SlideShare a Scribd company logo
2014 Second Quarter 
Financial & Strategic Update 
August 1, 2014 
Al Monaco 
President & CEO 
J. Richard Bird 
Executive Vice President, 
CFO and Corporate Development 
John Whelen 
Senior Vice President, Finance
Q2 2014 – Financial & Strategic Update 
• Presenters: 
Al Monaco 
President & CEO 
John Whelen 
Senior Vice President, Finance 
• Question & Answer Period 
2
Legal Notice 
This presentation includes certain forward looking information (FLI) to provide Enbridge shareholders and potential investors 
with information about Enbridge and management’s assessment of its future plans and operations, which may not be 
appropriate for other purposes. FLI is typically identified by words such as “anticipate”, “expect”, “project”, “estimate”, 
“forecast”, “plan”, “intend”, “target”, “believe” and similar words suggesting future outcomes or statements regarding an 
outlook. Although we believe that our FLI is reasonable based on the information available today and processes used to 
prepare it, such statements are not guarantees of future performance and you are cautioned against placing undue reliance 
on FLI. By its nature, FLI involves a variety of assumptions, risks, uncertainties and other factors which may cause actual 
results, levels of activity and achievements to differ materially from those expressed or implied in our FLI. Material 
assumptions include assumptions about: the expected supply and demand for crude oil, natural gas and natural gas liquids; 
prices of crude oil, natural gas and natural gas liquids; expected exchange rates; inflation; interest rates; the availability and 
price of labour and pipeline construction materials; operational reliability; anticipated in-service dates and weather. 
Our FLI is subject to risks and uncertainties pertaining to operating performance, regulatory parameters, weather, economic 
conditions, exchange rates, interest rates and commodity prices, including but not limited to those discussed more 
extensively in our filings with Canadian and US securities regulators. The impact of any one risk, uncertainty or factor on any 
particular FLI is not determinable with certainty as these are interdependent and our future course of action depends on 
management’s assessment of all information available at the relevant time. Except to the extent required by law, we assume 
no obligation to publicly update or revise any FLI, whether as a result of new information, future events or otherwise. All FLI 
in this presentation is expressly qualified in its entirety by these cautionary statements. 
This presentation will make reference to certain financial measures, such as adjusted net income, which are not recognized 
under GAAP. Reconciliations to the most closely related GAAP measures are included in the earnings release and also in the 
Management Discussion and Analysis posted to the website. 
3
• Recap of Financial Results 
• Recent Developments 
• Financial Review 
• Project Execution Update 
Agenda 
4
Q2 2014 – Financial Results ($MM) 
* Adjusted earnings and adjusted EPS are non-GAAP measures. For more information on non-GAAP measures please refer to disclosure in news release. 
Year-To-Date EPS: $1.00 $1.00 
2014 EPS Guidance: 
$1.84 $2.04 
5 
$488 $492 
$306 $328 
2013 2014 
Q1 
Q2 Q2 
$794 
Q1 
$820
EGD Custom Incentive Rate Approval 
• 5-Year term (2014-2019) 
• ROE set annually – 9.36% in 2014 
• Capital spending program 
approved – average 570 million/yr. 
• 50/50 sharing up to 300 bps above 
allowed ROE 
• Consistent with EPS growth 
expectations 
6
• Capital cost estimate finalized 
– Cdn $4.9 billion 
– US $2.6 billion 
• Surcharge: U.S. $0.895/bbl 
• Low double-digit equity 
return 
• Expected in-service: 
– 2nd half of 2017 
Line 3 Replacement Update 
7
U.S. Sponsored Vehicles 
8 
• Re-establish EEP as a strong 
sponsored vehicle 
– Preferred Share Purchase 
– Joint Funding 
– Receivables Purchase 
– Established Midcoast Energy Partners 
– IDR Restructuring 
• 2.1% distribution increase 
effective August 14, 2014 
• First post-IPO drop down 
– 12.6% interest in EEP’s G&P 
business (U.S.$350 Million) 
• 4% distribution increase 
effective August 14, 2014
Northern Gateway Project 
• Regulatory phase compete 
• Focus over next 12+ months: 
- Satisfy 209 JRP conditions and work with B.C. on 5 conditions for oil 
pipelines 
- Continue to engage with communities and First Nations 
- Finalize cost estimate and commercial agreements
Segmented Earnings* Variance 
10 
$ Millions 
SEGMENT 
Q2 2014 vs. 
Q2 2013 
Liquids Pipelines +61 
Gas Distribution -10 
Gas Pipelines, Processing and Energy Services -46 
Sponsored Investments +25 
Corporate -8 
TOTAL +22 
* Adjusted earnings are non-GAAP measures. For more information on non-GAAP measures please refer to disclosure in news release.
Record Mainline Throughput 
11 
• Record ex-Gretna volumes 
delivered 
- 2.1 million bpd in June 
• Strong Fundamentals 
- Increasing production 
- Strong PADD II demand 
(BP Whiting) 
• Capacity Optimization 
- Removal of pressure restrictions 
- Scheduling & operational 
optimization 
- Quality pooling 
0.5 
1.0 
1.5 
2.0 
2.5 
MMbpd 
Quarterly Ex-Gretna Throughput
Guidance Range 
Full Year 2014 EPS Guidance Outlook 
$1.84 
$2.04 
* Adjusted earnings are non-GAAP measures. For more information on non-GAAP measures please refer to disclosure in news release. 12 
Headwinds 
• Energy Services 
• Equity Prefunding 
Tailwinds 
• Liquids Pipelines
Enterprise Wide Funding and Liquidity Actions 
FUNDING SOURCES* 2014 
($ Billions) 
ENB Preferred Shares $1.1 
ENB DRIP $0.2 
Medium Term Notes $3.3 
Bank Credit Facility Additions $0.4 
ENB Common Equity Issuance $0.5 
EEQ PIK $0.1 
TOTAL $5.6 Billion 
* In Nominal CAD and US Currencies 13
2013 – 2017 Funding Requirements 
Excluding Sponsored Investments 
($ billions, as at July 2014) 
Maintenance Capital 5.6 
Secured Growth Capital 28.0 
Risked Growth Capital 3.2 
36.8 
Cash Flow Net of Dividends (14.6) 
Net Funding Requirement 22.2 
Debt 
Total Requirement 15.1 
Cash on Hand (1.1) 
Total Requirement, Net of Cash 14.0 
2013 – 2017 Maturities 5.2 
Preferred Share Issuances (1.3) 
Debt Already Issued (6.3) 
Debt Requirement 11.6 
Equity 
Total Requirement 7.1 
2013 Common Share Issuances (0.6) 
2014 Common Share Issuances (0.5) 
Noverco (0.2) 
Preferred Share Issuances (1.3 
DRIP/ESOP (2.5) 
Equity Requirement 2.0 
14
2013 – 2017 Remaining Requirement $2.0 Billion: 
Cost of Equity Optimization & Flexibility 
$ Billions 
Preferred Shares $1.3 
Asset Monetization/Sponsored Vehicle Drop Downs $3.0 
TOTAL $4.3 
ENB Public Equity ~ 
15
Enterprise Wide Growth Capital 
In-service 2014 
Gretna Montreal 
Regina 
Toledo 
Buffalo 
Houston 
Cromer 
Cushing 
Patoka 
Sarnia 
Superior 
Port Arthur 
Westover 
16 
Projects 
Estimated Cost 
($ Billion) 
Liquids Pipelines (Alberta Regional Infrastructure): 
Norealis Pipeline $0.5 
Surmont Phase 2 Expansion (2014-2015 Phases) $0.3 
Liquids Pipelines (Market Access Initiatives): 
Eastern Access 
- Line 6B Replacement (Griffith to Stockbridge) 
- Line 6B Replacement (Ortonville to Border) 
- Line 9 Reversal 
$1.4 
$0.7 
$0.6 
Western USGC Access: 
(Flanagan South, Seaway Twin, Associated Mainline) 
$4.6 
Light Oil Market Access (Line 9 Expansion) $0.1 
Eddystone Rail Project $0.1 
Line 6B 75 Miles Replacement Program $0.4 
Gas Pipelines: 
Pipestone and Sexsmith Project (2012-2014 Phases) $0.3 
Walker Ridge Gas Gathering System $0.4 
Gas Distribution: 
Other EGD Growth Capital $0.2 
Green Power: 
Blackspring Ridge Wind Project $0.3 
Hardisty 
Kerrobert 
Edmonton 
Fort 
McMurray 
+600 
kbpd 
+270 
kbpd 
+80 
kbpd 
Chicago/ 
Flanagan 
$9.9 Billion In-Service in 2014
Western U.S. Gulf Coast Access 
Cushing 
Houston 
Chicago/ 
Flanagan 
Port Arthur 
2 
3 
4 
* Includes $1.3B Seaway Acquisition completed in 2012 and Associated Mainline Expansions 
Total Secured Capital = $6.6 B* 
1 
Associated Mainline Expansions ($1.3B) 
Flanagan South Pipeline ($2.8B) 
Seaway Pipeline Acquisition + Reversal ($1.3B) 
Seaway Pipeline Twin + Lateral ($1.2B) 
1 
3 
2 
4 
Project Status Update 
• Flanagan South - Construction in progress 
• Seaway Twin – Mechanically complete as of early July 
17
2012 2017 
An Industry Leading DPS 
Growth Outlook (smoother) 
2012 2017 
An Industry Leading EPS* 
Growth Outlook (but lumpy) 
Industry Leading EPS & DPS Outlook 
* Adjusted earnings are non-GAAP measures. For more information on non-GAAP measures please refer 
to disclosure in news release. 
• Tilted Return 
Projects 
- $7.5B Line 3 
Replacement 
• New Growth 
Platforms 
• Sponsored Vehicle 
Drop Downs 
• EPS Growth 
• Surplus Cash 
Flow 
18 
$42 Billion Enterprise Wide Capital Program
Summary 
• Strong first half results 
• On track to be within full year EPS guidance 
range of $1.84 - $2.04 
• Project execution going well 
• On pace for 10-12% EPS growth through 2017 
19
Q&A 
2014 Second Quarter 
Financial & Strategic Update 
August 1, 2014

More Related Content

What's hot

Enlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations reportEnlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations report
EnLinkMidstreamLLC
 
Q4 15 operations report final2
Q4 15 operations report   final2Q4 15 operations report   final2
Q4 15 operations report final2
EnLinkMidstreamLLC
 
Investor presentation december 2015 v final
Investor presentation december 2015 v finalInvestor presentation december 2015 v final
Investor presentation december 2015 v final
CrestwoodCorporate
 
3rd Quarter Fiscal 2012 Update
3rd Quarter Fiscal 2012 Update3rd Quarter Fiscal 2012 Update
3rd Quarter Fiscal 2012 UpdateNewJerseyResources
 
February 2021 - Investor Presentation
February 2021 - Investor PresentationFebruary 2021 - Investor Presentation
February 2021 - Investor Presentation
Chesapeake Energy Corporation
 
02 24-16 fourth quarter & fy 2015 financial review final
02 24-16 fourth quarter & fy 2015 financial review final02 24-16 fourth quarter & fy 2015 financial review final
02 24-16 fourth quarter & fy 2015 financial review final
AES_BigSky
 
06 26-16 jpm energy conference final
06 26-16 jpm energy conference final06 26-16 jpm energy conference final
06 26-16 jpm energy conference final
AES_BigSky
 
February 2017 enlk and enlc operations report
February 2017 enlk and enlc operations reportFebruary 2017 enlk and enlc operations report
February 2017 enlk and enlc operations report
EnLinkMidstreamLLC
 
Investor presentation march 2016
Investor presentation march 2016Investor presentation march 2016
Investor presentation march 2016
CrestwoodCorporate
 
Crestwood investor deck january 2018
Crestwood investor deck january 2018Crestwood investor deck january 2018
Crestwood investor deck january 2018
CrestwoodCorporate
 
Devon Sharpens Focus
Devon Sharpens FocusDevon Sharpens Focus
Devon Sharpens Focus
Devon Energy Corporation
 
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLinkMidstreamLLC
 
Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - final
EnLinkMidstreamLLC
 
2017 en link midstream guidance
2017 en link midstream guidance2017 en link midstream guidance
2017 en link midstream guidance
EnLinkMidstreamLLC
 
Investor presentation march 2-4 2015
Investor presentation march 2-4 2015Investor presentation march 2-4 2015
Investor presentation march 2-4 2015
EnLinkMidstreamLLC
 
UBS MLP One-on-One Conference
UBS MLP One-on-One ConferenceUBS MLP One-on-One Conference
UBS MLP One-on-One Conference
SunocoLP
 
Enlk & enlc operations report third quarter 2017
Enlk & enlc operations report third quarter 2017Enlk & enlc operations report third quarter 2017
Enlk & enlc operations report third quarter 2017
EnLinkMidstreamLLC
 
Q1 16 operations report - final
Q1 16 operations report - finalQ1 16 operations report - final
Q1 16 operations report - final
EnLinkMidstreamLLC
 
Project phoenix investor presentation 10232016_225pm_ct
Project phoenix investor presentation 10232016_225pm_ctProject phoenix investor presentation 10232016_225pm_ct
Project phoenix investor presentation 10232016_225pm_ct
ir_jpenergy
 

What's hot (20)

Enlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations reportEnlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations report
 
Q4 15 operations report final2
Q4 15 operations report   final2Q4 15 operations report   final2
Q4 15 operations report final2
 
Investor presentation december 2015 v final
Investor presentation december 2015 v finalInvestor presentation december 2015 v final
Investor presentation december 2015 v final
 
3rd Quarter Fiscal 2012 Update
3rd Quarter Fiscal 2012 Update3rd Quarter Fiscal 2012 Update
3rd Quarter Fiscal 2012 Update
 
1st qtrearningsresults13
1st qtrearningsresults131st qtrearningsresults13
1st qtrearningsresults13
 
February 2021 - Investor Presentation
February 2021 - Investor PresentationFebruary 2021 - Investor Presentation
February 2021 - Investor Presentation
 
02 24-16 fourth quarter & fy 2015 financial review final
02 24-16 fourth quarter & fy 2015 financial review final02 24-16 fourth quarter & fy 2015 financial review final
02 24-16 fourth quarter & fy 2015 financial review final
 
06 26-16 jpm energy conference final
06 26-16 jpm energy conference final06 26-16 jpm energy conference final
06 26-16 jpm energy conference final
 
February 2017 enlk and enlc operations report
February 2017 enlk and enlc operations reportFebruary 2017 enlk and enlc operations report
February 2017 enlk and enlc operations report
 
Investor presentation march 2016
Investor presentation march 2016Investor presentation march 2016
Investor presentation march 2016
 
Crestwood investor deck january 2018
Crestwood investor deck january 2018Crestwood investor deck january 2018
Crestwood investor deck january 2018
 
Devon Sharpens Focus
Devon Sharpens FocusDevon Sharpens Focus
Devon Sharpens Focus
 
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
 
Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - final
 
2017 en link midstream guidance
2017 en link midstream guidance2017 en link midstream guidance
2017 en link midstream guidance
 
Investor presentation march 2-4 2015
Investor presentation march 2-4 2015Investor presentation march 2-4 2015
Investor presentation march 2-4 2015
 
UBS MLP One-on-One Conference
UBS MLP One-on-One ConferenceUBS MLP One-on-One Conference
UBS MLP One-on-One Conference
 
Enlk & enlc operations report third quarter 2017
Enlk & enlc operations report third quarter 2017Enlk & enlc operations report third quarter 2017
Enlk & enlc operations report third quarter 2017
 
Q1 16 operations report - final
Q1 16 operations report - finalQ1 16 operations report - final
Q1 16 operations report - final
 
Project phoenix investor presentation 10232016_225pm_ct
Project phoenix investor presentation 10232016_225pm_ctProject phoenix investor presentation 10232016_225pm_ct
Project phoenix investor presentation 10232016_225pm_ct
 

Viewers also liked

TD Securities Calgary Energy Conference 2014
TD Securities Calgary Energy Conference 2014TD Securities Calgary Energy Conference 2014
TD Securities Calgary Energy Conference 2014
Enbridge Inc.
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines
Enbridge Inc.
 
2014 C.D. Howe Institute Roundtable
2014 C.D. Howe Institute Roundtable 2014 C.D. Howe Institute Roundtable
2014 C.D. Howe Institute Roundtable
Enbridge Inc.
 
Governor-in-Council 2014 Northern Gateway Decision
Governor-in-Council 2014 Northern Gateway DecisionGovernor-in-Council 2014 Northern Gateway Decision
Governor-in-Council 2014 Northern Gateway Decision
Enbridge Inc.
 
Duluth Chamber of Commerce 2014 Annual Dinner
Duluth Chamber of Commerce 2014 Annual DinnerDuluth Chamber of Commerce 2014 Annual Dinner
Duluth Chamber of Commerce 2014 Annual Dinner
Enbridge Inc.
 
Piping questions
Piping questionsPiping questions
Piping questions
shameer kangadan
 
Fatigue analysis using caesar ii
Fatigue analysis using caesar iiFatigue analysis using caesar ii
Fatigue analysis using caesar ii
Rem Elems
 
2014 Enbridge Day - Enbridge Gas Distribution
2014 Enbridge Day - Enbridge Gas Distribution2014 Enbridge Day - Enbridge Gas Distribution
2014 Enbridge Day - Enbridge Gas Distribution
Enbridge Inc.
 
Caesar II (Pipe Stress Analysis) - Bahasa Melayu
Caesar II (Pipe Stress Analysis) -  Bahasa MelayuCaesar II (Pipe Stress Analysis) -  Bahasa Melayu
Caesar II (Pipe Stress Analysis) - Bahasa Melayu
Gem Gem
 

Viewers also liked (10)

TD Securities Calgary Energy Conference 2014
TD Securities Calgary Energy Conference 2014TD Securities Calgary Energy Conference 2014
TD Securities Calgary Energy Conference 2014
 
Add revit
Add   revitAdd   revit
Add revit
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines
 
2014 C.D. Howe Institute Roundtable
2014 C.D. Howe Institute Roundtable 2014 C.D. Howe Institute Roundtable
2014 C.D. Howe Institute Roundtable
 
Governor-in-Council 2014 Northern Gateway Decision
Governor-in-Council 2014 Northern Gateway DecisionGovernor-in-Council 2014 Northern Gateway Decision
Governor-in-Council 2014 Northern Gateway Decision
 
Duluth Chamber of Commerce 2014 Annual Dinner
Duluth Chamber of Commerce 2014 Annual DinnerDuluth Chamber of Commerce 2014 Annual Dinner
Duluth Chamber of Commerce 2014 Annual Dinner
 
Piping questions
Piping questionsPiping questions
Piping questions
 
Fatigue analysis using caesar ii
Fatigue analysis using caesar iiFatigue analysis using caesar ii
Fatigue analysis using caesar ii
 
2014 Enbridge Day - Enbridge Gas Distribution
2014 Enbridge Day - Enbridge Gas Distribution2014 Enbridge Day - Enbridge Gas Distribution
2014 Enbridge Day - Enbridge Gas Distribution
 
Caesar II (Pipe Stress Analysis) - Bahasa Melayu
Caesar II (Pipe Stress Analysis) -  Bahasa MelayuCaesar II (Pipe Stress Analysis) -  Bahasa Melayu
Caesar II (Pipe Stress Analysis) - Bahasa Melayu
 

Similar to Enbridge Inc. Second Quarter 2014 Financial Results

En link midstream jp morgan presentation
En link midstream jp morgan presentationEn link midstream jp morgan presentation
En link midstream jp morgan presentation
EnLinkMidstreamLLC
 
Credit suisse mlp conference presentation
Credit suisse mlp conference presentationCredit suisse mlp conference presentation
Credit suisse mlp conference presentation
EnLinkMidstreamLLC
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations report
EnLinkMidstreamLLC
 
Investor Presentation August 2015
Investor Presentation August 2015Investor Presentation August 2015
Investor Presentation August 2015
EnLinkMidstreamLLC
 
Jefferies global energy conference
Jefferies global energy conferenceJefferies global energy conference
Jefferies global energy conference
EnLinkMidstreamLLC
 
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceGoldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
EnLinkMidstreamLLC
 
Q3 2014 jnpr financial results slides final - 2014-10-27
Q3 2014 jnpr financial results slides   final - 2014-10-27Q3 2014 jnpr financial results slides   final - 2014-10-27
Q3 2014 jnpr financial results slides final - 2014-10-27
IRJuniperNetworks
 
Citi MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceCiti MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure Conference
EnLinkMidstreamLLC
 
Barclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalBarclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - final
EnLinkMidstreamLLC
 
2015 Jefferies Energy Conference
2015 Jefferies Energy Conference2015 Jefferies Energy Conference
2015 Jefferies Energy Conference
EnLinkMidstreamLLC
 
RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015
EnLinkMidstreamLLC
 
RBC Capital Markets MLP Conference
RBC Capital Markets MLP ConferenceRBC Capital Markets MLP Conference
RBC Capital Markets MLP Conference
EnLinkMidstreamLLC
 
Credit Suisse 20th Annual Energy Summit Presentation
Credit Suisse 20th Annual Energy Summit PresentationCredit Suisse 20th Annual Energy Summit Presentation
Credit Suisse 20th Annual Energy Summit Presentation
EnLinkMidstreamLLC
 
Q3 2014 jnpr financial results slides final
Q3 2014 jnpr financial results slides   finalQ3 2014 jnpr financial results slides   final
Q3 2014 jnpr financial results slides final
IRJuniperNetworks
 
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUMWELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
EnLinkMidstreamLLC
 
JP Morgan Energy Presentation
JP Morgan Energy PresentationJP Morgan Energy Presentation
JP Morgan Energy Presentation
Devon Energy Corporation
 
12 15-14 december investor presentation final
12 15-14 december investor presentation final12 15-14 december investor presentation final
12 15-14 december investor presentation final
AES_BigSky
 
Capital return-announcement-with-non-gaaps
Capital return-announcement-with-non-gaapsCapital return-announcement-with-non-gaaps
Capital return-announcement-with-non-gaaps
Delta_Airlines
 
Progressive Waste Solutions Fourth Quarter 2014 Financial Results
Progressive Waste Solutions Fourth Quarter 2014 Financial ResultsProgressive Waste Solutions Fourth Quarter 2014 Financial Results
Progressive Waste Solutions Fourth Quarter 2014 Financial Results
ProgressiveWaste
 
1 q2017 earnings_ppt_final
1 q2017 earnings_ppt_final1 q2017 earnings_ppt_final
1 q2017 earnings_ppt_final
InfraREIT
 

Similar to Enbridge Inc. Second Quarter 2014 Financial Results (20)

En link midstream jp morgan presentation
En link midstream jp morgan presentationEn link midstream jp morgan presentation
En link midstream jp morgan presentation
 
Credit suisse mlp conference presentation
Credit suisse mlp conference presentationCredit suisse mlp conference presentation
Credit suisse mlp conference presentation
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations report
 
Investor Presentation August 2015
Investor Presentation August 2015Investor Presentation August 2015
Investor Presentation August 2015
 
Jefferies global energy conference
Jefferies global energy conferenceJefferies global energy conference
Jefferies global energy conference
 
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceGoldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
 
Q3 2014 jnpr financial results slides final - 2014-10-27
Q3 2014 jnpr financial results slides   final - 2014-10-27Q3 2014 jnpr financial results slides   final - 2014-10-27
Q3 2014 jnpr financial results slides final - 2014-10-27
 
Citi MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceCiti MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure Conference
 
Barclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalBarclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - final
 
2015 Jefferies Energy Conference
2015 Jefferies Energy Conference2015 Jefferies Energy Conference
2015 Jefferies Energy Conference
 
RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015
 
RBC Capital Markets MLP Conference
RBC Capital Markets MLP ConferenceRBC Capital Markets MLP Conference
RBC Capital Markets MLP Conference
 
Credit Suisse 20th Annual Energy Summit Presentation
Credit Suisse 20th Annual Energy Summit PresentationCredit Suisse 20th Annual Energy Summit Presentation
Credit Suisse 20th Annual Energy Summit Presentation
 
Q3 2014 jnpr financial results slides final
Q3 2014 jnpr financial results slides   finalQ3 2014 jnpr financial results slides   final
Q3 2014 jnpr financial results slides final
 
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUMWELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
 
JP Morgan Energy Presentation
JP Morgan Energy PresentationJP Morgan Energy Presentation
JP Morgan Energy Presentation
 
12 15-14 december investor presentation final
12 15-14 december investor presentation final12 15-14 december investor presentation final
12 15-14 december investor presentation final
 
Capital return-announcement-with-non-gaaps
Capital return-announcement-with-non-gaapsCapital return-announcement-with-non-gaaps
Capital return-announcement-with-non-gaaps
 
Progressive Waste Solutions Fourth Quarter 2014 Financial Results
Progressive Waste Solutions Fourth Quarter 2014 Financial ResultsProgressive Waste Solutions Fourth Quarter 2014 Financial Results
Progressive Waste Solutions Fourth Quarter 2014 Financial Results
 
1 q2017 earnings_ppt_final
1 q2017 earnings_ppt_final1 q2017 earnings_ppt_final
1 q2017 earnings_ppt_final
 

More from Enbridge Inc.

2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing
Enbridge Inc.
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects
Enbridge Inc.
 
2014 Enbridge Day - Power, International and Energy Services
2014 Enbridge Day - Power, International and Energy Services2014 Enbridge Day - Power, International and Energy Services
2014 Enbridge Day - Power, International and Energy Services
Enbridge Inc.
 
2014 Enbridge Day - Strategic Overview
2014 Enbridge Day - Strategic Overview2014 Enbridge Day - Strategic Overview
2014 Enbridge Day - Strategic Overview
Enbridge Inc.
 
Market Access the Strategic Imperative Continues 2014
Market Access the Strategic Imperative Continues 2014Market Access the Strategic Imperative Continues 2014
Market Access the Strategic Imperative Continues 2014
Enbridge Inc.
 
2014 Petroleum Intelligence Weekly Q&A
2014 Petroleum Intelligence Weekly Q&A2014 Petroleum Intelligence Weekly Q&A
2014 Petroleum Intelligence Weekly Q&A
Enbridge Inc.
 
Enbridge Inc. 2014 AGM
Enbridge Inc. 2014 AGMEnbridge Inc. 2014 AGM
Enbridge Inc. 2014 AGM
Enbridge Inc.
 
2013 Bennett Jones Lake Louise World Cup Business Forum
2013 Bennett Jones Lake Louise World Cup Business Forum2013 Bennett Jones Lake Louise World Cup Business Forum
2013 Bennett Jones Lake Louise World Cup Business Forum
Enbridge Inc.
 
2012 Canada Europe Energy Roundtable
2012 Canada Europe Energy Roundtable2012 Canada Europe Energy Roundtable
2012 Canada Europe Energy Roundtable
Enbridge Inc.
 

More from Enbridge Inc. (9)

2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects
 
2014 Enbridge Day - Power, International and Energy Services
2014 Enbridge Day - Power, International and Energy Services2014 Enbridge Day - Power, International and Energy Services
2014 Enbridge Day - Power, International and Energy Services
 
2014 Enbridge Day - Strategic Overview
2014 Enbridge Day - Strategic Overview2014 Enbridge Day - Strategic Overview
2014 Enbridge Day - Strategic Overview
 
Market Access the Strategic Imperative Continues 2014
Market Access the Strategic Imperative Continues 2014Market Access the Strategic Imperative Continues 2014
Market Access the Strategic Imperative Continues 2014
 
2014 Petroleum Intelligence Weekly Q&A
2014 Petroleum Intelligence Weekly Q&A2014 Petroleum Intelligence Weekly Q&A
2014 Petroleum Intelligence Weekly Q&A
 
Enbridge Inc. 2014 AGM
Enbridge Inc. 2014 AGMEnbridge Inc. 2014 AGM
Enbridge Inc. 2014 AGM
 
2013 Bennett Jones Lake Louise World Cup Business Forum
2013 Bennett Jones Lake Louise World Cup Business Forum2013 Bennett Jones Lake Louise World Cup Business Forum
2013 Bennett Jones Lake Louise World Cup Business Forum
 
2012 Canada Europe Energy Roundtable
2012 Canada Europe Energy Roundtable2012 Canada Europe Energy Roundtable
2012 Canada Europe Energy Roundtable
 

Recently uploaded

An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Lviv Startup Club
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 

Recently uploaded (20)

An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 

Enbridge Inc. Second Quarter 2014 Financial Results

  • 1. 2014 Second Quarter Financial & Strategic Update August 1, 2014 Al Monaco President & CEO J. Richard Bird Executive Vice President, CFO and Corporate Development John Whelen Senior Vice President, Finance
  • 2. Q2 2014 – Financial & Strategic Update • Presenters: Al Monaco President & CEO John Whelen Senior Vice President, Finance • Question & Answer Period 2
  • 3. Legal Notice This presentation includes certain forward looking information (FLI) to provide Enbridge shareholders and potential investors with information about Enbridge and management’s assessment of its future plans and operations, which may not be appropriate for other purposes. FLI is typically identified by words such as “anticipate”, “expect”, “project”, “estimate”, “forecast”, “plan”, “intend”, “target”, “believe” and similar words suggesting future outcomes or statements regarding an outlook. Although we believe that our FLI is reasonable based on the information available today and processes used to prepare it, such statements are not guarantees of future performance and you are cautioned against placing undue reliance on FLI. By its nature, FLI involves a variety of assumptions, risks, uncertainties and other factors which may cause actual results, levels of activity and achievements to differ materially from those expressed or implied in our FLI. Material assumptions include assumptions about: the expected supply and demand for crude oil, natural gas and natural gas liquids; prices of crude oil, natural gas and natural gas liquids; expected exchange rates; inflation; interest rates; the availability and price of labour and pipeline construction materials; operational reliability; anticipated in-service dates and weather. Our FLI is subject to risks and uncertainties pertaining to operating performance, regulatory parameters, weather, economic conditions, exchange rates, interest rates and commodity prices, including but not limited to those discussed more extensively in our filings with Canadian and US securities regulators. The impact of any one risk, uncertainty or factor on any particular FLI is not determinable with certainty as these are interdependent and our future course of action depends on management’s assessment of all information available at the relevant time. Except to the extent required by law, we assume no obligation to publicly update or revise any FLI, whether as a result of new information, future events or otherwise. All FLI in this presentation is expressly qualified in its entirety by these cautionary statements. This presentation will make reference to certain financial measures, such as adjusted net income, which are not recognized under GAAP. Reconciliations to the most closely related GAAP measures are included in the earnings release and also in the Management Discussion and Analysis posted to the website. 3
  • 4. • Recap of Financial Results • Recent Developments • Financial Review • Project Execution Update Agenda 4
  • 5. Q2 2014 – Financial Results ($MM) * Adjusted earnings and adjusted EPS are non-GAAP measures. For more information on non-GAAP measures please refer to disclosure in news release. Year-To-Date EPS: $1.00 $1.00 2014 EPS Guidance: $1.84 $2.04 5 $488 $492 $306 $328 2013 2014 Q1 Q2 Q2 $794 Q1 $820
  • 6. EGD Custom Incentive Rate Approval • 5-Year term (2014-2019) • ROE set annually – 9.36% in 2014 • Capital spending program approved – average 570 million/yr. • 50/50 sharing up to 300 bps above allowed ROE • Consistent with EPS growth expectations 6
  • 7. • Capital cost estimate finalized – Cdn $4.9 billion – US $2.6 billion • Surcharge: U.S. $0.895/bbl • Low double-digit equity return • Expected in-service: – 2nd half of 2017 Line 3 Replacement Update 7
  • 8. U.S. Sponsored Vehicles 8 • Re-establish EEP as a strong sponsored vehicle – Preferred Share Purchase – Joint Funding – Receivables Purchase – Established Midcoast Energy Partners – IDR Restructuring • 2.1% distribution increase effective August 14, 2014 • First post-IPO drop down – 12.6% interest in EEP’s G&P business (U.S.$350 Million) • 4% distribution increase effective August 14, 2014
  • 9. Northern Gateway Project • Regulatory phase compete • Focus over next 12+ months: - Satisfy 209 JRP conditions and work with B.C. on 5 conditions for oil pipelines - Continue to engage with communities and First Nations - Finalize cost estimate and commercial agreements
  • 10. Segmented Earnings* Variance 10 $ Millions SEGMENT Q2 2014 vs. Q2 2013 Liquids Pipelines +61 Gas Distribution -10 Gas Pipelines, Processing and Energy Services -46 Sponsored Investments +25 Corporate -8 TOTAL +22 * Adjusted earnings are non-GAAP measures. For more information on non-GAAP measures please refer to disclosure in news release.
  • 11. Record Mainline Throughput 11 • Record ex-Gretna volumes delivered - 2.1 million bpd in June • Strong Fundamentals - Increasing production - Strong PADD II demand (BP Whiting) • Capacity Optimization - Removal of pressure restrictions - Scheduling & operational optimization - Quality pooling 0.5 1.0 1.5 2.0 2.5 MMbpd Quarterly Ex-Gretna Throughput
  • 12. Guidance Range Full Year 2014 EPS Guidance Outlook $1.84 $2.04 * Adjusted earnings are non-GAAP measures. For more information on non-GAAP measures please refer to disclosure in news release. 12 Headwinds • Energy Services • Equity Prefunding Tailwinds • Liquids Pipelines
  • 13. Enterprise Wide Funding and Liquidity Actions FUNDING SOURCES* 2014 ($ Billions) ENB Preferred Shares $1.1 ENB DRIP $0.2 Medium Term Notes $3.3 Bank Credit Facility Additions $0.4 ENB Common Equity Issuance $0.5 EEQ PIK $0.1 TOTAL $5.6 Billion * In Nominal CAD and US Currencies 13
  • 14. 2013 – 2017 Funding Requirements Excluding Sponsored Investments ($ billions, as at July 2014) Maintenance Capital 5.6 Secured Growth Capital 28.0 Risked Growth Capital 3.2 36.8 Cash Flow Net of Dividends (14.6) Net Funding Requirement 22.2 Debt Total Requirement 15.1 Cash on Hand (1.1) Total Requirement, Net of Cash 14.0 2013 – 2017 Maturities 5.2 Preferred Share Issuances (1.3) Debt Already Issued (6.3) Debt Requirement 11.6 Equity Total Requirement 7.1 2013 Common Share Issuances (0.6) 2014 Common Share Issuances (0.5) Noverco (0.2) Preferred Share Issuances (1.3 DRIP/ESOP (2.5) Equity Requirement 2.0 14
  • 15. 2013 – 2017 Remaining Requirement $2.0 Billion: Cost of Equity Optimization & Flexibility $ Billions Preferred Shares $1.3 Asset Monetization/Sponsored Vehicle Drop Downs $3.0 TOTAL $4.3 ENB Public Equity ~ 15
  • 16. Enterprise Wide Growth Capital In-service 2014 Gretna Montreal Regina Toledo Buffalo Houston Cromer Cushing Patoka Sarnia Superior Port Arthur Westover 16 Projects Estimated Cost ($ Billion) Liquids Pipelines (Alberta Regional Infrastructure): Norealis Pipeline $0.5 Surmont Phase 2 Expansion (2014-2015 Phases) $0.3 Liquids Pipelines (Market Access Initiatives): Eastern Access - Line 6B Replacement (Griffith to Stockbridge) - Line 6B Replacement (Ortonville to Border) - Line 9 Reversal $1.4 $0.7 $0.6 Western USGC Access: (Flanagan South, Seaway Twin, Associated Mainline) $4.6 Light Oil Market Access (Line 9 Expansion) $0.1 Eddystone Rail Project $0.1 Line 6B 75 Miles Replacement Program $0.4 Gas Pipelines: Pipestone and Sexsmith Project (2012-2014 Phases) $0.3 Walker Ridge Gas Gathering System $0.4 Gas Distribution: Other EGD Growth Capital $0.2 Green Power: Blackspring Ridge Wind Project $0.3 Hardisty Kerrobert Edmonton Fort McMurray +600 kbpd +270 kbpd +80 kbpd Chicago/ Flanagan $9.9 Billion In-Service in 2014
  • 17. Western U.S. Gulf Coast Access Cushing Houston Chicago/ Flanagan Port Arthur 2 3 4 * Includes $1.3B Seaway Acquisition completed in 2012 and Associated Mainline Expansions Total Secured Capital = $6.6 B* 1 Associated Mainline Expansions ($1.3B) Flanagan South Pipeline ($2.8B) Seaway Pipeline Acquisition + Reversal ($1.3B) Seaway Pipeline Twin + Lateral ($1.2B) 1 3 2 4 Project Status Update • Flanagan South - Construction in progress • Seaway Twin – Mechanically complete as of early July 17
  • 18. 2012 2017 An Industry Leading DPS Growth Outlook (smoother) 2012 2017 An Industry Leading EPS* Growth Outlook (but lumpy) Industry Leading EPS & DPS Outlook * Adjusted earnings are non-GAAP measures. For more information on non-GAAP measures please refer to disclosure in news release. • Tilted Return Projects - $7.5B Line 3 Replacement • New Growth Platforms • Sponsored Vehicle Drop Downs • EPS Growth • Surplus Cash Flow 18 $42 Billion Enterprise Wide Capital Program
  • 19. Summary • Strong first half results • On track to be within full year EPS guidance range of $1.84 - $2.04 • Project execution going well • On pace for 10-12% EPS growth through 2017 19
  • 20. Q&A 2014 Second Quarter Financial & Strategic Update August 1, 2014