The document summarizes the findings and proposed actions from a 2015 school review. Key findings include the need to encourage innovative teaching practices, increase staff collaboration, and leverage student data to improve learning. Three proposed actions are outlined: 1) collaboratively redesign teaching programs to increase student engagement; 2) utilize student assessment data to inform future planning; and 3) improve the staffroom environment through decluttering and increased use of technology. Specific steps and timeframes are provided for implementing each proposed action over the next few years.
4. Finding 1 & 2:
Curriculum Programming
• Teaching programs are fixed
and based predominately on
content delivery.
• Teaching programs need to
encourage innovative pedagogy.
• Teaching courses offered
address the needs of students.
5. Findings 3 & 4:
Teaching and Learning
• Staff collaboration can increase
to enable greater sharing of
ideas and resources.
6. Finding 5:
Assessment and Reporting
• School and system data can be
leveraged to improve practice
and learning.
• Greater evidence-based self
reflection.
7. Finding 6:
Faculty Management
• Staffroom space can be better
organised for greater wellbeing
and collaboration
• ICT usage to be cornerstone to
be a cornerstone.
13. Proposed: Action 2
• 2016 – commence student
performance tracking through
Stages 4-5.
• 2017-2018 – plan based on
student performance data
collected in 2016.
Indicative timeframe
15. Proposed: Action 3
• 2015-6 – migration of some administrative
data to OneDrive for Business.
• 2016-7 – SharePoint Online launched by
DoE, migration of data to SharePoint Online
and/or Yammer. Staff gain proficiency with
OneDrive for Business for personal storage.
• 2016 – detailed planning for staffroom
refurbishment undertaken.
• Q4 2016 – removal of cabinets and
cupboards from windowed side of staffroom
corridor. Major cleanup of shelves around
photocopier “dead end”.
• 2017-8 – refurbishment underway. Plan for
Textbook Storage Room refurbishment.
Indicative timeframe