Cycle Process PowerPoint Presentation Slides
Kaizen PDCA Cycle Process PowerPoint Presentation Slides Kaizen PDCA Cycle Process PowerPoint Presentation Slides
Kaizen PDCA Cycle Process PowerPoint Presentation Slides
 
BASIC OF TRAINING
BASIC OF TRAININGBASIC OF TRAINING
BASIC OF TRAINING
 
2015-09 IBMS
2015-09 IBMS2015-09 IBMS
2015-09 IBMS
 
5S Facilitator Guide
5S  Facilitator Guide5S  Facilitator Guide
5S Facilitator Guide
 
#1 PPT - Improving Business Performance with Visual Management
#1 PPT - Improving Business Performance with Visual Management#1 PPT - Improving Business Performance with Visual Management
#1 PPT - Improving Business Performance with Visual Management
 
Visual Mangement & Safety in the Workplace
Visual Mangement & Safety in the WorkplaceVisual Mangement & Safety in the Workplace
Visual Mangement & Safety in the Workplace
 

Similar to 8 Deadly Muda_(Shut Your Mouth!)

What is Lean ?
What is Lean ?What is Lean ?
What is Lean ?
LeanSixSigmaCafe
 
Sunil thawani bpr winning edge by osama hanafi
Sunil thawani bpr  winning edge by osama hanafiSunil thawani bpr  winning edge by osama hanafi
Sunil thawani bpr winning edge by osama hanafi
Osama Hanafi
 
introduction_module1.pptx
introduction_module1.pptxintroduction_module1.pptx
introduction_module1.pptx
SandipanMaji3
 
Service operation management 4
Service operation management 4Service operation management 4
Service operation management 4
Judianto Nugroho
 
Fishbone Diagrams (3).pptx
Fishbone Diagrams (3).pptxFishbone Diagrams (3).pptx
Fishbone Diagrams (3).pptx
PratimaSardana1
 
Simple Lean Value and Waste Training
Simple Lean Value and Waste TrainingSimple Lean Value and Waste Training
Simple Lean Value and Waste TrainingRomains Bos, PMP, MBA
 
Simply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisisSimply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisis
StephanieOrgan1
 
Automate Your Master Data Processes for Shared Service Center Excellence
Automate Your Master Data Processes for Shared Service Center ExcellenceAutomate Your Master Data Processes for Shared Service Center Excellence
Automate Your Master Data Processes for Shared Service Center Excellence
Precisely
 
The foundation for Operations/Supply Chain Optimization
The foundation for Operations/Supply Chain Optimization The foundation for Operations/Supply Chain Optimization
The foundation for Operations/Supply Chain Optimization
stephen Ross
 
Guide to project management 60 s
Guide to project management 60 sGuide to project management 60 s
Guide to project management 60 sRachit Gaur
 
Sap case studies
Sap case studiesSap case studies
Sap case studiesjktmktg
 
Business Operation Procedure for ERP
Business Operation Procedure for ERPBusiness Operation Procedure for ERP
Business Operation Procedure for ERP
Md. Towhidul Islam Chowdhury
 
Siedge Presentation English 1115
Siedge Presentation English 1115Siedge Presentation English 1115
Siedge Presentation English 1115Roberto Herran
 
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_FinalGuillermo (Bill/Gil) Echeverria
 
Seven wastes
Seven wastesSeven wastes
Seven wastesfa99
 
Operations Summit 2013: Best Practices in the Search and Selection of a 3PL P...
Operations Summit 2013: Best Practices in the Search and Selection of a 3PL P...Operations Summit 2013: Best Practices in the Search and Selection of a 3PL P...
Operations Summit 2013: Best Practices in the Search and Selection of a 3PL P...Fifth Gear
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
ADD VALUE CONSULTING Inc
 
Webinar Series: 5 steps to a Digital Workplace on Office 365 - Step 3: Define...
Webinar Series: 5 steps to a Digital Workplace on Office 365 - Step 3: Define...Webinar Series: 5 steps to a Digital Workplace on Office 365 - Step 3: Define...
Webinar Series: 5 steps to a Digital Workplace on Office 365 - Step 3: Define...
Darrell Trimble
 

Similar to 8 Deadly Muda_(Shut Your Mouth!) (20)

What is Lean ?
What is Lean ?What is Lean ?
What is Lean ?
 
Sunil thawani bpr winning edge by osama hanafi
Sunil thawani bpr  winning edge by osama hanafiSunil thawani bpr  winning edge by osama hanafi
Sunil thawani bpr winning edge by osama hanafi
 
introduction_module1.pptx
introduction_module1.pptxintroduction_module1.pptx
introduction_module1.pptx
 
Service operation management 4
Service operation management 4Service operation management 4
Service operation management 4
 
Fishbone Diagrams (3).pptx
Fishbone Diagrams (3).pptxFishbone Diagrams (3).pptx
Fishbone Diagrams (3).pptx
 
WASTE ELIMINATION
WASTE ELIMINATIONWASTE ELIMINATION
WASTE ELIMINATION
 
Simple Lean Value and Waste Training
Simple Lean Value and Waste TrainingSimple Lean Value and Waste Training
Simple Lean Value and Waste Training
 
Simply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisisSimply a matter of process: Building operational resilience in times of crisis
Simply a matter of process: Building operational resilience in times of crisis
 
Automate Your Master Data Processes for Shared Service Center Excellence
Automate Your Master Data Processes for Shared Service Center ExcellenceAutomate Your Master Data Processes for Shared Service Center Excellence
Automate Your Master Data Processes for Shared Service Center Excellence
 
The foundation for Operations/Supply Chain Optimization
The foundation for Operations/Supply Chain Optimization The foundation for Operations/Supply Chain Optimization
The foundation for Operations/Supply Chain Optimization
 
Guide to project management 60 s
Guide to project management 60 sGuide to project management 60 s
Guide to project management 60 s
 
Sap case studies
Sap case studiesSap case studies
Sap case studies
 
Business Operation Procedure for ERP
Business Operation Procedure for ERPBusiness Operation Procedure for ERP
Business Operation Procedure for ERP
 
Siedge Presentation English 1115
Siedge Presentation English 1115Siedge Presentation English 1115
Siedge Presentation English 1115
 
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
 
Operations Summit 2013: Best Practices in the Search and Selection of a 3PL P...
Operations Summit 2013: Best Practices in the Search and Selection of a 3PL P...Operations Summit 2013: Best Practices in the Search and Selection of a 3PL P...
Operations Summit 2013: Best Practices in the Search and Selection of a 3PL P...
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
 
Webinar Series: 5 steps to a Digital Workplace on Office 365 - Step 3: Define...
Webinar Series: 5 steps to a Digital Workplace on Office 365 - Step 3: Define...Webinar Series: 5 steps to a Digital Workplace on Office 365 - Step 3: Define...
Webinar Series: 5 steps to a Digital Workplace on Office 365 - Step 3: Define...
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 

Recently uploaded

W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
William (Bill) H. Bender, FCSI
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
akaash13
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
juniourjohnstone
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
Amir H. Fassihi
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
A. F. M. Rubayat-Ul Jannat
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
Tata Consultancy Services
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
CIOWomenMagazine
 

Recently uploaded (10)

W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
 

8 Deadly Muda_(Shut Your Mouth!)

  • 1. 8 Wastes To Eliminate In Order to Lean Out Your Processes Lin Fisher, CSM
  • 2. Defects Production Examples: • Unclear customer specifications • Incapable processes • Lack of process control • Unskilled personnel • Departmental rather than total company quality improvement initiatives • Incapable suppliers Service Examples: • Rejections in sourcing applications • Incorrect data entry Strategies to reduce: • Design review • Reduce defective materials • Train employees • Maintenance of machines and equipment
  • 3. Waiting Production Examples: • Unsynchronized processes; line imbalance • Inflexible workforce • Over staffing • Unscheduled machine downtime • Long setup times • Material shortage or delay • Manpower shortage or delay Service Examples: • Customers waiting to be served in a contact centre • System downtime
  • 4. Inventory Production Examples: • Overproduction • big batch sizes • Long lead times • Local optimization (turf mentality) • Large minimum order quantities • High rework rate (ties into defects) • Just In Time (JIT) incapable suppliers • Lack of material requisition and issuance standards Service Examples: • Files and documents waiting to be processed • Excess promotional materials sent to market • More infrastructure than required Strategies to reduce: • Dispose of obsolete material to save space and avoid confusion • Do not produce items ahead of customers delivery requirements • Do not manufacture products in excess of customer's requirements
  • 5. Motion Production Examples: • Poor workstation layout - excessive bending, walking and reaching • Poor method design - transferring parts from one hand to another • Reorientation of materials • Poor layout and housekeeping • Disorganized workplace and storage locations • Unclear, non-standardized work instructions • Unclear process and materials flow Service Examples: • Looking for data and information • Movement of people to and from office equipment Strategies to reduce: • Motion economy principal • Effective supervision
  • 6. Over Processing Production Examples: • Unclear customer specifications • Frequent engineering changes • Excessive quality (refinements, "polishing") • Inadequate value analysis/value engineering • Unclear work instructions Service Examples: • Too much paperwork in process • Same data required in multiple places in a process • Follow up coordination costs • Too many approvals • Reporting overburden Strategies to reduce: • Improve work allocation • Identify more effective methods • Limit overproduction
  • 7. Over Production Production Examples: • Volume incentives (sales, pay, purchasing) • High capacity equipment • Poor scheduling/shifting • Poor production planning • Cost accounting practices that encourage build up of inventory Service Examples: • Information sent automatically even when not required • Printing documents before they are required • Processing items before they are required by the next person in the process Strategies to reduce: • Strong production planning and control • Production according to customer schedule • Firm delivery requirements
  • 8. Underutilized Talent Production Examples: • Inappropriate policies • Incomplete measures • No time made available in operators work schedule • Problem solving only done with "experts" ignoring employees • Top down improvement ideas Service Examples: • Limited authority and responsibility • Person put on a wrong job Strategies to reduce: • Give staff ownership of work