This document provides an overview of developing business/IT solutions and the systems development process. It discusses the traditional systems development cycle as well as prototyping and end user approaches. The systems development cycle involves conception, design, and implementation of systems to meet business needs. It outlines the key stages of systems investigation, analysis, design, implementation, and maintenance. It also discusses evaluating hardware, software, and service acquisition. The goal is to use a systematic approach to analyze needs and design effective IT solutions to address business opportunities.
In this report I will compare two different information system methodologies. I would talk about SSADM (Structure System Analysis and Design Methodologies) and XP (Extreme Programing).
Describe the process of coding, testing, and converting an organizational information system and outline the deliverables and outcomes of the process.
Prepare a test plan for an information system.
Apply four installation strategies: direct, parallel, single-location, and phased installation.
List the deliverables for documenting the system and for training and supporting users.
Distinguish between system and user documentation and determine which types of documentation are necessary for a given information system.
Compare the many modes available for organizational information system training, including self-training and electronic performance support systems.
Discuss the issues of providing support for end-users.
Explain why system implementation sometimes fails.
Describe the threats to system security and remedies that can be applied.
Show how traditional implementation issues apply to electronic commerce applications.
discuss about System system analysis, system design, system analyst's role, Development of System through analysis, SDLC, Case Tools of SAD, Implementation, etc.
In this report I will compare two different information system methodologies. I would talk about SSADM (Structure System Analysis and Design Methodologies) and XP (Extreme Programing).
Describe the process of coding, testing, and converting an organizational information system and outline the deliverables and outcomes of the process.
Prepare a test plan for an information system.
Apply four installation strategies: direct, parallel, single-location, and phased installation.
List the deliverables for documenting the system and for training and supporting users.
Distinguish between system and user documentation and determine which types of documentation are necessary for a given information system.
Compare the many modes available for organizational information system training, including self-training and electronic performance support systems.
Discuss the issues of providing support for end-users.
Explain why system implementation sometimes fails.
Describe the threats to system security and remedies that can be applied.
Show how traditional implementation issues apply to electronic commerce applications.
discuss about System system analysis, system design, system analyst's role, Development of System through analysis, SDLC, Case Tools of SAD, Implementation, etc.
Management Information Systems – Week 7 Lecture 2Developme.docxcroysierkathey
Management Information Systems – Week 7 Lecture 2
Development & Improvement
Chapter 13 Systems Development: Design, Implementation, Maintenance,
and Review
You have learned about information systems and seen a little about how the project is run to create a new
system. This week you will focus on the actual systems design process. This will help you whether you
become a programmer, systems analyst or are a department manager. There are countless articles on
this subject on the internet and some great YouTube videos so take a moment to do some extra research
and learn more about systems development.
When an IS manager sits down to design a system they look at several areas and have many special
tools at their disposal.
A systems engineer or senior developer will first look at the logical design. This usually means that they
look at the user request and determine what they really mean! Once they have clarification they will create
a physical design. This might be object-oriented (using code that has already been created) or mock ups
showing interface design and controls. This is sometimes called storyboarding. This image is an example
of creating a new user interface:
System design time is an investment for the business, it will help by preventing, detecting, and correcting
errors prior to the application software being written. It will generate systems design alternatives. One
alternative is to ask software developers to create the application for the business, this is done by creating
a request for proposal (RFP). Software vendors will then propose several options at various price points.
The business can then review the proposals, do a cost benefit analysis and select an appropriate plan of
action.
Once a project has started it is a good idea to freezing design specifications using a contract, and even a
design report called a Functional Design Document. This process is intended to allow the development
team to focus on creating a specific application and not have to try to hit a constantly moving target. As
the application is being developed it is also time to acquire the hardware that will be needed. If the
application requires a headset with microphone for voice input or a super-fast computer, this is the time to
make sure the application will be functional when it is implemented.
Types of IS hardware vendors include:
General computer manufacturers
Small computer manufacturers
Peripheral equipment manufacturers
Computer dealers and distributors
Chip makers
While the application is being developed and the hardware acquired, in a perfect world the personnel will
be hired and trained and any preparations will be done for the site and data requirements (additional disk
drives for databases or could computing). One of the phases of software development is the testing
phase. It really cannot be considered the final stage because it may result in some additional planning,
programming or other modifications. It can be considered to be ...
Similar to 396849 developing-business-it-solutions (20)
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
Macroeconomics- Movie Location
This will be used as part of your Personal Professional Portfolio once graded.
Objective:
Prepare a presentation or a paper using research, basic comparative analysis, data organization and application of economic information. You will make an informed assessment of an economic climate outside of the United States to accomplish an entertainment industry objective.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
Honest Reviews of Tim Han LMA Course Program.pptxtimhan337
Personal development courses are widely available today, with each one promising life-changing outcomes. Tim Han’s Life Mastery Achievers (LMA) Course has drawn a lot of interest. In addition to offering my frank assessment of Success Insider’s LMA Course, this piece examines the course’s effects via a variety of Tim Han LMA course reviews and Success Insider comments.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
Digital Tools and AI for Teaching Learning and Research
396849 developing-business-it-solutions
1. 10 Developing Business/IT Solutions
I. LECTURE OVERVIEW
Foundation Concepts: Developing Business/IT Solutions, introduces the traditional, prototyping, and end user
approaches to the development of information systems, and discusses the processes and managerial issues in the
implementation of new e-business applications.
The Systems Development Cycle – Business end users and IS specialists may use a systems approach to help them
develop information systemsolutions to meet e-business opportunities. This frequently involves a systems
development cycle where IS specialists and end users conceive, design, and implements e-business systems. The
stages, activities, and products of the information systems development cycle are summarized in Figure 10.3.
Prototyping – Prototyping is a major alternative methodology to the traditional information systemdevelopment
cycle. It includes the use of prototyping tools and methodologies, which promote an iterative, interactive process
that develops prototypes of user interfaces and other information systemcomponents. See Figure 10.4.
EndUser Development – The application development capabilities built into many end user software packages have
made it easier for end users to develop their own e-business applications. End users should focus their development
efforts on the systemcomponents of business processes that can benefit fromthe user of information technology, as
summarized in Figure 10.15.
Implementing IS – The implementation process for information systemprojects is summarized in Figure 10.19.
Implementation involves acquisition, testing, documentation, training, installation, and conversion activities that
transforma newly designed e-business systeminto an operational systemfor end users.
Evaluating Hardware, Software, andServices – Business professionals should know how to evaluate the acquisition
of information systemresources. IT vendors’ proposals should be based on specifications developed during the
design stage of systems development. A formal evaluation process reduces the possibility of incorrect or
unnecessary purchases of hardware or software. Several major evaluation factors, summarized in Figures 10.22, 10.23,
and 10.24, can be used to evaluate hardware, software, and IS services.
II. LEARNING OBJECTIVES
Learning Objective
Use the systems development process outlined in this chapter, and the model of IS components fromChapter 1
as problem-solving frameworks to help you propose information systems solutions to simple business problems.
Describe and give examples to illustrate how you might use each of the steps of the information systems
development cycle to develop and implement an e-business system.
Explain how prototyping improves the process of systems development for end users and IS specialists.
Identify the activities involved in the implementation of new information systems.
Describe several evaluation factors that should be considered in evaluating the acquisition of hardware,
software, and IS services.
III. LECTURE NOTES
Section I: Developing e-Business System
IS DEVELOPMENT
2. This chapter presents a generic systems approach to problemsolving. It deals with how organizations can develop
systematic ways to problemsolving. This process is known as the systems approach. When the systems approach
to problemsolving is applied to the development of information systemsolutions to business problems, it is called
information systems development or application development. The systems approach can be used to develop e-
business systems and applications that meet the business needs of a company and its employees and stakeholders.
Analyzing Fidelity Investments and Others
We can learn a lot about the challenges of good Web systems design for B2B e-commerce. Take a few minutes to
read it, and we will discuss it (Fidelity Investments and Others in Section IX).
THESYSTEMS APPROACH: [Figure 10.3]
The systems approach to problemsolving uses a systems orientation to define problems and opportunities and
develop solutions. Studying a problemand formulating a solution involves the following interrelated activities:
Recognize and define a problemor opportunity using systems thinking.
Develop and evaluate alternative systemsolutions.
Select the systemsolution that best meets your requirements.
Design the selected systemsolution.
Implement and evaluate the success of the designed system.
3. Emphasize to the students that when using the systems approach:
Steps can overlap each other.
Activities required for problemsolving can be used in more than one step of the process.
The completion of activities in one step may extend into the performance of another.
Sometimes you may have to cycle back to a previously completed step.
Systems Thinking:
Using systems thinking to understand a problemor opportunity is one of the most important aspects of the systems
approach. The essence of the discipline of systems thinking is “seeing the forest and the trees” in any situation by:
Seeing interrelationships among systems rather than linear cause-and-effect chains whenever events occur.
Seeing processes of change among systems rather than discrete “snapshots” of change, whenever changes
occur.
One way of practising systems thinking is to try to find systems, subsystems, and components of s ystems in any
situation you are studying. This viewpoint ensures that important factors and their interrelationships are considered.
This is also known as using a systems context, or having a systematic view of a situation. For example, the business
organization or business process in which a problemor opportunity arises could be viewed as a systemof:
Input
Processing
Output
Feedback
Control
THESYSTEMS DEVELOPMENT CYCLE: [Figure 10.3]
Using the systems approach to develop information systems solutions can be viewed as a multistep processed called
the information systems development cycle, also known as the systems development life cycle (SDLC). The SDLC is
composed of five steps, which include:
Systems investigation Product: Feasibility Study
Systems analysis Product: Functional Requirements
Systems design Product: Systems Specifications
Systems implementation Product: Operational System
Systems maintenance Product: Improved System
STRESS to students that:
All the activities involved are highly related and interdependent.
Several developmental activities can occur at the same time.
Different parts of a development project can be at different stages of the development cycle.
May recycle back at any time to repeat previous activities in order to modify and improve a systembeing
developed.
PROTOTYPING: [Figure 10.4]
4. Prototyping is the rapid development and testing of working models, or prototypes, of new applications in an
interactive, iterative process involving both IS specialists and business professionals.
Prototyping makes the development process faster and easier for IS specialists and business professionals.
Prototyping makes the development process faster and easier, especially for projects where end user
requirements are hard to define. Thus, prototyping is sometimes called
rapid application design (RAD).
Prototyping has also opened up the application development process to end-users because it simplifies and
accelerates systems design. These developments are changing the roles of end users and information
systems specialists in systems development.
The Prototyping Process
Prototyping can be used for both large and small applications.
Typically, large e-business systems still require using the traditional systems development approach, but parts
of such systems can frequently be prototyped.
A prototype of a business application needed by an end user is developed quickly using a variety of
application development software tools. The prototype systemis then repeatedly refined until it is acceptable.
Prototyping is an iterative, interactive process that combines steps of the traditional systems development
cycle, and allows the rapid development and testing of a working model.
STARTINGTHESYSTEMS DEVELOPMENT PROCESS
The first step in the systems development process is the systems investigation stage. This step may involve
consideration of proposals generated by an e-business planning process. The investigation stage also includes the
preliminary study of proposed information systemsolutions to meet a company’s e-business priorities and
opportunities.
The three steps of the systems investigation stage involve:
Determining how to address e-business opportunities and priorities.
5. Conducting a feasibility study to determine whether a new or improved e-business systemis a feasible solution.
Developing a project management plan and obtaining management approval.
Feasibility Studies: [Figure 10.6 & Figure 10.7]
Because the process of developing can be costly, the systems investigation stage frequently requires a preliminary
study called a feasibility study. A feasibility study is a preliminary study, where the information needs of
prospective users and the resource requirements, costs, benefits, and feasibility of a proposed project are
determined.
Steps of a feasibility study:
Gather information/data for a feasibility study.
Formalize a written report including the preliminary specifications and a developmental plan for the proposed
systeme-business application.
Submit the report to management for approval.
Begin systemanalysis (if management approves the recommendations of the feasibility study).
The goal of feasibility studies is to:
Evaluate alternative e-business systems solutions.
Propose the most feasible and desirable e-business application for development.
The feasibility of a systemcan be evaluated in terms of four major categories
Organizational Feasibility:
- Focuses on how well a proposed systemsupports the e-business priorities of the organization.
Economic Feasibility:
6. - Focuses on whether expected cost savings, increased revenue, increased profits, and reductions in required
investment, and other types of benefits will exceed the costs of developing and operating a proposed system.
Technical Feasibility:
- Focuses on the reliabilities/capabilities of the hardware and software to meet the needs of the proposed system,
and whether they can be acquired or developed in the required time.
Operational Feasibility:
- Focuses on the willingness and ability of the management, employees, customers, suppliers, and others to
operate, use, and support the proposed system.
Cost/Benefit Analysis
Every legitimate solution will have some advantages or benefits, and some disadvantages or costs. These
advantages and disadvantages are identified when each alternative solution is evaluated. This process is typically
called cost/benefit analysis.
Tangible Costs: Tangible costs are costs and benefits that can be quantified (e.g., cost of hardware and
software, employee salaries, and other quantifiable costs needed to develop and implement a solution).
Intangible Costs: Intangible costs are costs and benefits that cannot be quantified (e.g., loss of customer
goodwill or employee morale caused by errors and disruptions arising fromthe installation of a new system).
Tangible Benefits: Tangible benefits are favorable results (e.g., decrease in payroll costs caused by a reduction
in personnel or a decrease in inventory carrying costs caused by a reduction in inventory)
Intangible Benefits: Intangible benefits are hard to estimate (e.g., better customer service or faster and more
accurate information for management).
SYSTEMS ANALYSIS
Systems analysis is an in-depth study of end user information needs, which produces functional requirements that
are used as the basis for the design of a new information system. Systems analysis traditionally involves a detailed
study of:
The information needs of the company and the end users.
The activities, resources, and products of any present information systems being used.
The information systems capabilities required to meet the information needs of end users, and those of other e-
business stakeholders that may use the system.
Organisational Analysis
Organisational analysis involves evaluating the organizational and environmental systems and subsystems
involved in any situation. Systems analysis traditionally involves a detailed study of the organizations:
Environment
Management structure
People
Business activities
Environmental systems it deals with
Current information systems
Analysis of the Present System
Before designing a new system, a detailed analysis of the current system(manual or automated) must be completed.
An analysis of the present systeminvolves analyzing activities, resources, and the products. You must analyze how
the present systemuses:
7. Hardware, software, people resources to convert data resources into information products, such as reports and
displays.
Document how the information activities of input, processing, output, storage, and control are being
accomplished.
Functional Requirements Analysis
This step of systems analysis is one of the most difficult. Steps involve:
Working as a teamwith IS analysts and end users to determine specific business information needs.
Determining the information processing capabilities required for each systemactivity (input, processing, output,
storage, and control) to meet the information needs. Goal is to identify WHAT should be done NOT how to do
it.
Develop functional requirements (information requirements that are not tied to the hardware, software, network,
data, and people resources that end users presently use or might use in the new system).
SYSTEMS DESIGN - [Figure 10.11]
Systems analysis describes what a systemshould do to meet the information needs of users.
System design specifies how the systemwill accomplish this objective.
Systems design consists of design activities, which produce systems specifications satisfying the functional
requirements developed in the systems analysis stage. These specifications are used as the basis for:
Software development
Hardware acquisition
Systemtesting
Other activities of the implementation stage
Systems design can be viewed as the design of three major products, or deliverables that should result fromthe
design stage. These activities include:
User interface design
Data design
Process design
User Interface Design
User interface design focuses on supporting the interactions between end users and their computer-based
applications. Designer’s concentrate on:
The design of attractive and efficient forms of user input and output, such as easy-to-use Internet or intranet
web pages.
Design is frequently a prototyping process, where working models or prototypes of user interface methods are
designed and modified several times with feedback fromend users.
Design process produces detailed design specifications for information products such as display screens,
interactive user/computer dialogues, audio responses, forms, documents, and reports.
Design tips to keep in mind:
8. Keep it simple
Keep it clean
Organize logically
System Specifications
System specifications formalize the design of an application’s user interface methods and products, database
structures, and processing and control procedures. Therefore, systems designers will frequently develop hardware,
software, network, data, and personnel specifications for a proposed system. Systems analysts work with you so
they can use your knowledge of your own work activities and their knowledge of computer-based systems to specify
the design of a new or improved information system.
The final systems design typically specifies:
Hardware resources (machines and media)
Software resources (programs and procedures)
Network resources (communications media and networks)
People resources (end users and information systems staff).
How resources will be used to convert data resources (stored in files and databases they design) into
information products (displays, responses, reports, and documents).
END USER DEVELOPMENT
In end user development, IS professionals play a consulting role while you do your own application development.
Sometimes a staff of user consultants may be available to help you and other end users with your application
development efforts. This may include:
Training in the use of application packages
Selection of hardware and software
Assistance in gaining access to organization databases
Assistance in analysis, design, and implementation
Focus on IS Activities: [Figure 10.15]
End user development should focus on the fundamental activities of an information system:
Input
Processing
Output
Storage
9. Control
In analyzing a potential application, you should focus on:
Output
- What information is needed and in what formshould it be presented?
Input
- What data are available, fromwhat sources? And in what form?
Processing
- What operations or transformation processes will be required to convert the available inputs into the desired
output?
- What software can best performthe operations required?
Storage
- Does the application use previously stored data?
- Does it create data that must be stored for future use by this or other applications?
Control
- What controls are needed to protect against accidental loss or damage?
- Is there a need to control access to data used by the application?
Doing End User Development:
In end user development, you and other business professionals can develop new or improved ways to performyour
jobs without the direct involvement of IS specialists. The application development capabilities built into a variety of
end user software packages have made it easier for many users to develop their own computer-based solutions.
Section II: Implementing e-Business Systems
IMPLEMENTATION
The implementation process is the next major stage that follows the investigation, analysis, and design stages of the
systems development process. Therefore, implementation is an important activity planned by an organization and its
end users.
Analyzing PacifiCorp, Reynolds, and Zurich NA
We can learn a lot fromthis case about the challenges of implementing customer-centric e-business systems. (See
Select PacifiCorp, Reynolds, and Zurich NA in Section IX)
IMPLEMENTINGNEW SYSTEMS: [Figure 10.19]
The implementation process for newly designed information systems involves a variety of acquisition, testing,
10. documentation, installation, and conversion activities. It also involves the training of end users in the operation and
use of the new information system. Thus, implementation is a vital step in ensuring the success of new systems.
Implementation involves a variety of activities, which include:
Acquisition of hardware, software and services.
Software development or modification.
Testing of programs, procedures, and hardware.
Systemdocumentation.
Conversion (parallel, pilot, phased, plunge).
End User training.
EVALUATINGHARDWARE, SOFTWARE, AND SERVICES
To evaluate and select hardware and software, computer-using organizations typically:
Require suppliers to present bids and proposals based on systemspecifications developed during the design
stage of systems development.
Establish minimumacceptable physical and performance characteristics for all hardware and software
requirements.
Government agencies and most large businesses use a document called an RFP (request for proposal) or RFQ
(request for quotation), which lists all the required specifications.
When several competing proposals for hardware or software acquisition need to be evaluated, a scoring system
may be used, giving a numerical score for each of several evaluation factors. Each competing proposal is
assigned points for each factor, depending on how well it meets the specifications of the computer user.
Hardware and software should be demonstrated and evaluated.
Using special benchmark test programs and test data to evaluate proposed hardware and software. Special
software simulators may also be available that simulate the processing of typical jobs on several computers and
evaluate their performances.
Other users are frequently the best source of information needed to evaluate the claims of manufacturers and
suppliers. Good example: Internet newsgroups.
Hardware Evaluation Factors: [Figure 10.22]
11. When evaluating computer hardware, you should investigate specific physical and performance characteristics for
each hardware component to be acquired. This is true whether you are evaluating mainframes, microcomputers, or
peripheral devices. Hardware evaluation factors include:
Performance
Cost
Reliability
Compatibility
Technology
Ergonomics
Connectivity
Scalability
Software
Support
Software Evaluation Factors: [Figure 10.23]
12. You should evaluate software according to many factors that are similar to those us ed for hardware evaluation.
Thus, the factors of performance, cost, reliability, availability, compatibility, modularity, technology, ergonomics, and
support should be used to evaluate proposed software acquisition. In addition, however, software evaluation
factors should also include evaluating:
Quality
Efficiency
Flexibility
Security
Connectivity
Language
Documentation
Hardware
Other factors (performance, cost, reliability etc.)
Evaluating IS Services: [Figure 10.24]
13. Suppliers of hardware and software products and many other firms offer a variety of IS services to end users and
organizations. Some IS services which are provided free or for a change include:
e-commerce website development
Installation or conversion of new hardware and software
Employee training
Hardware maintenance.
IS services can be outsourced to an outside company for a negotiated price. For example:
Systems integrators take over complete responsibility for an organization’s computer facilities when an
organization outsources its computer operations.
Systems integrators may assume responsibility for developing and implementing large systems development
projects that involve many vendors and subcontractors.
Value-added resellers (VARs) specialize in providing industry-specific hardware, software, and services from
selected manufacturers.
Other services include systems design, contract programming, and consulting services.
Evaluating IS services includes factors such as:
Performance
Systems development
Maintenance
Conversion
Training
Backup
Accessibility
Business position
Hardware
Software
14. OTHER IMPLEMENTATION ACTIVITIES
Testing, documentation, and training are keys to successful implementation of a new e-business system.
Testing:
System testing may involve:
Testing website performance
Testing and debugging software
Testing new hardware
Review of prototypes of displays, reports, and other output
Testing at every stage of the systems development process
Documentation:
Developing good user documentation is an important part of the implementation process.
Documentation serves as a method of communicating among the people responsible for developing,
implementing, and maintaining a computer-based system.
Documentation is extremely important in diagnosing errors and making changes.
Documentation involves developing:
1. Manuals for operating procedures 3. Sample forms
2. Sample data entry display screens 4. Sample reports
Training:
Training is a vital implementation activity. IS personnel must be sure that end users are trained to operate a new e-
business systemor its implementation will fail. Training may include:
Activities such as data entry
All aspects of the proper use of a new system
Managers and end users must be educated in how the new technology impacts the company’s business
operations and management.
Training programs for specific hardware devices, software packages, and their use for specific work activities.
Conversion Methods: [Figure 10.26]
The initial operation of a new e-business systemcan be a difficult task. Such an operation is usually a conversion
process in which the personnel, procedures, equipment, input/output media, and databases of an old information
systemmust be converted to the requirements of a new system. Four major forms of systemconversion include:
Parallel Conversion: - Both the old and the new systemare operated until the project development teamand
15. end user management agrees to switch completely over to the new system. It is during this time that the
operations and results of both systems are compared and evaluated. Errors can be identified and corrected, and
the operating problems can be solved before the old systemis abandoned.
Phased Conversion: - Only parts of a new application or only a few departments, branch offices, or plant
locations at a time are converted. A phased conversion allows a gradual implementation process to take place
within an organization.
Pilot Conversion: - Where one department or other work site serves as a test site. A new systemcan be tried
out at this site until developers feel it can be implemented throughout the organization.
Plunge/Direct Cutover: - Use the system immediately and totally abandons the old system.
IS Maintenance:
Once a systemis fully implemented and is being used in business operations, the maintenance function begins.
System maintenance is the monitoring, evaluating, and modifying of operational e-business systems to make
desirable or necessary improvements. The maintenance function includes:
A postimplementation review process to ensure that newly implemented systems meet the e-business
objectives established for them.
Correcting errors in the development or use of the system. This includes a periodic review or audit of a system
to ensure that it is operating properly and meeting its objectives.
Making modifications to an e-business systemdue to changes in the business organization or the business
environment.
IV. KEY TERMS AND CONCEPTS - DEFINED
Conversion Methods:
The process in which the hardware, software, people, and data resources of an old information systemmust be
converted to the requirements of a new information system. This usually involves a (1) parallel, (2) phased, (3) pilot,
or (4) plunge conversion process fromthe old to the new system.
Cost/benefit Analysis:
Identifying the advantages or benefits and the disadvantages or costs of a proposed solution.
Documentation:
A collection of documents or information that describes a computer program, information system, or required data
processing operations.
Economic Feasibility:
Whether expected cost savings, increased revenue, increased profits and reductions in required investment exceed
the costs of developing and operating a proposed system.
EndUser Development:
Managers and business specialists can develop their own computer-based business applications.
Evaluation Factors - Hardware:
Criteria used to evaluate hardware services (Figure 10.22)
Evaluation Factors - IS Services:
Criteria used to evaluate IS services (Figure 10.24)
Evaluation Factors - Software:
Criteria used to evaluate software services (Figure 10.23)
16. Feasibility Study:
A preliminary study that investigates the information needs of end users and the objectives, constraints, basic
resource requirements, cost/benefits, and feasibility of proposed projects.
Functional Requirements:
A detailed description of user information needs and the input, processing, output, storage, and control capabilities
required to meet those needs.
Implementation Process:
Includes acquisition, testing, training, and conversion to a new system.
Intangible Benefits:
The non-quantifiable benefits of a proposed solution.
Intangible Costs:
The non-quantifiable costs of a proposed solution.
Operational Feasibility:
The willingness and ability of management, employees, customers, and suppliers to operate, use, and support a
proposed system.
Organizational Analysis:
Evaluating the organizational and environmental systems and subsystems involved in any situation.
Organizational Feasibility:
How well a proposed information systemsupports the objectives of an organization’s strategic plan for information
systems.
Postimplementation Review:
Monitoring and evaluating the results of an implemented solution or system.
Prototype:
A working model. In particular, a working model of an information system, which includes tentative versions of user,
input and output, databases and files, control methods, and processing routines.
Prototyping:
The rapid development and testing of working models, or prototypes, of new information systemapplications in an
interactive, iterative process involving both systems analysts and end users.
Systems Analysis:
(1) Analyzing in detail the components and requirements of a system, (2) Analyzing in detail the information needs of
an organization, the characteristics and components of presently utilized information systems, and the functional
requirements of proposed information systems.
Systems Approach:
A systematic process of problemsolving based on the scientific method, which defines problems and opportunities
in a systems context. Data is gathered describing the problemor opportunity, and alternative solutions are identified
and evaluated. Then the best solution is selected and implemented, and its success evaluated.
Systems Design:
Deciding how a proposed information systemwill meet the information needs of end users. Includes logical and
physical design activities, and user interface, data and process design activities, which produce system
specifications that satisfy the systemrequirements developed in the systems analysis stage.
Systems Development Life Cycle:
17. (1) Conceiving, designing, and implementing a system, (2) Developing information systems by a process of
investigation, analysis, design, implementation, and maintenance. Also called information systems development, or
application development.
Systems Implementation:
The stage of systems development in which hardware and software are acquired, developed, and installed, the
systemis tested and documented, people are trained to operate and use the system, and an organization converts to
the use of a newly developed system.
Systems Investigation:
The screening, selection, and preliminary study of a proposed information systemsolution to a business prob lem.
Systems Maintenance:
The monitoring, evaluating, and modifying of a systemto make desirable or necessary improvements.
System Specifications:
The product of the systems design stage. It consists of specifications for the hardware, software, facilities,
personnel, databases, and the user interface of a proposed information system.
System Testing:
Checking whether hardware and software work properly.
Systems Thinking:
Trying to recognize systems and the new interrelationships and components of systems in any situation.
Tangible Benefits:
The quantifiable benefits of a proposed solution or system.
Tangible Costs:
The quantifiable costs of a proposed solution or system.
Technical Feasibility:
Whether reliable hardware and software capable of meeting the needs of a proposed systemcan be acquired or
developed by an organization in the required time.
User Interface, Data, andProcess Design:
The three major activities or products of systems design.
V. DISCUSSION QUESTIONS
Why has prototyping become a popular way to develop e-business applications. What are
prototyping’s advantages and disadvantages?
What are the three most important factors you would use in evaluating computer hardware?
Computer software?
Assume that in your first week on a new job you are asked to use a type of business software
that you have never used before. What kind of user training should your company provide to
you before you start?
What is the difference between the parallel, plunge, phased, and pilot forms of IS conversion?
Which strategy is best?
What are several key factors in designing a successful e-commerce or internet website?