Waterfall
vs.
Agile
… in plain English
Analysis
Design
Implementation
Testing
Evaluation
- Waterfall is also called the traditional project planning
method
- It relies on heavy up-front analysis and documentation of the
need and problems of the client
- A plan is formed and as a solution is constructed, it is
compared to the original plan
- The best methodology is the Systems Development Life Cycle
(SDLC):
Waterfall
Jonathan Donado Linkedin.com/in/jonathandonado
Waterfall
• It is easy to understand and manage as stages are
clearly defined
• Meticulous record keeping and documentation
• Client knows what to expect. Client will have an
idea of the size, cost, and timeline for the project.
Client will have a definite idea of what their
product will do in the end
• In the case of employee turnover, waterfall’s strong
documentation allows for minimal project impact
ADVANTAGES
Jonathan Donado Linkedin.com/in/jonathandonado
Waterfall
• It often becomes rigid and resistant to change.
• It relies heavily on initial requirements. However, if
these requirements are faulty in any manner, the
project is doomed.
• The whole product is only tested at the end. If
errors are discovered late in the process, their
existence may have affected the rest of the project.
• The plan does not take into account a client’s
evolving needs throughout the project cycle.
DISADVANTAGES
Jonathan Donado Linkedin.com/in/jonathandonado
Analysis
Design
Implementation
Testing
Analysis
Design
Implementation
Testing
Analysis
Design
Implementation
Testing
- Agile is method that breaks down a project into multiple
independent iterations. A set of iterations make a release of
the product to the customer.
Agile (part 1)
Analysis
Design
Implementation
Testing
Project
Linkedin.com/in/jonathandonadoJonathan Donado
Iteration 1 Iteration 2 Iteration N
- The project is dynamic and embraces change as it occurs during
the project
- Agile relies in the team “as a whole” for the decision making. There
is no hierarchy inside the team, and it is coordinated by a project
leader.
- Work is distributed by consensus, not by authority.
- Customer is heavily involved during the project. He participates
throughout the project to make sure that his requirements are
always met.
- Worked is delivered to the customer in small but frequent releases,
so it allows ongoing feedback.
Project
Linkedin.com/in/jonathandonadoJonathan Donado
Iteration 2Iteration 1 Iteration N
Agile (part 2)
• It allows for changes to be made after the initial planning
stage. It follows client’s requirements changes
• It is easier to add features that will keep the product up to
date with the latest developments in the industry.
• At the end of each sprint, project priorities are evaluated.
This allows clients to add their feedback, so that they
ultimately get the product they desire.
• The testing at the end of each sprint ensures that the
errors are caught in each cycle.
ADVANTAGES
Jonathan Donado
Agile
Linkedin.com/in/jonathandonado
• This dynamic methodology is not suitable for processes
that required complex decision making or formal
planning such as construction or manufacturing.
• As the initial project does not have a definitive plan, the
final product can be grossly different than what was
initially intended.
DISADVANTAGES
Jonathan Donado
Agile
Linkedin.com/in/jonathandonado
DISADVANTAGES
Jonathan Donado
Waterfall vs Agile
Linkedin.com/in/jonathandonado
Waterfall
Formal and Hierarchical. Project Manager is in charge.
Project is based on one single cycle with the traditional
project management process
Anticipation: No changes throughout the project
Early planning and design is key to the success of the
project
Agile
Informal. Decision are made by the entire team.
Project is based on a repetitive number of iterations that
are in one cycle or release. The product has numerous
releases.
Adaptation: Embraces changes
Product evolves with customer feedback. Product
features are added as customers see it fit
15
Let’s stay in touch
Linkedin.com/in/jonathandonado
Jonathan.L.Donado@gmail.com
www.branded.me/jonathandonado
twitter.com/donadosays
Jonathan Donado
Bilingual senior general management executive
with expertise in international business and
Mergers & Acquisitions (M&A).

Waterfall vs Agile : A Beginner's Guide in Project Management

  • 1.
  • 2.
    Analysis Design Implementation Testing Evaluation - Waterfall isalso called the traditional project planning method - It relies on heavy up-front analysis and documentation of the need and problems of the client - A plan is formed and as a solution is constructed, it is compared to the original plan - The best methodology is the Systems Development Life Cycle (SDLC): Waterfall Jonathan Donado Linkedin.com/in/jonathandonado
  • 3.
    Waterfall • It iseasy to understand and manage as stages are clearly defined • Meticulous record keeping and documentation • Client knows what to expect. Client will have an idea of the size, cost, and timeline for the project. Client will have a definite idea of what their product will do in the end • In the case of employee turnover, waterfall’s strong documentation allows for minimal project impact ADVANTAGES Jonathan Donado Linkedin.com/in/jonathandonado
  • 4.
    Waterfall • It oftenbecomes rigid and resistant to change. • It relies heavily on initial requirements. However, if these requirements are faulty in any manner, the project is doomed. • The whole product is only tested at the end. If errors are discovered late in the process, their existence may have affected the rest of the project. • The plan does not take into account a client’s evolving needs throughout the project cycle. DISADVANTAGES Jonathan Donado Linkedin.com/in/jonathandonado
  • 5.
    Analysis Design Implementation Testing Analysis Design Implementation Testing Analysis Design Implementation Testing - Agile ismethod that breaks down a project into multiple independent iterations. A set of iterations make a release of the product to the customer. Agile (part 1) Analysis Design Implementation Testing Project Linkedin.com/in/jonathandonadoJonathan Donado Iteration 1 Iteration 2 Iteration N
  • 6.
    - The projectis dynamic and embraces change as it occurs during the project - Agile relies in the team “as a whole” for the decision making. There is no hierarchy inside the team, and it is coordinated by a project leader. - Work is distributed by consensus, not by authority. - Customer is heavily involved during the project. He participates throughout the project to make sure that his requirements are always met. - Worked is delivered to the customer in small but frequent releases, so it allows ongoing feedback. Project Linkedin.com/in/jonathandonadoJonathan Donado Iteration 2Iteration 1 Iteration N Agile (part 2)
  • 7.
    • It allowsfor changes to be made after the initial planning stage. It follows client’s requirements changes • It is easier to add features that will keep the product up to date with the latest developments in the industry. • At the end of each sprint, project priorities are evaluated. This allows clients to add their feedback, so that they ultimately get the product they desire. • The testing at the end of each sprint ensures that the errors are caught in each cycle. ADVANTAGES Jonathan Donado Agile Linkedin.com/in/jonathandonado
  • 8.
    • This dynamicmethodology is not suitable for processes that required complex decision making or formal planning such as construction or manufacturing. • As the initial project does not have a definitive plan, the final product can be grossly different than what was initially intended. DISADVANTAGES Jonathan Donado Agile Linkedin.com/in/jonathandonado
  • 9.
    DISADVANTAGES Jonathan Donado Waterfall vsAgile Linkedin.com/in/jonathandonado Waterfall Formal and Hierarchical. Project Manager is in charge. Project is based on one single cycle with the traditional project management process Anticipation: No changes throughout the project Early planning and design is key to the success of the project Agile Informal. Decision are made by the entire team. Project is based on a repetitive number of iterations that are in one cycle or release. The product has numerous releases. Adaptation: Embraces changes Product evolves with customer feedback. Product features are added as customers see it fit
  • 10.
    15 Let’s stay intouch Linkedin.com/in/jonathandonado Jonathan.L.Donado@gmail.com www.branded.me/jonathandonado twitter.com/donadosays Jonathan Donado Bilingual senior general management executive with expertise in international business and Mergers & Acquisitions (M&A).