Non-Conformity Report(NCR)
Doc. Type: NCR
Doc. No: NCR-H1293-AMC-0001
Rev Status/Date
0 Issue/August 24,2022
Page 1 of 2
Hull No.: H1293
Project:
Block or item: Inspector: Shao Huiliang
Issued by : Signature:
Approved by: Signature:
Disciplines
Structural Piping Coating HVAC E/I & Telecom
Mechanical Architecture Other:
Observation
Item Description:
Reference Document:
Drawings:
Job Location:
Contractor Responsible Person:
Description of the Observation:
Deck surface is partially contaminated by oil stains due to careless moving around of deck stuff, the damaged area
covers about 100 m2 by visual estimation.
Suggestion:
The following actions to be taken:
.
Closing of the Action:
Non-Conformity Report(NCR)
Doc. Type: NCR
Doc. No: NCR-H1293-AMC-0001
Rev Status/Date
0 Issue/August 24,2022
Page 2 of 2
Owner Representative: Contractor Inspector:
Date: Date:

More Related Content

Similar to 4- The NCR action and complete form.doc

Due diligence builders
Due diligence  builders Due diligence  builders
Due diligence builders
IndoAsia Partners
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
Sahl Buhary
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignment
fareezsham
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
Pui Chun Shian
 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
Arissa Loh
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
Bahzad5
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
ashleyyeap
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
ashleyyeap
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
tfkc1212
 
Psscoc 2008 db contract
Psscoc 2008 db contractPsscoc 2008 db contract
Psscoc 2008 db contract
Vance Ang
 
Report for po no 7400005491.docx
Report for po no 7400005491.docxReport for po no 7400005491.docx
Report for po no 7400005491.docx
NAGANATHAN IYER
 
CFW NEC Management of change under the NEC3
CFW NEC  Management of change under the NEC3 CFW NEC  Management of change under the NEC3
CFW NEC Management of change under the NEC3
Rae Davies
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
MODI20077
 
Technical specifications package a vol 1
Technical specifications package a vol 1Technical specifications package a vol 1
Technical specifications package a vol 1
PRABIR DATTA
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
ssuser32da691
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
tfkc1212
 
A Claim submitted by the contractor during for slides.pptx
A Claim submitted by the contractor during for slides.pptxA Claim submitted by the contractor during for slides.pptx
A Claim submitted by the contractor during for slides.pptx
MahSobeh
 
FIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdfFIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdf
MohammedBilal554495
 

Similar to 4- The NCR action and complete form.doc (20)

Due diligence builders
Due diligence  builders Due diligence  builders
Due diligence builders
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignment
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
 
Psscoc 2008 db contract
Psscoc 2008 db contractPsscoc 2008 db contract
Psscoc 2008 db contract
 
Report for po no 7400005491.docx
Report for po no 7400005491.docxReport for po no 7400005491.docx
Report for po no 7400005491.docx
 
CFW NEC Management of change under the NEC3
CFW NEC  Management of change under the NEC3 CFW NEC  Management of change under the NEC3
CFW NEC Management of change under the NEC3
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
 
Technical specifications package a vol 1
Technical specifications package a vol 1Technical specifications package a vol 1
Technical specifications package a vol 1
 
Draft vol. ii
Draft vol. iiDraft vol. ii
Draft vol. ii
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
 
A Claim submitted by the contractor during for slides.pptx
A Claim submitted by the contractor during for slides.pptxA Claim submitted by the contractor during for slides.pptx
A Claim submitted by the contractor during for slides.pptx
 
FIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdfFIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdf
 

More from Hamidreza Shobeyri

Sheave wobble tests for rejecting criteria.pdf
Sheave wobble tests for rejecting criteria.pdfSheave wobble tests for rejecting criteria.pdf
Sheave wobble tests for rejecting criteria.pdf
Hamidreza Shobeyri
 
NC 38 DPs Inspection analysis012.pptx
NC 38 DPs Inspection analysis012.pptxNC 38 DPs Inspection analysis012.pptx
NC 38 DPs Inspection analysis012.pptx
Hamidreza Shobeyri
 
WPCE-Common-Quick-Union-Type-Connections-Reference-Guide.pdf
WPCE-Common-Quick-Union-Type-Connections-Reference-Guide.pdfWPCE-Common-Quick-Union-Type-Connections-Reference-Guide.pdf
WPCE-Common-Quick-Union-Type-Connections-Reference-Guide.pdf
Hamidreza Shobeyri
 
Tuboscope DPs Troubleshooting & Failures
Tuboscope DPs Troubleshooting & FailuresTuboscope DPs Troubleshooting & Failures
Tuboscope DPs Troubleshooting & Failures
Hamidreza Shobeyri
 
Bp drill string failure
Bp drill string failureBp drill string failure
Bp drill string failure
Hamidreza Shobeyri
 
Slb drill string-failure
Slb drill string-failureSlb drill string-failure
Slb drill string-failure
Hamidreza Shobeyri
 
Mudline Suspension (MLS)
Mudline Suspension (MLS)Mudline Suspension (MLS)
Mudline Suspension (MLS)
Hamidreza Shobeyri
 
Ju training matrix
Ju training matrixJu training matrix
Ju training matrix
Hamidreza Shobeyri
 
Zone Classification as per API RP 14F
Zone Classification as per API  RP 14FZone Classification as per API  RP 14F
Zone Classification as per API RP 14F
Hamidreza Shobeyri
 
Hydrill Co. Colour code and temperature ranged for three different types of e...
Hydrill Co. Colour code and temperature ranged for three different types of e...Hydrill Co. Colour code and temperature ranged for three different types of e...
Hydrill Co. Colour code and temperature ranged for three different types of e...
Hamidreza Shobeyri
 
TH. hill casing failures training course Presentation 2010
TH. hill  casing failures training course Presentation 2010TH. hill  casing failures training course Presentation 2010
TH. hill casing failures training course Presentation 2010
Hamidreza Shobeyri
 

More from Hamidreza Shobeyri (11)

Sheave wobble tests for rejecting criteria.pdf
Sheave wobble tests for rejecting criteria.pdfSheave wobble tests for rejecting criteria.pdf
Sheave wobble tests for rejecting criteria.pdf
 
NC 38 DPs Inspection analysis012.pptx
NC 38 DPs Inspection analysis012.pptxNC 38 DPs Inspection analysis012.pptx
NC 38 DPs Inspection analysis012.pptx
 
WPCE-Common-Quick-Union-Type-Connections-Reference-Guide.pdf
WPCE-Common-Quick-Union-Type-Connections-Reference-Guide.pdfWPCE-Common-Quick-Union-Type-Connections-Reference-Guide.pdf
WPCE-Common-Quick-Union-Type-Connections-Reference-Guide.pdf
 
Tuboscope DPs Troubleshooting & Failures
Tuboscope DPs Troubleshooting & FailuresTuboscope DPs Troubleshooting & Failures
Tuboscope DPs Troubleshooting & Failures
 
Bp drill string failure
Bp drill string failureBp drill string failure
Bp drill string failure
 
Slb drill string-failure
Slb drill string-failureSlb drill string-failure
Slb drill string-failure
 
Mudline Suspension (MLS)
Mudline Suspension (MLS)Mudline Suspension (MLS)
Mudline Suspension (MLS)
 
Ju training matrix
Ju training matrixJu training matrix
Ju training matrix
 
Zone Classification as per API RP 14F
Zone Classification as per API  RP 14FZone Classification as per API  RP 14F
Zone Classification as per API RP 14F
 
Hydrill Co. Colour code and temperature ranged for three different types of e...
Hydrill Co. Colour code and temperature ranged for three different types of e...Hydrill Co. Colour code and temperature ranged for three different types of e...
Hydrill Co. Colour code and temperature ranged for three different types of e...
 
TH. hill casing failures training course Presentation 2010
TH. hill  casing failures training course Presentation 2010TH. hill  casing failures training course Presentation 2010
TH. hill casing failures training course Presentation 2010
 

Recently uploaded

ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 

Recently uploaded (20)

ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 

4- The NCR action and complete form.doc

  • 1. Non-Conformity Report(NCR) Doc. Type: NCR Doc. No: NCR-H1293-AMC-0001 Rev Status/Date 0 Issue/August 24,2022 Page 1 of 2 Hull No.: H1293 Project: Block or item: Inspector: Shao Huiliang Issued by : Signature: Approved by: Signature: Disciplines Structural Piping Coating HVAC E/I & Telecom Mechanical Architecture Other: Observation Item Description: Reference Document: Drawings: Job Location: Contractor Responsible Person: Description of the Observation: Deck surface is partially contaminated by oil stains due to careless moving around of deck stuff, the damaged area covers about 100 m2 by visual estimation. Suggestion: The following actions to be taken: . Closing of the Action:
  • 2. Non-Conformity Report(NCR) Doc. Type: NCR Doc. No: NCR-H1293-AMC-0001 Rev Status/Date 0 Issue/August 24,2022 Page 2 of 2 Owner Representative: Contractor Inspector: Date: Date: