The document discusses potential problems that could arise during a film production and solutions to address them. It identifies issues such as equipment failure, weather problems, location access issues, and personnel issues. To control for these, the document recommends bringing backup equipment, checking weather, securing location permissions in advance, and having contingency dates and backup crew. It emphasizes the importance of preparation, organization, and planning to minimize risks and ensure the shoot goes smoothly. The person responsible for overseeing all problem solving and controls is identified as the filmmaker, Sam Schoettner.