EXPEDITING REPORT
STDFORM2
RFE REFERENCE: 2023-JY-TATA-0006
REPORT NO.: 001
SHEET 1 OF
JOB CODE : 0-8936-2 PROJECT NAME : GTPP / Golden Triangle
Polymers Project
TO : Mr. Ronald Ryan PO NO. : 7400005491
ATTN. : Mr. Ronald Ryan PO ISSUE DATE : 24/11/2022
COPY TO
FROM : 7/8/2023 to 22/8/2023 VENDOR : Siemens Energy INC
MANUFACTURER : Sparkle cleantech Pvt Ltd
EXPEDITER : Naganathan Iyer LOCATION : Khopoli Mumbai
CHECKED BY : CONTACT/TITLE : Mr. Rakesh Ranjan
ISSUE DATE : (22/8/2023) PHONE NO. : +91 7304481682
MTRL DESCRIPTION : Process Water Clean-up Unit (10-X-2400) E-MAIL :
rakesh@sparklecleantech.com
STATUS OF THE SUBJECT AS CHECKED ON 22/8/2023 IS AS FOLLOWS:
1. Latest promise related to contractual date □ MAINTAINED □ IMPROVED □ SLIPPED □✔ REVISED
PO Delivery Date & Terms : 25/12/2023
Previous Promise : 25/12/2023
Current Promise : 19/1/2024
Expediter’s Estimate : 25/1/2024 as per schedule
Reason for Delivery SLIPPAGE / REVISION:
There is delay in bought out item delivery and yet the complete engineering not freezed and document approval in
Code A is under process
Earlier Delivery Components Such As Template, Anchor Bolts, etc.: □ YES □✔ NO
If yes, Components Description Flowserve Seal Plan
Delivery Date End of December 2023
2. Action to be taken
ITEM ACTION REQUIRED ACTION BY
1) Document Submission status is attached to report need to expedite the approval
process
JKJV
2) Rhu pumps is not responding by email so need to Visit the facility to understand the
bottleneck
Sparkle
3)
4)
5)
6)
(To obtain Vendor’s required date to close out each item)
3. Highlights :
4. Next Visit Scheduled Date:
5. Expediting Hours This Visit
(If, Applicable)
Expediting: 8/Day Travel: 1/day Reporting: 1hr
Kilometers : Other Cost:
EXPEDITING REPORT
STDFORM2
6. INDIVIDUAL ITEM DELIVERY PROMISED
PO
Item No.
Equipment No.
Tag No.
Vendor
Ref.
No.
PO Delivery
Date
Promised
Del. Date
Expediter’s
Forecast
Remarks
1 10-X-2400 2022-
06-20-
USGCII
Rev L
25/12/2023 19/1/2024
25/1/2024
2 10-V-2400 2022-
06-20-
USGCII
Rev L
25/12/2023
19/1/2024 25/1/2024
3 10-P-2400A/B 2022-
06-20-
USGCII
Rev L
25/12/2023
19/1/2024 25/1/2024
4 10-P-2402A/B 2022-
06-20-
USGCII
Rev L
25/12/2023
19/1/2024 25/1/2024
5 10-P-2403A/B 2022-
06-20-
USGCII
Rev L
25/12/2023
19/1/2024 25/1/2024
6 10-V-2401A/B/C 2022-
06-20-
USGCII
Rev L
25/12/2023
19/1/2024 25/1/2024
7 10−P−2401 A/B/C 2022-
06-20-
USGCII
Rev L
25/12/2023
19/1/2024 25/1/2024
8 10−P−2404A/B 2022-
06-20-
USGCII
Rev L
25/12/2023
19/1/2024 25/1/2024
9 10−V−2402 2022-
06-20-
USGCII
Rev L
25/12/2023
19/1/2024 25/1/2024
10 10−V−2403 2022-
06-20-
USGCII
Rev L
25/12/2023
19/1/2024 25/1/2024
ITEM ACTION BY:
7. ATTENDEES:
(JGC) :
(Vendor) : Mr. Rakesh Ranjan
8. VERIFICATION OF PREVIOUS ACTION ITEMS: (IF APPLICABLE)
EXPEDITING REPORT
STDFORM2
ITEM ACTION BY:
(to confirm if each of the previous action items have been closed)
9. JGC’S P.O., REQUISITION, AND SPECIFICATIONS:
Yes
Sparkle & JGC
10. OUTSTANDING CORRESPONDENCES AND ISSUES:
Communication is on going
Sparkle & JGC
11. CRITICAL PATH DOCUMENTS:
Refer the updated sheet for vendor document status
JKJV
JKJV
12. VENDOR DOCUMENT STATUS:
Refer the updated sheet for vendor document status
13. VENDOR MONTHLY REPORT (VMR) STATUS
Last Issue Date: 20/7/2023
Next Issue Date: 20/8/2023
14. MATERIALS/COMPONENTS SUB-ORDERING STATUS:
Refer Enclosed Annexure A
Sparkle
15. FABRICATION STATUS:
Refer Annexure B &C
16. INSPECTION:
NA
NA
17. PACKING AND SHIPPING:
3 months Sparkle
18. WORKLOAD/ ANY OTHER BUSINESS
One More Project of ONGC is running
NA
19. ANY OTHER MATTERS
NA
NA
20. VENDOR ORGANIZATION
Yes
NA
EXPEDITING REPORT
STDFORM2
ITEM ACTION BY:
Project Manager : Rakesh Ranjan
Commercial : Pradip Mankame
Engineering : Nitesh
Procurement : Jyoti
QC : Anil Potdar
Fabrication : Kirti
Shipping : NA
21. CONCLUSION:
Hereby I conclude major items ordered are from Rhu Pumps whose delivery is constraint
as he sub ordering from flow serve so need have intense follow-up’s with the sub vendor
Note: Flash Report to be submitted if there is any critical issues found

More Related Content

Similar to Report for po no 7400005491.docx

Knks#312
Knks#312Knks#312
Knks#312
Kaushik Sharma
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
Tonni Bruce
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
 
Nmdc nspb c 2684 qap-approved
Nmdc nspb c 2684 qap-approvedNmdc nspb c 2684 qap-approved
Nmdc nspb c 2684 qap-approved
Pankaj Singh Rana
 
21 Capex 22-23 Template BPCL Jan 2024.pptx
21 Capex 22-23 Template BPCL Jan 2024.pptx21 Capex 22-23 Template BPCL Jan 2024.pptx
21 Capex 22-23 Template BPCL Jan 2024.pptx
Manish Singh
 
Government Contracting - FAR Supplements - DEAR - Energy
Government Contracting - FAR Supplements - DEAR - EnergyGovernment Contracting - FAR Supplements - DEAR - Energy
Government Contracting - FAR Supplements - DEAR - Energy
JSchaus & Associates
 
Evento patos
Evento patosEvento patos
Evento patos
Pablo Cortes
 
State work
State workState work
Soa report
Soa reportSoa report
Soa report
anil kumar
 
Cost Forecast Report
Cost Forecast ReportCost Forecast Report
182060001-GA-001 SHT 02 REV_1
182060001-GA-001 SHT 02 REV_1182060001-GA-001 SHT 02 REV_1
182060001-GA-001 SHT 02 REV_1
Henjo Capelle
 
Government Contracting - FAR Supplements - DLAD - DLA
Government Contracting - FAR Supplements - DLAD - DLAGovernment Contracting - FAR Supplements - DLAD - DLA
Government Contracting - FAR Supplements - DLAD - DLA
JSchaus & Associates
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
MODI20077
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
hepemod733
 
SAG NPD PPT APR2022 (00000002) (1).pptx
SAG NPD PPT  APR2022 (00000002) (1).pptxSAG NPD PPT  APR2022 (00000002) (1).pptx
SAG NPD PPT APR2022 (00000002) (1).pptx
ShashankSrivastava938270
 
Noise Oversight Committee notes
Noise Oversight Committee notesNoise Oversight Committee notes
Noise Oversight Committee notes
GilbertodePiento
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
TalebAlfihan
 
Inspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas PlanInspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas Plan
Muhammad Talha Kaleem
 
Inspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas PlanInspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas Plan
Muhammad Talha Kaleem
 
altaf resume work preparation
altaf resume work preparationaltaf resume work preparation
altaf resume work preparation
Altaf Tanwar
 

Similar to Report for po no 7400005491.docx (20)

Knks#312
Knks#312Knks#312
Knks#312
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Nmdc nspb c 2684 qap-approved
Nmdc nspb c 2684 qap-approvedNmdc nspb c 2684 qap-approved
Nmdc nspb c 2684 qap-approved
 
21 Capex 22-23 Template BPCL Jan 2024.pptx
21 Capex 22-23 Template BPCL Jan 2024.pptx21 Capex 22-23 Template BPCL Jan 2024.pptx
21 Capex 22-23 Template BPCL Jan 2024.pptx
 
Government Contracting - FAR Supplements - DEAR - Energy
Government Contracting - FAR Supplements - DEAR - EnergyGovernment Contracting - FAR Supplements - DEAR - Energy
Government Contracting - FAR Supplements - DEAR - Energy
 
Evento patos
Evento patosEvento patos
Evento patos
 
State work
State workState work
State work
 
Soa report
Soa reportSoa report
Soa report
 
Cost Forecast Report
Cost Forecast ReportCost Forecast Report
Cost Forecast Report
 
182060001-GA-001 SHT 02 REV_1
182060001-GA-001 SHT 02 REV_1182060001-GA-001 SHT 02 REV_1
182060001-GA-001 SHT 02 REV_1
 
Government Contracting - FAR Supplements - DLAD - DLA
Government Contracting - FAR Supplements - DLAD - DLAGovernment Contracting - FAR Supplements - DLAD - DLA
Government Contracting - FAR Supplements - DLAD - DLA
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
SAG NPD PPT APR2022 (00000002) (1).pptx
SAG NPD PPT  APR2022 (00000002) (1).pptxSAG NPD PPT  APR2022 (00000002) (1).pptx
SAG NPD PPT APR2022 (00000002) (1).pptx
 
Noise Oversight Committee notes
Noise Oversight Committee notesNoise Oversight Committee notes
Noise Oversight Committee notes
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
Inspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas PlanInspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas Plan
 
Inspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas PlanInspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas Plan
 
altaf resume work preparation
altaf resume work preparationaltaf resume work preparation
altaf resume work preparation
 

Recently uploaded

buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
Chandresh Chudasama
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
ABHILASH DUTTA
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
my Pandit
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 

Recently uploaded (20)

buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 

Report for po no 7400005491.docx

  • 1. EXPEDITING REPORT STDFORM2 RFE REFERENCE: 2023-JY-TATA-0006 REPORT NO.: 001 SHEET 1 OF JOB CODE : 0-8936-2 PROJECT NAME : GTPP / Golden Triangle Polymers Project TO : Mr. Ronald Ryan PO NO. : 7400005491 ATTN. : Mr. Ronald Ryan PO ISSUE DATE : 24/11/2022 COPY TO FROM : 7/8/2023 to 22/8/2023 VENDOR : Siemens Energy INC MANUFACTURER : Sparkle cleantech Pvt Ltd EXPEDITER : Naganathan Iyer LOCATION : Khopoli Mumbai CHECKED BY : CONTACT/TITLE : Mr. Rakesh Ranjan ISSUE DATE : (22/8/2023) PHONE NO. : +91 7304481682 MTRL DESCRIPTION : Process Water Clean-up Unit (10-X-2400) E-MAIL : rakesh@sparklecleantech.com STATUS OF THE SUBJECT AS CHECKED ON 22/8/2023 IS AS FOLLOWS: 1. Latest promise related to contractual date □ MAINTAINED □ IMPROVED □ SLIPPED □✔ REVISED PO Delivery Date & Terms : 25/12/2023 Previous Promise : 25/12/2023 Current Promise : 19/1/2024 Expediter’s Estimate : 25/1/2024 as per schedule Reason for Delivery SLIPPAGE / REVISION: There is delay in bought out item delivery and yet the complete engineering not freezed and document approval in Code A is under process Earlier Delivery Components Such As Template, Anchor Bolts, etc.: □ YES □✔ NO If yes, Components Description Flowserve Seal Plan Delivery Date End of December 2023 2. Action to be taken ITEM ACTION REQUIRED ACTION BY 1) Document Submission status is attached to report need to expedite the approval process JKJV 2) Rhu pumps is not responding by email so need to Visit the facility to understand the bottleneck Sparkle 3) 4) 5) 6) (To obtain Vendor’s required date to close out each item) 3. Highlights : 4. Next Visit Scheduled Date: 5. Expediting Hours This Visit (If, Applicable) Expediting: 8/Day Travel: 1/day Reporting: 1hr Kilometers : Other Cost:
  • 2. EXPEDITING REPORT STDFORM2 6. INDIVIDUAL ITEM DELIVERY PROMISED PO Item No. Equipment No. Tag No. Vendor Ref. No. PO Delivery Date Promised Del. Date Expediter’s Forecast Remarks 1 10-X-2400 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 2 10-V-2400 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 3 10-P-2400A/B 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 4 10-P-2402A/B 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 5 10-P-2403A/B 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 6 10-V-2401A/B/C 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 7 10−P−2401 A/B/C 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 8 10−P−2404A/B 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 9 10−V−2402 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 10 10−V−2403 2022- 06-20- USGCII Rev L 25/12/2023 19/1/2024 25/1/2024 ITEM ACTION BY: 7. ATTENDEES: (JGC) : (Vendor) : Mr. Rakesh Ranjan 8. VERIFICATION OF PREVIOUS ACTION ITEMS: (IF APPLICABLE)
  • 3. EXPEDITING REPORT STDFORM2 ITEM ACTION BY: (to confirm if each of the previous action items have been closed) 9. JGC’S P.O., REQUISITION, AND SPECIFICATIONS: Yes Sparkle & JGC 10. OUTSTANDING CORRESPONDENCES AND ISSUES: Communication is on going Sparkle & JGC 11. CRITICAL PATH DOCUMENTS: Refer the updated sheet for vendor document status JKJV JKJV 12. VENDOR DOCUMENT STATUS: Refer the updated sheet for vendor document status 13. VENDOR MONTHLY REPORT (VMR) STATUS Last Issue Date: 20/7/2023 Next Issue Date: 20/8/2023 14. MATERIALS/COMPONENTS SUB-ORDERING STATUS: Refer Enclosed Annexure A Sparkle 15. FABRICATION STATUS: Refer Annexure B &C 16. INSPECTION: NA NA 17. PACKING AND SHIPPING: 3 months Sparkle 18. WORKLOAD/ ANY OTHER BUSINESS One More Project of ONGC is running NA 19. ANY OTHER MATTERS NA NA 20. VENDOR ORGANIZATION Yes NA
  • 4. EXPEDITING REPORT STDFORM2 ITEM ACTION BY: Project Manager : Rakesh Ranjan Commercial : Pradip Mankame Engineering : Nitesh Procurement : Jyoti QC : Anil Potdar Fabrication : Kirti Shipping : NA 21. CONCLUSION: Hereby I conclude major items ordered are from Rhu Pumps whose delivery is constraint as he sub ordering from flow serve so need have intense follow-up’s with the sub vendor Note: Flash Report to be submitted if there is any critical issues found